CN107967758A - A kind of more equipment of single ammeter based on current monitoring share the electricity charge and temporarily receive system for settling account - Google Patents

A kind of more equipment of single ammeter based on current monitoring share the electricity charge and temporarily receive system for settling account Download PDF

Info

Publication number
CN107967758A
CN107967758A CN201711083239.XA CN201711083239A CN107967758A CN 107967758 A CN107967758 A CN 107967758A CN 201711083239 A CN201711083239 A CN 201711083239A CN 107967758 A CN107967758 A CN 107967758A
Authority
CN
China
Prior art keywords
electricity
current
electricity charge
equipment
charge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711083239.XA
Other languages
Chinese (zh)
Other versions
CN107967758B (en
Inventor
江文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Six Line Speed Cloud Information Technology Co Ltd
Original Assignee
Hefei Six Line Speed Cloud Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Six Line Speed Cloud Information Technology Co Ltd filed Critical Hefei Six Line Speed Cloud Information Technology Co Ltd
Priority to CN201711083239.XA priority Critical patent/CN107967758B/en
Publication of CN107967758A publication Critical patent/CN107967758A/en
Application granted granted Critical
Publication of CN107967758B publication Critical patent/CN107967758B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/003Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity for electricity
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/14Payment architectures specially adapted for billing systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/14Payment architectures specially adapted for billing systems
    • G06Q20/145Payments according to the detected use or quantity
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

Share the electricity charge the invention discloses a kind of more equipment of single ammeter based on current monitoring and temporarily receive system for settling account, ammeter charge management system is shared including more method, apparatus, more method, apparatus, which share ammeter charge management system, includes BTS management module, electric quantity data batch processing module, electricity registering flow path module, current data batch processing module, load equipment management module, threshold current management module, electric current verifies process module, flow blocking mechanism, electricity charge monthly magazine computing module, present invention uses calculated temporarily to receive the electricity electricity charge according to timing section current segmenting, the electric charge calculating method of clearance is shared in the meter reading electricity charge, realize the promptness that the electricity charge are temporarily received, according to the property looked into, clearance property, realize shared in operator base station and its like environment under the high-volume electricity charge effective administrative mechanism.

