CN107942926B - Small-brand parameter self-correction method/system, readable storage medium and device - Google Patents

Small-brand parameter self-correction method/system, readable storage medium and device Download PDF

Info

Publication number
CN107942926B
CN107942926B CN201810026119.4A CN201810026119A CN107942926B CN 107942926 B CN107942926 B CN 107942926B CN 201810026119 A CN201810026119 A CN 201810026119A CN 107942926 B CN107942926 B CN 107942926B
Authority
CN
China
Prior art keywords
grade
water drawing
small
drawing amount
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810026119.4A
Other languages
Chinese (zh)
Other versions
CN107942926A (en
Inventor
张翼
叶申
吴晓勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tobacco Group Co Ltd
Original Assignee
Shanghai Tobacco Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tobacco Group Co Ltd filed Critical Shanghai Tobacco Group Co Ltd
Priority to CN201810026119.4A priority Critical patent/CN107942926B/en
Publication of CN107942926A publication Critical patent/CN107942926A/en
Application granted granted Critical
Publication of CN107942926B publication Critical patent/CN107942926B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • G05B19/054Input/output
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/10Plc systems
    • G05B2219/11Plc I-O input output
    • G05B2219/1103Special, intelligent I-O processor, also plc can only access via processor

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Drying Of Solid Materials (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a small-brand parameter self-correction method/system, a readable storage medium and equipment, wherein the parameter self-correction method comprises the following steps: after receiving the current batch of production tasks, judging whether the current batch of production tasks are production tasks of production small marks or not; if so, combining the temporary value of the water drawing amount of the conventional mark of the historical production batch of the conventional mark to obtain the water drawing amount working point parameter of each small mark of the current batch, and correcting the pre-loaded dehydration coefficient of each small mark according to the correction mode of the pre-loaded dehydration coefficient; if not, correcting the water drawing quantity rated working point of each conventional mark according to the correction mode of the water drawing quantity rated working point; meanwhile, according to the correction mode of the pre-loading dehydration coefficient, the pre-loading dehydration coefficient of each conventional grade is corrected. The invention makes the control mode suitable for the working condition of the hardware change of the cut-tobacco drier and gives consideration to the characteristic of small grade, and improves the stub bar characteristic index and the process capability index of the conventional grade and small grade task production.

Description

Small-brand parameter self-correction method/system, readable storage medium and device
Technical Field
The invention belongs to the technical field of tobacco shred manufacturing process control, relates to a self-correction method and a self-correction system, and particularly relates to a small-brand parameter self-correction method/system, a storage medium and equipment.
Background
The cut tobacco drying equipment is one of important equipment in cigarette production and is key equipment for determining the inherent quality of cigarettes. In the tobacco shred manufacturing production process in the domestic tobacco industry at present, a drum-type sheet tobacco shred drying machine is the most common tobacco shred drying equipment, and the working principle of the drum-type sheet tobacco shred drying machine is to dry and dehumidify tobacco shreds by adopting a combined drying method of conduction and convection. The working states of the sheet cut-tobacco drier comprise preheating, starting, production and material tailing.
In the starting state, because the cut tobacco does not reach the outlet of the cut tobacco drying cylinder, the cut tobacco drying machine cannot realize the feedback control of the moisture, the temperature of the cylinder wall at the stage is mainly determined by feedforward control, and the feedforward control depends on the understanding of the equipment model and the accuracy of parameter setting.
When the cigarette tobacco production line is adjusted and tested, the technical parameters of the equipment used by the tobacco drying stub bar are solidified by the engineer of a supplier, but the hardware condition of the equipment changes along with the increase of the service time, the yield of small-grade varieties continuously increases, and the original control mode and the equipment parameters can not be suitable for the current production condition.
Therefore, how to provide a parameter/small-grade parameter self-correction method/system, a storage medium and equipment to solve the defects that in the prior art, when a cigarette tobacco production line is subjected to a debugging test, a supplier engineer solidifies the technical parameters of the equipment used by a cut tobacco drying stub, but the hardware condition of the equipment changes along with the increase of the service time, the yield of small-grade varieties continuously increases, the original control mode and the equipment parameters cannot be suitable for the current production condition, and the like, and the method becomes a technical problem to be solved urgently by technical staff in the field.
Disclosure of Invention
In view of the above disadvantages of the prior art, the present invention provides a small-grade parameter self-correction method/system, a storage medium and a device, which are used for solving the problems that in the prior art, when a cigarette tobacco production line is subjected to a debugging test, a supplier engineer solidifies the technical parameters of the device used by a tobacco drying stub, but the hardware condition of the device changes along with the increase of the use time, the yield of small-grade varieties continuously increases, and the original control mode and the device parameters cannot be applied to the current production condition.
To achieve the above and other related objects, there is provided, in one aspect, a method of manufacturing a semiconductor device
The small-grade parameter self-correction method comprises the following steps: after receiving the current batch of production tasks, judging whether the current batch of production tasks are production tasks of production small marks or not; if so, combining the temporary value of the water drawing amount of the conventional mark of the historical production batch of the conventional mark to obtain the water drawing amount working point parameter of each small mark of the current batch, and correcting the pre-loaded dehydration coefficient of each small mark according to the correction mode of the pre-loaded dehydration coefficient; if not, correcting the water drawing quantity rated working point of each conventional mark according to the correction mode of the water drawing quantity rated working point; meanwhile, correcting the pre-loaded dehydration coefficient of each conventional grade according to the correction mode of the pre-loaded dehydration coefficient;
in an embodiment of the present invention, the step of obtaining the water drawing amount working point parameter of each small mark of the current batch by combining the temporary storage value of the water drawing amount of the conventional mark of the historical production batch of the conventional mark comprises: reading the temporary water drawing amount value of the conventional mark in the last production batch of the small mark and the temporary water drawing amount value of the conventional mark of the latest production batch of the conventional mark; acquiring a working condition change reference coefficient according to the temporary value of the water drawing amount of the conventional mark in the last production batch of the small mark and the temporary value of the water drawing amount of the conventional mark of the latest production batch of the conventional mark; reading the temporary value of the water drawing amount of the last production batch of the small grade and the temporary value of the water drawing amount of the small grade of the current production batch of the small grade; acquiring a small-grade water drawing amount change reference coefficient according to the water drawing amount temporary storage value of the previous production batch of the small grade and the water drawing amount temporary storage value of the current production batch of the small grade; averaging the working condition change reference coefficient and the small-grade water drawing quantity change reference coefficient to obtain a water drawing quantity change proportion coefficient; and multiplying the preset small-grade water drawing quantity parameter by the obtained water drawing quantity change proportion coefficient to obtain the water drawing quantity working point parameter of each small grade in the current batch.
In an embodiment of the invention, the step of obtaining the reference coefficient of the change of the small-grade water-pulling amount according to the temporary storage value of the water-pulling amount of the small-grade of the penultimate production batch of the small-grade and the temporary storage value of the water-pulling amount of the small-grade of the latest production batch of the small-grade refers to calculating a difference value of the temporary storage value of the water-pulling amount of the conventional grade of the latest production batch of the conventional grade according to the temporary storage value of the water-pulling amount of the conventional grade of the penultimate production batch of the conventional grade and the temporary storage value of the water-pulling amount of the conventional grade of the latest production batch of the conventional grade, and inquiring a database according.
In an embodiment of the present invention, the step of correcting the water-drawing rated working points of the conventional brands according to the correction mode of the water-drawing rated working points includes: after entering the production process, collecting the data of the temperature of the cylinder wall of the silk drying cylinder and the water drawing amount until the silk drying cylinder enters a material tail state; calculating the average value of the temperature of the cylinder wall and the average value of the water drawing amount according to the collected data of the temperature of the cylinder wall and the water drawing amount process of the wire drying cylinder; calculating the water drawing amount based on the rated cylinder wall temperature according to the average value of the water drawing amount; writing the water drawing amount with the rated cylinder wall temperature as the reference into a corresponding water drawing amount data stack according to each conventional mark; extracting the water drawing amount of each batch of each conventional grade by taking the rated cylinder wall temperature as the reference from the water drawing amount data stack, and carrying out weighted average calculation on the water drawing amount of each conventional grade to obtain the temporary storage value of the water drawing amount of each conventional grade.
In one embodiment of the invention, the average value of the wall temperature of the wire drying cylinder is equal to the sum of the wall temperatures of the wire drying cylinder collected every preset collection period after the production process is started, and the collection times are divided; the average value of the water drawing amount is equal to the sum of the water drawing amount process data acquired every preset acquisition period after the production process is started, and the acquisition times are divided by the average value of the water drawing amount data; the water drawing amount with the rated cylinder wall temperature as the reference is equal to the average water drawing amount (the average cylinder wall temperature of the wire drying cylinder-the rated cylinder wall temperature)/the drying coefficient in the recipe parameters of the wire drying machine.
In an embodiment of the invention, the temporary value of the water withdrawal amount of each conventional grade is obtained by multiplying the water withdrawal amount of the first batch of each conventional grade based on the rated cylinder wall temperature by the corresponding weight value + the water withdrawal amount of the second batch of each conventional grade based on the rated cylinder wall temperature by the corresponding weight value + … + the water withdrawal amount of the nth batch of each conventional grade based on the rated cylinder wall temperature by the corresponding weight value.
In an embodiment of the present invention, the step of correcting the preloaded dehydration coefficients of each conventional grade according to the correction mode of the preloaded dehydration coefficients includes: after the silk drying cylinder is shifted to a starting stage, acquiring and counting an outlet moisture value to obtain the maximum value of the outlet moisture value in the stage until the silk drying cylinder is shifted to a production stage; calculating the difference value between the preset outlet moisture value and the maximum value of the outlet moisture value obtained after the starting stage; searching a correction coefficient of the pre-loaded dehydration coefficient corresponding to the difference value in a database of the pre-loaded dehydration coefficient; writing the correction coefficient of the preloaded dehydration coefficient into a corresponding preloaded dehydration coefficient data stack corresponding to each conventional grade; carrying out weighted average calculation on the correction coefficients of each batch of each conventional grade in the pre-loaded dehydration coefficient data stack to obtain the weighted average of the correction coefficients of each conventional grade; and calculating the pre-loaded dehydration coefficient of each conventional grade according to the weighted average value of the correction coefficients.
In an embodiment of the present invention, the weighted average of the correction coefficients of each conventional grade is the correction coefficient of the first batch of each conventional grade multiplied by the corresponding weight value + the correction coefficient of the second batch of each conventional grade multiplied by the corresponding weight value + … + the correction coefficient of the mth batch of each conventional grade multiplied by the corresponding weight value. Another aspect of the present invention provides a small-grade parameter self-correcting system, including: the judging module is used for judging whether the current batch of production tasks are production tasks for producing small marks or not after the current batch of production tasks are received; if so, calling a third correction module to obtain water drawing quantity working point parameters of each small mark of the current batch by combining with the temporary storage value of the water drawing quantity of the conventional mark of the historical production batch of the conventional mark, and calling a fourth correction module to correct the pre-loaded dehydration coefficient of each small mark according to the correction mode of the pre-loaded dehydration coefficient; if not, calling a fifth correction module to correct the water drawing rated working points of the conventional brands according to the correction mode of the water drawing rated working points; and meanwhile, calling a sixth correction module to correct the pre-loaded dehydration coefficient of each conventional grade according to the correction mode of the pre-loaded dehydration coefficient.
Yet another aspect of the present invention provides a readable storage medium having stored thereon a computer program which, when executed by a processor, implements a method of parameter self-correction of said mini-brand.
A final aspect of the invention provides an apparatus comprising: a processor and a memory; the memory is used for storing a computer program, and the processor is used for executing the computer program stored by the memory so as to enable the equipment to execute the parameter self-correction method of the small license plate
As described above, the small-brand parameter self-correction method/system, storage medium, and apparatus of the present invention have the following advantageous effects:
the small-grade parameter self-correction method/system pair enables the control mode to be suitable for the working condition of hardware change of the cut-tobacco drier and gives consideration to the characteristics of the small grade, and improves the stub bar characteristic index and the process capability index of conventional grade and small-grade task production.
Drawings
Fig. 1A is a flow chart illustrating a method for self-correcting parameters according to an embodiment of the present invention.
Fig. 1B is a schematic flow chart of S12 in the method for self-correcting parameters according to the present invention.
Fig. 1C is a schematic flow chart of S13 in the method for self-correction of parameters according to the present invention.
Fig. 2A is a flow chart illustrating a small-grade parameter self-correction method according to an embodiment of the present invention.
Fig. 2B is a schematic flow chart of S22 in the small-scale parameter self-correction method according to the present invention.
Fig. 3 is a schematic structural diagram of a parameter self-correction system according to an embodiment of the present invention.
Fig. 4 is a schematic structural diagram of a small-grade parameter self-correction system according to an embodiment of the present invention.
Description of the element reference numerals
3-parameter self-correction system
31 receiving module
32 first correction module
33 second correction module
Parameter self-correction system for 4 small-grade
40 judging module
43 third correction Module
44 fourth correction Module
45 fifth correction module
46 sixth correction module
S1-Sn step
Detailed Description
The embodiments of the present invention are described below with reference to specific embodiments, and other advantages and effects of the present invention will be easily understood by those skilled in the art from the disclosure of the present specification. The invention is capable of other and different embodiments and of being practiced or of being carried out in various ways, and its several details are capable of modification in various respects, all without departing from the spirit and scope of the present invention. It is to be noted that the features in the following embodiments and examples may be combined with each other without conflict.
It should be noted that the drawings provided in the following embodiments are only for illustrating the basic idea of the present invention, and the components related to the present invention are only shown in the drawings rather than drawn according to the number, shape and size of the components in actual implementation, and the type, quantity and proportion of the components in actual implementation may be changed freely, and the layout of the components may be more complicated.
Example one
The embodiment provides a parameter self-correcting method, which is used for correcting a water drawing rated working point and/or a pre-loading dehydration coefficient in cut tobacco drying moisture content stub bar control parameters; the self-correction method of the parameters comprises the following steps:
receiving a specified water drawing rated working point and/or a preloaded dehydration coefficient as a self-correcting target parameter;
correcting the water drawing amount rated working point of each cigarette production brand according to the correction mode of the water drawing amount rated working point; and/or
Correcting the pre-loaded dehydration coefficient of each cigarette production grade according to the correction mode of the pre-loaded dehydration coefficient;
wherein, each cigarette production grade comprises a small grade and a conventional grade.
The self-correction method of the parameters provided in the present embodiment will be described in detail with reference to the drawings. The parameter self-correction method is used for correcting the water drawing rated working point and/or the pre-loading dehydration coefficient in the cut tobacco drying water content stub bar control parameter.
Before the self-correction method of the parameters described in the present embodiment is performed, the most critical factors affecting the outlet moisture need to be found first, and since the final target object is the outlet moisture, it is first analyzed which factor has the largest influence on the outlet moisture. The factors influencing the moisture at the cut tobacco drying outlet mainly comprise: incoming material moisture, feeding flow, circulating hot air temperature, cylinder wall temperature and draft hood pressure. The 5 predictive variables and 1 response are responded through multivariate linear regression in a linear classification method, and the factor with the largest influence on the outlet moisture is judged to be the cylinder wall temperature. And then selecting cylinder wall temperature parameters, wherein the recipe parameters of the cut-tobacco drying cylinder comprise 12 items, wherein 4 items related to the cylinder wall temperature are respectively a pre-loading dehydration coefficient, a water drawing quantity rated working point (parameter), a cylinder wall temperature rated working point (parameter) and a cylinder wall temperature drying coefficient. In the process of selecting the cylinder wall temperature parameters, a related calculation formula is arranged between the rated water drawing quantity working point (parameter) and the rated cylinder wall temperature working point (parameter), and under the condition that the cylinder temperature and the water drawing quantity in the previous batch of processes are known, the rated water drawing quantity working point and the rated cylinder wall temperature working point can be mutually converted. The front cylinder wall temperature rated working point is a parameter issued by a process department, so the cylinder wall temperature rated working point is selected as a fixed quantity, and the water drawing amount rated working point is selected as a variable quantity. And then carrying out univariate adjustment in the preloading dehydration coefficient, the water drawing rated working point (parameter) and the cylinder wall temperature drying coefficient to observe the influence of the parameters on the cylinder temperature. And selecting the rated working point of the water drawing amount and the pre-loaded dehydration coefficient as self-corrected target parameters.
In this embodiment, the preload coefficient is used to calculate the set cylinder wall temperature through the rated cylinder temperature parameter and the rated water withdrawal parameter in the starting stage of the cut-tobacco drying cylinder. However, in order to reduce the overshoot or undershoot of the head water during starting, a preloading coefficient is arranged in the parameters, the temperature of the cylinder wall can be proportionally increased in the starting stage, and the head water overshoot or undershoot can be reduced through adjustment.
Please refer to fig. 1A, which is a flow chart illustrating a parameter self-correction method according to an embodiment. As shown in fig. 1A, the self-correction method of the parameters specifically includes the following steps:
s11, receiving the specified water drawing rated working point and/or the pre-loaded dehydration coefficient as a self-correcting target parameter; wherein, each cigarette production grade comprises a small grade and a conventional grade. In this embodiment, the small brand refers to a cigarette production brand with low production frequency, and the conventional brand refers to a cigarette production brand with high production frequency.
And S12, correcting the rated water drawing amount working point of each cigarette production brand according to the correction mode of the rated water drawing amount working point.
Referring to fig. 1B, a schematic flow chart of S12 is shown. As shown in fig. 1B, the S12 specifically includes:
and S121, collecting the data of the wall temperature and the water drawing amount of the wire drying cylinder after the wire drying cylinder enters the production process until the wire drying cylinder enters a material tail state. In this embodiment, the data of the wall temperature and the water drawing amount of the wire drying cylinder are collected in a preset collection period until the wire drying cylinder enters a material tail state. For example, data a is automatically collected every 6 seconds1,a2,…,an,b1,b2,…,bnWherein a isnCylinder wall temperature for the nth acquisition, bnThe data of the water drawing process collected for the nth time.
And S122, calculating the average value of the temperature of the cylinder wall and the average value of the water drawing amount according to the collected data of the temperature of the cylinder wall and the water drawing amount of the wire drying cylinder.
For example, the average value of the wall temperature of the baking wire cylinder is equal to the sum of the wall temperatures of the baking wire cylinder collected at predetermined collection periods after the baking wire cylinder enters the production process, and the sum is divided by the collection times, namely
Figure BDA0001544998800000061
The average value of the water drawing amount is equal to the sum of the data of the water drawing amount process collected every preset collection period after the production process is started, and the collection times are divided, namely
Figure BDA0001544998800000062
And S123, calculating the water drawing amount based on the rated cylinder wall temperature according to the average water drawing amount.
In this example, the water withdrawal amount based on the rated cylindrical wall temperature is equal to the average water withdrawal amount- (the average cylindrical wall temperature of the spinning cylinder-the rated cylindrical wall temperature)/the drying coefficient in the recipe parameters of the spinning machine.
For example, using a barrel temperature of 130 ℃ as the nominal barrel wall temperatureCalculating the corresponding water drawing amount Cw130
Amount of water drawn
Figure BDA0001544998800000063
Wherein DFW is the drying coefficient in the parameters of the tobacco dryer.
