CN107957107A - Air fast cycle apparatus in a kind of metallurgy steel-making workshop - Google Patents

Air fast cycle apparatus in a kind of metallurgy steel-making workshop Download PDF

Info

Publication number
CN107957107A
CN107957107A CN201711055699.1A CN201711055699A CN107957107A CN 107957107 A CN107957107 A CN 107957107A CN 201711055699 A CN201711055699 A CN 201711055699A CN 107957107 A CN107957107 A CN 107957107A
Authority
CN
China
Prior art keywords
shaft
installing plate
strut
bearing
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711055699.1A
Other languages
Chinese (zh)
Other versions
CN107957107B (en
Inventor
王磊
谢永顺
朱鹏华
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Luyuan Linkage Machinery Manufacturing Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711055699.1A priority Critical patent/CN107957107B/en
Publication of CN107957107A publication Critical patent/CN107957107A/en
Application granted granted Critical
Publication of CN107957107B publication Critical patent/CN107957107B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F5/00Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
    • F24F5/0007Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater cooling apparatus specially adapted for use in air-conditioning
    • F24F5/0035Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater cooling apparatus specially adapted for use in air-conditioning using evaporation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D25/00Pumping installations or systems
    • F04D25/02Units comprising pumps and their driving means
    • F04D25/08Units comprising pumps and their driving means the working fluid being air, e.g. for ventilation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D25/00Pumping installations or systems
    • F04D25/16Combinations of two or more pumps ; Producing two or more separate gas flows
    • F04D25/163Combinations of two or more pumps ; Producing two or more separate gas flows driven by a common gearing arrangement
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D25/00Pumping installations or systems
    • F04D25/16Combinations of two or more pumps ; Producing two or more separate gas flows
    • F04D25/166Combinations of two or more pumps ; Producing two or more separate gas flows using fans
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F6/00Air-humidification, e.g. cooling by humidification
    • F24F6/02Air-humidification, e.g. cooling by humidification by evaporation of water in the air
    • F24F6/06Air-humidification, e.g. cooling by humidification by evaporation of water in the air using moving unheated wet elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/54Free-cooling systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Transmission Devices (AREA)
  • Air-Flow Control Members (AREA)

Abstract

The present invention relates to air fast cycle apparatus in a kind of recycle unit, more particularly to a kind of metallurgical steel-making workshop.The technical problem to be solved in the present invention is to provide air fast cycle apparatus in the metallurgical steel-making workshop of a kind of quick regulation cross-ventilation circulation rate, the use scope of reasonable adjustment equipment and increase air humidity.In order to solve the above technical problem, the present invention provides air fast cycle apparatus in such a metallurgical steel-making workshop, include the first installing plate, slide, sliding block, second installing plate etc.;First installing plate top left side is inlaid with slide, and symmetrical slidingtype is connected with sliding block at the top of slide, and left and right sides sliding block top is equipped with the second installing plate, air circulation device is equipped with the top of the second installing plate.The present invention accelerates cross-ventilation circulation rate, easy to the air in workshop and outside air fast exchange, comfortable safe working environment has been built for worker by the left and right sides the first blade high-speed rotation.

Description

Air fast cycle apparatus in a kind of metallurgy steel-making workshop
Technical field
The present invention relates to air fast cycle apparatus in a kind of recycle unit, more particularly to a kind of metallurgical steel-making workshop.
Background technology
Metallurgy is exactly that metal or metallic compound are extracted from mineral, and metal is made with certain with various processing methods The process and technique of the metal material of performance, metallurgy has long developing history, during from the Stone Age to subsequent bronze ware Generation, then the extensive development to modern age smelting iron and steel, the history of human development have merged the developing history of metallurgy, metallurgical technology Mainly include pyrometallurgy, hydrometallurgy and electrometallurgy, as physical chemistry is applied successfully in metallurgy, metallurgy is walked from technique To science, the then quality Personnel in Metallurgical Engineering in You Liao universities.
Pyrometallurgy is the metallurgical process carried out under the high temperature conditions, in this course, is efficiently closed to pursue heat Reason ground transmits, and can be used for heating ores instead of traditional coal using natural gas in part pyrometallurgy process, but using During natural gas, since natural gas leakage will be caused under the action of force majeure or human factor, if leakage portion Point natural gas do not drain into the external world in time, the workshop under hot environment will cause the natural gas that largely accumulates quick-fried rapidly It is fried, cause serious accident.
To sum up, need to research and develop a kind of quick regulation cross-ventilation circulation rate, the use scope of reasonable adjustment equipment at present , in the prior art can not quick regulation to overcome with air fast cycle apparatus in the metallurgical steel-making workshop of increase air humidity Cross-ventilation circulation rate, cannot rationally the use scope of adjustment equipment and be difficult to increase air humidity the shortcomings that.
The content of the invention
(1)Technical problems to be solved
The present invention in order to overcome in the prior art can not quick regulation cross-ventilation circulation rate, cannot rationally adjustment equipment make The shortcomings that with scope and being difficult to increase air humidity, the technical problem to be solved in the present invention is to provide a kind of quick regulation air pair Flow air Rapid Circulation in the metallurgical steel-making workshop of circulation rate, the use scope of reasonable adjustment equipment and increase air humidity Equipment.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a metallurgical steel-making to be set with air Rapid Circulation in workshop It is standby, include the first installing plate, slide, sliding block, the second installing plate, air circulation device and move left and right device, the first installation Plate top left side is inlaid with slide, and symmetrical slidingtype is connected with sliding block at the top of slide, and left and right sides sliding block top is equipped with the Two installing plates, the second installing plate top are equipped with air circulation device, and the first installing plate top right side is equipped with and moves left and right device, left Device left part is moved right with being connected on the right side of the second installing plate.
Preferably, air circulation device includes the first motor, first rotating shaft, first bevel gear, the first strut, first axle Bearing, the second shaft, second bevel gear and the first blade, the second installing plate top center are equipped with the first motor, and the first motor is defeated Shaft is connected with first rotating shaft, and first rotating shaft top is connected with first bevel gear, and left and right is symmetrically connected with the top of the second installing plate First strut, the left and right sides the first strut top are equipped with first bearing seat, second are equipped with the first bearing seat of the left and right sides Shaft, the left and right sides the second shaft the inner are respectively connected with second bevel gear, and left and right sides second bevel gear is and first bevel gear Engagement, the left and right sides the second shaft outer end is respectively connected with the first blade.
Preferably, move left and right device and include the second strut, the second motor, the 3rd shaft, turntable, first connecting rod and Two connecting rods, the first installing plate top right side are connected with the second strut, the second motor, the second motor are equipped with front side of the second strut top Output shaft is connected with the 3rd shaft, and the 3rd shaft front end is connected with turntable, and turntable front central is hingedly connected with first connecting rod, the One connecting rod top is hingedly connected with second connecting rod, is articulated and connected on the right side of second connecting rod left end and the second installing plate.
Preferably, worm screw, the 3rd strut, second bearing seat, the 4th shaft, worm gear, third hand tap gear, the 3rd have been further included It is bearing, the 5th shaft, the 4th bevel gear, the first belt pulley, fourth bearing, the 6th shaft, the second blade, the second belt pulley, flat Belt, the 3rd installing plate and the 4th strut, the first installing plate lower section are equipped with the 3rd installing plate, the connection of the 3rd installing plate top left side There is the 4th strut, the 4th strut top is connected with the first installing plate bottom left, and worm screw, the first installation are equipped with the middle part of the 3rd shaft Plate top right side is connected with the 3rd strut, and for the 3rd strut on the right side of the second strut, the 3rd strut top is equipped with second bearing seat, the The 4th shaft is equipped with two bearing bracket, the 4th shaft left end is connected with worm gear, worm gear and worm engaging, the connection of the 4th shaft right end There is a third hand tap gear, the 3rd installing plate bottom right is symmetrical to be respectively equipped with fourth bearing and 3rd bearing, in 3rd bearing Equipped with the 5th shaft, the 5th shaft top is connected with the 4th bevel gear, and the 4th bevel gear engages with third hand tap gear, the 5th shaft Lower part is equipped with the first belt pulley, is equipped with the 6th shaft in fourth bearing, the 6th shaft top is connected with the second blade, the 6th shaft Top is equipped with the second belt pulley, and flat belt is wound between the second belt pulley and the first belt pulley.
Preferably, pinion gear, L-shaped strut, water frame, 5th bearing, the 7th shaft, sealing ring, bull stick and big have been further included Gear, the 6th shaft lower part are equipped with pinion gear, and the 3rd installing plate top left side is equipped with L-shaped strut, and L-shaped strut right end is connected with water Frame, water frame bottom center are equipped with sealing ring, are equipped with 5th bearing at the top of the 3rd installing plate immediately below water frame, are set in 5th bearing There is the 7th shaft, the 7th shaft passes through the sealing ring of water frame bottom, and the 7th shaft top is symmetrical to be equipped with bull stick, the 7th shaft Lower part is equipped with gear wheel, and gear wheel is engaged with pinion gear.
Preferably, isolation frame has been further included, isolation frame is equipped with the top of the first bearing seat of the left and right sides.
Preferably, further included and be connected with web plate between two wall inside upper part of web plate, water frame or so.
Operation principle:When needing to keep the air Rapid Circulation in workshop, control air circulation device running, passes through sky Gas circulator accelerates the air Rapid Circulation in workshop, and then control moves left and right device running, by moving left and right device The horizontal level of air circulation device is adjusted, easy to keep the air of varying level position in workshop effectively to circulate, improves equipment Actionradius, when workshop stops producing, can be chosen whether to need according to actual conditions to control air circulation device with it is left Device is moved right to stop operating.
Because air circulation device includes the first motor, first rotating shaft, first bevel gear, the first strut, clutch shaft bearing Seat, the second shaft, second bevel gear and the first blade, the second installing plate top center are equipped with the first motor, the output of the first motor Axis connection has a first rotating shaft, and first rotating shaft top is connected with first bevel gear, and left and right is symmetrically connected with the at the top of the second installing plate One strut, the left and right sides the first strut top are equipped with first bearing seat, second turn are equipped with the first bearing seat of the left and right sides Axis, the left and right sides the second shaft the inner are respectively connected with second bevel gear, and left and right sides second bevel gear is nibbled with first bevel gear To close, the left and right sides the second shaft outer end is respectively connected with the first blade, so when needing to keep the air Rapid Circulation in workshop, The first motor is controlled to rotate, the first motor output shaft drives first rotating shaft to rotate, and then drives first bevel gear to rotate, so that band Dynamic left and right sides second bevel gear rotates so that the second shaft of the left and right sides rotates, and the second shaft of the left and right sides drives a left side respectively Right the first blade of both sides rotates, and by the left and right sides the first blade high-speed rotation, accelerates cross-ventilation circulation rate, easy to workshop Interior air and outside air fast exchange, comfortable safe working environment has been built for worker, when needing to stop air circulation When device operates, the first motor stalls are controlled.
Because moving left and right device includes the second strut, the second motor, the 3rd shaft, turntable, first connecting rod and second Connecting rod, the first installing plate top right side are connected with the second strut, are equipped with the second motor on front side of the second strut top, the second motor is defeated Shaft is connected with the 3rd shaft, and the 3rd shaft front end is connected with turntable, and turntable front central is hingedly connected with first connecting rod, and first Connecting rod top is hingedly connected with second connecting rod, is articulated and connected on the right side of second connecting rod left end and the second installing plate, so when air follows When loop device operates, if need to adjust the horizontal level of air circulation device according to actual conditions, the second motor of control turns Dynamic, the second motor output shaft drives the 3rd shaft to rotate, and the 3rd shaft drives turntable to rotate, and then drives first connecting rod to rotate, By the hinged cooperation of first connecting rod and second connecting rod, the reciprocal left and right that the circular motion of turntable is converted into the second installing plate is transported Dynamic, so as to drive air circulation device bilateral reciprocation, when air circulation device stops operating, the second motor of control stops Rotate, move left and right device and also stop operating therewith, the horizontal level of air circulation device is adjusted by moving left and right device, is added Big equipment adjusts the scope of workshop inner air convection circulation, improves the utilization rate of equipment.
Because worm screw, the 3rd strut, second bearing seat, the 4th shaft, worm gear, third hand tap gear, the 3rd axis are further included Hold, the 5th shaft, the 4th bevel gear, the first belt pulley, fourth bearing, the 6th shaft, the second blade, the second belt pulley, flat skin Band, the 3rd installing plate and the 4th strut, the first installing plate lower section are equipped with the 3rd installing plate, and the 3rd installing plate top left side is connected with 4th strut, the 4th strut top are connected with the first installing plate bottom left, and worm screw, the first installing plate are equipped with the middle part of the 3rd shaft Top right side is connected with the 3rd strut, and for the 3rd strut on the right side of the second strut, the 3rd strut top is equipped with second bearing seat, and second The 4th shaft is equipped with bearing block, the 4th shaft left end is connected with worm gear, worm gear and worm engaging, and the 4th shaft right end is connected with Third hand tap gear, the 3rd installing plate bottom right is symmetrical to be respectively equipped with fourth bearing and 3rd bearing, is set in 3rd bearing There is the 5th shaft, the 5th shaft top is connected with the 4th bevel gear, and the 4th bevel gear engages with third hand tap gear, under the 5th shaft Portion is equipped with the first belt pulley, is equipped with the 6th shaft in fourth bearing, and the 6th shaft top is connected with the second blade, in the 6th shaft Portion is equipped with the second belt pulley, and flat belt is wound between the second belt pulley and the first belt pulley, so when the 3rd shaft rotates, the Three shafts drive worm screw to rotate, and worm screw drives worm gear to rotate, and then drive the 4th shaft to rotate, so as to drive third hand tap gear to turn Dynamic, third hand tap gear drives the 4th bevel gear to rotate so that and the 5th shaft rotates, and the 5th shaft drives the first pulley rotation, First belt pulley drives the second pulley rotation by flat belt, and the second belt pulley drives the 6th shaft to rotate so that the second leaf Piece rotates, and is rotated by the second blade, can be by the air of lower height in workshop easy to produce upward cross-ventilation circulation The external world can also be effectively drained into, compensate for equipment can not adjust the deficiency of height, improve the practicality of equipment, when the 3rd turn When axis stops operating, the second blade also stops operating therewith.
Because pinion gear, L-shaped strut, water frame, 5th bearing, the 7th shaft, sealing ring, bull stick and canine tooth are further included Wheel, the 6th shaft lower part are equipped with pinion gear, and the 3rd installing plate top left side is equipped with L-shaped strut, and L-shaped strut right end is connected with water Frame, water frame bottom center are equipped with sealing ring, are equipped with 5th bearing at the top of the 3rd installing plate immediately below water frame, are set in 5th bearing There is the 7th shaft, the 7th shaft passes through the sealing ring of water frame bottom, and the 7th shaft top is symmetrical to be equipped with bull stick, the 7th shaft Lower part is equipped with gear wheel, and gear wheel is engaged with pinion gear, so when the 6th shaft rotates, the 6th shaft drives pinion gear to turn It is dynamic, and then bull gear drive is driven, so as to drive the 7th shaft to rotate so that bar rotation, by bar rotation, improves water frame The evaporation rate of interior water, can effectively increase the air humidity in workshop, while the process of water evaporation needs to absorb heat, certain journey Reduce the temperature in workshop, when water is insufficient in water frame, worker rationally adds water according to actual conditions, passes through small tooth degree Wheel drives bull gear drive, significantly reduces the transmission speed of the 6th shaft, avoids the 7th shaft rotating speed excessive, prevent water frame Interior water sputters away, influences the normal operation of equipment, and when the 6th shaft stops operating, bull stick also stops operating therewith.
Isolation frame is equipped with because having further included isolation frame, at the top of the first bearing seat of the left and right sides, so by isolating frame, can To ensure that worker can not touch the second bevel gear of high-speed rotation, the production safety of worker has been ensured.
Because having further included web plate, web plate is connected between two wall inside upper part of water frame or so, can be with so by web plate Prevent the water in water frame to be subject to external force to act on and sputter largely to equipment surface, reach the effect for ensureing that equipment stablizes running.
The control mode of the present invention is automatically controlled by controller, the skill that the control circuit of controller passes through this area Art personnel simple programming can be achieved, and belong to the common knowledge of this area, and the present invention is mainly used to protect mechanical device, institute Control mode is not explained with the present invention to connect with circuit.
(3)Beneficial effect
The present invention accelerates cross-ventilation circulation rate, easy to the air in workshop by the left and right sides the first blade high-speed rotation With outside air fast exchange, comfortable safe working environment has been built for worker, by bar rotation, has improved water in water frame Evaporation rate, can effectively increase the air humidity in workshop, while the process of water evaporation needs to absorb heat, and drops to a certain extent Temperature in low workshop, by web plate, can prevent the water in water frame to be subject to external force to act on and sputter largely to equipment surface, The effect for ensureing that equipment stablizes running is reached.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the main structure diagram of air circulation device of the present invention.
Fig. 3 is the main structure diagram that the present invention moves left and right device.
Fig. 4 is the left view structural representation that the present invention moves left and right device.
Fig. 5 is second of main structure diagram of the present invention.
Fig. 6 is the part left view structural representation of the present invention.
Fig. 7 is the first part main structure diagram of the present invention.
Fig. 8 is second of part main structure diagram of the present invention.
Fig. 9 is the third part main structure diagram of the present invention.
Mark in attached drawing for:The first installing plates of 1-, 2- slides, 3- sliding blocks, the second installing plates of 4-, 5- air circulations dress Put, the first motors of 51-, 52- first rotating shafts, 53- first bevel gears, the first struts of 54-, 55- first bearing seats, second turn of 56- Axis, 57- second bevel gears, the first blades of 58-, 6- move left and right device, the second struts of 61-, the second motors of 62-, the 3rd turn of 63- Axis, 64- turntables, 65- first connecting rods, 66- second connecting rods, 7- worm screws, the 3rd struts of 8-, 9- second bearing seats, the 4th turn of 10- Axis, 11- worm gears, 12- third hand tap gears, 13- 3rd bearings, the 5th shafts of 14-, the 4th bevel gears of 15-, the first belt pulleys of 16-, 17- fourth bearings, the 6th shafts of 18-, the second blades of 19-, the second belt pulleys of 20-, 21- flat belts, the 3rd installing plates of 22-, 23- 4th strut, 24- pinion gears, 25-L shape struts, 26- water frames, 27- 5th bearings, the 7th shafts of 28-, 29- sealing rings, 30- turn Bar, 31- gear wheels, 32- isolation frames, 33- web plates.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
Air fast cycle apparatus in a kind of metallurgy steel-making workshop, as shown in figs 1-9, include the first installing plate 1, slide 2, Sliding block 3, the second installing plate 4, air circulation device 5 and device 6 is moved left and right, 1 top left side of the first installing plate is inlaid with slide 2, the symmetrical slidingtype in the top of slide 2 is connected with sliding block 3, and sliding block 3 top in the left and right sides is equipped with the second installing plate 4, the second peace The top of loading board 4 is equipped with air circulation device 5, and 1 top right side of the first installing plate is equipped with and moves left and right device 6, moves left and right device 6 Left part is connected with the right side of the second installing plate 4.
Embodiment 2
Air fast cycle apparatus in a kind of metallurgy steel-making workshop, as shown in figs 1-9, include the first installing plate 1, slide 2, Sliding block 3, the second installing plate 4, air circulation device 5 and device 6 is moved left and right, 1 top left side of the first installing plate is inlaid with slide 2, the symmetrical slidingtype in the top of slide 2 is connected with sliding block 3, and sliding block 3 top in the left and right sides is equipped with the second installing plate 4, the second peace The top of loading board 4 is equipped with air circulation device 5, and 1 top right side of the first installing plate is equipped with and moves left and right device 6, moves left and right device 6 Left part is connected with the right side of the second installing plate 4.
Air circulation device 5 includes the first motor 51, first rotating shaft 52, first bevel gear 53, the first strut 54, first Bearing block 55, the second shaft 56,57 and first blade 58 of second bevel gear, 4 top center of the second installing plate are equipped with the first motor 51,51 output shaft of the first motor is connected with first rotating shaft 52, and 52 top of first rotating shaft is connected with first bevel gear 53, the second installation The top of plate 4 left and right is symmetrically connected with the first strut 54, and 54 top of the first strut of the left and right sides is equipped with first bearing seat 55, left and right The second shaft 56 is equipped with both sides first bearing seat 55,56 the inner of the second shaft of the left and right sides is respectively connected with second bevel gear 57, left and right sides second bevel gear 57 is engaged with first bevel gear 53, and 56 outer end of the second shaft of the left and right sides is respectively connected with One blade 58.
Embodiment 3
Air fast cycle apparatus in a kind of metallurgy steel-making workshop, as shown in figs 1-9, include the first installing plate 1, slide 2, Sliding block 3, the second installing plate 4, air circulation device 5 and device 6 is moved left and right, 1 top left side of the first installing plate is inlaid with slide 2, the symmetrical slidingtype in the top of slide 2 is connected with sliding block 3, and sliding block 3 top in the left and right sides is equipped with the second installing plate 4, the second peace The top of loading board 4 is equipped with air circulation device 5, and 1 top right side of the first installing plate is equipped with and moves left and right device 6, moves left and right device 6 Left part is connected with the right side of the second installing plate 4.
Air circulation device 5 includes the first motor 51, first rotating shaft 52, first bevel gear 53, the first strut 54, first Bearing block 55, the second shaft 56,57 and first blade 58 of second bevel gear, 4 top center of the second installing plate are equipped with the first motor 51,51 output shaft of the first motor is connected with first rotating shaft 52, and 52 top of first rotating shaft is connected with first bevel gear 53, the second installation The top of plate 4 left and right is symmetrically connected with the first strut 54, and 54 top of the first strut of the left and right sides is equipped with first bearing seat 55, left and right The second shaft 56 is equipped with both sides first bearing seat 55,56 the inner of the second shaft of the left and right sides is respectively connected with second bevel gear 57, left and right sides second bevel gear 57 is engaged with first bevel gear 53, and 56 outer end of the second shaft of the left and right sides is respectively connected with One blade 58.
Move left and right device 6 and include the second strut 61, the second motor 62, the 3rd shaft 63, turntable 64, first connecting rod 65 With second connecting rod 66,1 top right side of the first installing plate is connected with the second strut 61, the second electricity is equipped with front side of 61 top of the second strut Machine 62,62 output shaft of the second motor are connected with the 3rd shaft 63, and 63 front end of the 3rd shaft is connected with turntable 64, in 64 front portion of turntable The heart is hingedly connected with first connecting rod 65, and 65 top of first connecting rod is hingedly connected with second connecting rod 66,66 left end of second connecting rod and The articulated connection of the right side of two installing plate 4.
Embodiment 4
Air fast cycle apparatus in a kind of metallurgy steel-making workshop, as shown in figs 1-9, include the first installing plate 1, slide 2, Sliding block 3, the second installing plate 4, air circulation device 5 and device 6 is moved left and right, 1 top left side of the first installing plate is inlaid with slide 2, the symmetrical slidingtype in the top of slide 2 is connected with sliding block 3, and sliding block 3 top in the left and right sides is equipped with the second installing plate 4, the second peace The top of loading board 4 is equipped with air circulation device 5, and 1 top right side of the first installing plate is equipped with and moves left and right device 6, moves left and right device 6 Left part is connected with the right side of the second installing plate 4.
Air circulation device 5 includes the first motor 51, first rotating shaft 52, first bevel gear 53, the first strut 54, first Bearing block 55, the second shaft 56,57 and first blade 58 of second bevel gear, 4 top center of the second installing plate are equipped with the first motor 51,51 output shaft of the first motor is connected with first rotating shaft 52, and 52 top of first rotating shaft is connected with first bevel gear 53, the second installation The top of plate 4 left and right is symmetrically connected with the first strut 54, and 54 top of the first strut of the left and right sides is equipped with first bearing seat 55, left and right The second shaft 56 is equipped with both sides first bearing seat 55,56 the inner of the second shaft of the left and right sides is respectively connected with second bevel gear 57, left and right sides second bevel gear 57 is engaged with first bevel gear 53, and 56 outer end of the second shaft of the left and right sides is respectively connected with One blade 58.
Move left and right device 6 and include the second strut 61, the second motor 62, the 3rd shaft 63, turntable 64, first connecting rod 65 With second connecting rod 66,1 top right side of the first installing plate is connected with the second strut 61, the second electricity is equipped with front side of 61 top of the second strut Machine 62,62 output shaft of the second motor are connected with the 3rd shaft 63, and 63 front end of the 3rd shaft is connected with turntable 64, in 64 front portion of turntable The heart is hingedly connected with first connecting rod 65, and 65 top of first connecting rod is hingedly connected with second connecting rod 66,66 left end of second connecting rod and The articulated connection of the right side of two installing plate 4.
Worm screw 7, the 3rd strut 8, second bearing seat 9, the 4th shaft 10, worm gear 11, third hand tap gear 12, are further included Three bearings 13, the 5th shaft 14, the 4th bevel gear 15, the first belt pulley 16, fourth bearing 17, the 6th shaft 18, the second blade 19th, the second belt pulley 20, flat belt 21, the 3rd installing plate 22 and the 4th strut 23, the lower section of the first installing plate 1 are equipped with the 3rd installation Plate 22,22 top left side of the 3rd installing plate are connected with the 4th strut 23,23 top of the 4th strut and 1 bottom left of the first installing plate Connection, the middle part of the 3rd shaft 63 are equipped with worm screw 7, and 1 top right side of the first installing plate is connected with the 3rd strut 8, and the 3rd strut 8 is the The right side of two strut 61,8 top of the 3rd strut are equipped with second bearing seat 9, and second bearing seat 9 is interior to be equipped with the 4th shaft 10, the 4th turn 10 left end of axis is connected with worm gear 11, and worm gear 11 is engaged with worm screw 7, and 10 right end of the 4th shaft is connected with third hand tap gear 12, and the 3rd 22 bottom right of installing plate is symmetrical to be respectively equipped with fourth bearing 17 and 3rd bearing 13, and the 5th turn is equipped with 3rd bearing 13 Axis 14,14 top of the 5th shaft are connected with the 4th bevel gear 15, and the 4th bevel gear 15 engages with third hand tap gear 12, the 5th shaft 14 lower parts are equipped with the first belt pulley 16, are equipped with the 6th shaft 18 in fourth bearing 17,18 top of the 6th shaft is connected with the second leaf Piece 19,18 top of the 6th shaft are equipped with the second belt pulley 20, flat belt are wound between the second belt pulley 20 and the first belt pulley 16 21。
Pinion gear 24, L-shaped strut 25, water frame 26,5th bearing 27, the 7th shaft 28, sealing ring 29, bull stick are further included 30 and gear wheel 31,18 lower part of the 6th shaft be equipped with pinion gear 24,22 top left side of the 3rd installing plate is equipped with L-shaped strut 25, L-shaped 25 right end of strut is connected with water frame 26, and 26 bottom centre of Shui Kuang is equipped with sealing ring 29, the 3rd installing plate 22 of the underface of water frame 26 Top is equipped with 5th bearing 27, and the 7th shaft 28 is equipped with 5th bearing 27, and the 7th shaft 28 passes through the sealing of 26 bottom of water frame Circle 29,28 top of the 7th shaft is symmetrical to be equipped with bull stick 30, and 28 lower part of the 7th shaft is equipped with gear wheel 31, gear wheel 31 with it is small Gear 24 engages.
Isolation frame 32 is further included, the top of left and right sides first bearing seat 55 is equipped with isolation frame 32.
Web plate 33 has been further included, web plate 33 is connected between 26 or so two wall inside upper part of water frame.
Operation principle:When needing to keep the air Rapid Circulation in workshop, control air circulation device 5 operates, and passes through Air circulation device 5 accelerates the air Rapid Circulation in workshop, and then control moves left and right device 6 and operates, by moving left and right Device 6 adjusts the horizontal level of air circulation device 5, easy to keep the air of varying level position in workshop effectively to circulate, carries The actionradius of high equipment, when workshop stops producing, can choose whether to need to control air circulation dress according to actual conditions Put 5 and stop operating with moving left and right device 6.
Because air circulation device 5 include the first motor 51, first rotating shaft 52, first bevel gear 53, the first strut 54, First bearing seat 55, the second shaft 56,57 and first blade 58 of second bevel gear, 4 top center of the second installing plate are equipped with first Motor 51,51 output shaft of the first motor are connected with first rotating shaft 52, and 52 top of first rotating shaft is connected with first bevel gear 53, and second The top of installing plate 4 left and right is symmetrically connected with the first strut 54, and 54 top of the first strut of the left and right sides is equipped with first bearing seat 55, The second shaft 56 is equipped with left and right sides first bearing seat 55,56 the inner of the second shaft of the left and right sides is respectively connected with the second cone tooth Wheel 57, left and right sides second bevel gear 57 is engaged with first bevel gear 53, and 56 outer end of the second shaft of the left and right sides is respectively connected with First blade 58, so when needing to keep the air Rapid Circulation in workshop, the first motor 51 of control rotates, the first motor 51 Output shaft drives first rotating shaft 52 to rotate, and then drives first bevel gear 53 to rotate, so as to drive left and right sides second bevel gear 57 rotate so that the second shaft of the left and right sides 56 rotates, and the second shaft of the left and right sides 56 drives the first blade of the left and right sides respectively 58 rotate, and by 58 high-speed rotation of the first blade of the left and right sides, accelerate cross-ventilation circulation rate, easy to the air in workshop with Outside air fast exchange, comfortable safe working environment has been built for worker, is operated when needing stopping air circulation device 5 When, the first motor 51 of control stops operating.
Connect because moving left and right device 6 and including the second strut 61, the second motor 62, the 3rd shaft 63, turntable 64, first Bar 65 and second connecting rod 66,1 top right side of the first installing plate are connected with the second strut 61, and the is equipped with front side of 61 top of the second strut Two motors 62,62 output shaft of the second motor are connected with the 3rd shaft 63, and 63 front end of the 3rd shaft is connected with turntable 64, before turntable 64 Portion center is hingedly connected with first connecting rod 65, and 65 top of first connecting rod is hingedly connected with second connecting rod 66,66 left end of second connecting rod It is articulated and connected with the right side of the second installing plate 4, so when air circulation device 5 operates, if needing to adjust according to actual conditions During the horizontal level of air circulation device 5, the second motor 62 of control rotates, and 62 output shaft of the second motor drives 63 turns of the 3rd shaft Dynamic, the 3rd shaft 63 drives turntable 64 to rotate, and then drives first connecting rod 65 to rotate, and passes through first connecting rod 65 and second connecting rod 66 Hinged cooperation, the circular motion of turntable 64 is converted into the reciprocal side-to-side movement of the second installing plate 4, so as to drive air circulation 5 bilateral reciprocation of device, when air circulation device 5 stops operating, the second motor 62 of control stops operating, and moves left and right dress Put 6 also to stop operating therewith, the horizontal level of air circulation device 5 is adjusted by moving left and right device 6, increase equipment and adjust factory The scope of room inner air convection circulation, improves the utilization rate of equipment.
Because worm screw 7, the 3rd strut 8, second bearing seat 9, the 4th shaft 10, worm gear 11, third hand tap gear are further included 12nd, 3rd bearing 13, the 5th shaft 14, the 4th bevel gear 15, the first belt pulley 16, fourth bearing 17, the 6th shaft 18, second Blade 19, the second belt pulley 20, flat belt 21, the 3rd installing plate 22 and the 4th strut 23, the lower section of the first installing plate 1 are equipped with the 3rd Installing plate 22,22 top left side of the 3rd installing plate are connected with the 4th strut 23,23 top of the 4th strut and 1 bottom of the first installing plate Left side connects, and the middle part of the 3rd shaft 63 is equipped with worm screw 7, and 1 top right side of the first installing plate is connected with the 3rd strut 8, the 3rd strut 8 On the right side of the second strut 61,8 top of the 3rd strut is equipped with second bearing seat 9, and the 4th shaft 10 is equipped with second bearing seat 9, the Four shafts, 10 left end is connected with worm gear 11, and worm gear 11 is engaged with worm screw 7, and 10 right end of the 4th shaft is connected with third hand tap gear 12, 3rd installing plate, 22 bottom right is symmetrical to be respectively equipped with fourth bearing 17 and 3rd bearing 13, and the is equipped with 3rd bearing 13 Five shafts 14,14 top of the 5th shaft are connected with the 4th bevel gear 15, and the 4th bevel gear 15 engages with third hand tap gear 12, and the 5th 14 lower part of shaft is equipped with the first belt pulley 16, is equipped with the 6th shaft 18 in fourth bearing 17, and 18 top of the 6th shaft is connected with the Two blades 19,18 top of the 6th shaft are equipped with the second belt pulley 20, are wound between the second belt pulley 20 and the first belt pulley 16 flat Belt 21, so when the 3rd shaft 63 rotates, the 3rd shaft 63 drives worm screw 7 to rotate, and worm screw 7 drives worm gear 11 to rotate, into And drive the 4th shaft 10 to rotate, so as to drive third hand tap gear 12 to rotate, third hand tap gear 12 drives 15 turns of the 4th bevel gear It is dynamic so that the 5th shaft 14 rotates, and the 5th shaft 14 drives the first belt pulley 16 to rotate, and the first belt pulley 16 passes through flat belt 21 The second belt pulley 20 is driven to rotate, the second belt pulley 20 drives the 6th shaft 18 to rotate so that the second blade 19 rotates, by the Two blades 19 rotate, can also be effective by the air of lower height in workshop easy to produce upward cross-ventilation circulation Ground drains into the external world, and compensate for equipment can not adjust the deficiency of height, improve the practicality of equipment, when the 3rd shaft 63 stops turning When dynamic, the second blade 19 also stops operating therewith.
Because further included pinion gear 24, L-shaped strut 25, water frame 26,5th bearing 27, the 7th shaft 28, sealing ring 29, Bull stick 30 and gear wheel 31,18 lower part of the 6th shaft are equipped with pinion gear 24, and 22 top left side of the 3rd installing plate is equipped with L-shaped strut 25,25 right end of L-shaped strut is connected with water frame 26, and 26 bottom centre of Shui Kuang is equipped with sealing ring 29, the 3rd peace of the underface of water frame 26 The top of loading board 22 is equipped with 5th bearing 27, is equipped with the 7th shaft 28 in 5th bearing 27, the 7th shaft 28 passes through 26 bottom of water frame Sealing ring 29,28 top of the 7th shaft is symmetrical to be equipped with bull stick 30, and 28 lower part of the 7th shaft is equipped with gear wheel 31, gear wheel 31 engage with pinion gear 24, so when the 6th shaft 18 rotates, the 6th shaft 18 drives pinion gear 24 to rotate, and then drive big Gear 31 rotates, so as to drive the 7th shaft 28 to rotate so that bull stick 30 rotates, and is rotated by bull stick 30, improves in water frame 26 The evaporation rate of water, can effectively increase the air humidity in workshop, while the process of water evaporation needs to absorb heat, to a certain degree Ground reduces the temperature in workshop, and when water is insufficient in water frame 26, worker rationally adds water according to actual conditions, passes through small tooth The drive gear wheel 31 of wheel 24 rotates, and significantly reduces the transmission speed of the 6th shaft 18, avoids 28 rotating speed of the 7th shaft excessive, Prevent the water in water frame 26 from sputtering away, influence the normal operation of equipment, when the 6th shaft 18 stops operating, bull stick 30 also with Stop operating.
Because having further included isolation frame 32, the top of left and right sides first bearing seat 55 is equipped with isolation frame 32, thus by every From frame 32, it is ensured that worker can not touch the second bevel gear 57 of high-speed rotation, ensure the production safety of worker.
Because having further included web plate 33, web plate 33 is connected between 26 or so two wall inside upper part of water frame, so passing through net Plate 33, can prevent the water in water frame 26 to be subject to external force to act on and sputter largely to equipment surface, reach guarantee equipment stabilization The effect of running.
The control mode of the present invention is automatically controlled by controller, the skill that the control circuit of controller passes through this area Art personnel simple programming can be achieved, and belong to the common knowledge of this area, and the present invention is mainly used to protect mechanical device, institute Control mode is not explained with the present invention to connect with circuit.
Embodiment described above only expresses the preferred embodiment of the present invention, its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (7)

1. air fast cycle apparatus in a kind of metallurgy steel-making workshop, it is characterised in that include the first installing plate(1), it is sliding Rail(2), sliding block(3), the second installing plate(4), air circulation device(5)With move left and right device(6), the first installing plate(1)Top Slide is inlaid with the left of portion(2), slide(2)The symmetrical slidingtype in top is connected with sliding block(3), left and right sides sliding block(3)Top End is equipped with the second installing plate(4), the second installing plate(4)Top is equipped with air circulation device(5), the first installing plate(1)Top right Side is equipped with and moves left and right device(6), move left and right device(6)Left part and the second installing plate(4)Right side connects.
2. air fast cycle apparatus in a kind of metallurgical steel-making workshop according to claim 1, it is characterised in that air Circulator(5)Include the first motor(51), first rotating shaft(52), first bevel gear(53), the first strut(54), first axle Bearing(55), the second shaft(56), second bevel gear(57)With the first blade(58), the second installing plate(4)Top center is equipped with First motor(51), the first motor(51)Output shaft is connected with first rotating shaft(52), first rotating shaft(52)Top is connected with first Bevel gear(53), the second installing plate(4)Top or so is symmetrically connected with the first strut(54), the first strut of the left and right sides(54)Top End is equipped with first bearing seat(55), left and right sides first bearing seat(55)Inside it is equipped with the second shaft(56), the left and right sides Two shafts(56)The inner is respectively connected with second bevel gear(57), left and right sides second bevel gear(57)And first bevel gear(53) Engagement, the second shaft of the left and right sides(56)Outer end is respectively connected with the first blade(58).
3. air fast cycle apparatus in a kind of metallurgical steel-making workshop according to claim 2, it is characterised in that left and right Mobile device(6)Include the second strut(61), the second motor(62), the 3rd shaft(63), turntable(64), first connecting rod(65) And second connecting rod(66), the first installing plate(1)Top right side is connected with the second strut(61), the second strut(61)Set on front side of top There is the second motor(62), the second motor(62)Output shaft is connected with the 3rd shaft(63), the 3rd shaft(63)Front end, which is connected with, to be turned Disk(64), turntable(64)Front central is hingedly connected with first connecting rod(65), first connecting rod(65)Top is hingedly connected with second Connecting rod(66), second connecting rod(66)Left end and the second installing plate(4)Right side is articulated and connected.
4. air fast cycle apparatus in a kind of metallurgical steel-making workshop according to claim 3, it is characterised in that also wrap Worm screw is included(7), the 3rd strut(8), second bearing seat(9), the 4th shaft(10), worm gear(11), third hand tap gear(12), Three bearings(13), the 5th shaft(14), the 4th bevel gear(15), the first belt pulley(16), fourth bearing(17), the 6th shaft (18), the second blade(19), the second belt pulley(20), flat belt(21), the 3rd installing plate(22)With the 4th strut(23), first Installing plate(1)Lower section is equipped with the 3rd installing plate(22), the 3rd installing plate(22)Top left side is connected with the 4th strut(23), the 4th Strut(23)Top and the first installing plate(1)Bottom left connects, the 3rd shaft(63)Middle part is equipped with worm screw(7), the first installation Plate(1)Top right side is connected with the 3rd strut(8), the 3rd strut(8)In the second strut(61)Right side, the 3rd strut(8)Top Equipped with second bearing seat(9), second bearing seat(9)Inside it is equipped with the 4th shaft(10), the 4th shaft(10)Left end is connected with worm gear (11), worm gear(11)With worm screw(7)Engagement, the 4th shaft(10)Right end is connected with third hand tap gear(12), the 3rd installing plate (22)Bottom right is symmetrical to be respectively equipped with fourth bearing(17)And 3rd bearing(13), 3rd bearing(13)Inside it is equipped with the 5th Shaft(14), the 5th shaft(14)Top is connected with the 4th bevel gear(15), the 4th bevel gear(15)With third hand tap gear(12) Engagement, the 5th shaft(14)Lower part is equipped with the first belt pulley(16), fourth bearing(17)Inside it is equipped with the 6th shaft(18), the 6th turn Axis(18)Top is connected with the second blade(19), the 6th shaft(18)Top is equipped with the second belt pulley(20), the second belt pulley (20)With the first belt pulley(16)Between be wound with flat belt(21).
5. air fast cycle apparatus in a kind of metallurgical steel-making workshop according to claim 4, it is characterised in that also wrap Pinion gear is included(24), L-shaped strut(25), water frame(26), 5th bearing(27), the 7th shaft(28), sealing ring(29), bull stick (30)And gear wheel(31), the 6th shaft(18)Lower part is equipped with pinion gear(24), the 3rd installing plate(22)Top left side is equipped with L-shaped Strut(25), L-shaped strut(25)Right end is connected with water frame(26), water frame(26)Bottom centre is equipped with sealing ring(29), water frame (26)3rd installing plate of underface(22)Top is equipped with 5th bearing(27), 5th bearing(27)Inside it is equipped with the 7th shaft (28), the 7th shaft(28)Through water frame(26)The sealing ring of bottom(29), the 7th shaft(28)Symmetrical be equipped with top turns Bar(30), the 7th shaft(28)Lower part is equipped with gear wheel(31), gear wheel(31)With pinion gear(24)Engagement.
6. air fast cycle apparatus in a kind of metallurgical steel-making workshop according to claim 5, it is characterised in that also wrap Isolation frame is included(32), left and right sides first bearing seat(55)Top is equipped with isolation frame(32).
7. air fast cycle apparatus in a kind of metallurgical steel-making workshop according to claim 6, it is characterised in that also wrap Web plate is included(33), water frame(26)Web plate is connected between two wall inside upper part of left and right(33).
CN201711055699.1A 2017-11-01 2017-11-01 Quick circulation equipment of air in factory building for metallurgical steelmaking Expired - Fee Related CN107957107B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711055699.1A CN107957107B (en) 2017-11-01 2017-11-01 Quick circulation equipment of air in factory building for metallurgical steelmaking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711055699.1A CN107957107B (en) 2017-11-01 2017-11-01 Quick circulation equipment of air in factory building for metallurgical steelmaking

Publications (2)

Publication Number Publication Date
CN107957107A true CN107957107A (en) 2018-04-24
CN107957107B CN107957107B (en) 2020-08-07

Family

ID=61964399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711055699.1A Expired - Fee Related CN107957107B (en) 2017-11-01 2017-11-01 Quick circulation equipment of air in factory building for metallurgical steelmaking

Country Status (1)

Country Link
CN (1) CN107957107B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109340985A (en) * 2018-08-16 2019-02-15 叶婉芳 A kind of ventilation energy-saving equipment of plant floor
CN109404317A (en) * 2018-11-26 2019-03-01 许建林 A kind of facility floor mopping rapid draing blower

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101030464B1 (en) * 2010-12-30 2011-04-19 효성기연산업 주식회사 Fan motor base
CN104456802A (en) * 2014-12-22 2015-03-25 刘喜祥 Stirring type humidifier
CN105465021A (en) * 2014-09-10 2016-04-06 青岛世纪云帆实业有限公司 Electric fan blowing air from three sides
CN205655427U (en) * 2016-04-05 2016-10-19 嵊州市诺米克进出口有限公司 Building site uses workman's heat sink
CN205919453U (en) * 2016-07-20 2017-02-01 江西普特物流有限公司 Hazardous chemical gases bottle warehouse ventilation unit
CN206196237U (en) * 2016-11-29 2017-05-24 广州科伺智能科技有限公司 Intelligence servo driver safety heat abstractor

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101030464B1 (en) * 2010-12-30 2011-04-19 효성기연산업 주식회사 Fan motor base
CN105465021A (en) * 2014-09-10 2016-04-06 青岛世纪云帆实业有限公司 Electric fan blowing air from three sides
CN104456802A (en) * 2014-12-22 2015-03-25 刘喜祥 Stirring type humidifier
CN205655427U (en) * 2016-04-05 2016-10-19 嵊州市诺米克进出口有限公司 Building site uses workman's heat sink
CN205919453U (en) * 2016-07-20 2017-02-01 江西普特物流有限公司 Hazardous chemical gases bottle warehouse ventilation unit
CN206196237U (en) * 2016-11-29 2017-05-24 广州科伺智能科技有限公司 Intelligence servo driver safety heat abstractor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109340985A (en) * 2018-08-16 2019-02-15 叶婉芳 A kind of ventilation energy-saving equipment of plant floor
CN109404317A (en) * 2018-11-26 2019-03-01 许建林 A kind of facility floor mopping rapid draing blower
CN109404317B (en) * 2018-11-26 2020-11-17 九安信息科技(徐州)有限责任公司 Quick drying fan for painting of factory floor

Also Published As

Publication number Publication date
CN107957107B (en) 2020-08-07

Similar Documents

Publication Publication Date Title
CN206084705U (en) Production is with quick burnishing device of five gold plate materials
CN106811947B (en) Industrial ironing machine
CN107957107A (en) Air fast cycle apparatus in a kind of metallurgy steel-making workshop
CN207478479U (en) One kind waves blender
CN104988336B (en) A kind of operating method of the outer degasification deslagging device of aluminium liquid stove
CN207289676U (en) A kind of timber manufacture surface grinding device
CN206375949U (en) A kind of automobile steering device production technology gear heat treatment device
CN106938413A (en) A kind of drum high-efficiency sanding apparatus of the handware production with shock-absorbing function
CN109807757A (en) A kind of energy-saving steel pipe sand-blasting machine
CN207003024U (en) Artificial leather degreasing plant is used in a kind of basketball manufacture
CN106985047A (en) Efficient sanding apparatus is used in a kind of handware production
CN107225460A (en) A kind of wind power generation blade edge sanding apparatus
CN208866971U (en) A kind of high-accuracy graphite jig burnishing device
CN106403620A (en) Industrial metallurgy cooling device
CN212357301U (en) Spring quenching device
CN205684766U (en) A kind of last furnace shell numerical control tapping machine of adjustable opening angle's degree
CN106944886A (en) A kind of drum high-efficiency sanding apparatus of the handware production with shock-absorbing function
CN207452854U (en) Water conservancy and hydropower gate lifting device
CN105780440B (en) Thickness gravity autocontrol Scissoring device
CN112665353A (en) Draining device for cleaned bolts
CN207845711U (en) A kind of automobile steering device production gear heat treatment device
CN209636406U (en) A kind of device preventing the abrasion of sectional warper lease reed
CN207605781U (en) A kind of metallurgical Large Fe ore crushing equipment
CN209510202U (en) A kind of rolling screen door lifting device
CN206571322U (en) Water injection machine is closed the door mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Gao Wanliang

Inventor after: Wang Lei

Inventor after: Xie Yongshun

Inventor after: Zhu Penghua

Inventor after: Other inventor requests not to publish the name

Inventor before: Wang Lei

Inventor before: Xie Yongshun

Inventor before: Zhu Penghua

Inventor before: Other inventor requests not to publish the name

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20200714

Address after: 014010 Fengying community 33-28, Kundulun District, Baotou City, Inner Mongolia Autonomous Region

Applicant after: Inner Mongolia Luyuan linkage Machinery Manufacturing Co., Ltd

Address before: 341000 Ganzhou Institute of Nonferrous Metallurgy, 62 Yingbin Avenue, Ganzhou Economic and Technological Development Zone, Jiangxi Province

Applicant before: Zeng Hejin

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200807

Termination date: 20201101

CF01 Termination of patent right due to non-payment of annual fee