Description

A kind of more equipment of single ammeter based on current monitoring share the electricity charge and temporarily receive system for settling account
Technical field
The present invention relates to information technology field, it is temporary to share the electricity charge for a kind of specifically more equipment of single ammeter based on current monitoring Receive system for settling account.
Background technology
The existing list more equipment of ammeter share electricity bill control, as communication base station shares electricity bill control, before this from Utilities Electric Co. Electricity charge inventory is obtained, then shares the electricity charge using each family of the auxiliary tools such as Excel calculating, end user is given after the completion of calculating As the foundation for collecting the electricity charge.
More advanced shares the electricity charge using the more equipment of software system management list ammeter, operates, leads in ammeter manager Cross and share each electricity electricity charge of Current calculation, end user is not involved in.Also some systems are managed by way of internal process Each family shares electric current, the basis calculated as each electricity electricity charge.
There are problems with for the prior art:1st, way to manage is closed, and ammeter manager voluntarily manages each family and shares electric current, do not have Have and share electric current directly facing end user management, cause result poor in end user side's acceptance;
2nd, the electricity charge, which are collected, yields poor results, and the electricity charge are collected using the list of charges that Utilities Electric Co. provides as foundation, have monthly count in time The hysteresis quality of calculation;
3rd, each family shares current management inefficient, and the changing value that each family shares electric current is managed in a manner of manually finding, handle, Labor costs are more in the case that ammeter is more, inefficient, accuracy be not high.
The content of the invention
It is temporary to share the electricity charge the technical problem to be solved in the present invention is to provide a kind of more equipment of single ammeter based on current monitoring System for settling account is received, to solve the problems, such as to mention in background technology.
To achieve the above object, the present invention provides following technical solution:
A kind of more equipment of single ammeter based on current monitoring share the electricity charge and temporarily receive system for settling account, including more method, apparatus share ammeter electricity Take management system, more method, apparatus, which share ammeter charge management system, includes BTS management module, electric quantity data batch processing mould Block, electricity registering flow path module, current data batch processing module, load equipment management module, threshold current management module, electric current Verify process module, flow blocking mechanism and electricity charge monthly magazine computing module;The BTS management module includes base station information batch Import, base station information is safeguarded, the base station information batch, which imports, is used for batch registration base station information, including base station number, base station Affiliated area, each family share electric current, share electric current confirmation date and time information, and it is to safeguard the base that batch imports that the base station information, which is safeguarded, Stand information;The electric quantity data batch processing module includes electricity batch and imports, imports batch data submission electricity registering flow path, electricity Amount registering flow path is not resubmited by data;The electricity registering flow path module is including calculating is temporarily received in the electricity electricity charge, electricity is stepped on Remember flow;It is the temporary receipts electricity temporarily received according to the electricity electricity charge in one period of algorithm calculation base station that the electricity electricity charge, which are temporarily received and calculated, Measure, the electricity charge, algorithm is temporarily received in the electricity electricity charge to be included advance weighting PUE calculating, terminate the calculating of ammeter reading, electricity calculating, electricity Take calculating, the after-tax electricity charge calculate, operator's electricity charge calculate;The electricity registering flow path includes electricity charge information registration, electricity charge information Confirm, branch of electricity charge information county label, branch of electricity charge information city label, electricity charge information are audited, electricity charge information examines six nodes;It is described Current data batch processing module includes the importing of electric current batch, current fluctuation calculates, and the current fluctuation, which calculates, includes no equipment electricity Stream fluctuation calculates, has device current fluctuation to calculate, and the threshold current management module is submitted including no equipment threshold current, set Standby threshold current specifies, has the submission of equipment threshold current;It is that will meet the threshold current of threshold number that the threshold current, which is submitted, According to group areas, a group by a group be submitted to that electric current verifies flow or electricity registration distance, the threshold current after submission tire out Meter calculating terminates, and the electric current verification process module verifies initiation including electric current, electric current verifies execution, electric current verification receives, electric Stream is verified and confirmed, electric current verifies examination & verification, electric current verifies six nodes of examination & approval;The flow blocking mechanism is submitted including electric quantity data Electricity registering flow path obstruction, threshold current submit obstruction, and electric current verifies flow obstruction electricity registering flow path, early date flow obstruction Late date flow, flow list base station uniqueness;The electricity charge monthly magazine computing module temporarily receives calculating, meter reading electricity charge meter including the electricity charge Calculate, collect charges for electricity in advance calculating, paid electricity charge calculating, the meter reading electricity charge of primary and secondary station of history are shared.
Further technical solution as the present invention:The no device current fluctuation calculates and has device current fluctuation to calculate The two same time can only perform one kind, have device current fluctuation to calculate preferential execution, be calculated not there is device current fluctuation In the case of perform without device current fluctuate calculate.
Further technical solution as the present invention:The load equipment management module includes equipment threshold current and builds Stand, equipment enables, equipment is closed.
Further technical solution as the present invention:It is described to meet that threshold number refers to accumulative time of no equipment threshold current Number is more than or equal to pre-determined threshold number, and the pre-determined threshold number refers to that threshold current cumulative number set in advance reaches submission The number of condition.
Compared with prior art, the beneficial effects of the invention are as follows:Present invention uses according to timing section current segmenting meter The electric charge calculating method of clearance is shared in the calculation temporarily receipts electricity electricity charge, the meter reading electricity charge, realizes promptness, foundation that the electricity charge are temporarily received The property looked into, clearance property, realize shared in operator base station and its like environment under the high-volume electricity charge effective administrative mechanism.
Brief description of the drawings
Fig. 1 is Business Stream block schematic illustration;
Fig. 2 is electricity registering flow path schematic diagram;
Fig. 3 verifies flow diagram for electric current;
Fig. 4 manages schematic diagram for threshold current;
Fig. 5 registers blocking mechanism schematic diagram for electricity;
