CN107969957A - A kind of bathroom water fender - Google Patents

A kind of bathroom water fender Download PDF

Info

Publication number
CN107969957A
CN107969957A CN201711254420.2A CN201711254420A CN107969957A CN 107969957 A CN107969957 A CN 107969957A CN 201711254420 A CN201711254420 A CN 201711254420A CN 107969957 A CN107969957 A CN 107969957A
Authority
CN
China
Prior art keywords
winding
group
water fender
roller
axis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711254420.2A
Other languages
Chinese (zh)
Other versions
CN107969957B (en
Inventor
唐丙振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Zhicheng Accounting Service Co Ltd
Original Assignee
唐丙振
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 唐丙振 filed Critical 唐丙振
Priority to CN201711254420.2A priority Critical patent/CN107969957B/en
Publication of CN107969957A publication Critical patent/CN107969957A/en
Application granted granted Critical
Publication of CN107969957B publication Critical patent/CN107969957B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47KSANITARY EQUIPMENT NOT OTHERWISE PROVIDED FOR; TOILET ACCESSORIES
    • A47K3/00Baths; Douches; Appurtenances therefor
    • A47K3/28Showers or bathing douches
    • A47K3/30Screens or collapsible cabinets for showers or baths
    • A47K3/302Screens or collapsible cabinets for showers or baths splash guards

Landscapes

  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Epidemiology (AREA)
  • General Health & Medical Sciences (AREA)
  • Bathtub Accessories (AREA)
  • Devices For Medical Bathing And Washing (AREA)

Abstract

The present invention provides a kind of bathroom water fender, lower baffle plate assembly including at least three groups of overhead gage assemblies and installation corresponding with overhead gage assembly described in every group, overhead gage assembly described in adjacent two groups, lower baffle plate assembly described in adjacent two groups are respectively adopted two groups of connectors and are hinged, and connector described in every group is respectively arranged in the top and bottom of the overhead gage assembly and the top and bottom of the lower baffle plate assembly.The present invention has the advantages that simple in structure and quick for installation, and can be folded and is unfolded, placement space, while conveniently moving can be saved, easy to dry, therefore, easy to be used in the small toilet in space and bathroom;It can prevent bath water large area from splashing down by water fender, the water splashed down on water fender quickly can be cleared up and dried after bathing, therefore, easy to the cleaning in toilet and bathroom after bathing, beneficial to rapid draing in toilet and bathroom, indoor mouldy, generation peculiar smell is prevented.