And S124, writing the water drawing amount based on the rated cylinder wall temperature into a corresponding water drawing amount data stack according to the cigarette production brand.
And S125, extracting the water drawing amount of each batch of each cigarette production grade based on the rated cylinder wall temperature from the water drawing amount data stack, and performing weighted average calculation on the water drawing amount to obtain the temporary storage value of the water drawing amount of each cigarette production grade.
In this step, the weight value corresponding to the water withdrawal amount based on the rated cylinder wall temperature of each batch of each cigarette production brand is preset.
The temporary value of the water drawing amount of each cigarette generation brand is equal to the water drawing amount of the first batch taking the rated cylinder wall temperature as the reference, multiplied by the corresponding weight value, multiplied by the water drawing amount of the second batch taking the rated cylinder wall temperature as the reference, multiplied by the corresponding weight value, multiplied by …, multiplied by the water drawing amount of the Nth batch taking the rated cylinder wall temperature as the reference, multiplied by the corresponding weight value.
For example, the weight values of 20 batches are set to 50% for the first batch weight f1, 30% for the second to tenth batches weight f2, and 20% for the tenth to twentieth batches weight f 3.
Temporary value of water drawing quantity of cigarette generation brand
Figure BDA0001544998800000071
The calculation formula of (a) is as follows:
Figure BDA0001544998800000072
and/or
And S13, correcting the preloaded dehydration coefficient of each cigarette production brand according to the correction mode of the preloaded dehydration coefficient.
Please refer to fig. 1C, which shows a schematic flow chart of S13. As shown in fig. 1C, the S13 includes:
s131, collecting and counting outlet moisture values after the silk drying cylinder is switched to a starting stage so as to obtain the maximum value of the outlet moisture values.
In this embodiment, the outlet moisture value is collected in a predetermined collection period, for example, every 6 seconds, and recorded, the outlet moisture value collected in the next 6 seconds is compared with the outlet moisture value collected in the last 6 seconds, and if the outlet moisture value is greater than the outlet moisture value, the outlet moisture value collected in the last 6 seconds is covered until the cut-tobacco drier enters the production state, and the maximum value of the outlet moisture value is obtained
S132, calculating the difference value between the preset outlet moisture value and the maximum value of the outlet moisture value acquired after the starting stage.
S133, the correction coefficient of the pre-loaded dehydration coefficient corresponding to the difference value is searched in the database of the pre-loaded dehydration coefficient.
And S134, writing the correction coefficient of the preloaded dehydration coefficient corresponding to each cigarette production brand into a corresponding preloaded dehydration coefficient data stack.
S135, carrying out weighted average calculation on the correction coefficients of each batch of each cigarette production grade in the pre-loaded dehydration coefficient data stack to obtain the weighted average of the correction coefficients of each cigarette production grade.
In this step, the weight value corresponding to the correction coefficient for each batch of each cigarette production brand is set in advance.
The weighted average of the correction coefficients of each cigarette production brand is the correction coefficient of the first batch multiplied by the corresponding weight value + the correction coefficient of the second batch multiplied by the corresponding weight value + … + the correction coefficient of the Mth batch multiplied by the corresponding weight value.
For example, the weight values of 10 batches are set to 50% for the first batch weight f1, 30% for the second to fifth batches f2, and 20% for the sixth to tenth batches f 3.
Weighted average of correction coefficients for cigarette production brands
Figure BDA0001544998800000073
The calculation formula of (a) is as follows:
Figure BDA0001544998800000074
and S136, calculating the pre-loaded dehydration coefficient of each cigarette production grade according to the weighted average value of the correction coefficients.
In this embodiment, the pre-loaded dehydration coefficient of each cigarette production grade is the weighted average of the correction coefficients of each cigarette production grade
Figure BDA0001544998800000081
X preloaded dehydration factor to be corrected.
The method for self-correcting the parameters is deployed on a set of leaf shred drying equipment in a workshop, namely a roller type thin plate shred drying machine KLD for use. After a cut tobacco drying water stub bar parameter self-correction mode is used, one process quality, namely the process data of the cut tobacco drying water content, is improved, the characteristic values of two stub bar water, namely overshoot and stability time, are improved, and the received good control effect and feedback are achieved.
The embodiment also provides a parameter self-correction method for small brands, which comprises the following steps:
after receiving the current batch of production tasks, judging whether the current batch of production tasks are production tasks of production small marks or not; if so, combining the temporary value of the water drawing amount of the conventional mark of the historical production batch of the conventional mark to obtain the water drawing amount working point parameter of each small mark of the current batch, and correcting the pre-loaded dehydration coefficient of each small mark according to the correction mode of the pre-loaded dehydration coefficient; if not, correcting the water drawing quantity rated working point of each conventional mark according to the correction mode of the water drawing quantity rated working point; meanwhile, according to the correction mode of the pre-loading dehydration coefficient, the pre-loading dehydration coefficient of each conventional grade is corrected.
The small-scale parameter self-correction method described in this embodiment will be described in detail below with reference to the drawings. Please refer to fig. 2A, which is a flowchart illustrating a small-grade parameter self-correction method according to an embodiment. As shown in figure 2A of the drawings,
s21, after receiving the current batch production task, judging whether the current batch production task is a production task for producing small brands, if yes, executing S22 and S22 ', and if not, executing S23 and S23'.
And S22, acquiring the water drawing amount working point parameters of each small mark of the current batch by combining the temporary storage value of the water drawing amount of the conventional mark of the historical production batch of the conventional mark. Please refer to fig. 2B, which shows a schematic flow chart of S22. As shown in fig. 2B, the S22 includes the following steps:
s221, reading the temporary value of the water drawing amount of the conventional mark in the last production batch of the small mark and the temporary value of the water drawing amount of the conventional mark of the latest production batch of the conventional mark.
S222, acquiring a working condition change reference coefficient according to the temporary value of the water drawing amount of the conventional mark in the last production batch of the small mark and the temporary value of the water drawing amount of the conventional mark of the latest production batch of the conventional mark.
Specifically, the difference between the temporary value of the water drawing amount of the conventional mark when the small mark is in the previous production batch and the temporary value of the water drawing amount of the conventional mark of the latest production batch of the conventional mark is calculated, and the working condition change reference coefficient corresponding to the difference between the two is obtained by searching in the database according to the difference between the two.
S223, reading the temporary value of the water drawing amount of the last production batch of the small grade and reading the temporary value of the water drawing amount of the small grade of the current production batch of the small grade.
S224, obtaining a small-grade water drawing amount change reference coefficient according to the water drawing amount temporary storage value of the previous production batch of the small grade and the water drawing amount temporary storage value of the current production batch of the small grade.
Specifically, the difference between the temporary value of the water drawing amount of the previous production batch of the small grade and the temporary value of the water drawing amount of the current production batch of the small grade is calculated, and the reference coefficient of the change of the water drawing amount of the small grade corresponding to the difference between the two is searched and obtained in the database according to the difference between the two.
S225, averaging the working condition change reference coefficient and the small-grade water drawing quantity change reference coefficient to obtain a water drawing quantity change proportion coefficient. That is, the water withdrawal quantity change proportion coefficient is (working condition change reference coefficient + small grade water withdrawal quantity change reference coefficient)/2.
S226, multiplying the preset small-grade water drawing quantity parameter by the obtained water drawing quantity change proportion coefficient to obtain the water drawing quantity working point parameter of each small grade in the current batch.
And S22', correcting the pre-loaded dehydration coefficient of each small mark according to the correction mode of the pre-loaded dehydration coefficient.
Specifically, the method comprises the following steps:
after the silk drying cylinder is shifted to a starting stage, acquiring and counting an outlet moisture value to obtain the maximum value of the outlet moisture value in the stage until the silk drying cylinder is shifted to a production stage;
calculating the difference value between the preset outlet moisture value and the maximum value of the outlet moisture value obtained after the starting stage;
searching a correction coefficient of the pre-loaded dehydration coefficient corresponding to the difference value in a database of the pre-loaded dehydration coefficient;
writing the correction coefficient of the preloaded dehydration coefficient corresponding to each small mark into a corresponding preloaded dehydration coefficient data stack;
carrying out weighted average calculation on the correction coefficients of each batch of each small grade in the pre-loaded dehydration coefficient data stack to obtain the weighted average of the correction coefficients of each small grade;
and calculating the pre-loaded dehydration coefficient of each small grade according to the weighted average value of the correction coefficients.
And S23, correcting the water drawing amount rated working point of each conventional mark according to the correction mode of the water drawing amount rated working point.
Specifically, step S23 includes:
after entering the production process, collecting the data of the temperature of the cylinder wall of the silk drying cylinder and the water drawing amount until the silk drying cylinder enters a material tail state;
calculating the average value of the temperature of the wall of the wire drying cylinder and the average value of the water drawing amount according to the collected data of the wall temperature and the water drawing amount of the wire drying cylinder;