Fig. 6 is no equipment threshold current blocking mechanism schematic diagram;
Fig. 7 is that have equipment threshold current blocking mechanism schematic diagram.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment, belongs to the scope of protection of the invention.
- 7 are please referred to Fig.1, a kind of more equipment of single ammeter based on current monitoring share the electricity charge and temporarily receive system for settling account, including more Method, apparatus shares ammeter charge management system, more method, apparatus share ammeter charge management system include BTS management module, Electric quantity data batch processing module, electricity registering flow path module, current data batch processing module, load equipment management module, thresholding Current management block, electric current verify process module, flow blocking mechanism, electricity charge monthly magazine computing module.
The BTS management module is to manage basic information, the power information of base station, and the basic information is compiled including ammeter Number, district, street information described in ammeter, the power information include power supply mode, invoice type, the burden of taxation factor, electricity Unit Price, Multiplying power, loss, electricity, electricity initial reading, electricity terminate reading, electricity Start Date, the electricity Close Date, the electricity charge amount of money, The after-tax electricity charge amount of money, meter reading reading, the meter reading electricity charge, meter reading method, telecommunications electric current, migration current, unicom electric current, other units electricity Stream.
The purpose of the BTS management module is the basic information of base station maintenance, checks the information about power of base station.
The electric quantity data batch processing module includes the importing of electricity batch, importing batch data submits electricity registering flow path, Electricity registering flow path is not resubmited by data.
It is that batch imports base station electric quantity data that electricity batch, which imports, the base station electric quantity data include base station number, Power supply mode, invoice type, the burden of taxation factor, electricity Unit Price, multiplying power, loss, electricity, electricity initial reading, electricity terminate reading, Electricity Start Date, electricity Close Date, the electricity charge amount of money, the after-tax electricity charge amount of money, meter reading reading, the meter reading electricity charge, meter reading method, electricity Believe electric current, migration current, unicom electric current, other unitary currents.
It is described import batch data submit electricity registering flow path be the electricity that all batches can raise the price import data by According to respective base station region be grouped, a group by a group be submitted to electricity registering flow path.
The electricity registering flow path is not resubmited by data not to be resubmited including electricity registering flow path by data Electricity registering flow path, electricity registering flow path do not resubmit electricity by data and verify flow.The electricity registering flow path does not lead to It is that the electric quantity data that electricity registering flow path is appraised and decided not over each side is submitted electricity to cross data and resubmit electricity to verify flow Verify flow and verify each electric current again, it is by electricity that the electricity registering flow path does not resubmit electricity registering flow path by data The electric quantity data that amount registering flow path is appraised and decided not over each side submits electricity registering flow path to re-register circulation.
The electricity registering flow path module temporarily receives calculating, electricity registering flow path including the electricity electricity charge.
It is the temporary receipts temporarily received according to the electricity electricity charge in one period of algorithm calculation base station that the electricity electricity charge, which are temporarily received and calculated, Electricity, the electricity charge, the electricity electricity charge temporarily receive algorithm include advance weighting PUE calculate, terminate ammeter reading calculate, electricity calculating, The electricity charge calculate, the after-tax electricity charge calculate, operator's electricity charge calculate, and the receipts weighting PUE, which is calculated, is:Weighting in calculating cycle daily The sum of ratio of the advance PUE, that is, month PUE × month number of days in total number of days, PUE monthly are independently arranged, automatic to inherit, institute State and terminate ammeter reader at last:Initial ammeter reading+[base station] total current × 54 ×(Advance weighting PUE)× number of days × 24/ ([base station] multiplying power × 1000), the voltameter is at last(Terminate ammeter reading-initial ammeter reading)× [base station] multiplying power+[this Phase] loss, it is electricity × [base station] unit price that the electricity charge, which calculate, and the after-tax electricity charge, which calculate, is:The electricity charge × [base station] burden of taxation because Son, operator's electricity charge, which calculate, is:The after-tax electricity charge × [base station] operator amortization ratio, [base station] refers to that base station does not have During the correspondence parameter checked, using parameter this time value calculating, when there is the correspondence parameter checked in base station, base station parameter is used Calculate.
The electricity registering flow path includes electricity charge information registration, electricity charge information confirms, branch of electricity charge information county label, electricity charge letter Cease branch of city label, electricity charge information examination & verification, electricity charge information six nodes of examination & approval.
The electricity charge information registration includes confirming electricity charge information, increase electricity charge information, and operating personnel are steel tower side personnel.Institute State the correctness for confirming that electricity charge information is the electric quantity data that confirmation is submitted from electric quantity data batch processing module, the increase Electricity charge information refers to the electric quantity data of the one or more base stations of increase manually, and electricity charge information is submitted to next node after confirmation Electricity charge information confirms.
The electricity charge information confirmation refers to that the data to come are submitted in confirmation from electricity charge information registered nodes, and operating personnel are iron Tower side personnel, ensure the correctness of data by the secondary-confirmation of electricity charge information, are submitted to electricity charge information after confirmation next Branch of node electricity charge information county is signed, and branch of electricity charge information county label include electricity charge information movement branch of county label, electricity charge information electricity Believe branch of county label, branch of electricity charge information unicom county label.
Electricity charge information movement branch of the county label are that verification confirms that node submits the electricity charge information to come, behaviour from electricity charge information Work side is mobile personnel, confirms the correctness of data, and error flag and filling explanation are chosen when incorrect, mistake is not chosen when correct It is mis-marked, electricity charge information is submitted to branch of next node electricity charge information city label, this described electricity charge information city point after confirmation Countersign refers to electricity charge information movement branch of city label.
Verification confirms that node submits the electricity charge information to come, behaviour from electricity charge information when branch of the electricity charge information telecommunications county is signed Work side is telecommunications personnel, confirms the correctness of data, and error flag and filling explanation are chosen when incorrect, mistake is not chosen when correct It is mis-marked, electricity charge information is submitted to branch of next node electricity charge information city label, this described electricity charge information city point after confirmation Countersign refers to that branch of electricity charge information telecommunications city is signed.
Verification confirms that node submits the electricity charge information to come, behaviour from electricity charge information when branch of the electricity charge information unicom county is signed Work side is unicom personnel, confirms the correctness of data, and error flag and filling explanation are chosen when incorrect, mistake is not chosen when correct It is mis-marked, electricity charge information is submitted to branch of next node electricity charge information city label, this described electricity charge information city point after confirmation Countersign refers to that branch of electricity charge information unicom city is signed.
Electricity charge information movement branch of the city label are that the electricity to come is submitted in verification from electricity charge information movement branch of county label node Charge information, operation side are mobile personnels, confirm the correctness of data, error flag and filling explanation are chosen when incorrect, correctly When do not choose error flag, after confirmation by electricity charge information be submitted to next node electricity charge information examination & verification.
Branch of electricity charge information telecommunications city label are that the electricity to come is submitted in verification from branch of electricity charge information telecommunications county label node Charge information, operation side are telecommunications personnel, confirm the correctness of data, error flag and filling explanation are chosen when incorrect, correctly When do not choose error flag, after confirmation by electricity charge information be submitted to next node electricity charge information examination & verification.
Branch of electricity charge information unicom city label are that the electricity to come is submitted in verification from branch of electricity charge information unicom county label node Charge information, operation side are unicom personnel, confirm the correctness of data, error flag and filling explanation are chosen when incorrect, correctly When do not choose error flag, after confirmation by electricity charge information be submitted to next node electricity charge information examination & verification.
The electricity charge information examination & verification is that the electricity charge information to come is submitted in examination & verification from branch of electricity charge information city label, and operating personnel are Steel tower side personnel, branch of electricity charge information telecommunications city label, electricity charge information movement branch of city label, branch of electricity charge information unicom city label are all It can be audited after being submitted to electricity charge information examination & verification node, branch of You Yifang cities label are waited when coming without submission, one during examination & verification If branch of a electric quantity data electricity charge information telecommunications city label of base station, electricity charge information movement branch of city label, electricity charge information unicom Branch of city is signed with a side and is marked as mistake, then this part of electric quantity data state is mistake, otherwise is correct status, will after confirmation Electricity charge information is submitted to the examination & approval of next node electricity charge information.
The electricity charge information examination & approval include confirmation operation, reform data generation, refresh base station electric quantity data, and operating personnel are Steel tower side personnel, the confirmation operation refer to that the data to come are submitted in examination & approval from electricity charge information examination & verification node, pass through electricity charge information Secondary examination & approval ensure data reporting to property, this flow terminates after confirmation, it is described reform data generation be that will choose mistake The data of mark are re-registered into electric quantity data batch processing module, and the refreshing base station electric quantity data is by correct electricity number According to flushing in respective base station, base station electric quantity data is updated.
The current data batch processing module includes the importing of electric current batch, current fluctuation calculates.
It is to import base station current data in batches that the electric current batch, which imports, including base station number, date, electric current, electric current are exhausted In predetermined current section it is right value to value, otherwise is improper value, the predetermined current section is initial setting base station electricity Flow maximum, minimum value section.
The current fluctuation, which is calculated, to be calculated including the fluctuation of no device current, has device current fluctuation to calculate, wherein without equipment Current fluctuation calculates, has device current fluctuation the two same time of calculating to perform one kind, has device current fluctuation to calculate excellent First carry out, performed in the case where not there is device current fluctuation to calculate and fluctuate calculating without device current.
The no device current fluctuation, which is calculated, establishes including no equipment benchmark, adds up without equipment benchmark, the no equipment base It is that difference exceedes default poor compared with calculating difference, ring ratio by current period current value and first three phase current value ratio of respective base station that standard, which is established, Value threshold values or ring ratio are considered once effectively to fluctuate when exceeding default ring ratio, with effectively fluctuating relevant electric current early period Established on date without equipment threshold current benchmark, calculating benchmark, thresholding electricity are fluctuated without device current as follow-up respective base station The initial cumulative number for flowing benchmark is 1.The no equipment benchmark adds up to be on the basis of equipment threshold current has been whether there is, and incites somebody to action This primary current calculating difference, ring ratio compared with no equipment threshold current reference current, difference exceed preset difference value threshold values or Ring ratio is considered once effectively to fluctuate when exceeding default ring ratio, and the cumulative number of benchmark adds 1.
Described to have device current fluctuation calculating to include the foundation of equipment benchmark, have equipment benchmark to add up, the benchmark is established Be established in load equipment management module have equipment threshold current benchmark.It is described that to have equipment benchmark to add up be to set On the basis of standby threshold current, by this primary current, calculating difference, difference exceed negative compared with having equipment threshold current reference current It is considered once effectively to fluctuate when carrying device current, the cumulative number of benchmark adds 1.
The threshold current management module is submitted including no equipment threshold current, has equipment threshold current to specify, has equipment Threshold current is submitted.
It is that will meet the threshold current of threshold number according to group areas that the no equipment threshold current, which is submitted, a group by a group Be submitted to electric current verify flow, after submission without equipment threshold current cumulative calculation terminate, it is described to meet that threshold number refers to The cumulative number of no equipment threshold current is more than or equal to pre-determined threshold number, and the pre-determined threshold number refers to door set in advance Threshold currents cumulative number reaches the number of submission condition.
It is described have equipment threshold current specify including it is automatic specify electricity registering flow path, manually specified electricity registering flow path, Specified electricity verifies flow manually.Automatically the specified electricity registering flow path refer to when there is equipment threshold current to meet number and Number of devices calculates when second largest difference is less than 2 times of device current for 1 and fluctuation and specifies this to have equipment threshold current to carry automatically Friendship target is electricity registering flow path.The electricity registering flow path specified manually is to be unsatisfactory for specifying electricity registering flow path bar automatically The situation of part, chooses designated equipment, fills in device current value, reaches the standard grade the date, specifies and is submitted to electricity registering flow path.It is described manual It is to be unsatisfactory for the situation of specified electricity registering flow path condition automatically, choosing designated equipment, fill in and set that specified current flow, which verifies flow, Standby current value, reach the standard grade the date, specifies and is submitted to electric current verification flow.
Described have equipment threshold current to submit to include equipment threshold current and be submitted to electricity registering flow path, have equipment thresholding Electric current is submitted to electric current and verifies flow.It is described that to have equipment threshold current to be submitted to electricity registering flow path be that will meet threshold number Specify and be submitted to the threshold current of electricity registering flow path according to group areas, a group by a group be submitted to electric current registering flow path, carry There is equipment threshold current cumulative calculation to terminate after friendship, it is described to meet that threshold number refers to the cumulative number for having equipment threshold current More than or equal to pre-determined threshold number, the pre-determined threshold number refers to that threshold current cumulative number set in advance reaches submission bar The number of part.It is described have equipment threshold current be submitted to electric current verify flow be that will meet that the specified of threshold number is submitted to electric current The threshold current for verifying flow verifies flow, has appliance doors after submission according to group areas, the electric current that is submitted to a group by a group Threshold currents cumulative calculation terminates, described to meet that threshold number refers to have the cumulative number of equipment threshold current to be more than or equal to pre- gating Number is limited, the pre-determined threshold number refers to that threshold current cumulative number set in advance reaches the number of submission condition.
The electric current verification process module includes electric current verification initiation, electric current verifies execution, electric current verifies reception, electric current core Examination & verification is verified in real confirmation, electric current, electric current verifies six nodes of examination & approval.
The electric current, which is verified, initiates to be the correct of current data that confirmation, verification are submitted from threshold current management Property, the current data includes base station name, base station number, base station total current, base station movement electric current, base station unicom electric current, base Telecommunications of standing electric current, the other unitary currents in base station, this total current, this migration current, this unicom electric current, this telecommunications electricity Stream, this other unitary current, verify requirement, verify feedback, and current information is submitted to next section after confirmation modification is errorless Point electric current, which is verified, to be performed, and operating personnel are steel tower side personnel.
The electric current, which is verified to perform, to be referred to perform the current information verified from electric current and initiate to submit, and operating personnel are iron Tower side personnel, to field measurement after fill in, change this total current, this migration current, this unicom electric current, this telecommunications electricity Stream, this other unitary current, verify feedback, after the completion of by current information be submitted to next node electric current verify receive.
The electric current, which is verified to receive, to be referred to confirm to verify the current information for performing and submitting from electric current, and operating personnel are iron Tower side personnel, after the completion of current information be submitted to next node electric current verify and confirm, the electric current is verified and confirmed including electricity Stream verifies mobile confirmation, electric current verification telecommunications confirms, electric current is verified unicom and confirmed.
It is to confirm to verify the current information for receiving and submitting from electric current that the electric current, which verifies mobile confirmation, and operation side is shifting Moving member, confirms the correctness of data, and error flag and filling explanation are chosen when incorrect, error flag is not chosen when correct, Current information is submitted to next node electric current after confirmation and verifies examination & verification.
The electric current verifies telecommunications and confirms it is to confirm to verify the current information for receiving and submitting from electric current, and operation side is electricity Letter personnel, confirm the correctness of data, and error flag and filling explanation are chosen when incorrect, error flag is not chosen when correct, Current information is submitted to next node electric current after confirmation and verifies examination & verification.
The electric current verifies unicom and confirms it is to confirm to verify the current information for receiving and submitting from electric current, and operation side is connection Logical personnel, confirm the correctness of data, error flag and filling explanation are chosen when incorrect, error flag is not chosen when correct, Current information is submitted to next node electric current after confirmation and verifies examination & verification.
It is that the current information for submitting is verified and confirmed in examination & verification from electric current that the electric current, which verifies examination & verification, and operating personnel are steel towers Square personnel, electric current verifies unicom confirmation, electric current verifies telecommunications confirmation, electricity electric current verifies movement and confirms that whole electric currents that are submitted to are verified It can be audited after examination & verification node, there is side's electric current to verify and confirm and waited when not submitting, the portion of one base station during examination & verification If current data electric current is verified, unicom, which confirms, electric current verifies telecommunications confirmation, electric electric current verifies mobile confirmation has a side to be marked Mistake is denoted as, then this part of current data state is mistake, otherwise is correct status, current information is submitted to after confirmation next Node current verifies examination & approval.
The electric current verifies examination & approval and refers to that the current data to come is submitted in examination & approval from electric current verification examination & verification node, passes through electric current The secondary examination & approval of information ensure the reporting to property of data, this flow terminates after confirmation.
The load equipment management module includes the foundation of equipment threshold current, equipment enables, equipment is closed.
It is described have equipment threshold current establish be to establish one when registering load of base station equipment to have equipment threshold current, have The benchmark that equipment threshold current is established is checked forward in the latest current data batch processing when being registration load of base station equipment Base station current data, as have device current fluctuation calculate basis, it is described registration load of base station equipment be increase, reduce one The load equipment of a base station, data item include base station number, device name, device current.
The equipment enables the equipment for being to have been switched off and is arranged to enable state, while establishes and corresponding have equipment thresholding Electric current.
It is to close the equipment of opening that the equipment, which is closed, and simultaneously closing off corresponding has equipment threshold current.
The flow blocking mechanism includes electric quantity data and submits electricity registering flow path obstruction, threshold current to submit obstruction.
The electric quantity data submits electricity registering flow path obstruction to include non-electric quantity data of reforming and submits condition, reforms electricity number According to the condition of submission.The data submission condition of reforming is hindered from other conditions.The non-electric quantity data of reforming submits condition Including the circulation that 1. base stations do not complete in electricity registering flow path, the newest electricity registering flow path in 2. base stations does not have Mistake is chosen, 3. base stations verify the circulation not completed in flow in electricity, and 4. base station not cut-off dates are earlier The electricity registration record without submission, 5. base stations do not meet that the needs of threshold number specify flow but unspecified have friendship Single monitoring bulk registration is paid, including had previously specified the situation for needing to specify again after electricity verification is submitted, 6. base stations are not deposited Meet for the first time threshold condition time be less than the electricity Close Date without the bulk registration do not submitted.
The threshold current submits obstruction to submit electricity to verify flow obstruction including no equipment threshold current, have equipment thresholding Electric current submits obstruction.
The no equipment threshold current, which submits electricity to verify flow obstruction, to be included, and 1. meet the base station of threshold number 2. without base The quasi- date meet that number do not submit earlier without equipment threshold current, electric current of 3. base stations without the completion that do not circulate verifies flow.
It is described to there is equipment threshold current to submit obstruction to include equipment threshold current submission electric current verification flow obstruction, set Standby threshold current submits electricity registering flow path obstruction.
Described to have equipment threshold current to submit electric current verification flow obstruction to include, 1. meet threshold number, and 2. specify electricity Stream verifies flow, and 3. base stations meet that what the specified current flow that number do not submit verified flow has appliance doors without base period earlier Threshold currents, electric current of 4. base stations without the completion that do not circulate verify flow.
Described to have equipment threshold current to submit electricity registering flow path obstruction to include, 1. meet threshold number, and 2. specify electricity Amount registering flow path or an only equipment and secondary high current are less than multiplying power electric current, and 3. base stations meet secondary earlier without base period Count the specified electricity registering flow path do not submitted or an only equipment and secondary high current there are appliance doors less than multiplying power electric current Threshold currents, electric current of 4. base stations without the completion that do not circulate verify flow, electricity registering flow path of 5. base stations without the completion that do not circulate.
The electricity charge monthly magazine computing module temporarily receives calculating including the electricity charge, meter reading electricity charge calculating, history collect charges for electricity in advance calculating, reality Collect charges for electricity calculating, letter station the electricity charge share.
The electricity charge temporarily receive the electric quantity data segmentation calculating for calculating and being to have been acknowledged according to electricity registering flow path and temporarily collect charges for electricity. The segmentation calculating refers to that segmentation is partitioned into this electricity charge on the basis of calculating the electricity charge in foregoing electricity registering flow path The electricity charge in calculating cycle, including total electricity bill, the mobile electricity charge, the unicom electricity charge, the telecommunications electricity charge, other unit electricity charge are temporarily received, are calculated Formula is:Time number of days/number of days of original period × electricity charge of original period in the period electricity charge=calculating cycle in calculating cycle.
It is according to electricity registering flow path according to the meter reading data that electricity registering flow path has been acknowledged that the meter reading electricity charge, which calculate, Migration current, unicom electric current, telecommunications electric current, the other unitary currents of each period confirmed is segmented in Computation for apportionment meter reading data The meter reading electricity charge, including total meter reading electricity charge, the mobile meter reading electricity charge, the unicom meter reading electricity charge, the telecommunications meter reading electricity charge, other unit meter readings The electricity charge.Calculation formula is:The total electricity in electricity/meter reading cycle of the meter reading electricity charge=mono- period of one period × meter reading electricity Take, the meter reading of electricity × mono- period of mobile electricity/mono- period of the mobile meter reading electricity charge=mono- period of a time The electricity charge, electricity × mono- period of unicom electricity/mono- period of the unicom meter reading electricity charge=mono- period of a time copy The table electricity charge, electricity × mono- period of telecommunications electricity/mono- period of the telecommunications meter reading electricity charge=mono- period of a time The meter reading electricity charge, the electricity of other unit quantity of electricity/mono- periods of the other unit meter reading electricity charge=mono- periods of a time × The meter reading electricity charge of one period.
It is to calculate this electricity charge temporarily to receive going through for the meter reading electricity charge corresponding cycle in the cycle that the history, which collects charges for electricity calculate in advance, History collects charges for electricity in advance, is collected charges for electricity in advance according to actual meter reading electricity charge period divisions history.
It is to calculate this paid electricity charge that the paid electricity charge, which calculate, and paid total electricity bill=temporarily receive total electricity bill-clearance is always electric To take, the clearance total electricity bill is to clear total electricity bill=meter reading total electricity bill-advance total electricity bill of history, paid unicom total electricity bill=temporarily Receipts unicom total electricity bill-clearance unicom total electricity bill, paid telecommunications total electricity bill=temporarily receive telecommunications total electricity bill-clearance telecommunications total electricity bill, Paid mobile total electricity bill=temporarily receive mobile total electricity bill-clearance movement total electricity bill, paid other unit total electricity bills=temporarily receive other lists The position other unit total electricity bills of total electricity bill-clearance.
It is that the meter reading electricity charge of mother station are shared mother according to substation, mother station respective electricity accounting that the letter station electricity charge, which are shared, Stand the electricity charge, calculation formula is:The mother station meter reading electricity charge=mother station electricity/(Mother station electricity+all substations electricity)× meter reading the electricity charge.
The foregoing is merely the embodiment of the present invention, is not intended to limit the scope of the invention, every to utilize this hair The equivalent structure or equivalent flow shift that bright specification and accompanying drawing content are made, is directly or indirectly used in other relevant skills Art field, is included within the scope of the present invention.

Claims (4)

1. a kind of more equipment of single ammeter based on current monitoring share the electricity charge and temporarily receive system for settling account, it is characterised in that including multi-party Equipment shares ammeter charge management system, and more method, apparatus, which share ammeter charge management system, includes BTS management module, electricity Measure data batch processing module, electricity registering flow path module, current data batch processing module, load equipment management module, thresholding electricity Stream management module, electric current verify process module, flow blocking mechanism and electricity charge monthly magazine computing module;The BTS management module bag Base station information batch is included to import, base station information is safeguarded, the base station information batch, which imports, is used for batch registration base station information, including Base station number, base station affiliated area, each family share electric current, share electric current confirmation date and time information, and it is dimension that the base station information, which is safeguarded, The base station information that shield batch imports;The electric quantity data batch processing module includes electricity batch and imports, imports batch data submission Electricity registering flow path, electricity registering flow path are not resubmited by data;The electricity registering flow path module includes the electricity electricity charge Temporarily receive calculating, electricity registering flow path;It is temporarily to receive algorithm calculation base station one according to the electricity electricity charge that calculating is temporarily received in the electricity electricity charge Temporary receipts electricity in period, the electricity charge, algorithm is temporarily received in the electricity electricity charge to be included advance weighting PUE calculating, terminates ammeter reading Calculate, electricity calculates, the electricity charge calculate, the after-tax electricity charge calculate, operator's electricity charge calculate;The electricity registering flow path is believed including the electricity charge Breath registration, electricity charge information confirmation, branch of electricity charge information county label, branch of electricity charge information city label, electricity charge information examination & verification, electricity charge information are examined Criticize six nodes;The current data batch processing module includes the importing of electric current batch, current fluctuation calculates, the current fluctuation meter Calculate and calculated including the fluctuation of no device current, there is device current fluctuation to calculate, the threshold current management module includes no appliance doors Threshold currents are submitted, have equipment threshold current to specify, having the submission of equipment threshold current;It is that will meet thresholding that the threshold current, which is submitted, The threshold current of number is verified flow or electricity registration distance, is submitted according to group areas, the electric current that is submitted to a group by a group Threshold current cumulative calculation afterwards terminates, and the electric current verification process module includes electric current verification initiation, electric current verifies execution, electricity Stream verifies reception, electric current is verified and confirmed, electric current verifies examination & verification, electric current verifies six nodes of examination & approval;The flow blocking mechanism bag Including electric quantity data submits electricity registering flow path obstruction, threshold current to submit obstruction, and electric current verifies flow obstruction electricity registering flow path, The early late date flow of date flow obstruction, flow list base station uniqueness;The electricity charge monthly magazine computing module temporarily receives meter including the electricity charge Collect charges for electricity in advance calculating, paid electricity charge calculating, the meter reading electricity charge of primary and secondary station of calculation, meter reading electricity charge calculating, history are shared.
2. a kind of more equipment of single ammeter based on current monitoring according to claim 1 share the electricity charge and temporarily receive system for settling account, It is characterized in that, the no device current fluctuation calculates and has device current fluctuation the two same time of calculating to perform one Kind, there is device current fluctuation to calculate preferential execution, performed in the case where not there is device current fluctuation to calculate without device current Fluctuation calculates.
3. a kind of more equipment of single ammeter based on current monitoring according to claim 1 share the electricity charge and temporarily receive system for settling account, It is characterized in that, the load equipment management module includes, equipment threshold current is established, equipment enables, equipment is closed.
4. a kind of more equipment of single ammeter based on current monitoring according to claim 1 share the electricity charge and temporarily receive system for settling account, It is characterized in that, described meet that threshold number refers to that the cumulative number of no equipment threshold current is more than or equal to pre-determined threshold number, The pre-determined threshold number refers to that threshold current cumulative number set in advance reaches the number of submission condition.
CN201711083239.XA 2017-11-07 2017-11-07 Single-ammeter multi-device apportionment electric charge temporary collection and calculation system based on current monitoring Active CN107967758B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711083239.XA CN107967758B (en) 2017-11-07 2017-11-07 Single-ammeter multi-device apportionment electric charge temporary collection and calculation system based on current monitoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711083239.XA CN107967758B (en) 2017-11-07 2017-11-07 Single-ammeter multi-device apportionment electric charge temporary collection and calculation system based on current monitoring

Publications (2)

Publication Number Publication Date
CN107967758A true CN107967758A (en) 2018-04-27
CN107967758B CN107967758B (en) 2020-03-27

Family

ID=62000807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711083239.XA Active CN107967758B (en) 2017-11-07 2017-11-07 Single-ammeter multi-device apportionment electric charge temporary collection and calculation system based on current monitoring

Country Status (1)

Country Link
CN (1) CN107967758B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063696A (en) * 2007-05-25 2007-10-31 李唯楚 Electricity degree metering mechanism used for electric charge shareing for building elevator
JP2010033524A (en) * 2008-07-29 2010-02-12 Kenji Kashiwagi System for monitoring amount of public utility charge
EP2503503A1 (en) * 2011-03-21 2012-09-26 General Electric Company Systems and methods for generating a utility bill
CN104268816A (en) * 2014-09-22 2015-01-07 北京首钢自动化信息技术有限公司 Charging system and method for calculating different fees of property business
CN105447983A (en) * 2015-11-16 2016-03-30 上海申瑞继保电气有限公司 User-side mixed electric meter demand electric charge apportionment method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063696A (en) * 2007-05-25 2007-10-31 李唯楚 Electricity degree metering mechanism used for electric charge shareing for building elevator
JP2010033524A (en) * 2008-07-29 2010-02-12 Kenji Kashiwagi System for monitoring amount of public utility charge
EP2503503A1 (en) * 2011-03-21 2012-09-26 General Electric Company Systems and methods for generating a utility bill
CN104268816A (en) * 2014-09-22 2015-01-07 北京首钢自动化信息技术有限公司 Charging system and method for calculating different fees of property business
CN105447983A (en) * 2015-11-16 2016-03-30 上海申瑞继保电气有限公司 User-side mixed electric meter demand electric charge apportionment method

Also Published As

Publication number Publication date
CN107967758B (en) 2020-03-27

Similar Documents

Publication Publication Date Title
CN111091224A (en) Electric vehicle charging electric energy transaction method based on block chain technology
CN103559760B (en) Electricity-consumption managing system device
CN104899978B (en) Based on the resident's day electricity charge charging method and system for taking control technology
CN108280937A (en) Accurately system and method is shared in metering for the electricity charge under multi-user shared ammeter scene
CN105356461B (en) A kind of accounting method of the load unbalanced administration project carbon emission reduction amount of low voltage electric network
CN106846176A (en) A kind of electricity charge accounting system
CN102403720A (en) Hyper-real-time setting method for superposed time sequences based on transient voltage safety margin
CN102116857A (en) Method for checking electric quantity at power grid gate
CN110942204A (en) New power grid capital construction project annual planning model construction method and system
CN109242293A (en) A kind of power purchase enterprise electricity marketization settles accounts check system and method
CN108256723A (en) Coal changes the assessment of economic benefit method and terminal device for being electrically accessed power grid
CN106127376A (en) Electric power integration Quantitative Managingsystems and method of work thereof
CN105867274B (en) Electric control system and method are connect based on remote bill control, the anti-intelligent residential district dress table visited one house after another
DE112022000053T5 (en) PROCEDURE FOR STATISTICAL ACCOUNTING OF ELECTRIC ENERGY AND CARBON EMISSIONS BASED ON DIGITAL WALLET AND BLOCKCHAIN
CN107944680A (en) A kind of substation's electric energy balance monitoring method based on intelligent electric energy meter
CN109978502A (en) Automatic budget method, system and computer storage medium are changed in engineering design
CN108428295A (en) Domestic consumer's multiple-energy-source comprehensively utilizes the multiple-in-one system and method under scene
CN106530116A (en) Method for calculating electricity quantity charge return and compensation based on cross-coupling variable
CN107967758A (en) A kind of more equipment of single ammeter based on current monitoring share the electricity charge and temporarily receive system for settling account
Ali Flavour changing neutral current processes in B decays
CN205827195U (en) Electric control system is connect based on remote bill control, the anti-intelligent residential district dress table visited one house after another
CN101930642A (en) Ethernet paying business hall system
CN116402482A (en) Data processing method and processing equipment based on intelligent settlement of electric charge
JP2004320963A (en) Electric power load estimating method and system, and energy charge billing method
CN112884277B (en) Intelligent power utilization system applied to power transfer and supply and use method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant