CN107956199A - The method for dismantling airfield runway - Google Patents
The method for dismantling airfield runway Download PDFInfo
- Publication number
- CN107956199A CN107956199A CN201711216385.5A CN201711216385A CN107956199A CN 107956199 A CN107956199 A CN 107956199A CN 201711216385 A CN201711216385 A CN 201711216385A CN 107956199 A CN107956199 A CN 107956199A
- Authority
- CN
- China
- Prior art keywords
- hole
- group
- forcible entry
- airfield runway
- coating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/06—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
- E01C23/12—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for taking-up, tearing-up, or full-depth breaking-up paving, e.g. sett extractor
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Repair (AREA)
Abstract
The invention belongs to brittle solid to dismantle technical field, specifically provides a kind of method for dismantling airfield runway.Present invention seek to address that airfield runway forcible entry efficiency is low, of high cost and heavy-polluted problem.The method of the forcible entry airfield runway of the present invention includes providing pillar hydraulic pressure in hole and splits stone implement;The first group job hole is formed on the coating above matrix to be repaired;The basis of formation hole on the coating above matrix to be repaired;Pillar hydraulic pressure in hole is split into pillar hydraulic pressure in the corresponding first operation hole Zhong Bingshi holes of first group of expansion tube insertion of stone implement and splits stone implement action, to form at least one the first crackles on the coating above matrix to be repaired, coating to be repaired is divided into and multiple waits to dismantle or region to be removed by least one the first crackles.Therefore, the forcible entry efficiency of airfield runway and the operation ability of airfield runway are improved by the method for the forcible entry airfield runway of the present invention, while has saved forcible entry cost, reduced forcible entry pollution.
Description
Technical field
The invention belongs to brittle solid to dismantle technical field, specifically provides a kind of method for dismantling airfield runway.
Background technology
, according to the type of airport landing aircraft, there is not the thickness of concrete layer on airfield runway upper strata covered with concrete
Same requirement, as the thickness of the concrete layer of civil airport runway can be normally reached 30-40 centimetres.Also, since airport is run
Road still suffers from aircraft in impact force caused by landing in addition to the weight of aircraft to be born, therefore to the strong of concrete layer
Degree requires also very high.Airfield runway is after a certain period of use time, it is necessary to carry out it sectional repair or overall overhaul.With part
Exemplified by repairing, before sectional repair is carried out, it must crush and remove first and be covered in airfield runway section top to be repaired
Concrete layer, the method that is broken and removing concrete layer taken at present is mixed using instruments such as hydraulic impact hammer, milling machines
The exterior of solidifying soil layer applies destructive strength to achieve the purpose that to dismantle concrete layer.
As previously described, because the concrete layer of civil airport runway has the characteristics that thickness is big, intensity is high, so broken to it
Broken difficulty is very big.Since hydraulic impact hammer and milling machine are all to make concrete from the exterior mode for applying external force of concrete layer
Layer is broken, thus hydraulic impact hammer and milling machine need to overcome be concrete layer compression strength, forcible entry efficiency is low.In addition,
In view of the disposal ability of hydraulic impact hammer and milling machine, in large-area construction, in order to shorten the construction period, generally require and meanwhile into
Row tens even hundreds of hydraulic impact hammers and milling machine, even need to take special road traffic safeguard at this time.
Also, hydraulic impact hammer and milling machine also there are power is big, non-stop run when need to consume mass energy, persistently produce it is huge
Noise/dust pollution etc. the defects of, therefore it is big to dismantle of high cost and pollution.And for hydraulic impact hammer, mix
The top layer elaterite of solidifying soil layer is unfavorable for the crushing effect of hydraulic impact hammer.Therefore, current forcible entry scheme urgently needs
Improve.
Correspondingly, this area needs a kind of method for dismantling airfield runway to solve the above problems.
The content of the invention
In order to solve the above problem of the prior art, be solution airfield runway forcible entry efficiency it is low, it is of high cost and
Heavy-polluted problem, the present invention provides a kind of method for dismantling airfield runway, the airfield runway includes matrix and setting
Coating above described matrix, this method include:Pillar hydraulic pressure in hole is provided and splits stone implement, pillar hydraulic pressure splits stone in the hole
Device includes first group of expansion gear;The first hole group, the first hole group bag are formed on the coating above matrix to be repaired
Include and several matched the first operation holes of first group of expansion gear;Formed on the coating above matrix to be repaired
Allow at least one basic hole that coating spalling is peeled off;Keep at least one basic hole for dummy status and by described first
Group expansion gear is inserted into the corresponding first operation hole, and pillar hydraulic pressure in the hole is split stone implement action, so as in institute
State and at least one the first crackles are formed on the coating above matrix to be repaired.
In the optimal technical scheme of above-mentioned forcible entry method, " being formed on the coating above matrix to be repaired allows
The step of basic hole that coating spalling is peeled off ", further comprises:Determine that coating is swollen according to several described the first operation holes
Split the dbjective state of peeling;The number and orientation in the basic hole are determined according to the dbjective state.
In the optimal technical scheme of above-mentioned forcible entry method, several described the first operation holes are enclosed arranged on one or one group
The periphery in the basis hole;Or a side of coating of the basic pore size distribution above the matrix to be repaired described in one group
Edge.
In the optimal technical scheme of above-mentioned forcible entry method, " first group of expansion gear insertion is corresponding described
In first operation hole and pillar hydraulic pressure in the hole is set to split stone implement action, so as to the coating above the matrix to be repaired
It is upper to form at least one the first crackles " the step of before, the method further includes:Predict the swollen of at least one the first crackle
Split direction;According to the spalling direction, several limiting holes are formed on the coating above matrix to be repaired, to avoid institute
At least one the first crackles are stated to the region beyond the coating above matrix to be repaired to extend.
In the optimal technical scheme of above-mentioned forcible entry method, is formed on the coating above the matrix to be repaired
After one crackle, the coating above the matrix to be repaired is divided into and multiple waits to dismantle by least one first crackle
Region or region to be removed, pillar hydraulic pressure splits stone implement and further includes second group of expansion gear in the hole, and the method further includes:
Form the second hole group on the region to be dismantled, second hole group include with second group of expansion gear it is matched several
Second operation hole;Second group of expansion gear is inserted into the corresponding second operation hole and makes pillar hydraulic pressure in the hole
Stone implement action is split, to form at least one the second crackles on region dismantle, and is repeated the above steps, until described in
The coating in region to be dismantled can be removed.
In the optimal technical scheme of above-mentioned forcible entry method, the aperture in the second operation hole is equal to or different from that described
The aperture in one operation hole.
In the optimal technical scheme of above-mentioned forcible entry method, first group of expansion gear include first group of expansion housing and
First group of expansion tube being arranged in first group of expanding shell body, first group of expansion housing are two-flap type structure;It is described
Second group of expansion gear includes second group of expansion housing and second group of expansion tube being arranged in second group of expanding shell body, institute
It is multi-clove type structure to state second group of expansion housing.
In the optimal technical scheme of above-mentioned forcible entry method, pillar hydraulic pressure splits stone implement and is configured with oil pressure pump in the hole, institute
Oil pressure pump is stated as manual drive or the oil pressure pump of external connection power driving.
In the optimal technical scheme of above-mentioned forcible entry method, the basic hole, limiting holes, described is formed using drilling machine
First operation hole and/or the second operation hole.
In the optimal technical scheme of above-mentioned forcible entry method, the drilling machine is the drilling machine for being configured with dust collecting.
It will be appreciated to those of skill in the art that in the preferred technical solution of the present invention, by providing pillar in hole
Hydraulic pressure splits stone implement and the first operation hole associated with splitting stone implement, second is formed on the coating above matrix to be repaired
Operation hole, basic hole and limiting holes, realize to use and split forcible entry operation of the stone implement to airfield runway.Wherein, basic hole is mainly used
Make the freedom " face " during coating spalling, mobile and peeling space is provided for the first spalling of coating;Limiting holes are main
For limiting spalling line to the extension of non-forcible entry region.Specifically, stone implement, the first operation hole and base are split by pillar hydraulic pressure in hole
The cooperation in plinth hole, can form at least one the first crackles on the coating above the matrix to be repaired of airfield runway, real
Now first time spalling crushes.The coating spalling above matrix to be repaired is treated to be multiple by least one the first crackle
Dismantle region or region to be removed.The cooperation in stone implement and the second operation hole is split by pillar hydraulic pressure in hole, can be treated brokenly multiple
Tear open and at least one the second crackles are formed on region, spalling is multiple smallers at least one the second crackle again by region dismantle
Region to be dismantled or region to be removed, this process is repeated in new region to be dismantled, until the coating in region to be dismantled can
To be removed.By the setting of limiting holes, the scope in forcible entry region is reasonably controlled, ensure that the normal fortune of airfield runway
Battalion, reduces forcible entry cost.
Brief description of the drawings
With reference to the accompanying drawings and airfield runway is combined to describe the preferred embodiment of the present invention, in attached drawing:
Fig. 1 is the structure diagram that pillar hydraulic pressure splits stone implement in hole;
Fig. 2A is the first schematic diagram of the expansion housing for the expansion gear that pillar hydraulic pressure splits stone implement in hole;
Fig. 2 B are the second schematic diagrames of the expansion housing for the expansion gear that pillar hydraulic pressure splits stone implement in hole;
Fig. 2 C are the 3rd schematic diagrames of the expansion housing for the expansion gear that pillar hydraulic pressure splits stone implement in hole;
Fig. 3 is the flow diagram one of the method for the forcible entry airfield runway of an embodiment of the present invention;
Fig. 4 is first of the first operation hole and basic hole in the method for the forcible entry airfield runway of an embodiment of the present invention
Kind schematic layout pattern;
Fig. 5 is second of the first operation hole and basic hole in the method for the forcible entry airfield runway of an embodiment of the present invention
Kind schematic layout pattern;
Fig. 6 is the flow diagram two of the method for the forcible entry airfield runway of an embodiment of the present invention.
Reference numerals list:
1st, hydraulic power source;2nd, expansion gear;21st, two-flap type expansion housing;22nd, three-clove style expansion housing;23rd, fFour piece type expands
Housing;3rd, energy distributor;4th, hydraulic tube;5th, pre-manufactured hole;6th, basic hole;7th, the first operation hole;8th, limiting holes.
Embodiment
It will be apparent to a skilled person that this section embodiment is used only for explaining the technical principle of the present invention,
It is not intended to limit protection scope of the present invention.For example, although the present embodiment is to describe the broken of the present invention with reference to airfield runway
Tear method open, but the forcible entry method of the present invention can be also used for other occasions, thicker rock system hard brittle material layer
Forcible entry, those skilled in the art as needed can make adjustment it, to adapt to specific application scenario.Obviously, adjust
Technical solution afterwards will fall into protection scope of the present invention.
It should be noted that in the description of the present invention, term " " center ", " on ", " under ", "left", "right", " vertical ",
The term of the direction indication such as " level ", " interior ", " outer " or position relationship is to be based on direction shown in the drawings or position relationship, this is only
Description is for only for ease of, rather than instruction or hint described device or element there must be specific orientation, with specific side
Position construction and operation, therefore be not considered as limiting the invention.In addition, term " first ", " second ", " the 3rd " are only used for
Purpose is described, and it is not intended that instruction or hint relative importance.
In addition it is also necessary to explanation, in the description of the present invention, unless otherwise clearly defined and limited, term " peace
Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly
Connection;Can mechanically connect or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary,
It can be the connection inside two elements.To those skilled in the art, it can understand that above-mentioned term exists as the case may be
Concrete meaning in the present invention.
As shown in Figure 1, Fig. 1 is the structure diagram that pillar hydraulic pressure splits stone implement in hole.With reference to Fig. 1, pillar hydraulic pressure is split in hole
Stone implement mainly includes hydraulic power source 1, expansion gear 2, energy distributor 3 and hydraulic tube 4.Energy distributor 3 is connected by hydraulic tube 4
It is connected between hydraulic power source 1 and expansion gear 2.It should be pointed out that in order to clearly illustrate be arranged on it is swollen in rock to be cracked
Swollen device 2, is shown as rock in Fig. 1 and is broken away along its pre-manufactured hole 5, and for the ease of indicating attached drawing, does not draw rock
Hatching line, but expansion gear 2 is not splitted correspondingly along the hatching line.As shown in Figure 1, split when lapicide makees, it is necessary to first
The prefabricated pre-manufactured hole 5 equal with the quantity of expansion gear 2 on rock, correspondingly sets an expansion dress in each hole 5
Put 2.Being sized and shaped to for pre-manufactured hole 5 is similar to expansion gear 2, so that expansion gear 2 can be smooth before inflation
It is contained in hole 5, and with regard to the hole wall of pre-manufactured hole 5 can be extruded after somewhat expanding.A kind of example is such as used as, is shown in Fig. 1
Stone equipment of splitting there are 4 expansion gears 2, but it is understood that, those skilled in the art can be according to actual conditions to split
Stone equipment selects the expansion gear of different numbers.Hydraulic power source 1 is used to provide fluid under pressure for expansion gear 2;And preferably, liquid
Potential source 1 is the hydraulic power source of manual actuation or the hydraulic power source of external connection power driving, and hydraulic tube 4 is high-pressure oil pipe.When hydraulic power source 1 is hand
During the hydraulic power source of dynamic driving, energy distributor 3 is connected on hydraulic power source by hydraulic tube 4 first, is then again led to expansion gear 2
Hydraulic tube 4 is crossed to be connected on energy distributor 3.When hydraulic power source of the hydraulic power source 1 for external connection power driving, energy distributor 3 can
To be built in the hydraulic power source of external connection power driving, so as to save the link of connection oil pressure conduction, improve work efficiency.Tool
Body, fluid under pressure divides hydraulic fluid port respectively through liquid from hydraulic power source 1 through hydraulic tube 4 to energy distributor 3, then from energy distributor 3
The partial pressure pipe of pressure pipe 4 is to expansion gear 2.It should be pointed out that what all parts in Fig. 1 were not necessarily drawn to scale.In order to
It can preferably show details, the illustrated dimensions of expansion gear 2 are exaggerated.Therefore, in attached drawing between all parts
Illustrated dimensions, which are not intended as, to be implied or is limited to the size and relative size of component.
As shown in Fig. 2A, Fig. 2 B and Fig. 2 C, Fig. 2A is the expansion housing for the expansion gear that pillar hydraulic pressure splits stone implement in hole
First schematic diagram, Fig. 2 B are the second schematic diagrames of the expansion housing for the expansion gear that pillar hydraulic pressure splits stone implement in hole, and Fig. 2 C are holes
Interior pillar hydraulic pressure splits the 3rd schematic diagram of the expansion housing of the expansion gear of stone implement.With reference to Fig. 2A, Fig. 2 B and Fig. 2 C, pillar in hole
The expansion gear that hydraulic pressure splits stone implement includes expansion housing and expansion tube.Specifically, expansion housing can be two-flap type expansion housing
21 either three-clove style expansion housing 22 either fFour piece type expansion housing 23 or more multi-clove type expansion shell structure.Splitting stone
In the state of device assembles, more valves expansion housing of expansion gear is symmetrically and evenly distributed, and forms cavity between them, swollen
Tube expansion is set in the cavity and against more valves expansion housing.Specifically, hydraulic pressure causes to expand tube swelling and to extrude more valves swollen
Swollen housing is faced out along axle center to move.Expansion housing produces operation hole wall mechanical swollen due to being limited be subject to operation hole inner wall
Swelling pressure power, when the hydraulic pressure in expansion tube is sufficiently large, expansion housing is also sufficiently large to the mechanical swelling pressure of operation hole inner wall, from
And reach the effect of spalling rock mass.
The method research and development of the forcible entry airfield runway of the present invention need to be familiar with the spalling mechanism that pillar hydraulic pressure in hole splits stone implement, with
And the contrast of stone implement is split with other hydraulic pressure;It is familiar with rock mechanics and rock engineering (explosion, well lane engineering);It is familiar with specific work
Journey task, such as the defects of the structure of airfield runway, the requirement of forcible entry, existing forcible entry technology etc..Therefore the destroying machine of the present invention
The method of field runway is to be developed in inventor after largely testing and overcoming larger technical difficulty.
For example, inventor is established using the basic hole of varying number by the use of FEM-software ANSYS is used as the spalling scope of freedom
Computation model, pillar hydraulic swelling technology force analysis in hole when Research foundation hole number is different, i.e., basic hole number difference
When finite element model solve result of calculation stress analysis.
By the first principal stress cloud atlas in the basic hole to varying number, equivalent stress nephanalysis, varying number is obtained
The first principal stress in basic hole, the maximum of equivalent stress and its there is position, thus:1st, basic hole number and spalling are found
The relation of effect;2nd, when first principal stress is more than the saturated uniaxial compressive strength value of rock, pillar hydraulic pressure splits stone implement in hole
Under the action of, rock can be by drawing crack easily;3rd, the relation of equivalent stress maximum and basic hole number is found;4th, due to etc.
Efficacy is much larger than the single shaft saturation tensile strength values (generally 7.0~25.0MPa) of rock, and the single shaft saturation of concrete resists
Tensile strength value is in the range of the single shaft saturation tensile strength values of rock, therefore under the action of pillar hydraulic pressure splits stone implement in hole,
Concrete can be crushed easily.
By the use of FEM-software ANSYS establish using variety classes rock, varying number basic hole (emptying aperture) as swollen
The computation model on the scope of freedom is split, obtains cloud atlas, the equivalent stress cloud atlas in the asynchronous first principal stress direction of Rock Species.Utilize
FEM-software ANSYS establishes the static spalling model of operation hole and basic hole (emptying aperture), passes through first principal stress field, the 3rd master
Stress field, displacement vector and cloud atlas, spalling mechanism of the analysis operation hole to basic hole (emptying aperture).Utilize FEM-software ANSYS
Establishing has the spalling model on second scope of freedom, and physical model is calculated, and show that rock material produces under function load action
Raw fractue spacing, realizes and simulates the mistake that pillar hydraulic pressure in hole splits the broken drawing crack of rock (concrete) during stone implement static state spalling
Journey, it was demonstrated that pillar hydraulic pressure splits the validity of stone implement forcible entry airfield runway in hole.It is static that analysis is established using FEM-software ANSYS
Spalling technology mechanism model, by static spalling rock (concrete) Stress displacement cloud atlas, drills during the static spalling of announcement
Variation of stress, illustrates the application mechanism of spalling technology in airfield runway forcible entry etc..
As shown in figure 3, Fig. 3 is the flow diagram one of the method for the forcible entry airfield runway of an embodiment of the present invention.This
The method of the forcible entry airfield runway of invention mainly includes the following steps that:
Step S10, pillar hydraulic pressure in hole is provided split stone implement, pillar hydraulic pressure, which splits stone implement and includes first group of expansion, in the hole fills
Put;
Step S20, the first hole group is formed on the coating above matrix to be repaired, the first hole group includes and first group
Several matched the first operation holes of expansion gear;
Step S30, being formed on the coating above matrix to be repaired allows at least one of coating spalling peeling
Basic hole;
Step S40, at least one basic hole is kept to be inserted into corresponding first work for dummy status and by first group of expansion gear
Pillar hydraulic pressure splits stone implement action in the Zhong Bingshi holes of industry hole, to form at least one on the coating above matrix to be repaired
First crackle.
It should be noted that concrete, as a kind of rock system hard brittle material, it is much smaller than resistance to compression with tensile strength
The characteristics of intensity.In consideration of it, in the inventive solutions, the rock spalling skill of stone implement is split by using pillar hydraulic pressure in hole
Art completes the forcible entry operation of airfield runway, it is clear that splits what the expansion gear of stone implement overcame during runway forcible entry is completed
It is the tensile strength of concrete layer, therefore dismantles difficulty and substantially reduce, forcible entry efficiency greatly improves.
Specifically, under the action of hydraulic pressure, expansion tube produces turgor movement, in the close limitation of the first operation hole inner wall
Under, expansion housing produces the pressure perpendicular to the first operation hole inner wall, and acts on concrete.Continuous with the bulbs of pressure increases
Add, the tension in concrete constantly increases, and for the superposition of tangential stress on the first operation hole axle heart face, makes axle center face
Tension it is maximum, become principal stress plane.And the turgor movement for expanding housing further concentrates on tension perpendicular to swollen
The hole wall of the swollen housing direction of motion.Drawing on the first operation hole axle heart face at the hole wall of the expansion housing direction of motion should
Occurs the radial cracking of certain length when power reaches the tensile strength by forcible entry concrete at first, at this.With the bulbs of pressure
Constantly expand, crackle will be along the first operation hole axle heart face perpendicular to expansion tube shell direction of motion extension, finally in axle center face
Centre is met perforation, the smooth plane of fracture is formed, so as to achieve the purpose that cutting and crushing.Pillar hydraulic pressure splits stone implement in one hole
One group of expansion gear can be operated at the same time, and floor space is small, conveniently carrying, operating process are simple, a construction personnel
Forcible entry is completed in operation, whole to dismantle process simple and flexible, improves the forcible entry efficiency of airfield runway and the operation energy of airfield runway
Power, while saved forcible entry cost.Pillar hydraulic pressure splits stone implement during spalling concrete in hole, without noise, slungshot and
Dust pollution.Therefore by the forcible entry method of the present invention, it can peel off the quick spalling of airfield runway and reduce forcible entry pollution, make
Forcible entry process is more safe and reliable.
It should be noted that the execution sequence between step S10, step S20 and step S30 is intended only as a kind of example,
It is not specific.Specifically, those skilled in the art can replace the execution between these three steps according to actual conditions
Sequentially, or at the same time these three steps are performed.It should also be noted that, when the area that airfield runway needs dismantle is larger,
Pillar hydraulic pressure in more sets of holes can be used to split stone implement equipment, constructed at the same time on the coating above matrix to be repaired.
Specifically, step S30 further comprises:
The dbjective state of coating spalling peeling is determined according to several the first operation holes;
The number and orientation in basic hole are determined according to dbjective state.
By the setting in basic hole, the scope of freedom for being used for realization first spalling is formed.After the completion of first spalling, shown on runway
The scope of freedom can be so produced, therefore no longer needs basic hole to assist spalling.
More specifically, as shown in Figure 4 and Figure 5, Fig. 4 be an embodiment of the present invention the first operation hole and basic hole the
A kind of schematic layout pattern, Fig. 5 are the first operation hole and second of schematic layout pattern in basic hole of an embodiment of the present invention.
In the case of airfield runway needs the area that dismantles less, the base of a basic hole 6 or one group of integrated distribution can be only set
Plinth hole 6, several the first operation holes 7 are enclosed arranged on the periphery in basic hole 6.In the case of forcible entry area is larger, one can be set
The basic hole 6 of the discrete distribution of group, 6 discrete type of multiple basis holes are distributed in a side of the coating above matrix to be repaired
Edge.By the setting in basic hole, the smooth plane of fracture can be formed, effect is peeled off in the spalling for being conducive to improve coating, at the same time
Improve the forcible entry efficiency of coating.
It should be noted that the layout type in the operation hole and basic hole described in the present embodiment is a kind of example, no
It is understood that the limitation of the layout type for the operation hole to the present invention and basic hole.Those skilled in the art can be according to actual feelings
Condition is adjusted the layout type in operation hole and basic hole.
As a preferred embodiment, before step S40, the method for forcible entry airfield runway of the invention further includes:
Predict the spalling direction of at least one the first crackles;
According to spalling direction, several limiting holes are formed on the coating above matrix to be repaired, to avoid at least
One the first crackle extends to the region beyond the coating above matrix to be repaired.
Specifically, with continued reference to Fig. 5, during coating of the expansion gear above spalling matrix to be repaired, the first crackle
It is possible to that the normal coating region that need not be dismantled can be extended to.According to the direction of the first crackle above matrix to be repaired
Coating on drill out emptying aperture as limiting holes 8.After coating spalling, the first crackle can stop holding in the position of limiting holes 8
Split, so as to prevent this damage of forcible entry operation to the coating of non-maintenance area, it is ensured that the accuracy of forcible entry, avoids out
Now since forcible entry excessively causes the increased phenomenon of maintenance cost.
It should be noted that the construction area that the coating above matrix to be repaired is formed is rectangular.Split according to first
The direction of line, limiting holes are arranged at the edge of rectangle construction area.It is intended only as it should also be noted that, construction area is rectangular
A kind of example, it is impossible to be interpreted as the limitation of the construction area shape to the present invention., it is understood that those skilled in the art can
To adjust the shape of construction area according to actual conditions.
As shown in fig. 6, Fig. 6 is the flow diagram two of the method for the forcible entry airfield runway of an embodiment of the present invention.Hole
Interior pillar hydraulic pressure splits stone implement and further includes second group of expansion gear, and with reference to Fig. 6, after the step s 40, forcible entry airport of the invention is run
The method in road is further comprising the steps of:
Step S50, the second hole group is formed on region to be dismantled, the second hole group includes matched with second group of expansion gear
Several the second operation holes;
Step S60, second group of expansion gear is inserted into pillar hydraulic pressure in corresponding second operation hole Zhong Bingshi holes and splits stone implement
Action, so as at least one the second crackle of formation on region dismantle;
Repeat step S50 to S60, until the coating in region to be dismantled can be removed.As can be seen that pass through each expansion
The area that spalling crushes, is gradually completing forcible entry task, and entirely dismantle process is easy to operate, and spalling process is shockproof, noise,
Dust and slungshot, construction safety, forcible entry operation do not influence the Aerodrome Operations activity of surrounding, improve forcible entry efficiency and airfield runway
Operation ability.Furthermore, it is possible to splitting stone implement only with pillar hydraulic pressure in a hole completes above-mentioned forcible entry, can also be according to reality
Demand introduces pillar hydraulic pressure in Duo Tai holes and splits stone implement, while constructs in multiple regions to be dismantled.Pillar hydraulic pressure splits stone implement and applies in hole
Work is flexible, has good adaptability.
It should be noted that need to predict this in the case of in region to be dismantled with non-maintenance area being connected, before spalling
The spalling direction of secondary spalling line, according to spalling direction between the coating in region to be dismantled and the coating of non-maintenance area shape
Into several limiting holes, prevent spalling line from extending to beyond region to be dismantled, destroy the runway beyond region to be dismantled.
It should also be noted that, second group of expansion gear can be first group of expansion gear or in first group of expansion gear
On the basis of increase or decrease expansion gear number one group of expansion gear or different from first group of expansion gear
Other expansion gears.
As a preferred embodiment, aperture of the aperture in the second operation hole equal to or different from that the first operation hole.First crackle will
Coating above matrix to be repaired be divided into it is multiple after region is dismantled, using the second operation hole aperture be equal to first make
During the aperture in industry hole, the expansion gear and drill bit for replacing different-diameter in the construction process are avoided, improves the efficiency of forcible entry.
The area in region to be dismantled is less than the area of the coating above initial matrix to be repaired, so in the region of forcible entry small area
When, it can also use the expansion gear smaller than the diameter of first group of expansion gear.On the one hand it is convenient in small area region to be dismantled
Upper precise manipulation, on the other hand saves the energy.Obviously, the aperture in the second operation hole can also be more than the hole in the first operation hole
Footpath.
As a preferred embodiment, the aperture in basic hole is equal to the aperture in the first operation hole.Avoid and replace in the construction process
The drill bit of different-diameter, improves forcible entry efficiency.Obviously, the aperture in basic hole may also be distinct from that the aperture in the first operation hole,
Those skilled in the art can make rational matching and selection according to practice of construction situation to the aperture in various holes.
As a preferred embodiment, the first operation hole, the second operation hole, basic hole and limiting holes can be formed using drilling machine,
Such as drilling machine can be hydraulic drill rig, down-the-hole drill or air drill.Since drilling machine can produce solid in boring procedure
Particle and dust, therefore, drilling machine preferably selection and deployment have the drilling machine of dust collecting, for example, dust collecting can be with
It is bag filter.
As a preferred embodiment, first group of expansion gear includes first group of expansion housing and is arranged in first group of expanding shell body
First group of expansion tube, first group of expansion housing is two-flap type structure;Second group of expansion gear include second group of expansion housing and
Second group of expansion tube being arranged in second group of expanding shell body, second group of expansion housing are multi-clove type structure.Need to illustrate
Although second group of expansion housing is multi-clove type structure, but it is clear that two-flap type expanding shell body can be such that the bulbs of pressure more collect
In, spalling degree bigger.Therefore in order to improve forcible entry efficiency, a kind of scheme being more highly preferred to is the institute in the forcible entry of airfield runway
The expansion housing used is two-flap type expansion housing.Obviously, first group of expansion housing and second group of expansion housing can also be equal
For the multi-clove type structure more than two valves.For example, enclose the peripheral layout arranged on one or a set of operation hole in several basic holes
Under mode, expansion housing can be the multi-clove type structure more than two valves.But when the forcible entry operation of airfield runway is larger, use
Multi-clove type more than two valves expands housing, and forcible entry efficiency is low and is unable to the swollen direction of check of accurate judgement.The housing pair of different flap-type
The direction for the bulbs of pressure that operation hole wall produces is different.It is understood that those skilled in the art can be according to forcible entry object
With the suitable expansion housing of actual conditions selection of operation.
It should be noted that the depth in basic hole is equal to the thickness of the coating above the matrix to be repaired residing for basic hole
Degree.The depth in the first operation hole be equal to the first operation hole residing for matrix to be repaired above coating thickness, first group
The length of each expansion tube in expansion gear is less than or equal to and each expansion tube corresponding first in first group of expansion gear
The depth in operation hole.The depth in the second operation hole is equal to the thickness of the coating in the region to be dismantled residing for the second operation hole, the
The length of each expansion tube in two groups of expansion gears is less than or equal to corresponding with each expansion tube in second group of expansion gear
The depth in the second operation hole.And, it is preferable that expansion housing and the hole wall non-angular in operation hole come into full contact with.To expand
During the bulbs of pressure increase of pipe, the pressure that expansion housing acts on operation hole hole wall is uniformly and abundant.
It should be noted that between expansion gear and operation hole there are gap in the case of, can expansion gear with
Thin curved metal gasket is placed between operation hole, to improve spalling effect.
As a preferred embodiment, in hole pillar hydraulic pressure split stone implement hydraulic power source can be external connection power driving oil pressure pump or
Hand-driven oil pressure pump.Forcible entry operation it is smaller or without external connection power under conditions of, hand-driven oil can be used
Press pump.Dismantling, operation is larger or when the construction time is urgent, can use the oil pressure pump of external connection power driving.Obviously, it is external
Power-actuated oil pressure pump is more efficient than hand-driven oil pressure pump, therefore in order to improve the operation ability of airfield runway and forcible entry
Efficiency, a kind of scheme being more highly preferred to are the oil pressure pump that the hydraulic power source that pillar hydraulic pressure splits stone implement in hole is external connection power driving.
By foregoing description as can be seen that the method for the forcible entry airfield runway of the present invention mainly includes:Pillar in hole is provided
Hydraulic pressure splits stone implement and the first operation hole associated with splitting stone implement, second is formed on the coating above matrix to be repaired
Operation hole, basic hole and limiting holes, realize to use and split forcible entry operation of the stone implement to airfield runway.Wherein, basic hole is mainly used
Make the freedom " face " during coating spalling, mobile and peeling space is provided for the first spalling of coating;Limiting holes are main
For limiting spalling line to the extension of non-forcible entry region.Specifically, stone implement, the first operation hole and base are split by pillar hydraulic pressure in hole
The cooperation in plinth hole, can form at least one the first crackles on the coating above the matrix to be repaired of airfield runway, real
Now first time spalling crushes.The coating spalling above matrix to be repaired is treated to be multiple by least one the first crackle
Dismantle region or region to be removed.The cooperation in stone implement and the second operation hole is split by pillar hydraulic pressure in hole, can be treated brokenly multiple
Tear open and at least one the second crackles are formed on region, spalling is multiple smallers at least one the second crackle again by region dismantle
Region to be dismantled or region to be removed, this process is repeated in new region to be dismantled, until the coating in region to be dismantled can
To be removed.By the setting of limiting holes, the scope in forcible entry region is reasonably controlled, ensure that the normal fortune of airfield runway
Battalion, reduces forcible entry cost.
So far, the preferred embodiment shown in the drawings technical solution that the invention has been described, still, this area are had been combined
Technical staff is it is easily understood that protection scope of the present invention is expressly not limited to these embodiments.Without departing from this
On the premise of the principle of invention, those skilled in the art can make correlation technique feature equivalent change or replacement, these
Technical solution after changing or replacing it is fallen within protection scope of the present invention.
Claims (10)
1. a kind of method for dismantling airfield runway, the airfield runway includes matrix and the covering being arranged above described matrix
Layer, it is characterised in that this method includes:
Pillar hydraulic pressure in hole is provided and splits stone implement, pillar hydraulic pressure, which splits stone implement, in the hole includes first group of expansion gear;
The first hole group is formed on the coating above matrix to be repaired, first hole group includes and first group of expansion
Several matched the first operation holes of device;
At least one basic hole for allowing coating spalling to peel off is formed on the coating above matrix to be repaired;
At least one basic hole is kept to make for dummy status and by first group of expansion gear insertion corresponding described first
In industry hole and pillar hydraulic pressure in the hole is set to split stone implement action, to be formed on the coating above the matrix to be repaired
At least one the first crackles.
2. the method for forcible entry airfield runway according to claim 1, it is characterised in that " above matrix to be repaired
The step of basic hole that the spalling of formation permission coating is peeled off on coating ", further comprises:
The dbjective state of coating spalling peeling is determined according to several described the first operation holes;
The number and orientation in the basic hole are determined according to the dbjective state.
3. the method for forcible entry airfield runway according to claim 2, it is characterised in that enclose in several described the first operation holes
Arranged on the periphery in basic hole described in one or one group;Or
The one side edge of coating of the basic pore size distribution above the matrix to be repaired described in one group.
4. the method for forcible entry airfield runway according to claim 1, it is characterised in that " filling first group of expansion
Put in the corresponding first operation hole of insertion and pillar hydraulic pressure in the hole is split stone implement action, so as to described to be repaired
At least one the first crackles are formed on coating above matrix " the step of before, the method further includes:
Predict the spalling direction of at least one the first crackle;
According to the spalling direction, several limiting holes are formed on the coating above matrix to be repaired, to avoid described
At least one the first crackles extend to the region beyond the coating above matrix to be repaired.
5. the method for forcible entry airfield runway according to any one of claim 1 to 3, it is characterised in that wait to tie up described
Formed on the coating above matrix repaiied after the first crackle, at least one first crackle is by the matrix to be repaired
The coating of top is divided into multiple regions to be dismantled, and pillar hydraulic pressure splits stone implement and further includes second group of expansion gear in the hole,
The method further includes:
The second hole group is formed on the region to be dismantled, second hole group includes matched with second group of expansion gear
Several the second operation holes;
Second group of expansion gear is inserted into the corresponding second operation hole and pillar hydraulic pressure in the hole is split stone implement
Action, to form at least one the second crackles on region dismantle, and repeats the above steps, until described in wait to dismantle
The coating in region can be removed.
6. the method for forcible entry airfield runway according to claim 5, it is characterised in that the aperture in the second operation hole etc.
In or different from the first operation hole aperture.
7. the method for forcible entry airfield runway according to claim 5, it is characterised in that first group of expansion gear includes
First group of expansion housing and first group of expansion tube being arranged in first group of expanding shell body, first group of expansion housing are
Two-flap type structure;Second group of expansion gear includes second group of expansion housing and is arranged in second group of expanding shell body
Second group of expansion tube, second group of expansion housing are multi-clove type structure.
8. the method for forcible entry airfield runway according to claim 3, it is characterised in that pillar hydraulic pressure splits stone implement in the hole
Oil pressure pump is configured with, the oil pressure pump is manual drive or the oil pressure pump of external connection power driving.
9. the method for forcible entry airfield runway according to claim 5, it is characterised in that the basis is formed using drilling machine
Hole, the limiting holes, the first operation hole and/or the second operation hole.
10. the method for forcible entry airfield runway according to claim 9, it is characterised in that the drilling machine is to be configured with dust
The drilling machine of collection device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711216385.5A CN107956199A (en) | 2017-11-28 | 2017-11-28 | The method for dismantling airfield runway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711216385.5A CN107956199A (en) | 2017-11-28 | 2017-11-28 | The method for dismantling airfield runway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107956199A true CN107956199A (en) | 2018-04-24 |
Family
ID=61961630
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711216385.5A Pending CN107956199A (en) | 2017-11-28 | 2017-11-28 | The method for dismantling airfield runway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107956199A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101519965A (en) * | 2009-03-09 | 2009-09-02 | 黄晓东 | Method and device for exploiting stone |
CN104533418A (en) * | 2014-11-19 | 2015-04-22 | 太原理工大学 | Deep hole static rock breaking method for underground coal mine |
CN105423832A (en) * | 2015-12-02 | 2016-03-23 | 广东中人集团建设有限公司 | Blast construction method of orientation window of thick-wall brick chimney |
-
2017
- 2017-11-28 CN CN201711216385.5A patent/CN107956199A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101519965A (en) * | 2009-03-09 | 2009-09-02 | 黄晓东 | Method and device for exploiting stone |
CN104533418A (en) * | 2014-11-19 | 2015-04-22 | 太原理工大学 | Deep hole static rock breaking method for underground coal mine |
CN105423832A (en) * | 2015-12-02 | 2016-03-23 | 广东中人集团建设有限公司 | Blast construction method of orientation window of thick-wall brick chimney |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110346216B (en) | Coal rock triaxial loading test device and method under condition of simulated tunneling disturbance | |
CN108361023A (en) | The evaluation method for one, two cement plane breakdown strengths of cementing the well under dynamic load | |
Fan et al. | Directional hydraulic fracturing to control hard-roof rockburst in coal mines | |
WO2019205578A1 (en) | Simulation test system for gas extraction from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity | |
CN107807051A (en) | Simulate the experimental rig and test method of Blasting Excavation off-load under three-dimensional loading environment | |
CN202330181U (en) | Hydraulic fracturing device for crack-containing rock-like materials | |
CN102808526A (en) | Nondestructive demolition construction method of reinforced concrete frame beam | |
CN205538273U (en) | A indoor test device for simulating deep tunnel excavation | |
CN107327306A (en) | Tunnel excavation construction method is superimposed under the conditions of the shallow embedding of city | |
CN112748016A (en) | Large three-dimensional detachable drilling chip analog simulation experiment device | |
CN107956199A (en) | The method for dismantling airfield runway | |
CN106906996A (en) | Reusable pre-buried ring | |
CN107989616A (en) | The method for exploiting stone ore | |
CN107190864A (en) | A kind of accurate pre-embedded construction method of steel construction foundation bolt | |
CN108331041B (en) | A kind of experimental rig and method of soil anchor drawing | |
CN113668414A (en) | Bridge deck concrete pavement layer dismantling construction method | |
CN107916668A (en) | The method for dismantling pile crown | |
CN206134109U (en) | Tunnel country rock deformation simulation experimental apparatus | |
CN110107226B (en) | Soil body reaming device and method | |
CN104929057B (en) | A kind of pocket device for hoisting for being conveniently replaceable arch bridge suspender | |
CN107966077A (en) | The method of slotting | |
CN110568159A (en) | shallow tunnel surrounding rock destruction analogue means that buries | |
CN114280102B (en) | Explosion experiment device and method for peripheral holes of deep-buried tunnel based on wire electric explosion | |
CN102778552B (en) | Experimental method for steering law of directional perforation and fracturing fracture | |
CN212614665U (en) | True triaxial CO2 fracturing experimental device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180424 |