the average temperature of the wall of the wire drying cylinder is equal to that of the wire drying cylinder collected every other preset collection period after the wire drying cylinder enters the production processThe sum of the temperatures of the walls of the collected wire drying drums is divided by the collection times, i.e.
Figure BDA0001544998800000091
The average value of the water drawing amount is equal to the sum of the data of the water drawing amount process collected every preset collection period after the production process is started, and the collection times are divided, namely
Figure BDA0001544998800000092
Calculating the water drawing amount based on the rated cylinder wall temperature according to the average value of the water drawing amount;
in this example, the drawing amount based on the rated cylindrical wall temperature is equal to the average drawing amount (the cylindrical wall temperature of the wire drying cylinder is equal to the average drawing amount)
Mean value-rated cylinder wall temperature)/drying coefficient in the matched parameters of the cut-tobacco drier. According to each conventional mark, the rated wall temperature of the cylinder is
Writing the reference water drawing amount into a corresponding water drawing amount data stack;
extracting the water drawing amount of each batch of each conventional grade by taking the rated cylinder wall temperature as the reference from the water drawing amount data stack, and carrying out weighted average calculation on the water drawing amount of each conventional grade to obtain the temporary storage value of the water drawing amount of each conventional grade.
In this step, the weight value corresponding to the water withdrawal amount of each batch of each conventional grade based on the rated cylinder wall temperature is preset.
The temporary water drawing amount value of each conventional grade is equal to the water drawing amount of the first batch of each conventional grade based on the rated cylinder wall temperature multiplied by the corresponding weight value, the water drawing amount of the second batch of each conventional grade based on the rated cylinder wall temperature multiplied by the corresponding weight value + …, and the water drawing amount of the Nth batch of each conventional grade based on the rated cylinder wall temperature multiplied by the corresponding weight value.
And S23', correcting the pre-loading dehydration coefficient of each conventional mark according to the correction mode of the pre-loading dehydration coefficient.
Specifically, S23' includes:
after the silk drying cylinder is shifted to a starting stage, collecting and counting outlet moisture values to obtain the maximum value of the outlet moisture values;
calculating the difference value between the preset outlet moisture value and the maximum value of the outlet moisture value obtained after the starting stage;
searching a correction coefficient of the pre-loaded dehydration coefficient corresponding to the difference value in a database of the pre-loaded dehydration coefficient;
writing the correction coefficient of the preloaded dehydration coefficient into a corresponding preloaded dehydration coefficient data stack corresponding to each conventional grade;
carrying out weighted average calculation on the correction coefficients of each batch of each conventional grade in the pre-loaded dehydration coefficient data stack to obtain the weighted average of the correction coefficients of each conventional grade;
in this step, the weight value corresponding to the correction coefficient of each batch of each conventional grade is preset.
The weighted average value of the correction coefficients of each conventional grade is the correction coefficient of the first batch of each conventional grade multiplied by the corresponding weight value + the correction coefficient of the second batch of each conventional grade multiplied by the corresponding weight value + … + the correction coefficient of the Mth batch of each conventional grade multiplied by the corresponding weight value.
And calculating the pre-loaded dehydration coefficient of each conventional grade according to the weighted average value of the correction coefficients.
In the embodiment, the pre-loading dehydration coefficient of each conventional grade is the weighted average value of the correction coefficients of each conventional grade multiplied by the pre-loading dehydration coefficient to be corrected.
The small-grade parameter self-correction method enables the control mode to be suitable for the working condition of hardware change of the cut-tobacco drier and gives consideration to the characteristics of the small grade, and improves stub bar characteristic indexes and process capability indexes of conventional grade and small-grade task production.
The self-correction method provided by the embodiment is deployed on a set of leaf shred drying equipment in a workshop, namely a roller type thin plate shred drying machine KLD for use. After a cut tobacco drying water stub bar parameter self-correction mode is used, one process quality, namely the process data of the cut tobacco drying water content, is improved, the characteristic values of two stub bar water, namely overshoot and stability time, are improved, and the received control effect and feedback are good. Through sampling for two months, data of a conventional 62-lot with a stub bar and data of a 39-lot with a stub bar are obtained. The concrete effects are as follows:
the internal control indexes of the dried water content of the plant cut tobacco are as follows:
1. the dried moisture content Ppk of the conventional grade cut tobacco reaches the standard of more than or equal to 2.00, and the standard reaching rate is improved to 80.6 percent from the original 70 percent; the stability-reaching time is less than or equal to 12min, and the standard reaching rate is improved from the original 30% to 85.4%; the absolute value of the overshoot of the water stub bar is less than or equal to 0.5 percent, and the standard reaching rate is improved from the original 70 percent to 91.9 percent;
2. the dried moisture content Ppk of the small-grade cut tobacco reaches the standard of more than or equal to 1.33, and the standard reaching rate is improved from the original 50 percent to 82.5 percent; the stability-achieving time is less than or equal to 13min, and the standard-reaching rate is improved from the original 30% to 87.1%; the absolute value of the overshoot of the water stub bar is less than or equal to 0.5 percent, and the standard reaching rate is improved from the original 50 percent to 84.6 percent.
The present embodiment also provides a readable storage medium (computer-readable storage medium) having stored thereon a computer program which, when executed by a processor, implements the self-correction method of the parameter, and/or implements the self-correction method of the parameter of the small-brand. Those of ordinary skill in the art will understand that: all or part of the steps for implementing the above method embodiments may be performed by hardware associated with a computer program. The aforementioned computer program may be stored in a computer readable storage medium. When executed, the program performs steps comprising the method embodiments described above; and the aforementioned storage medium includes: various media that can store program codes, such as ROM, RAM, magnetic or optical disks.
Example two
The parameter self-correcting system is used for correcting a water drawing rated working point and/or a pre-loading dehydration coefficient in cut tobacco drying moisture content stub bar control parameters. Referring to fig. 3, a schematic diagram of a parameter self-correction system according to an embodiment is shown. As shown in fig. 3, the self-correction system 3 for the parameters includes: a receiving module 31, a first modification module 32 and/or a second modification module 33.
In this embodiment, the receiving module 31 is configured to receive the specified water withdrawal rated operating point and/or the pre-loaded dehydration coefficient as the self-correction target parameter. Wherein, each cigarette production grade comprises a small grade and a conventional grade.
The first correcting module 32 coupled to the receiving module 32 is used for correcting the water drawing amount rated working point of each cigarette production brand according to the correcting mode of the water drawing amount rated working point.
Specifically, the first modification module 32 is configured to collect data of a temperature of a cylinder wall and a water drawing amount of the cut tobacco drying cylinder after entering a production process until the cut tobacco drying cylinder enters a material tail state; calculating the average value of the temperature of the cylinder wall and the average value of the water drawing amount according to the collected data of the temperature of the cylinder wall and the water drawing amount of the wire drying cylinder; calculating the water drawing amount based on the rated cylinder wall temperature according to the average value of the water drawing amount; writing the water drawing amount with the rated cylinder wall temperature as the reference into a corresponding water drawing amount data stack according to the cigarette production brand; and extracting the water drawing amount of each batch of each cigarette production grade by taking the rated cylinder wall temperature as a reference from the water drawing amount data stack, and performing weighted average calculation on the water drawing amount to obtain the temporary storage value of the water drawing amount of each cigarette generation grade.
The second correction module 33 coupled to the receiving module 31 is configured to correct the preloaded dehydration coefficients of each cigarette production brand according to a correction mode of the preloaded dehydration coefficients.
Specifically, the second correction module 33 is configured to collect data of a cylinder wall temperature and a water drawing amount process of the cut tobacco drying cylinder after entering a production process until the cut tobacco drying cylinder enters a material tail state; calculating the average value of the temperature of the cylinder wall and the average value of the water drawing amount according to the collected data of the temperature of the cylinder wall and the water drawing amount of the wire drying cylinder; calculating the water drawing amount based on the rated cylinder wall temperature according to the average value of the water drawing amount; writing the water drawing amount with the rated cylinder wall temperature as the reference into a corresponding water drawing amount data stack according to the cigarette production brand; and extracting the water drawing amount of each batch of each cigarette production grade by taking the rated cylinder wall temperature as a reference from the water drawing amount data stack, and performing weighted average calculation on the water drawing amount to obtain the temporary storage value of the water drawing amount of each cigarette generation grade.
The embodiment also provides a small-grade parameter self-correction system. Please refer to fig. 4, which is a schematic structural diagram of a small-grade parameter self-correcting system in an embodiment. As shown in fig. 4, the small-grade parameter self-correcting system 4 includes a determining module 40, a third correcting module 43, a fourth correcting module 44, a fifth correcting module 45, and a sixth correcting module 46.
Specifically, the determining module 40 is configured to determine whether the current batch of production tasks is a production task with a small production grade after receiving the current batch of production tasks, if so, invoke the third correcting module 43 and the fourth correcting module 44, and if not, invoke the fifth correcting module 45 and the sixth correcting module 46.
The third correction module 43 is configured to obtain the water drawing amount working point parameter of each small mark in the current batch by combining the temporary value of the water drawing amount of the conventional mark in the historical production batch of the conventional mark.
Specifically, the third correction module 43 is configured to read the temporary storage value of the water drawing amount of the conventional grade of the penultimate production batch of the conventional grade and the temporary storage value of the water drawing amount of the conventional grade of the latest production batch of the conventional grade; acquiring a working condition change reference coefficient according to the temporary storage value of the water drawing amount of the conventional mark of the penultimate production batch of the conventional mark and the temporary storage value of the water drawing amount of the conventional mark of the latest production batch of the conventional mark; reading the temporary water drawing amount value of the small grade of the penultimate production batch and the temporary water drawing amount value of the small grade of the latest production batch of the small grade; acquiring a small-grade water drawing amount change reference coefficient according to the temporary water drawing amount value of the small grade of the penultimate production batch and the temporary water drawing amount value of the small grade of the latest production batch of the small grade; averaging the working condition change reference coefficient and the small-grade water drawing quantity change reference coefficient to obtain a water drawing quantity change proportion coefficient; and multiplying the preset small-grade water drawing quantity parameter by the obtained water drawing quantity change proportion coefficient to obtain the water drawing quantity working point parameter of each small grade in the current batch.
Specifically, the difference between the temporary value of the water drawing amount of the conventional grade of the penultimate production batch and the temporary value of the water drawing amount of the conventional grade of the nearest production batch of the conventional grade is calculated, and a working condition change reference coefficient corresponding to the difference between the two is obtained by searching in a database according to the difference between the two.
Specifically, the difference between the temporary value of the water drawing amount of the small grade of the penultimate production batch and the temporary value of the water drawing amount of the small grade of the nearest production batch of the small grade is calculated, and the small grade water drawing amount change reference coefficient corresponding to the difference between the two is searched and obtained in the database according to the difference between the two.
The fourth correction module 43 is configured to correct the preloaded dehydration coefficients of each small grade according to the correction mode of the preloaded dehydration coefficients.
Specifically, the fourth correction module 43 is configured to collect and count the outlet moisture value after the oven drum is shifted to the starting stage, so as to obtain a maximum value of the outlet moisture value; calculating the difference value between the preset outlet moisture value and the maximum value of the outlet moisture value obtained after the starting stage; searching a correction coefficient of the pre-loaded dehydration coefficient corresponding to the difference value in a database of the pre-loaded dehydration coefficient; writing the correction coefficient of the preloaded dehydration coefficient corresponding to each small mark into a corresponding preloaded dehydration coefficient data stack; carrying out weighted average calculation on the correction coefficients of each batch of each small grade in the pre-loaded dehydration coefficient data stack to obtain the weighted average of the correction coefficients of each small grade; and calculating the pre-loaded dehydration coefficient of each small grade according to the weighted average value of the correction coefficients.
The fifth correcting module 45 is configured to correct the water-drawing rated working points of the conventional brands according to the correcting mode of the water-drawing rated working points.
Specifically, the fifth correction module 45 is configured to collect data of the temperature of the cylinder wall of the cut tobacco drying cylinder and the water drawing amount process after entering the production process until the cut tobacco drying cylinder enters the material tail state; calculating the average value of the temperature of the cylinder wall and the average value of the water drawing amount according to the collected data of the temperature of the cylinder wall and the water drawing amount process of the wire drying cylinder; calculating the water drawing amount based on the rated cylinder wall temperature according to the average value of the water drawing amount; writing the water drawing amount with the rated cylinder wall temperature as the reference into a corresponding water drawing amount data stack according to each conventional mark; extracting the water drawing amount of each batch of each conventional grade by taking the rated cylinder wall temperature as the reference from the water drawing amount data stack, and carrying out weighted average calculation on the water drawing amount of each conventional grade to obtain the temporary storage value of the water drawing amount of each conventional grade.
The sixth modification module 46 is configured to modify the preloaded dehydration coefficients of each conventional grade according to a modification mode of the preloaded dehydration coefficients.
Specifically, the sixth modification module 46 is configured to collect and count the outlet moisture value after the oven drum is shifted to the starting stage, so as to obtain a maximum value of the outlet moisture value; calculating the difference value between the preset outlet moisture value and the maximum value of the outlet moisture value obtained after the starting stage; searching a correction coefficient of the pre-loaded dehydration coefficient corresponding to the difference value in a database of the pre-loaded dehydration coefficient; writing the correction coefficient of the preloaded dehydration coefficient into a corresponding preloaded dehydration coefficient data stack corresponding to each conventional grade; carrying out weighted average calculation on the correction coefficients of each batch of each conventional grade in the pre-loaded dehydration coefficient data stack to obtain the weighted average of the correction coefficients of each conventional grade; and calculating the pre-loaded dehydration coefficient of each conventional grade according to the weighted average value of the correction coefficients.
It should be noted that the division of the modules of the above systems 3 and 4 is only a logical division, and the actual implementation may be wholly or partially integrated into one physical entity or may be physically separated. And these modules can be realized in the form of software called by processing element; or may be implemented entirely in hardware; and part of the modules can be realized in the form of calling software by the processing element, and part of the modules can be realized in the form of hardware. For example, the x module may be a processing element that is set up separately, or may be implemented by being integrated in a chip of the apparatus, or may be stored in a memory of the apparatus in the form of program code, and the function of the x module may be called and executed by a processing element of the apparatus. Other modules are implemented similarly. In addition, all or part of the modules can be integrated together or can be independently realized. The processing element described herein may be an integrated circuit having signal processing capabilities. In implementation, each step of the above method or each module above may be implemented by an integrated logic circuit of hardware in a processor element or an instruction in the form of software.
For example, the above modules may be one or more integrated circuits configured to implement the above methods, such as: one or more Application Specific Integrated Circuits (ASICs), or one or more microprocessors (DSPs), or one or more Field Programmable Gate Arrays (FPGAs), etc. For another example, when one of the above modules is implemented in the form of a processing element scheduler code, the processing element may be a general-purpose processor, such as a Central Processing Unit (CPU) or other processor capable of calling program code. For another example, these modules may be integrated together and implemented in the form of a system-on-a-chip (SOC).
EXAMPLE III
The present embodiment provides an apparatus, comprising: a processor, a memory, a transceiver, a communication interface, and a system bus; the memory and the communication interface are connected with the processor and the transceiver through a system bus and are used for mutually communicating, the memory is used for storing a computer program, the communication interface is used for communicating with other equipment, and the processor and the transceiver are used for running the computer program to enable the x device to execute the steps of the parameter self-correction method according to the embodiment I and/or execute the steps of the parameter self-correction method of the small brand according to the embodiment I.
The above-mentioned system bus may be a Peripheral Component Interconnect (PCI) bus, an Extended Industry Standard Architecture (EISA) bus, or the like. The system bus may be divided into an address bus, a data bus, a control bus, and the like. For ease of illustration, only one thick line is shown, but this does not mean that there is only one bus or one type of bus. The communication interface is used for realizing communication between the database access device and other equipment (such as a client, a read-write library and a read-only library). The memory may include a Random Access Memory (RAM), and may further include a non-volatile memory (non-volatile memory), such as at least one disk memory.
The processor may be a general-purpose processor, and includes a Central Processing Unit (CPU), a Network Processor (NP), and the like; the integrated circuit may also be a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), a Field Programmable Gate Array (FPGA) or other programmable logic device, discrete gate or transistor logic device, or discrete hardware components.
In conclusion, the small-grade parameter self-correction method/system is deployed on a set of leaf shred drying equipment, namely a roller type thin plate shred drying machine KLD in a workshop for use. After a cut tobacco drying water stub bar parameter self-correction mode is used, one process quality, namely the process data of the cut tobacco drying water content, is improved, the characteristic values of two stub bar water, namely overshoot and stability time, are improved, and the received good control effect and feedback are achieved. The small-grade parameter self-correction method/system pair enables the control mode to be suitable for the working condition of hardware change of the cut-tobacco drier and gives consideration to the characteristics of the small grade, and improves the stub bar characteristic index and the process capability index of conventional grade and small-grade task production. Therefore, the invention effectively overcomes various defects in the prior art and has high industrial utilization value.
The foregoing embodiments are merely illustrative of the principles and utilities of the present invention and are not intended to limit the invention. Any person skilled in the art can modify or change the above-mentioned embodiments without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (10)

1. A small-grade parameter self-correction method is characterized by comprising the following steps:
after receiving the current batch of production tasks, judging whether the current batch of production tasks are production tasks of production small marks or not; if so, combining the temporary value of the water drawing amount of the conventional mark of the historical production batch of the conventional mark to obtain the water drawing amount working point parameter of each small mark of the current batch, and correcting the pre-loaded dehydration coefficient of each small mark according to the correction mode of the pre-loaded dehydration coefficient; if not, correcting the water drawing quantity rated working point of each conventional mark according to the correction mode of the water drawing quantity rated working point; meanwhile, according to the correction mode of the pre-loading dehydration coefficient, the pre-loading dehydration coefficient of each conventional grade is corrected.
2. The small-grade parameter self-correction method according to claim 1, wherein the step of obtaining the water drawing amount working point parameter of each small grade of the current batch by combining the temporary value of the water drawing amount of the conventional grade historical production batch comprises:
reading the temporary water drawing amount value of the conventional mark in the last production batch of the small mark and the temporary water drawing amount value of the conventional mark of the latest production batch of the conventional mark;
acquiring a working condition change reference coefficient according to the temporary value of the water drawing amount of the conventional mark in the last production batch of the small mark and the temporary value of the water drawing amount of the conventional mark of the latest production batch of the conventional mark;
reading the temporary water drawing amount value of the small mark of the previous production batch of the small mark and reading the temporary water drawing amount value of the small mark of the current production batch of the small mark;
acquiring a small-grade water drawing amount change reference coefficient according to the temporary value of the water drawing amount of the small grade of the previous production batch of the small grade and the temporary value of the water drawing amount of the small grade of the current production batch of the small grade;
averaging the working condition change reference coefficient and the small-grade water drawing quantity change reference coefficient to obtain a water drawing quantity change proportion coefficient;
and multiplying the preset small-grade water drawing quantity parameter by the obtained water drawing quantity change proportion coefficient to obtain the water drawing quantity working point parameter of each small grade in the current batch.
3. The self-correcting method of small-grade parameters according to claim 1, wherein the step of correcting the rated water withdrawal operating point of each conventional grade according to the correction mode of the rated water withdrawal operating point comprises:
after entering the production process, collecting the data of the temperature of the cylinder wall of the silk drying cylinder and the water drawing amount until the silk drying cylinder enters a material tail state;
calculating the average value of the temperature of the cylinder wall and the average value of the water drawing amount according to the collected data of the temperature of the cylinder wall and the water drawing amount process of the wire drying cylinder;
calculating the water drawing amount based on the rated cylinder wall temperature according to the average value of the water drawing amount;
writing the water drawing amount with the rated cylinder wall temperature as the reference into a corresponding water drawing amount data stack according to each conventional mark;
extracting the water drawing amount of each batch of each conventional grade by taking the rated cylinder wall temperature as the reference from the water drawing amount data stack, and carrying out weighted average calculation on the water drawing amount of each conventional grade to obtain the temporary storage value of the water drawing amount of each conventional grade.
4. The method of self-correction of a small-scale parameter of claim 1,
the average value of the wall temperature of the wire drying cylinder is equal to the sum of the wall temperatures of the wire drying cylinder collected every preset collection period after the wire drying cylinder enters the production process, and the collection times are divided;
the average value of the water drawing amount is equal to the sum of the water drawing amount process data acquired every preset acquisition period after the production process is started, and the acquisition times are divided by the average value of the water drawing amount data;
the water drawing amount with the rated cylinder wall temperature as the reference is equal to the average water drawing amount (the average cylinder wall temperature of the wire drying cylinder-the rated cylinder wall temperature)/the drying coefficient in the recipe parameters of the wire drying machine.
5. The self-correction method for small-grade parameters according to claim 4, wherein the temporary storage value of the water-drawing amount of each conventional grade is the water-drawing amount of the first batch of each conventional grade based on the rated cylinder wall temperature multiplied by the corresponding weight value + the water-drawing amount of the second batch of each conventional grade based on the rated cylinder wall temperature multiplied by the corresponding weight value + … + the water-drawing amount of the Nth batch of each conventional grade based on the rated cylinder wall temperature multiplied by the corresponding weight value.
6. The method of self-correction of small-grade parameters according to claim 3, wherein the step of correcting the preloaded water removal coefficients of each regular grade according to the preloaded water removal coefficient correction pattern comprises:
after the silk drying cylinder is shifted to a starting stage, acquiring and counting an outlet moisture value to obtain the maximum value of the outlet moisture value in the stage until the silk drying cylinder is shifted to a production stage;
calculating the difference value between the preset outlet moisture value and the maximum value of the outlet moisture value obtained after the starting stage;
searching a correction coefficient of the pre-loaded dehydration coefficient corresponding to the difference value in a database of the pre-loaded dehydration coefficient;
writing the correction coefficient of the preloaded dehydration coefficient into a corresponding preloaded dehydration coefficient data stack corresponding to each conventional grade;
carrying out weighted average calculation on the correction coefficients of each batch of each conventional grade in the pre-loaded dehydration coefficient data stack to obtain the weighted average of the correction coefficients of each conventional grade;
and calculating the pre-loaded dehydration coefficient of each conventional grade according to the weighted average value of the correction coefficients.
7. The method for self-correcting small-grade parameters according to claim 6, wherein the weighted average of the correction coefficients of each regular grade is the correction coefficient of the first batch of each regular grade multiplied by the corresponding weight value + the correction coefficient of the second batch of each regular grade multiplied by the corresponding weight value + … + the correction coefficient of the Mth batch of each regular grade multiplied by the corresponding weight value.
8. A small-brand parameter self-correction system, comprising:
the judging module is used for judging whether the current batch of production tasks are production tasks for producing small marks or not after the current batch of production tasks are received; if so, calling a third correction module to obtain water drawing quantity working point parameters of each small mark of the current batch by combining with the temporary storage value of the water drawing quantity of the conventional mark of the historical production batch of the conventional mark, and calling a fourth correction module to correct the pre-loaded dehydration coefficient of each small mark according to the correction mode of the pre-loaded dehydration coefficient; if not, calling a fifth correction module to correct the water drawing rated working points of the conventional brands according to the correction mode of the water drawing rated working points; and meanwhile, calling a sixth correction module to correct the pre-loaded dehydration coefficient of each conventional grade according to the correction mode of the pre-loaded dehydration coefficient.
9. A readable storage medium, on which a computer program is stored, which, when being executed by a processor, carries out a method for self-correction of parameters of a sub-brand according to any one of claims 1 to 7.
10. An apparatus, comprising: a processor and a memory;
the memory is configured to store a computer program, and the processor is configured to execute the computer program stored by the memory to cause the apparatus to perform the parameter self-correction method of the small-scale license plate of any one of claims 1 to 7.
CN201810026119.4A 2018-01-11 2018-01-11 Small-brand parameter self-correction method/system, readable storage medium and device Active CN107942926B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810026119.4A CN107942926B (en) 2018-01-11 2018-01-11 Small-brand parameter self-correction method/system, readable storage medium and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810026119.4A CN107942926B (en) 2018-01-11 2018-01-11 Small-brand parameter self-correction method/system, readable storage medium and device

Publications (2)

Publication Number Publication Date
CN107942926A CN107942926A (en) 2018-04-20
CN107942926B true CN107942926B (en) 2020-05-12

Family

ID=61938534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810026119.4A Active CN107942926B (en) 2018-01-11 2018-01-11 Small-brand parameter self-correction method/system, readable storage medium and device

Country Status (1)

Country Link
CN (1) CN107942926B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108771281A (en) * 2018-08-24 2018-11-09 山东中烟工业有限责任公司 It is a kind of to reduce the method and system fluctuated between drum-type cut-tobacco drier barrel temperature batch
CN110222061B (en) * 2019-06-13 2023-08-25 红云红河烟草(集团)有限责任公司 Equipment parameter management system and method for cigarette production line
CN111480874B (en) * 2020-04-29 2022-03-15 上海烟草集团有限责任公司 Cut tobacco drying moisture composite control method and system and cut tobacco drying machine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101853393A (en) * 2010-04-22 2010-10-06 深圳市鼎为科技有限公司 Automatic production and automatic learning method of machine vision system detection algorithm
CN201622451U (en) * 2009-09-22 2010-11-03 赵凯 Responsive-type tobacco leaf curing automatic control instrument
CN102090708A (en) * 2010-09-10 2011-06-15 龙岩烟草工业有限责任公司 Control method for improving stability of moisture content of cut tobaccos
CN102141804A (en) * 2011-03-28 2011-08-03 秦皇岛烟草机械有限责任公司 Online control method for tobacco processing process parameters by using computer programs
CN102331712A (en) * 2011-08-18 2012-01-25 中国烟草总公司郑州烟草研究院 Variable-parameter drum control method in tobacco shred drying process
CN102669812A (en) * 2011-03-08 2012-09-19 豪尼机械制造股份公司 Control device and control method for machine used for manufacturing rod-shaped products in tobacco processing industry

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201622451U (en) * 2009-09-22 2010-11-03 赵凯 Responsive-type tobacco leaf curing automatic control instrument
CN101853393A (en) * 2010-04-22 2010-10-06 深圳市鼎为科技有限公司 Automatic production and automatic learning method of machine vision system detection algorithm
CN102090708A (en) * 2010-09-10 2011-06-15 龙岩烟草工业有限责任公司 Control method for improving stability of moisture content of cut tobaccos
CN102090708B (en) * 2010-09-10 2013-08-21 龙岩烟草工业有限责任公司 Control method for improving stability of moisture content of cut tobaccos
CN102669812A (en) * 2011-03-08 2012-09-19 豪尼机械制造股份公司 Control device and control method for machine used for manufacturing rod-shaped products in tobacco processing industry
CN102141804A (en) * 2011-03-28 2011-08-03 秦皇岛烟草机械有限责任公司 Online control method for tobacco processing process parameters by using computer programs
CN102331712A (en) * 2011-08-18 2012-01-25 中国烟草总公司郑州烟草研究院 Variable-parameter drum control method in tobacco shred drying process

Also Published As

Publication number Publication date
CN107942926A (en) 2018-04-20

Similar Documents

Publication Publication Date Title
CN108175121B (en) Method/system for self-correction of parameters, computer readable storage medium and apparatus
CN107942926B (en) Small-brand parameter self-correction method/system, readable storage medium and device
JP6890382B2 (en) Production system
CN113017132A (en) Cut tobacco quality optimization method based on cut tobacco dryer process parameter prediction
CN113608566B (en) Method and system for monitoring and adjusting environment of textile workshop
CN105334738B (en) A kind of method of evaluating performance suitable for tobacco processing course pid control circuit
CN113080500B (en) Tobacco leaf baking method and system based on neural network and related components thereof
CN110807245B (en) Automatic modeling method and system for equipment fault early warning
CN108771281A (en) It is a kind of to reduce the method and system fluctuated between drum-type cut-tobacco drier barrel temperature batch
CN109984375B (en) Method for controlling cigarette hardness
CN110876481B (en) Control method and device for tobacco shred drying parameters
CN107909554A (en) Image denoising method, device, terminal device and medium
CN111972693B (en) Method, device, medium and terminal for identifying abnormal working conditions of tobacco leaf threshing and redrying
CN108376263B (en) Method and device for predicting environment temperature and humidity of workplace
CN112965365B (en) Model identification method, device and system of PID control loop and storage medium
CN113076309A (en) System and method for predicting water adding amount of raw tobacco shred
CN114062303B (en) Tobacco uniformity monitoring method, system, medium and equipment
WO2014117139A1 (en) Reducing product variations via variance partition analysis
EP3334861A1 (en) System and method for step test-free machine modeling using statistical information about multiple web manufacturing or processing systems
CN111062120B (en) Dynamic setting optimization method and device for thickness of cold continuous rolling raw material
CN117981895A (en) Control method of hot air blower for loosening and conditioning machine and electronic equipment
TWI824192B (en) Method and server for verifying environment detection data based on random effect model
CN117804639A (en) Temperature calibration method and system for temperature control sensor of cementing machine
CN116738137A (en) Method for predicting and adjusting temperature of cut tobacco drying cylinder wall of cylinder cut tobacco dryer
CN114091873A (en) Work order generation method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant