CN107956467A - A kind of high seam pre-draining borehole parameter optimization and the method for extracting result assessment - Google Patents

A kind of high seam pre-draining borehole parameter optimization and the method for extracting result assessment Download PDF

Info

Publication number
CN107956467A
CN107956467A CN201711154679.XA CN201711154679A CN107956467A CN 107956467 A CN107956467 A CN 107956467A CN 201711154679 A CN201711154679 A CN 201711154679A CN 107956467 A CN107956467 A CN 107956467A
Authority
CN
China
Prior art keywords
concordant
draining
draining borehole
borehole
stope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711154679.XA
Other languages
Chinese (zh)
Inventor
周爱桃
王凯
陶博
徐超
臧杰
郭海军
华明国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201711154679.XA priority Critical patent/CN107956467A/en
Publication of CN107956467A publication Critical patent/CN107956467A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/003Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by analysing drilling variables or conditions

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a kind of method that high seam pre-draining borehole parameter optimization and extracting result are assessed, this method is remained unchanged mainly for concordant pre-draining borehole negative pressure in front of stope face to face, cloth hole orientation is unreasonable, cloth hole number is unsatisfactory for the problems such as high seam extraction needs, it is proposed the differentiation control for including concordant pre-draining borehole extraction negative pressure in front of stope, concordant pre-draining borehole cloth hole orientation angles optimize, two rows of concordant pre-draining boreholes are arranged along coal seam short transverse, the high seam pre-draining borehole parameter optimizations such as concordant pre-draining borehole gas pumping effect dynamic evaluation and the method for extracting result assessment, this method can improve high seam pre-draining borehole extracting result, ensure the safety in production of stope.

Description

A kind of high seam pre-draining borehole parameter optimization and the method for extracting result assessment
Technical field
The invention belongs to the technical fields such as mine gas prevention and control, and in particular to high seam pre-draining borehole parameter optimization and extraction The method of recruitment evaluation.
Background technology
Concordant Gas pre-drainage have single hole pore-forming expense is low, drilling using advantages such as time long, drilling utilization ratio height, be A kind of important means that mine gas is administered at present, but on the whole, the concordant Gas pre-drainage extraction amount of the most of mines in China Smaller, extraction is inefficient, and main cause has two aspects:First, natural cause, the high methane and protrusion in China more than 95% The coal seam that mine is exploited belongs to low air permeability coal seam, and gas drainage under suction (particularly pre- to take out) difficulty is very big;Second, technology and pipe Reason factor, is mainly shown as that the extraction time is short, borehole engineering amount deficiency, sealing quality difference etc..In addition, mine concordant at present Gas pre-drainage there is a problem in that:(1) all aperture negative pressure of concordant pre-draining borehole remain unchanged, and reduce concordant pre-draining borehole Extraction efficiency;On the one hand the extraction efficiency of single concordant pre-draining borehole is reduced;Since there are release in front of stope Area, anallobar and voltage stabilizing area;The desorption of distressed zone coal gas is easier to, and relatively low extraction negative pressure can meet extraction requirement, and When extraction pressure is higher, since sealing of hole is relatively difficult, extraction air leakage is big, causes extracting result bad;Anallobar coal body solution Gas more difficulty is inhaled, it is necessary to which the extraction negative pressure of bigger can just be met the requirements;The drilling in voltage stabilizing area keeps aperture under normal conditions Negative pressure is constant, but can occur collapse hole, practice of construction perforate azimuth angle error, drill bit during the drilling construction of part because coal body is soft Developed and turned on due to coalmass crevasse behind unilateral centrifugal action off-design track and construction, many factors such as Geological Structure Effect Cause drilling that collapse hole occurs, alters phenomena such as hole, it is also desirable to which adjustment extraction negative pressure in time, ensures preferable single hole gas pumping effect Fruit.Still further aspect, constrains the extracting result of whole stope, when stope gas pumping rate is not reaching to 《Coal mine gas drainage temporary provisions up to standard》It is required that when, in requisition for the negative pressure of timely adjustment stope collecting pipe, improve back Mining face gas pumping efficiency.(2) most pre- vertical coal wall directions of concordant drilling of taking out are arranged, have impact on pre- pumping effect;By There is anisotropic character in coal body permeability, when concordant drill arrangement azimuth it is different when, gas pumping effect have compared with Big difference;In addition, when concordant pre-draining borehole towards working face open-off cut eye direction with having certain angle, single pre- take out can be extended and bored The extraction time in hole.(3) most pre- pumping concordant drillings only arrange a row hole drilling along vertical coal seam short transverse, influence coal-bed gas It is pre- to take out effect, especially for high seam, since pre-draining borehole extraction coverage is limited, particularly along vertical coal seam height side Small to permeability, single pre-draining borehole often can not effective extraction superjacent gas.In view of the above-mentioned problems, targetedly Optimize concordant pre-draining borehole parameter, to increase concordant drilling single hole gas pumping efficiency, improve the watt pre- of whole stope Effect is taken out, can be to prevent mine gas disaster from providing relatively reliable safety guarantee, to promoting mine safety, efficiently production has Significance.
The content of the invention
In view of the problems of the existing technology, the present invention provides a kind of high seam pre-draining borehole parameter optimization and extracting result The method of assessment, this method is remained unchanged mainly for concordant pre-draining borehole negative pressure in front of stope face to face, cloth hole orientation Unreasonable, cloth hole number is unsatisfactory for the problems such as high seam extraction needs, and situation is assessed with reference to extracting result, proposes that concordant takes out brill in advance Hole parameter optimization scheme, so as to improve high seam pre-draining borehole extracting result, ensures the safety in production of stope.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:A kind of high seam concordant pre-draining borehole parameter Optimization and the method for extracting result assessment, including the differentiation of concordant pre-draining borehole extraction negative pressure controls in front of stope, Concordant pre-draining borehole cloth hole orientation angles optimize, and two rows of concordant pre-draining boreholes, concordant pre-draining borehole are arranged along coal seam short transverse Gas pumping effect dynamic evaluation.
The differentiation control of concordant pre-draining borehole extraction negative pressure in front of the stope, in stope return air Valve is respectively provided with crossheading and haulage gate confluence manifold and each extraction borehole branch pipe, changes valve openings size, realizes suitable The dynamic adjustment of layer pre-draining borehole extraction negative pressure.
The concordant pre-draining borehole cloth hole orientation angles optimization, the main factor for considering two aspects, first as far as possible Ensure that concordant pre-draining borehole cloth hole direction is vertical with coal seam biggest principal stress direction, secondly consider concordant pre-draining borehole and towards back production There is certain angle in working face open-off cut eye direction, and angle is optimal at 15 °~25 °.
Described arranges two rows of concordant pre-draining boreholes along coal seam short transverse, and first row concordant pre-draining borehole is arranged in 1/3 Coal seam is highly located, and second row concordant pre-draining borehole is arranged in 2/3 coal seam and highly locates;First row concordant pre-draining borehole is used under extraction Portion's coal gas, second row concordant pre-draining borehole are used for extraction top coal gas.
The concordant pre-draining borehole gas pumping effect dynamic evaluation, it is more by installing gas drainage under suction on extraction pipeline Parameter determinator, monitors gas extraction flow and extraction concentration, a period of time internal drilling gas pumping scale is counted, with reference to coal seam Original gas bearing capacity, predicts the coal seam residual gas content after extraction;With reference to the wind resource assessment amount of stope, back production is predicted The gas pumping rate of working face;According to the coal seam residual gas content after the concordant pre-draining borehole extraction of prediction, watt of working face This extraction rate, evaluates concordant pre-draining borehole extracting result, proposes stope confluence manifold Valve controlling schemes.
The change valve openings size, reduces and is opened positioned at distressed zone concordant pre-draining borehole valve in front of stope Mouthful, valve openings of the increase positioned at the extraction borehole of anallobar in front of stope.
The change valve openings size, the concordant pre-draining borehole valve openings positioned at voltage stabilizing area in front of stope Size, is adjusted according to single concordant pre-draining borehole methane gas concentration, when single concordant pre-draining borehole methane gas concentration During significantly lower than periphery voltage stabilizing area concordant pre-draining borehole methane gas concentration, reduce the concordant pre-draining borehole valve openings.
The stope confluence manifold Valve controlling schemes, coal seam residual gas content or back production after extraction The gas pumping rate of working face is not up to《Coal mine gas drainage temporary provisions up to standard》It is required that when, increase stope collecting pipe Valve openings, or reduce adjacent stope collecting pipe valve openings, realize and improve stope collecting pipe extraction negative pressure. Beneficial effects of the present invention:
High seam pre-draining borehole parameter optimization provided by the invention and the method for extracting result assessment, including stope The differentiation control of front concordant pre-draining borehole extraction negative pressure, concordant pre-draining borehole cloth hole orientation angles optimization, along coal seam height The two rows of concordant pre-draining boreholes of direction arrangement, concordant pre-draining borehole gas pumping effect dynamic evaluation, comprehensive to optimize concordant pre- Draining borehole parameter, improves high seam pre-draining borehole extracting result, ensure that the safety in production of stope.
Brief description of the drawings
Fig. 1 is overall schematic of the present invention (top view)
Fig. 2 is pre-draining borehole arrangement schematic diagram (top view)
Fig. 3 is valve and multi parameter tester arrangement schematic diagram
Fig. 4 is pre-draining borehole arrangement schematic diagram 1 (front view)
Fig. 5 is pre-draining borehole arrangement schematic diagram 2 (front view)
Fig. 6 is valve and multi parameter tester arrangement enlarged diagram
In figure, 1-stope, 2-stope air return way, 3-face haulage crossheading, 4-working face Front anallobar, 5-working face front depressor area, 6-working face front voltage stabilizing area, 7-crossheading pre-draining borehole, 8-single hole valve Door, 9-confluence tube valve, 10-multi parameter tester, 11-collecting pipe, 12-concordant pre-draining borehole towards stope with cutting Eye angular separation.
Embodiment
As shown in figs. 1 to 6, a kind of high seam concordant pre-draining borehole parameter optimization provided by the invention and extracting result assessment Method, include 1 front concordant pre-draining borehole of stope, 7 extraction negative pressure differentiation control, 7 cloth hole of concordant pre-draining borehole Orientation angles optimize, and two rows of concordant pre-draining boreholes 7 (including the first row hole drilling 701-706, second row are arranged along coal seam short transverse Drill 713-718), the 7 gas pumping effect dynamic evaluation of concordant pre-draining borehole.The 1 front concordant of stope is taken out in advance The differentiation control for the 7 extraction negative pressure that drill, sets on stope air return way 2 and the confluence of haulage gate 3 manifold 11 and converges Flow tube valve 9 (including haulage gate 901 and air return way 902), sets single hole valve 8 on each extraction borehole branch pipe (801-812), changes confluence tube valve 9 (901,902) and single hole valve 8 (801-812) openings of sizes, realizes that concordant takes out brill in advance The dynamic adjustment of hole 7 (701-712) extraction negative pressure.7 cloth hole orientation angles of the concordant pre-draining borehole optimization, mainly considers two The factor of a aspect, ensures that concordant pre-draining borehole cloth hole direction is vertical with coal seam biggest principal stress direction as far as possible first, maximum Principal stress can be drawn according to live detecting earth stress;Secondly consider that concordant pre-draining borehole 7 has with cutting a direction towards stope 1 Certain angle 12, angle are optimal at 15 °~25 °.Described arranges two rows of concordant pre-draining boreholes 7 along coal seam short transverse, First row concordant pre-draining borehole 701-706 is arranged in 1/3 coal seam and highly locates, and second row concordant pre-draining borehole 713-718 is arranged in Highly locate in 2/3 coal seam;First row concordant pre-draining borehole 701-706 is used for extraction lower part coal gas, and second row concordant takes out brill in advance Hole 713-718 is used for extraction top coal gas.The 7 gas pumping effect dynamic evaluation of concordant pre-draining borehole, by Gas drainage under suction multi-parameter 10 (1001-1012) is installed on extraction pipeline, monitors gas extraction flow and extraction concentration, system A period of time internal drilling gas pumping scale is counted, with reference to the original gas bearing capacity in coal seam, predicts that the coal seam residual gas after extraction contains Amount;With reference to the wind resource assessment amount of stope 1, the gas pumping rate of prediction stope 1;Taken out in advance according to the concordant of prediction Drill the coal seam residual gas content after 7 extractions, the gas pumping rate of working face, evaluates concordant pre-draining borehole extracting result, carries Go out stope confluence tube valve 9 (including haulage gate 901 and air return way 902) control program.Due to stope There are depressor area, anallobar and voltage stabilizing area, depressor area coal body in front to be subject to Mining failure serious, and crack is more developed, relatively low Extraction negative pressure is good with regard to that can reach relatively good extraction, and anallobar is just the opposite;Therefore, 8 openings of sizes of change valve, subtracts It is small to be open positioned at 5 concordant pre-draining borehole valve 801,802,807,808 of distressed zone in front of stope, so as to reduce back production work 5 concordant pre-draining borehole of square distressed zone in face of making;Increase in front of the stope valve 803 of the extraction borehole of anallobar 4, 804th, 809,810 opening, so as to increase the extraction borehole negative pressure positioned at anallobar 4 in front of stope.The change valve 8 openings of sizes of door, the opening of concordant pre-draining borehole valve 805,806,811,812 positioned at voltage stabilizing area 6 in front of stope are big It is small, it is adjusted according to single concordant pre-draining borehole methane gas concentration, when single concordant pre-draining borehole (such as 705) device in Gas When bulk concentration is significantly lower than periphery voltage stabilizing area concordant pre-draining borehole (such as 706) methane gas concentration, reduces the concordant and take out brill in advance 707 valve 805 of hole is open.Confluence 9 control program of tube valve of stope 1, coal seam residual gas after extraction Content or the gas pumping rate of stope 1 are not up to《Coal mine gas drainage temporary provisions up to standard》It is required that when, increase back production The confluence tube valve 9 of working face 1 (including haulage gate 901 and air return way 902) opening, or reduce adjacent stope confluence Pipe valve door opening, realizes and improves 1 collecting pipe of stope, 11 extraction negative pressure.

Claims (8)

1. a kind of high seam concordant pre-draining borehole parameter optimization and the method for extracting result assessment, including stope front are suitable The differentiation control of layer pre-draining borehole extraction negative pressure, concordant pre-draining borehole cloth hole orientation angles optimization, along coal seam short transverse cloth Put two rows of concordant pre-draining boreholes, concordant pre-draining borehole gas pumping effect dynamic evaluation.
2. a kind of high seam concordant pre-draining borehole parameter optimization according to claim 1 and the method for extracting result assessment, It is characterized in that:The differentiation control of concordant pre-draining borehole extraction negative pressure in front of the stope, in stope Valve is respectively provided with air return way and haulage gate confluence manifold and each extraction borehole branch pipe, changes valve openings size, it is real The dynamic adjustment of existing concordant pre-draining borehole extraction negative pressure.
3. a kind of high seam concordant pre-draining borehole parameter optimization according to claim 1 and the method for extracting result assessment, It is characterized in that:The concordant pre-draining borehole cloth hole orientation angles optimization, the main factor for considering two aspects, to the greatest extent may be used first It can guarantee that concordant pre-draining borehole cloth hole direction is vertical with coal seam biggest principal stress direction, secondly consider that concordant pre-draining borehole is returned with court Mining face, which cuts a direction, certain angle, and angle is optimal at 15 °~25 °.
4. a kind of high seam concordant pre-draining borehole parameter optimization according to claim 1 and the method for extracting result assessment, It is characterized in that:Described arranges two rows of concordant pre-draining boreholes along coal seam short transverse, and first row concordant pre-draining borehole is arranged in 1/3 coal seam is highly located, and second row concordant pre-draining borehole is arranged in 2/3 coal seam and highly locates;First row concordant pre-draining borehole is used to take out Lower part coal gas is adopted, second row concordant pre-draining borehole is used for extraction top coal gas.
5. a kind of high seam concordant pre-draining borehole parameter optimization according to claim 1 and the method for extracting result assessment, It is characterized in that:The concordant pre-draining borehole gas pumping effect dynamic evaluation, is taken out by installing gas on extraction pipeline Multi-parameter is put, monitors gas extraction flow and extraction concentration, counts a period of time internal drilling gas pumping scale, with reference to The original gas bearing capacity in coal seam, predicts the coal seam residual gas content after extraction;With reference to the wind resource assessment amount of stope, prediction The gas pumping rate of stope;According to the coal seam residual gas content after the concordant pre-draining borehole extraction of prediction, working face Gas pumping rate, evaluate concordant pre-draining borehole extracting result, propose stope confluence manifold Valve controlling schemes.
6. a kind of high seam concordant pre-draining borehole parameter optimization according to claim 2 and the method for extracting result assessment, It is characterized in that:The change valve openings size, reduces positioned at distressed zone concordant pre-draining borehole valve in front of stope Door opening, valve openings of the increase positioned at the extraction borehole of anallobar in front of stope.
7. a kind of high seam concordant pre-draining borehole parameter optimization according to claim 2 and the method for extracting result assessment, It is characterized in that:The change valve openings size, the concordant pre-draining borehole valve positioned at voltage stabilizing area in front of stope Openings of sizes, is adjusted according to single concordant pre-draining borehole methane gas concentration, when single concordant pre-draining borehole methane gas When concentration is significantly lower than periphery voltage stabilizing area concordant pre-draining borehole methane gas concentration, reduce the concordant pre-draining borehole valve openings.
8. a kind of high seam concordant pre-draining borehole parameter optimization according to claim 5 and the method for extracting result assessment, It is characterized in that:The stope collecting pipe Valve controlling scheme, coal seam residual gas content after extraction or is returned The gas pumping rate of mining face is not up to《Coal mine gas drainage temporary provisions up to standard》It is required that when, increase stope confluence Pipe valve door opening, or reduce adjacent stope collecting pipe valve openings, realize that improving stope collecting pipe extraction bears Pressure.
CN201711154679.XA 2017-11-20 2017-11-20 A kind of high seam pre-draining borehole parameter optimization and the method for extracting result assessment Pending CN107956467A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711154679.XA CN107956467A (en) 2017-11-20 2017-11-20 A kind of high seam pre-draining borehole parameter optimization and the method for extracting result assessment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711154679.XA CN107956467A (en) 2017-11-20 2017-11-20 A kind of high seam pre-draining borehole parameter optimization and the method for extracting result assessment

Publications (1)

Publication Number Publication Date
CN107956467A true CN107956467A (en) 2018-04-24

Family

ID=61963846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711154679.XA Pending CN107956467A (en) 2017-11-20 2017-11-20 A kind of high seam pre-draining borehole parameter optimization and the method for extracting result assessment

Country Status (1)

Country Link
CN (1) CN107956467A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685732A (en) * 2019-09-29 2020-01-14 华北科技学院 Coal seam drilling gas extraction method based on extraction pipeline valve control
CN112211666A (en) * 2020-09-30 2021-01-12 四川华蓥山龙滩煤电有限责任公司 Coal face blind area distinguishing method
CN112647906A (en) * 2020-12-18 2021-04-13 华能煤炭技术研究有限公司 Method for extracting gas from ground of multi-goaf without coal pillar
CN115110921A (en) * 2022-07-18 2022-09-27 中煤科工集团重庆研究院有限公司 Pressure-maintaining displacement extraction method for gas in permeability anisotropic coal seam

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103670496A (en) * 2013-12-12 2014-03-26 中国矿业大学 Gob-side entry retaining and sectional coal seam gas pre-extracting method for single low-permeability outburst coal seam
CN105003292A (en) * 2015-08-19 2015-10-28 太原理工大学 Intelligent control system for gas extraction of underground coal roadway and control method of intelligent control system
CN105239988A (en) * 2015-09-23 2016-01-13 辽宁工程技术大学 Bionic gas extraction drill hole
CN105822338A (en) * 2016-03-18 2016-08-03 河南工程学院 Coal-mine gas extraction control system and method
CN106545296A (en) * 2016-12-02 2017-03-29 淮北矿业股份有限公司 A kind of surface drilling grouting treatment method of deep mining coal seam base plate limestone water damage
CN206144597U (en) * 2016-10-12 2017-05-03 山西汾西矿业(集团)有限责任公司 System of putting is taken out in gas linkage
CN106761753A (en) * 2017-03-15 2017-05-31 河南理工大学 A kind of thick seam slicing system lower leaf face layout of actual mining roadway method
CN107916953A (en) * 2017-11-24 2018-04-17 陕西省煤层气开发利用有限公司 Gas drainage system, pumping method and construction technology based on roof horizontal drilling

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103670496A (en) * 2013-12-12 2014-03-26 中国矿业大学 Gob-side entry retaining and sectional coal seam gas pre-extracting method for single low-permeability outburst coal seam
CN105003292A (en) * 2015-08-19 2015-10-28 太原理工大学 Intelligent control system for gas extraction of underground coal roadway and control method of intelligent control system
CN105239988A (en) * 2015-09-23 2016-01-13 辽宁工程技术大学 Bionic gas extraction drill hole
CN105822338A (en) * 2016-03-18 2016-08-03 河南工程学院 Coal-mine gas extraction control system and method
CN206144597U (en) * 2016-10-12 2017-05-03 山西汾西矿业(集团)有限责任公司 System of putting is taken out in gas linkage
CN106545296A (en) * 2016-12-02 2017-03-29 淮北矿业股份有限公司 A kind of surface drilling grouting treatment method of deep mining coal seam base plate limestone water damage
CN106761753A (en) * 2017-03-15 2017-05-31 河南理工大学 A kind of thick seam slicing system lower leaf face layout of actual mining roadway method
CN107916953A (en) * 2017-11-24 2018-04-17 陕西省煤层气开发利用有限公司 Gas drainage system, pumping method and construction technology based on roof horizontal drilling

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685732A (en) * 2019-09-29 2020-01-14 华北科技学院 Coal seam drilling gas extraction method based on extraction pipeline valve control
CN112211666A (en) * 2020-09-30 2021-01-12 四川华蓥山龙滩煤电有限责任公司 Coal face blind area distinguishing method
CN112647906A (en) * 2020-12-18 2021-04-13 华能煤炭技术研究有限公司 Method for extracting gas from ground of multi-goaf without coal pillar
CN115110921A (en) * 2022-07-18 2022-09-27 中煤科工集团重庆研究院有限公司 Pressure-maintaining displacement extraction method for gas in permeability anisotropic coal seam
CN115110921B (en) * 2022-07-18 2023-07-14 中煤科工集团重庆研究院有限公司 Pressure-maintaining displacement extraction method for gas in permeable anisotropic coal seam

Similar Documents

Publication Publication Date Title
CN107956467A (en) A kind of high seam pre-draining borehole parameter optimization and the method for extracting result assessment
CN108506037B (en) Coal working face top plate high position directional drilling group's pressure relief gas pumping mining method
CN101915083B (en) Method for extracting coalbed gases from coal mines by upper and lower combination
CN107083988B (en) Mining induced fissure band gas drainage technical method based on km directional drilling
CN100462523C (en) Gob-side entry retaining Y-shaped ventilation goaf roof pressure relief gas extraction method
CN101446178B (en) Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith
CN101251028A (en) Method for taking out and picking high gassy seam group dislodging gob-side entry retaining Y type ventilated decompression firedamp
CN101915072B (en) Method for extracting coal bed gas in stable mining region by ground well drilling
CN108301866B (en) Mining of closed distance coal seam group adjacent layer gas pressure relief directional drilling stops pumping method
CN104763466B (en) Method for detecting active diffusion radius of covered rock separation grouting filling slurry
CN106761584A (en) Abandoned mine goaf coal bed gas ground discharge and mining method under a kind of aqueous conditions
CN105736039A (en) Gas extraction method based on high-pressure hydraulic cave construction on bedding hole of driving working face
CN106437632A (en) Coal ore long goaf zone Vans drainage method
CN108468566A (en) Really method is put in spy to empty crystal to mine based on underground pencil directional drilling always
CN108316964A (en) A kind of low air permeability coal seam pressure relief gas pumping mining method
CN102748065A (en) Method for extracting gas of blank zone of working face with large mining length
WO2020006870A1 (en) Gas extraction hole drilling and hole sealing method for building anti-seepage barrier based on grooving-backfilling method
CN102635389B (en) Method for gas drainage from high-position roadway coal seam containing shielded soft rock
CN109098711A (en) It is a kind of to block the heavily stressed method in ore body top using pressure relief groove
CN106014345B (en) A kind of lower part caving method exploits the pumping method for the compound old dead zone coal bed gas to be formed
CN102182426A (en) Method for pumping coal bed gas from long-distance pressure-relieved coal bed
CN104819008A (en) Efficient extraction method of coal seam gas
CN204327172U (en) Formula boring goaf extraction structure before and after high-rise position
CN102207004A (en) Method for carrying out gas control on coal faces
CN105971563A (en) Extraction method for coal bed gas in composite old mined-out area formed through lower tool post method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180424

WD01 Invention patent application deemed withdrawn after publication