Description

A kind of bathroom water fender
Technical field
The present invention relates to house ornamentation field, specifically a kind of bathroom water fender.
Background technology
Modern Family and hotel, equipped with bathroom, and are usually disposed in toilet with room.Existing bathroom Integral type shower room is installed in toilet and forms the space of an independent bathing by finishing, and advantage is to prevent bathing Water splashes to toilet other positions, can realize toilet separating dry space from moist space, is cleared up easy to toilet, prevents from sending out in toilet It is mould.But since the limitation of toilet area and general layout can not install integral expression shower house, shower is usually directly mounted at health Between on wall, and then bath water can be splashed on toilet metope, sitting toilet and bath cabinet, especially between enclosed sanitary, steam It can not in time discharge, cause mouldy in toilet, generation peculiar smell.In order to avoid bath water splashes down, it is provided with indivedual toilets Bathroom water isolation curtain, but be to be fixedly installed in toilet the shortcomings that bathroom water isolation curtain, occupied space, vision zero can be caused Disorderly, and bathroom water isolation curtain ripe soon can not dry, and soapsuds can cause bathroom water isolation curtain to be difficult to clearly for a long time after splashing to cloth cover Reason, therefore, in view of a kind of bathroom of above-mentioned offer solves above-mentioned deficiency with water fender.
The content of the invention
The technical problem to be solved in the present invention is:During bathing, it can prevent bath water large area from splashing down, when bathroom is set When in toilet, the cleaning and drying of toilet are beneficial to after bathing, prevents that life is interior mouldy, produces peculiar smell.
The technical solution adopted by the present invention to solve the technical problems is:
Provide a kind of bathroom water fender, including at least three groups of overhead gage assemblies and peace corresponding with overhead gage assembly described in every group Baffle assembly is held, overhead gage assembly described in adjacent two groups, lower baffle plate assembly described in adjacent two groups are respectively adopted two groups Connector is hinged, connector described in every group be respectively arranged in the overhead gage assembly top and bottom and the lower baffle plate it is total Into top and bottom;Overhead gage assembly described in every group includes upper mounting plate and is rotatablely installed respectively in the upper mounting plate The upper axis of two side ends, is connected described in two groups at the top of upper axis by transmission belt V belt translation, and upper axis outer wall is arranged along its axis described in every group Row are provided with multigroup upper roller, and the upper roller outer sheath is equipped with upper winding, and the roller of upper axis installation passes through described in every group The upper winding V belt translation connection, upper scraping plate are installed at the top of the upper mounting plate;Bracelet, institute are equipped with the top of the upper mounting plate State upper mounting plate both sides and be respectively equipped with collar and the first mounting groove on multigroup interlaced spread configuration, the upper axis sequentially passes through Upper roller is simultaneously installed in first mounting groove by upper collar described in every group;Lower baffle plate assembly described in every group includes lower installation Plate and it is rotatablely installed respectively in the lower axle of the lower installation board both sides, lower axle outer wall described in every group is provided with along the arrangement of its axis Multigroup bottom roller, the bottom roller outer sheath are equipped with lower winding, and the bottom roller of every group of lower axle installation passes through the lower winding V belt translation connects, and lower scraping plate is installed at the top of the lower installation board;Hand groove, the lower installation are offered at the top of the lower installation board Plate both sides are respectively equipped with collar and the second mounting groove, the lower axle under multigroup interlaced spread configuration and sequentially pass through described in every group Bottom roller is installed in second mounting groove by lower collar;The lower installation board bottom is equipped with multigroup mounting head, described in every group Mounting head is separately installed with supporting leg;The connector end surface symmetric offers through hole, and two through holes are respectively arranged in adjacent set The two lower baffle plate assemblies that the end of the upper axis for the two overhead gage assemblies put or be respectively arranged in is disposed adjacent it is described The end of lower axle.
Preferably, the lower installation board top is equipped with positioning tube, the upper mounting plate bottom is provided with inserted link, it is described on Installing plate bottom is simultaneously provided with positioning table along the inserted link, and the inserted link is installed in the positioning tube, the positioning table and institute Lower installation board top is stated to be connected;The upper axis bottom is connected with the lower axle top.
Preferably, the upper axis bottom is polygon shaft header structure, the lower axle top offers and the polygon Shaft head structure coordinates the shape changeable pore structure of installation.
As priority, the transmission belt is synchronous belt, is provided with the top of the upper axis and is engaged installation with the transmission belt Synchronizing wheel, the upper axis perisporium and lower axle perisporium offer keyway arrangements, the upper roller and bottom roller be respectively equipped with The keyway arrangements coordinate the bond structure of installation.
As priority, the upper roller diameter dimension is more than the bottom roller diameter dimension, extends at the top of the lower winding To the upper winding.
Preferably, the upper winding and lower winding are made of PVC material, the upper winding internal face and it is described under Winding internal face is disposed with multigroup bump structure, the bump structure and the upper roller perisporium or the bottom roller respectively Perisporium is in contact.
As priority, the upper scraping plate includes fixed chuck and is arranged at the fixed chuck both sides and to its bottom The scraper plate of extension, the fixed chuck bottom face offer the first bayonet for placing the upper mounting plate and place on described respectively Second bayonet of winding, the scraper plate are connected on the outside of the upper winding and extend at the bottom edge of the upper winding; The lower scraping plate includes fixed chuck and is arranged at the fixed chuck both sides and the scraper plate extended to its bottom, described solid Determine clamp bottom and offer the first bayonet for placing the lower installation board, the scraper plate is connected on the outside of the lower winding and prolongs At the bottom edge for extending the lower winding.
As priority, it is small to be symmetrically disposed on spacing on the inside of the both sides and two scraper plates of the fixed chuck for the scraper plate In the distance between the upper winding and the scraper plate connecting pin or less than between the lower winding and the scraper plate connecting pin Distance.
As priority, the fixed chuck both ends may extend to the upper mounting plate and be located at the upper shaft end.
As priority, the supporting leg can rotate in the mounting head;The supporting leg can use castor.
The invention has the advantages that the present invention has the advantages that simple in structure and quick for installation, and can be rolled over Folded and expansion, can save placement space, while conveniently moving, easy to dry, therefore, easy in the small toilet in space and bath Indoor use;Can prevent bath water large area from splashing down by water fender, will can be splashed down after bathing water on water fender into Row is quickly cleared up and dried, therefore, easy to the cleaning in toilet and bathroom after bathing, beneficial to fast rapid-curing cutback in toilet and bathroom It is dry, prevent indoor mouldy, generation peculiar smell.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is attached drawing needed in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without creative efforts, can be with Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the overall structure diagram that the embodiment of the present invention is provided;
Fig. 2 is the exploded structure diagram of Fig. 1;
Fig. 3 is the First partial attachment structure schematic diagram that the embodiment of the present invention is provided;
Fig. 4 is second game's portion connecting structure schematic diagram that the embodiment of the present invention is provided;
Fig. 5 is the 3rd local attachment structure schematic diagram that the embodiment of the present invention is provided;
Fig. 6 is the upper mounting plate structure diagram that the embodiment of the present invention is provided;
Fig. 7 is the lower installation board structure diagram that the embodiment of the present invention is provided;
Fig. 8 is the upper scraping plate structure diagram that the embodiment of the present invention is provided;
In figure:100. overhead gage assembly, 110. upper mounting plates, 111. inserted links, 112. positioning tables, 113. bracelets, collar on 114., 115. the first mounting groove, winding on 120., axis on 130., 140. transmission belts, 150. upper scraping plates, 151. fixed chucks, 1511. One bayonet, 1512. second bayonets, 152. scraper plates, 160. upper rollers;200. lower baffle plate assemblies, 210. lower installation boards, 211. positioning Cylinder, 212. mounting heads, 213. hand grooves, 214. times collars, 215. second mounting grooves, 220. times winding, 230. lower axles, 240. Leg, 250. lower scraping plates, 260. bottom rollers;
300. connector.
Embodiment
Such scheme is described further below in conjunction with specific embodiment.It should be understood that these embodiments are to be used to illustrate The present invention rather than limit the scope of the invention.The implementation condition used in embodiment can be done according to the condition of specific producer into One successive step, the implementation condition being not specified are usually the condition in normal experiment.
As Figure 1-Figure 8, Fig. 1 is the overall structure diagram that the embodiment of the present invention is provided, and Fig. 2 is the part of Fig. 1 Decomposition texture schematic diagram, Fig. 3 are the First partial attachment structure schematic diagrams that the embodiment of the present invention is provided, and Fig. 4 is of the invention real Second game's portion connecting structure schematic diagram that example is provided is applied, Fig. 5 is the 3rd local connection structure that the embodiment of the present invention is provided Schematic diagram, Fig. 6 are the upper mounting plate structure diagrams that the embodiment of the present invention is provided, and Fig. 7 is that the embodiment of the present invention is provided Lower installation board structure diagram, Fig. 8 are the upper scraping plate structure diagrams that the embodiment of the present invention is provided.
In a kind of specific embodiment, there is provided a kind of bathroom water fender, including at least three groups of overhead gage assemblies 100 and The lower baffle plate assembly 200 of installation corresponding with overhead gage assembly 100 described in every group, overhead gage assembly 100, phase described in adjacent two groups Lower baffle plate assembly 200 described in adjacent two groups is respectively adopted two groups of connectors 300 and is hinged, and connector 300 is installed respectively described in every group In the top and bottom of the overhead gage assembly 100 and the top and bottom of the lower baffle plate assembly 200;Upper gear described in every group Plate assembly 100 includes upper mounting plate 110 and is rotatablely installed respectively in the upper axis 130 of 110 two side ends of upper mounting plate, two The group upper top of axis 130 is connected by 140 V belt translation of transmission belt, and upper 130 outer wall of axis is arranged along its axis described in every group installs There is multigroup upper roller 160,160 outer sheath of upper roller is equipped with upper winding 120, the rolling that upper axis 130 described in every group is installed Wheel 160 is connected by upper 120 V belt translation of winding, and upper scraping plate 150 is installed on the top of upper mounting plate 110;The upper peace The top of loading board 110 is equipped with bracelet 113, and 110 both sides of upper mounting plate are respectively equipped with collar on multigroup interlaced spread configuration 114 and first mounting groove 115, the upper axis 130 sequentially pass through upper collar 114 described in every group and upper roller 160 be installed on institute State in the first mounting groove 115;Lower baffle plate assembly 200 described in every group includes lower installation board 210 and is rotatablely installed respectively in institute The lower axle 230 of 210 both sides of lower installation board is stated, 230 outer wall of lower axle described in every group is provided with multigroup bottom roller along the arrangement of its axis 260,260 outer sheath of bottom roller is equipped with lower winding 220, and the bottom roller 260 that every group of lower axle 230 is installed is by under described 220 V belt translation of winding connects, and lower scraping plate 250 is installed on the top of lower installation board 210;The top of lower installation board 210 opens up There is hand groove 213,210 both sides of lower installation board are respectively equipped with collar 214 and second under multigroup interlaced spread configuration and install Groove 215, the lower axle 230 sequentially pass through lower collar 214 described in every group and bottom roller 260 are installed on second mounting groove 215 It is interior;210 bottom of lower installation board is equipped with multigroup mounting head 212, and mounting head 212 is separately installed with supporting leg 240 described in every group;Institute State 300 end surface symmetric of connector and offer through hole, two through holes are respectively arranged in two be disposed adjacent the overhead gage assembly The end of the 100 upper axis 130 or be respectively arranged in two lower baffle plate assemblies being disposed adjacent the lower axle 230 end.
2 preferably, 210 top of the lower installation board is equipped with positioning tube 211, and 110 bottom of upper mounting plate is provided with Inserted link 111,110 bottom of upper mounting plate are simultaneously provided with positioning table 112 along the inserted link 111, and the inserted link 111 is installed on institute State in positioning tube 211, the positioning table 112 is connected with 210 top of lower installation board;130 bottom of upper axis with it is described 230 top of lower axle is connected.
Preferably, 130 bottom of upper axis is polygon shaft header structure, 230 top of lower axle offer with it is described Polygon shaft header structure coordinates the shape changeable pore structure of installation, therefore, it is possible to realize moment of torsion between upper axis 130 and lower axle 230 Transmit.
As priority, the transmission belt 140 is synchronous belt, and the upper top of axis 130 is provided with and 140 phase of transmission belt Coordinate the synchronizing wheel of installation, upper 130 perisporium of axis and 230 perisporium of lower axle offer keyway arrangements, 160 He of upper roller Bottom roller 260 is respectively equipped with the bond structure for coordinating installation with the keyway arrangements, therefore, realizes the torsion between each axis and each roller Square transmission, and then promote each axis to be rotated synchronously with each roller.
As priority, 160 diameter dimension of upper roller is more than 260 diameter dimension of bottom roller, the lower winding 220 Top extends to the inner side of upper winding 120, therefore, it is possible to prevent bath water from passing through lower winding 220 and the connection of upper winding 120 Place enters inside water fender.
Preferably, the upper winding 120 and lower winding 220 are made of PVC material, each tape surface can be beneficial to Cleaning and dry;120 internal face of upper winding and 220 internal face of lower winding are disposed with multigroup salient point knot respectively Structure, the bump structure is in contact with 160 perisporium of upper roller or 260 perisporium of the bottom roller, therefore, it is possible to increase roller With the friction between each winding, reduce and skid, beneficial to the rotation of each winding.
As priority, the upper scraping plate 150 includes fixed chuck 151 and is arranged at 151 both sides of fixed chuck simultaneously And to the scraper plate 152 that its bottom extends, 151 bottom face of fixed chuck offers respectively places the upper mounting plate 110 First bayonet 1511 and the second bayonet 1512 for placing the upper winding 120, the scraper plate 152 are connected to the upper winding 120 Outside and extend at the bottom edge of the upper winding 120;The lower scraping plate 250 includes fixed chuck 151 and sets In 151 both sides of fixed chuck and to the scraper plate 152 of its bottom extension, 151 bottom of fixed chuck offers placement First bayonet 1511 of the lower installation board 210, the scraper plate 152 are connected to the outside of lower winding 220 and extend to institute At the bottom edge for stating lower winding 220.
As priority, the scraper plate 152 is symmetrically disposed on both sides and two scraper plates 152 of the fixed chuck 151 Inner side is smaller than the distance between the upper winding 120 and 152 connecting pin of scraper plate or less than the lower winding 220 and institute The distance between 152 connecting pin of scraper plate is stated, therefore, two scraper plates 152 can clamp each winding, when each winding rotates, pass through Scraper plate 152 carries out each tape surface quickly to scrape water and cleaning, and then drying easy to water fender, prevents that its is mouldy.
As priority, 151 both ends of fixed chuck may extend to the upper mounting plate 110 and be located at upper 130 end of axis, Therefore, it can prevent shower water from entering inside water fender upper 120 top seal of winding by fixed chuck 151.
As priority, the supporting leg 240 can rotate in the mounting head 212, after water fender is unfolded, supporting leg 240 It is vertically arranged with lower installation board 210, it is possible to increase stability of strutting system, after water fender folds, supporting leg 240 and lower installation board 210 It is arranged in parallel, placement space can be saved, the supporting leg 240 can uses castor, can be easy to water fender entirety by castor It is mobile.
Specific work process, bathtub construction is integrally launched into using preceding by device, its slit opening end direction is provided with flower The wall spilt;During bathing, shower water, which can rush, splashes supreme winding 120 and lower 220 surface of winding, therefore, it is possible to prevent that bath water is big Area splashes down, easy to bathroom or toilet cleaning and dry;After bathing, pull respectively at the top of every group of overhead gage assembly 100 Transmission belt 140 simultaneously drives winding 120 and lower winding 220 to rotate respectively by upper axis 130 and lower axle 230, during rotation, Neng Goutong Cross scraper plate 152 each tape surface is carried out quickly to scrape water and cleaning, therefore, easy to drying for water fender, prevent that its is mouldy;Use After overhead gage assembly 100 can be subjected to dismounting with lower baffle plate assembly 200 and separate, and can be by the component assembly or folding after fractionation The overall removal bathroom or toilet of poststack are placed and dried, and therefore, it is possible to save the space in bathroom or health, prevent from sending out Mould generation peculiar smell, and then used suitable for being placed on small area or the bathroom limited by construction pattern or toilet.
It is complete by above-mentioned description, relevant staff using the above-mentioned desirable embodiment according to the present invention as enlightenment Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' entirely.The technology of this invention Property scope is not limited to the content on specification, it is necessary to determines its technical scope according to right.

Claims (10)

1. a kind of bathroom water fender, including at least three groups of overhead gage assemblies and installation corresponding with overhead gage assembly described in every group Two groups of connections are respectively adopted in lower baffle plate assembly, overhead gage assembly described in adjacent two groups, lower baffle plate assembly described in adjacent two groups Part is hinged, and connector described in every group is respectively arranged in the top and bottom of the overhead gage assembly and the lower baffle plate assembly Top and bottom, it is characterised in that overhead gage assembly described in every group includes upper mounting plate and is rotatablely installed respectively in described The upper axis of upper mounting plate two side ends, is connected described in two groups at the top of upper axis by transmission belt V belt translation, upper axis outer wall edge described in every group The arrangement of its axis is provided with multigroup upper roller, and the upper roller outer sheath is equipped with upper winding, and upper axis installation is described described in every group Roller is connected by the upper winding V belt translation, and upper scraping plate is installed at the top of the upper mounting plate;Set at the top of the upper mounting plate Have a bracelet, the upper mounting plate both sides are respectively equipped with collar and the first mounting groove on multigroup interlaced spread configuration, it is described on Axis sequentially passes through upper collar described in every group and upper roller is installed in first mounting groove;Lower baffle plate assembly is equal described in every group It is rotatablely installed including lower installation board and respectively in the lower axle of the lower installation board both sides, lower axle outer wall described in every group is along its axis Arrangement is provided with multigroup bottom roller, and the bottom roller outer sheath is equipped with lower winding, and the bottom roller of every group of lower axle installation passes through The lower winding V belt translation connection, lower scraping plate are installed at the top of the lower installation board;Hand groove is offered at the top of the lower installation board, The lower installation board both sides are respectively equipped with collar and the second mounting groove, the lower axle under multigroup interlaced spread configuration and wear successively Cross lower collar described in every group bottom roller is installed in second mounting groove;The lower installation board bottom is equipped with multigroup installation Head, mounting head described in every group are separately installed with supporting leg;The connector end surface symmetric offers through hole, and two through holes are pacified respectively The end of the upper axis loaded on the two overhead gage assemblies being disposed adjacent is respectively arranged in two lower baffle plates being disposed adjacent The end of the lower axle of assembly.
A kind of 2. bathroom water fender as claimed in claim 1, it is characterised in that the lower installation board top is equipped with positioning tube, The upper mounting plate bottom is provided with inserted link, and the upper mounting plate bottom is simultaneously provided with positioning table, the inserted link along the inserted link It is installed in the positioning tube, the positioning table is connected with the lower installation board top;The upper axis bottom and the lower axle Top is connected.
3. a kind of bathroom water fender as claimed in claim 2, it is characterised in that the upper axis bottom is polygon spindle nose knot Structure, the lower axle top offer the shape changeable pore structure for coordinating installation with the polygon shaft header structure.
4. a kind of bathroom water fender as claimed in claim 3, it is characterised in that the transmission belt is synchronous belt, the upper axis Top is provided with the synchronizing wheel that installation is engaged with the transmission belt, and the upper axis perisporium and lower axle perisporium offer keyway knot Structure, the upper roller and bottom roller are respectively equipped with the bond structure for coordinating installation with the keyway arrangements.
A kind of 5. bathroom water fender as claimed in claim 1, it is characterised in that the upper roller diameter dimension be more than it is described under Roller diameter size, the lower winding top are extended on the inside of the upper winding.
6. a kind of bathroom water fender as claimed in claim 5, it is characterised in that the upper winding and lower winding use PVC Material is made, and the upper winding internal face and the lower winding internal face are disposed with multigroup bump structure respectively, described convex Point structure connects with the upper roller perisporium or the bottom roller perisporium.
7. a kind of bathroom water fender as claimed in claim 1, it is characterised in that the upper scraping plate includes fixed chuck and sets The fixed chuck both sides and the scraper plate extended to its bottom are placed in, the fixed chuck bottom face offers respectively places institute State the first bayonet of upper mounting plate and place the second bayonet of the upper winding, the scraper plate is connected on the outside of the upper winding simultaneously And extend at the bottom edge of the upper winding;The lower scraping plate includes fixed chuck and is arranged at the fixed chuck two Side and the scraper plate extended to its bottom, the fixed chuck bottom offers the first bayonet for placing the lower installation board, institute Scraper plate is stated to be connected on the outside of the lower winding and extend at the bottom edge of the lower winding.
8. a kind of bathroom water fender as claimed in claim 7, it is characterised in that the scraper plate is symmetrically disposed on the fixing card The distance between the upper winding and described scraper plate connecting pin are smaller than on the inside of the scraper plate of both sides and two of head or is less than The distance between the lower winding and the scraper plate connecting pin.
9. a kind of bathroom water fender as claimed in claim 8, it is characterised in that the fixed chuck both ends may extend to described Upper mounting plate is located at the upper shaft end.
10. a kind of bathroom water fender as claimed in claim 1, it is characterised in that the supporting leg can be in the mounting head Rotate;The supporting leg can use castor.
CN201711254420.2A 2017-12-04 2017-12-04 A kind of bathroom water fender Active CN107969957B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711254420.2A CN107969957B (en) 2017-12-04 2017-12-04 A kind of bathroom water fender

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711254420.2A CN107969957B (en) 2017-12-04 2017-12-04 A kind of bathroom water fender

Publications (2)

Publication Number Publication Date
CN107969957A true CN107969957A (en) 2018-05-01
CN107969957B CN107969957B (en) 2019-12-03

Family

ID=62008928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711254420.2A Active CN107969957B (en) 2017-12-04 2017-12-04 A kind of bathroom water fender

Country Status (1)

Country Link
CN (1) CN107969957B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2732106Y (en) * 2004-05-27 2005-10-12 承韦家具股份有限公司 Movable pivoting screen structure
CN201033042Y (en) * 2007-04-02 2008-03-12 洪智委 Folding screen in the bathing room
CN201295189Y (en) * 2008-10-30 2009-08-26 郭忠叶 Land water-retaining screen
CN201870526U (en) * 2010-10-27 2011-06-22 南通芯迎设计服务有限公司 Wall-hanging embedded type waterproof screen board of bath room
CN203885398U (en) * 2013-11-28 2014-10-22 浙江名陶实业有限公司 Bathroom cabinet
CN104644003A (en) * 2015-02-06 2015-05-27 成都陶玛斯卫浴有限责任公司 Bathroom partition device beneficial for airing and ventilating
CN206554740U (en) * 2017-01-20 2017-10-13 福建西河卫浴科技有限公司 A kind of shower house baffle device for water

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2732106Y (en) * 2004-05-27 2005-10-12 承韦家具股份有限公司 Movable pivoting screen structure
CN201033042Y (en) * 2007-04-02 2008-03-12 洪智委 Folding screen in the bathing room
CN201295189Y (en) * 2008-10-30 2009-08-26 郭忠叶 Land water-retaining screen
CN201870526U (en) * 2010-10-27 2011-06-22 南通芯迎设计服务有限公司 Wall-hanging embedded type waterproof screen board of bath room
CN203885398U (en) * 2013-11-28 2014-10-22 浙江名陶实业有限公司 Bathroom cabinet
CN104644003A (en) * 2015-02-06 2015-05-27 成都陶玛斯卫浴有限责任公司 Bathroom partition device beneficial for airing and ventilating
CN206554740U (en) * 2017-01-20 2017-10-13 福建西河卫浴科技有限公司 A kind of shower house baffle device for water

Also Published As

Publication number Publication date
CN107969957B (en) 2019-12-03

Similar Documents

Publication Publication Date Title
CN106320752A (en) Multifunctional integrated bathroom
CN106982751A (en) A kind of Poodle cleaning device
CN104224472A (en) Multifunctional nursing bed
CN107969957A (en) A kind of bathroom water fender
CN108515525A (en) A kind of mechanical hand, nursing robot's system and its care method
SE431999B (en) DRY DEVICE AT SHOWER SPACE
US2045815A (en) Combined bathtub safety grip and towel rack
CN209653051U (en) A kind of multifunctional integrated basin
CN207506381U (en) Steamer
CN201356487Y (en) Retractable bathtub
DE3611745A1 (en) Apparatus and device for the purpose of supplementing a shower apparatus with the effects of a laundry-hang device
CN108866978B (en) Clothes hanger that dries in air of attached antidrip of domestic curved surface
CN208551589U (en) A kind of portable multilayer soap box
US20060042003A1 (en) Basin assembly
CN211815027U (en) Washing machine inner barrel support and washing machine inner barrel matched with same
CN214736769U (en) Shoe washing device
KR20120115164A (en) A movable shower booth
KR200298668Y1 (en) Subsidiary hanger for laundry hanger
KR102319246B1 (en) A kitchen sink with a collapsible dish dryer
CN209661572U (en) A kind of spraying and cleaning apparatus
CN205126067U (en) Bathe and use support frame in bathroom
US1651443A (en) Combined table and tub
CN213309346U (en) Prevent seamless concatenation bathtub of jam
CN108703704A (en) A kind of shower room adjustable detachable article rack manually
CN207646860U (en) A kind of balcony being convenient to clean

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191108

Address after: No. 68-1 Zhangwen Road, Menlou village, Zhanggang street, Changle City, Fuzhou City, Fujian Province

Applicant after: Fujian new creation nylon Industry Co., Ltd.

Address before: 125001 Unit 1, Building 2-11, Luye Villa, No. 2 Lianyang Road, Lianshan District, Huludao City, Liaoning Province

Applicant before: Tang Bingzhen

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201228

Address after: Room 910, unit 1, building 2 and office 1, Shimao square, Yunlong District, Xuzhou City, Jiangsu Province, 221000

Patentee after: Xuzhou Zhicheng Accounting Service Co.,Ltd.

Address before: No.68-1 Zhangwen Road, Menlou village, Zhanggang street, Changle City, Fuzhou City, Fujian Province, 350200

Patentee before: Fujian new creation nylon Industry Co.,Ltd.