CN107964946B - 基于抽排水降水的劲性复合桩的施工方法 - Google Patents
基于抽排水降水的劲性复合桩的施工方法 Download PDFInfo
- Publication number
- CN107964946B CN107964946B CN201711257585.5A CN201711257585A CN107964946B CN 107964946 B CN107964946 B CN 107964946B CN 201711257585 A CN201711257585 A CN 201711257585A CN 107964946 B CN107964946 B CN 107964946B
- Authority
- CN
- China
- Prior art keywords
- pile
- soil
- pumping
- stiff composite
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
Abstract
本发明公开了一种基于抽排水降水的劲性复合桩的施工方法,包括下列步骤:(1)在待施工劲性复合桩的桩位外周软土层中,设置多个管井和塑料排水板进行抽排水作业,使地下水位降低,土体含水量降低、密度提高,上部软土硬化密实;(2)在桩位上进行散体桩的施工作业;(3)在散体桩中进行搅拌和高压喷气、喷粉或喷浆作业施工水泥土桩,周围的管井同时继续进行抽排水作业,使所喷的气、粉体或浆体向着管井方向运动,从而使粉或浆易被土体吸收;(4)在水泥土桩中施工刚性芯桩。本发明在软土中施工效果好,桩身密实强度高,桩周土稳定,地基整体稳定性好。
Description
技术领域
本发明涉及一种基于抽排水降水的劲性复合桩的施工方法。
背景技术
现有的水泥土类桩的施工如果处于软土中,由于软土地基地下水位高,土体含水量高,桩基施工中容易产生较大的超空隙水压力且难以消散。该问题会导致土体水平、竖向位移,甚至会造成桩身上浮、桩位偏移,影响基础的质量和稳定性。
发明内容
本发明的目的在于提供一种适合软土中水泥土类桩施工方法,加入了管井、塑料排水板和散体材料,在软土中形成排气排水通道,与施工刚性芯桩时的挤压力共同作用,提高了桩本身的密实度和强度,也加固了桩周软土。
本发明的技术解决方案是:
一种基于抽排水降水的劲性复合桩的施工方法,其特征是:包括下列步骤:
(1)在待施工劲性复合桩的桩位外周软土层中,设置多个管井和塑料排水板进行抽排水作业,使地下水位降低,土体含水量降低、密度提高,上部软土硬化密实;
(2)在桩位上进行散体桩的施工作业,将散体材料打入软土中;
(3)在散体桩中施工水泥土桩,用高压旋搅桩机在散体桩中进行搅拌和高压喷气、喷粉或喷浆作业,周围的管井同时继续进行抽排水作业,使所喷的气、粉体或浆体穿过散体材料、劈裂桩位外周软土,向着管井方向运动,从而使粉或浆易被土体吸收,原来的软土固化为较硬的含水泥土体;
(4)在水泥土桩中施工刚性芯桩。
所述管井的深度为10米以上,位于桩位外1~35米。
所述塑料排水板的深度为8米以上,间距5m以上。
所述散体桩的散体材料包括碎石、卵石、砂、钢渣、矿渣中的至少一种硬体材料。
所述粉体或浆体为水泥、粉煤灰、硅粉、钢渣或矿渣的粉体,配水则为浆体。
所述刚性芯桩包括现浇混凝土桩、现浇钢筋混凝土桩或预制钢筋混凝土桩。
在桩位上进行劲性复合桩的施工作业前提前1-40天进行所述管井和塑料排水板的抽排水作业。在水泥土桩的施工作业前提前1-40天进行所述散体桩的施工作业。水泥土桩施工结束后24小时内开始施工刚性芯桩。
本发明设置了管井、塑料排水板和散体材料作为排气排水通道,在高压力的作用下可以使桩施工中的喷入气、粉体、浆体从桩中心穿过散体材料,劈裂桩周软土,最终到达周围的管井和塑料排水板中。在这一过程中,桩身水泥土达到最优含水量,并在桩机反压力的作用下达到最大干密度,强度、密实度、刚度提高;同时桩周软土的含水量降低,不会产生负面的超空隙水压力;土体中混入了水泥等硬凝材料,变成了干硬土体,使地基的整体稳定性提高。
下面结合实施例对本发明作进一步说明。
具体实施方式
一种基于抽排水降水的劲性复合桩的施工方法,包括下列步骤:
(1)劲性复合桩施工前20天,在待施工劲性复合桩的桩位外周软土层中,设置多个管井和间隔布置的塑料排水板进行抽排水作业,使地下水位降低,土体含水量降低、密度提高,上部软土硬化密实,管井深度15米,位于桩位外20米,塑料排水板深度10米,间距6m;
(2)水泥土桩施工前10天在桩位上进行散体桩的施工作业,将碎石、卵石等散体材料打入软土中;
(3)在散体桩中施工水泥土桩,用高压旋搅桩机在散体桩中进行搅拌和高压喷气、喷粉作业,喷入空气、水泥和粉煤灰混合粉体并搅拌,周围的管井同时继续进行抽排水作业,使所喷的气和粉体穿过散体材料、劈裂桩位外周软土,向着管井方向运动,从而使粉体易被土体吸收,原来的软土固化为较硬的含水泥土体;
(4)在水泥土桩中打入预制钢筋混凝土桩。
Claims (9)
1.一种基于抽排水降水的劲性复合桩的施工方法,其特征是:包括下列步骤:
(1)在待施工劲性复合桩的桩位外周软土层中,设置多个管井和塑料排水板进行抽排水作业,使地下水位降低,土体含水量降低、密度提高,上部软土硬化密实;
(2)在桩位上进行散体桩的施工作业,将散体材料打入软土中;
(3)在散体桩中施工水泥土桩,用高压旋搅桩机在散体桩中进行搅拌和高压喷气和喷粉或喷浆作业,周围的管井同时继续进行抽排水作业,使所喷的气和粉体或浆体穿过散体材料、劈裂桩位外周软土,向着管井方向运动,从而使粉或浆易被土体吸收,原来的软土固化为较硬的含水泥土体;
(4)在水泥土桩中施工刚性芯桩。
2.根据权利要求1所述的基于抽排水降水的劲性复合桩的施工方法,其特征是:所述管井的深度为10米以上,位于桩位外1~35米。
3.根据权利要求1所述的基于抽排水降水的劲性复合桩的施工方法,其特征是:所述塑料排水板的深度为8米以上,间距5m以上。
4.根据权利要求1所述的基于抽排水降水的劲性复合桩的施工方法,其特征是:所述散体桩的散体材料包括碎石、卵石、砂、钢渣、矿渣中的至少一种硬体材料。
5.根据权利要求1所述的基于抽排水降水的劲性复合桩的施工方法,其特征是:所述粉体为水泥、粉煤灰、硅粉、钢渣或矿渣的粉体,粉体配水则为浆体。
6.根据权利要求1所述的基于抽排水降水的劲性复合桩的施工方法,其特征是:所述刚性芯桩包括现浇混凝土桩、现浇钢筋混凝土桩或预制钢筋混凝土桩。
7.根据权利要求1所述的基于抽排水降水的劲性复合桩的施工方法,其特征是:在桩位上进行劲性复合桩的施工作业前提前1-40天进行所述管井和塑料排水板的抽排水作业。
8.根据权利要求1所述的基于抽排水降水的劲性复合桩的施工方法,其特征是:在水泥土桩的施工作业前提前1-40天进行所述散体桩的施工作业。
9.根据权利要求1所述的基于抽排水降水的劲性复合桩的施工方法,其特征是:水泥土桩施工结束后24小时内开始施工刚性芯桩。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711257585.5A CN107964946B (zh) | 2017-12-04 | 2017-12-04 | 基于抽排水降水的劲性复合桩的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711257585.5A CN107964946B (zh) | 2017-12-04 | 2017-12-04 | 基于抽排水降水的劲性复合桩的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107964946A CN107964946A (zh) | 2018-04-27 |
CN107964946B true CN107964946B (zh) | 2020-04-10 |
Family
ID=61998651
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711257585.5A Active CN107964946B (zh) | 2017-12-04 | 2017-12-04 | 基于抽排水降水的劲性复合桩的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107964946B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109930596B (zh) * | 2019-04-09 | 2020-11-10 | 沙焕焕 | 一种水泥土桩的施工方法 |
CN112323560B (zh) * | 2020-11-19 | 2022-03-01 | 中电建路桥集团有限公司 | 复杂软基环境下路基施工沉降控制系统 |
CN113897951A (zh) * | 2021-10-26 | 2022-01-07 | 邓亚光 | 超载验证劲性复合桩的施工方法 |
CN114658023B (zh) * | 2022-03-25 | 2024-01-16 | 中电建路桥集团有限公司 | 高速公路大直径超长群桩及其施工方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104631428B (zh) * | 2015-01-05 | 2017-01-25 | 温州大学 | 一种局部深层增压式真空预压处理软土地基的方法 |
CN105649053A (zh) * | 2016-02-05 | 2016-06-08 | 沙焕焕 | 多元劲性复合桩的施工方法 |
-
2017
- 2017-12-04 CN CN201711257585.5A patent/CN107964946B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN107964946A (zh) | 2018-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107964946B (zh) | 基于抽排水降水的劲性复合桩的施工方法 | |
CN105887837B (zh) | 一种现场地面搅拌水泥土桩的施工方法 | |
CN105544460B (zh) | 现浇植生型生态混凝土护坡施工方法 | |
CN105386433B (zh) | 一种微生物固土cfg桩复合地基及施工方法 | |
CN102767173B (zh) | 一种高聚物材料浆固散体材料桩复合地基及其施工方法 | |
CN105019422B (zh) | 表层土就地固化与桩组合承载的地基施工方法 | |
CN103184734A (zh) | 一种植入注浆组合桩及施工方法 | |
CN107740434B (zh) | 一种用于砂卵石、白云岩破碎带水坝基坑防水帷幕的施工方法 | |
CN104196017B (zh) | 一种防治溶岩地区冲/钻孔灌注桩漏浆、塌孔的方法 | |
CN108411889A (zh) | 一种结构化胶结碎石桩及其施工方法 | |
CN105350516B (zh) | 一种岩土层注料改性加固方法 | |
CN102235008B (zh) | 软土地基防工程桩偏位结构及预处理法 | |
CN104727273B (zh) | 一种采用自嵌式砌块进行直立堤岸生态修复的方法 | |
CN105484230A (zh) | 桩土混凝一体化复合桩及其施工方法 | |
CN102839683A (zh) | 散体桩-透水性混凝土桩新型二元复合地基及处理方法 | |
CN104108919A (zh) | 一种环保止水帷幕 | |
CN106917402A (zh) | 一种cfg桩预制桩头及cfg桩施工方法 | |
CN104695455B (zh) | 大流量高水头防冲刷、防渗过水围堰结构及其施工方法 | |
CN101899827B (zh) | 乱堆石填土地基中沉管内冲击锤破碎土振动挤密处理方法 | |
CN208293531U (zh) | 一种可控制差异沉降的微型桩土组合结构 | |
KR101326113B1 (ko) | 중력식 보강토 블록과 이의 제조 및 이를 이용한 옹벽 시공방법 | |
CN206052770U (zh) | 一种使用钻孔灌注桩结合压密注浆的挡土墙 | |
CN202202318U (zh) | 软土地基lcsg桩与堆载预压联合处理装置 | |
CN201943060U (zh) | 一种河床深厚覆盖层闸坝基础的加固结构 | |
CN105421446A (zh) | 一种用于软基处理的混合土挤压固化预制桩及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |