CN107939437A - A kind of constructing tunnel building site dust-extraction unit - Google Patents

A kind of constructing tunnel building site dust-extraction unit Download PDF

Info

Publication number
CN107939437A
CN107939437A CN201711072597.0A CN201711072597A CN107939437A CN 107939437 A CN107939437 A CN 107939437A CN 201711072597 A CN201711072597 A CN 201711072597A CN 107939437 A CN107939437 A CN 107939437A
Authority
CN
China
Prior art keywords
water
elevating lever
interlocked
pump controller
plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711072597.0A
Other languages
Chinese (zh)
Other versions
CN107939437B (en
Inventor
张罗悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Changzheng Construction Co.,Ltd.
Original Assignee
张罗悦
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张罗悦 filed Critical 张罗悦
Priority to CN201711072597.0A priority Critical patent/CN107939437B/en
Publication of CN107939437A publication Critical patent/CN107939437A/en
Application granted granted Critical
Publication of CN107939437B publication Critical patent/CN107939437B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F5/00Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires
    • E21F5/02Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires by wetting or spraying
    • E21F5/04Spraying barriers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D15/00Control, e.g. regulation, of pumps, pumping installations or systems
    • F04D15/0005Control, e.g. regulation, of pumps, pumping installations or systems by using valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D15/00Control, e.g. regulation, of pumps, pumping installations or systems
    • F04D15/02Stopping of pumps, or operating valves, on occurrence of unwanted conditions
    • F04D15/0209Stopping of pumps, or operating valves, on occurrence of unwanted conditions responsive to a condition of the working fluid
    • F04D15/0218Stopping of pumps, or operating valves, on occurrence of unwanted conditions responsive to a condition of the working fluid the condition being a liquid level or a lack of liquid supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D29/00Details, component parts, or accessories
    • F04D29/66Combating cavitation, whirls, noise, vibration or the like; Balancing
    • F04D29/669Combating cavitation, whirls, noise, vibration or the like; Balancing especially adapted for liquid pumps

Abstract

The invention discloses a kind of constructing tunnel building site dust-extraction unit, its structure includes air inlet, power cord, makes mist cylinder, angle shaft, fixing bracket, atomizing nozzle, upper hose, turntable, switch board, control panel, universal wheel, water storage box, water plug, and water plug is installed on switch board rear end for rectangular configuration and front end by manner.This practical beneficial effect:The water plug that this practicality is equipped with is communicated with water storage water tank by internal sink and realizes water level and share, as the change of water level controls kickboard to lift fluctuating for plate with lifting, and driving chain both ends control the switch button of water pump controller by the first elevating lever and the second elevating lever, then engaged by driving chain with pressure regulation shaft, realize water level change synchronous with the pump pressure that draws water, avoid suction pump from being in empty pumping state, avoid blade from being damaged because of cavitation erosion, save the loss of suction pump.

Description

A kind of constructing tunnel building site dust-extraction unit
Technical field
The present invention is a kind of constructing tunnel building site dust-extraction unit, belongs to building site deduster field.
Background technology
With social progress, country, enterprise increasingly pay attention to occupational health, and one is created well for construction worker Operating environment be an inevitable requirement.Constructing tunnel operation is because of its operation faciostenosis, and ventilation condition is poor, in production process of constructing Dust, the toxic and harmful gas of generation are not easy to spread, and the health of construction worker is brought and is seriously affected, and dirt occurs The severely afflicated area of the occupational diseases such as lung, acute and chronic poisonous gas poisoning.Constructing tunnel is a complicated process, its environmental pollution Greatly.Constructing tunnel face is more, and single port driving length, construction Dust Capacity is big, and when construction blasting can produce substantial amounts of dust, and dust-laying effect is straight Connect and be related to construction site, if construction site carries out depositing dust not in time, it will the serious health for endangering producers, Influence construction safety and manufacturing schedule.
The dynamics that existing technology can not be drawn water by water level control, when water level is in minimum liquid level, suction pump one Straight to be in empty pumping state, the blade that may result in suction pump is damaged because of cavitation erosion, and loss is very big.
The content of the invention
In view of the deficienciess of the prior art, it is an object of the present invention to provide a kind of constructing tunnel building site dust-extraction unit, with solution The dynamics that certainly existing technology can not be drawn water by water level control, when water level is in minimum liquid level, suction pump is constantly in The problem of empty pumping state, the blade that may result in suction pump are damaged because of cavitation erosion, and loss is very big.
To achieve these goals, the present invention is to realize by the following technical solutions:Remove in a kind of constructing tunnel building site Dirt device, its structure include air inlet, power cord, make mist cylinder, angle shaft, fixing bracket, atomizing nozzle, upper hose, turntable, control Cabinet processed, control panel, universal wheel, water storage box, water plug, the universal wheel are equipped with four and uniform by manner altogether Switch board and water storage box bottom are distributed in, the water plug is installed on control for rectangular configuration and front end by manner Cabinet rear end, the water plug rear end are equipped with the groove of activity installing water storage box, and the fixing bracket is U-shaped structure and opens Groove both ends are interlocked by angle shaft with making mist cylinder both ends, and the air inlet interlocks for circular configuration and with making mist tube rear end Merge into a single whole molding structure, and the atomizing nozzle is connected with making mist cylinder by manner, and described making is logical in the middle part of mist cylinder Cross upper hose with water storage box to be connected, the mist tube rear end of making is electrically connected by power cord with switch board, the dress that draws water Put including drinking-water pipe, the connector that draws water, start button, water pump controller, pressure regulating valve, adjust shaft, X button, mandril, auxiliary Roller, the first elevating lever, driving chain, sink, the second elevating lever, lifting lift plate, kickboard, water tank box, pump mouth are helped, it is described Water plug right end be connected with water tank box, the sink is arranged on right end and the knot that is integrally formed inside water plug Structure, the water pump controller are installed on water plug upper end by embedded mode, and the connector that draws water is columnar structured And water pump controller right end is installed on by embedded mode, the water pump controller is connected by the connector that draws water with drinking-water pipe Connect, the start button is installed on water pump controller bottom both ends, the water pump control with X button by embedded mode The circular groove of activity installing pressure regulating valve is equipped with the middle part of device processed, is interlocked in the middle part of the pressure regulating valve with adjusting shaft, institute The driving chain stated is interlocked with adjusting shaft, and the driving chain left end is connected with the first elevating lever, and described first Auxiliary wheel is equipped with the left of elevating lever and is bonded by auxiliary wheel with water plug inner left wall, on first elevating lever End is interlocked by mandril and X button bottom, and the driving chain right end is equipped with the second elevating lever, described second liter Drop bar is interlocked with lifting lift plate, and lifting lift plate is installed on inside sink by embedded mode, lifting lift plate Bottom is equipped with kickboard, and with being communicated inside water tank box, the pump mouth is interlocked with bottom of the tube of drawing water for sink inside And it is located at the water tank box lower right corner.
Further, the water pump controller includes transformation valve, transmission balance, transformer, transmission shaft.
Further, the transformer for rectangular configuration and is installed on water pump controller right end, institute by manner The transformation valve stated is installed on water pump controller left end by embedded mode, and the transformation valve left end interlocks with transmission balance Close, be connected in the middle part of the transmission balance by transmission shaft with adjusting shaft.
Further, the control panel is installed on the right side upper end on switch board surface by embedded mode, described Turntable is installed in the middle part of switch board for circular configuration and bottom by embedded mode, the turntable upper end and fixing bracket bottom It is interlocked.
Further, the water tank box water level inside and tank water bit parallel, the sink height of water level is with floating Plate bottom level is consistent.
Beneficial effect
A kind of constructing tunnel building site of the invention dust-extraction unit, beneficial effects of the present invention are:As shown in Figs. 1-5, carrying out When use, switch board is operated by control panel and carries out making mist dedusting, then carrying out automation by water plug draws water Control, water storage is carried out by water storage box, and water storage box is communicated with water plug, is conveniently controlled, and the power cord being equipped with is used for Mist cylinder is made in control, is made gas suction in mist cylinder by air inlet, and gas is shed at the same time with moisture by atomizing nozzle, so that into Row dedusting, the top inside water plug being equipped with is equipped with water pump controller, and the water pump controller is connected by the connector that draws water Drinking-water pipe, so as to control pump mouth to draw water, the sink water level inside being equipped with keeps same liquid level with water tank box, works as water level In it is minimum when, the kickboard in sink drives lifting lift plate to be moved down with the second elevating lever, connection with water level decreasing Driving chain on the left of the second elevating lever declines therewith, is engaged in the middle part of the driving chain being equipped with adjusting shaft and drives adjusting Shaft is rotated counterclockwise, so as to control pressure regulating valve draw water pressure adjustment, in addition, the driving chain other end drives the One elevating lever is risen with mandril, by ejector pin contact X button, so as to carry out the closing control of water pump controller, is equipped with Auxiliary wheel be arranged on the first elevating lever left end, for reduce the first lifter rod lifting movement resistance, be equipped with water pump control The transformer that device is internally provided with controls transformation valve to carry out voltage adjustment by being driven balance, it is achieved thereby that the pumping to suction pump The control of water pressure size, which is interlocked by transmission shaft with adjusting shaft, so as to fulfill coordinated signals.
The water plug that this practicality is equipped with is communicated with water storage water tank by internal sink and realizes water level and share, with water level Change control kickboard to fluctuate with lifting lift plate, and driving chain both ends pass through the first elevating lever and the second elevating lever The switch button of water pump controller is controlled, is then engaged by driving chain with pressure regulation shaft, realizes water level and pump pressure of drawing water The synchronous change of power, avoids suction pump from being in empty pumping state, avoids blade from being damaged because of cavitation erosion, save the loss of suction pump.
Brief description of the drawings
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, further feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is a kind of structure diagram of constructing tunnel building site of the invention dust-extraction unit.
Fig. 2 is the water plug internal structure schematic diagram of the present invention.
Fig. 3 is the water pump controller internal structure schematic diagram of the present invention.
Fig. 4 is water plug the first morphosis schematic diagram of the present invention.
Fig. 5 is water plug the second morphosis schematic diagram of the present invention.
In figure:Air inlet -1, power cord -2, make mist cylinder -3, angle shaft -4, fixing bracket -5, atomizing nozzle -6, upper water Pipe -7, turntable -8, switch board -9, control panel -10, universal wheel -11, water storage box -12, water plug -13, drinking-water pipe -1301, Draw water connector -1302, start button -1303, water pump controller -1304, pressure regulating valve -1305, adjust shaft -1306, close Button -1307, mandril -1308, auxiliary wheel -1309, the first elevating lever -1310, driving chain -1311, sink -1312, Two elevating levers -1313, lifting lift plate -1314, kickboard -1315, water tank box -1316, pump mouth -1317, transformation valve - 13041st, balance -13042, transformer -13043, transmission shaft -13044 are driven.
Embodiment
To make the technical means, the creative features, the aims and the efficiencies achieved by the present invention easy to understand, with reference to Embodiment, the present invention is further explained.
Embodiment
- Fig. 5 is please referred to Fig.1, the present invention provides a kind of constructing tunnel building site dust-extraction unit:Its structure includes air inlet 1, electricity Source line 2, make mist cylinder 3, angle shaft 4, fixing bracket 5, atomizing nozzle 6, upper hose 7, turntable 8, switch board 9, control panel 10, ten thousand To wheel 11, water storage box 12, water plug 13, the universal wheel 11 is equipped with four and is uniformly distributed in control by manner altogether Cabinet 9 processed and 12 bottom of water storage box, the water plug 13 are installed on switch board 9 for rectangular configuration and front end by manner Rear end, 13 rear end of water plug are equipped with the groove of activity installing water storage box 12, and the fixing bracket 5 is U-shaped structure And fluting both ends are interlocked by angle shaft 4 with making 3 both ends of mist cylinder, the air inlet 1 is for circular configuration and with making mist cylinder 3 The rear end merging that interlocks is an integral molding structure, and the atomizing nozzle 6 is connected with making mist cylinder 3 by manner, and described makes The middle part of mist cylinder 3 is connected by upper hose 7 with water storage box 12, and 3 rear end of mist cylinder of making passes through power cord 2 and the electricity of switch board 9 Connection, the water plug 13 include drinking-water pipe 1301, the connector 1302 that draws water, start button 1303, water pump controller 1304, Pressure regulating valve 1305, adjust shaft 1306, X button 1307, mandril 1308, auxiliary wheel 1309, the first elevating lever 1310, Driving chain 1311, sink 1312, the second elevating lever 1313, lifting lift plate 1314, kickboard 1315, water tank box 1316, draw water Mouth 1317,13 right end of water plug is connected with water tank box 1316, and the sink 1312 is arranged on water plug 13 Internal right end is simultaneously an integral molding structure, and the water pump controller 1304 is installed on water plug 13 by embedded mode End, the connector 1302 that draws water is columnar structured and is installed on 1304 right end of water pump controller by embedded mode, described Water pump controller 1304 be connected by the connector 1302 that draws water with drinking-water pipe 1301, the start button 1303 is pressed with closing Button 1307 is installed on 1304 bottom both ends of water pump controller by embedded mode, and the middle part of water pump controller 1304, which is equipped with, lives The circular groove of dynamic installing pressure regulating valve 1305, the middle part of pressure regulating valve 1305 is interlocked with adjusting shaft 1306, described Driving chain 1311 with adjust shaft 1306 be interlocked, 1311 left end of driving chain is connected with the first elevating lever 1310 Connect, the left side of the first elevating lever 1310 is equipped with auxiliary wheel 1309 and by auxiliary wheel 1309 and the left side of water plug 13 Inner wall is bonded, and 1310 upper end of the first elevating lever is interlocked by mandril 1308 and 1307 bottom of X button, described 1311 right end of driving chain is equipped with the second elevating lever 1313, and second elevating lever 1313 is interlocked with lifting lift plate 1314, The lifting lift plate 1314 is installed on inside sink 1312 by embedded mode, and 1314 bottom of lifting lift plate is equipped with floating Plate 1315, the inside of sink 1312 inside water tank box 1316 with communicating, the pump mouth 1317 and drinking-water pipe 1301 Bottom is interlocked and is located at 1316 lower right corner of water tank box, and the water pump controller 1304 includes transformation valve 13041, transmission Balance 13042, transformer 13043, transmission shaft 13044, the transformer 13043 are pacified for rectangular configuration and by manner Loaded on 1304 right end of water pump controller, the transformation valve 13041 is installed on the left side of water pump controller 1304 by embedded mode End, 13041 left end of transformation valve are interlocked with transmission balance 13042, and the middle part of transmission balance 13042 passes through biography Moving axis 13044 is connected with adjusting shaft 1306, and the control panel 10 is installed on 9 surface of switch board by embedded mode Right side upper end, the turntable 8 are installed on the middle part of switch board 9, the turntable 8 for circular configuration and bottom by embedded mode Upper end is interlocked with 5 bottom of fixing bracket, and 1316 water level inside of water tank box is parallel with 1312 water level of sink, described 1312 height of water level of sink is consistent with 1315 bottom level of kickboard.
The present invention provides a kind of constructing tunnel building site dust-extraction unit, its operation principle is:As shown in Figs. 1-5, into enforcement With when, by control panel 10 operate switch board 9 carry out making mist dedusting, automation pumping is then carried out by water plug 13 Water management, water storage is carried out by water storage box 12, and water storage box 12 is communicated with water plug 13, is conveniently controlled, the electricity being equipped with Source line 2 makes mist cylinder 3 for control, is made gas suction 3 in mist cylinder by air inlet 1, and by atomizing nozzle 6 that gas is same with moisture When shed, so as to carry out dedusting, the top inside water plug 13 being equipped with is equipped with water pump controller 1304, and the water pump controls Device 1304 connects drinking-water pipe 1301 by the connector 1302 that draws water, so that control pump mouth 1317 to draw water, the sink being equipped with 1312 water level insides and water tank box 1316 keep same liquid level, when water level is in it is minimum when, the kickboard 1315 in sink 1312 With water level decreasing, drive lifting lift plate 1314 to be moved down with the second elevating lever 1313, be connected to the second elevating lever The driving chain 1311 in 1313 left sides declines therewith, and the middle part of driving chain 1311 being equipped with is engaged and driven with adjusting shaft 1306 Adjust shaft 1306 to be rotated counterclockwise, so as to control pressure regulating valve 1305 to carry out pressure adjustment of drawing water, in addition, driving chain 1311 other ends drive the first elevating lever 1310 to be risen with mandril 1308, and X button 1307 is contacted by mandril 1308, So as to carry out the closing control of water pump controller 1304, the auxiliary wheel 1309 being equipped with is arranged on 1310 left end of the first elevating lever, uses In the resistance for reducing 1310 lifting moving of the first elevating lever, the transformer 13043 that the water pump controller 1304 being equipped with is internally provided with Transformation valve 13041 is controlled to carry out voltage adjustment by being driven balance 13042, it is achieved thereby that big to the pressure of drawing water of suction pump Small control, which is interlocked by transmission shaft 13044 with adjusting shaft 1306, so as to fulfill coordinated signals.
Water plug 13 of the present invention refers to possess each one of the air exhaust nozzle of one-in-and-one-out, exhaust nozzle, and into Vacuum or negative pressure can be persistently formed at mouthful;Micro-positive pressure is formed at exhaust nozzle.
The present invention solves the problems, such as it is dynamics that existing technology can not be drawn water by water level control, in water level in most During low liquid level, suction pump is constantly in empty pumping state, and the blade that may result in suction pump is damaged because of cavitation erosion, and loss is very big, this Invention is combined with each other by above-mentioned component, is realized water level change synchronous with the pump pressure that draws water, is avoided suction pump from being in sky Pumping state, avoids blade from being damaged because of cavitation erosion, saves the loss of suction pump.
The basic principles, main features and the advantages of the invention have been shown and described above, for this area skill For art personnel, it is clear that the invention is not restricted to the details of above-mentioned one exemplary embodiment, and without departing substantially from the present invention spirit or In the case of essential characteristic, the present invention can be realized in other specific forms.Therefore, in all respects, should all incite somebody to action Embodiment regards exemplary as, and is non-limiting, the scope of the present invention by appended claims rather than on state Bright restriction, it is intended that including all changes fallen in the implication and scope of the equivalency of claim in the present invention It is interior.Any reference numeral in claim should not be considered as to the involved claim of limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical solution, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (5)

1. a kind of constructing tunnel building site dust-extraction unit, its structure includes air inlet (1), power cord (2), makes mist cylinder (3), angle turn Axis (4), fixing bracket (5), atomizing nozzle (6), upper hose (7), turntable (8), switch board (9), control panel (10), universal wheel (11), water storage box (12), water plug (13), it is characterised in that:
The universal wheel (11) is equipped with four and is uniformly distributed in switch board (9) and water storage box (12) bottom by manner altogether Portion, the water plug (13) are installed on switch board (9) rear end, the pumping for rectangular configuration and front end by manner Water installations (13) rear end is equipped with the groove of activity installing water storage box (12), and the fixing bracket (5) is U-shaped structure and fluting two End is interlocked by angle shaft (4) with making mist cylinder (3) both ends, and the air inlet (1) is for circular configuration and with making mist cylinder (3) The rear end merging that interlocks is an integral molding structure, and the atomizing nozzle (6) is connected with making mist cylinder (3) by manner, described Make and be connected by upper hose (7) with water storage box (12) in the middle part of mist cylinder (3), described mist cylinder (3) rear end of making passes through power cord (2) it is electrically connected with switch board (9);
The water plug (13) includes drinking-water pipe (1301), the connector that draws water (1302), start button (1303), water pump control Device (1304), pressure regulating valve (1305), adjust shaft (1306), X button (1307), mandril (1308), auxiliary wheel (1309), the first elevating lever (1310), driving chain (1311), sink (1312), the second elevating lever (1313), lifting lift plate (1314), kickboard (1315), water tank box (1316), pump mouth (1317), the water plug (13) right end and water tank case Body (1316) is connected, and the sink (1312) is arranged on the internal right end of water plug (13) and is an integral molding structure, described Water pump controller (1304) water plug (13) upper end is installed on by embedded mode, the connector that draws water (1302) is circle Tubular construction and water pump controller (1304) right end is installed on by embedded mode, the water pump controller (1304) passes through pumping Water swivel (1302) is connected with drinking-water pipe (1301), and the start button (1303) passes through insertion with X button (1307) Mode is installed on water pump controller (1304) bottom both ends, and activity installing pressure regulation is equipped with the middle part of the water pump controller (1304) The circular groove of valve (1305), the pressure regulating valve (1305) middle part are interlocked with adjusting shaft (1306), the biography Dynamic chain (1311) is interlocked with adjusting shaft (1306), the driving chain (1311) left end and the first elevating lever (1310) It is connected, auxiliary wheel (1309) is equipped with the left of first elevating lever (1310) and by auxiliary wheel (1309) with drawing water Device (13) inner left wall is bonded, and the first elevating lever (1310) upper end passes through mandril (1308) and X button (1307) Bottom is interlocked, and the driving chain (1311) right end is equipped with the second elevating lever (1313), second elevating lever (1313) it is interlocked with lifting lift plate (1314), lifting lift plate (1314) is installed on sink (1312) by embedded mode Inside, lifting lift plate (1314) bottom are equipped with kickboard (1315), the sink (1312) inside and water tank box (1316) internal to communicate, the pump mouth (1317) is interlocked with drinking-water pipe (1301) bottom and is located at water tank box (1316) The lower right corner.
A kind of 2. constructing tunnel building site dust-extraction unit according to claim 1, it is characterised in that:The water pump controller (1304) transformation valve (13041), transmission balance (13042), transformer (13043), transmission shaft (13044) are included.
A kind of 3. constructing tunnel building site dust-extraction unit according to claim 2, it is characterised in that:The transformer (13043) rectangular configuration and to be installed on water pump controller (1304) right end, the transformation valve by manner (13041) water pump controller (1304) left end, transformation valve (13041) left end and transmission are installed on by embedded mode Balance (13042) is interlocked, by transmission shaft (13044) with adjusting shaft (1306) in the middle part of the transmission balance (13042) It is connected.
A kind of 4. constructing tunnel building site dust-extraction unit according to claim 1, it is characterised in that:The control panel (10) the right side upper end on switch board (9) surface is installed on by embedded mode, the turntable (8) leads to for circular configuration and bottom Cross embedded mode to be installed in the middle part of switch board (9), the turntable (8) upper end is interlocked with fixing bracket (5) bottom.
A kind of 5. constructing tunnel building site dust-extraction unit according to claim 1, it is characterised in that:The water tank box (1316) water level inside is parallel with sink (1312) water level, and sink (1312) height of water level is high with kickboard (1315) bottom Degree is consistent.
CN201711072597.0A 2017-11-04 2017-11-04 A kind of constructing tunnel building site dust-extraction unit Active CN107939437B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711072597.0A CN107939437B (en) 2017-11-04 2017-11-04 A kind of constructing tunnel building site dust-extraction unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711072597.0A CN107939437B (en) 2017-11-04 2017-11-04 A kind of constructing tunnel building site dust-extraction unit

Publications (2)

Publication Number Publication Date
CN107939437A true CN107939437A (en) 2018-04-20
CN107939437B CN107939437B (en) 2019-06-04

Family

ID=61933272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711072597.0A Active CN107939437B (en) 2017-11-04 2017-11-04 A kind of constructing tunnel building site dust-extraction unit

Country Status (1)

Country Link
CN (1) CN107939437B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109209469A (en) * 2018-10-25 2019-01-15 付耀文 A kind of new-type coal mine atomizing de-dusting apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533506A (en) * 2014-12-30 2015-04-22 邹城兖矿泰德工贸有限公司 Mine-used sprinkler
CN105863718A (en) * 2016-04-12 2016-08-17 淄博矿业集团有限责任公司许厂煤矿 Mine water treatment and circulation system
CN106238243A (en) * 2016-08-26 2016-12-21 无锡市恒达矿山机械有限公司 The spraying machine that a kind of mine uses
CN107191217A (en) * 2017-07-19 2017-09-22 广州市欧伊若科技有限公司 A kind of mining mist-spraying cooling fan

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533506A (en) * 2014-12-30 2015-04-22 邹城兖矿泰德工贸有限公司 Mine-used sprinkler
CN105863718A (en) * 2016-04-12 2016-08-17 淄博矿业集团有限责任公司许厂煤矿 Mine water treatment and circulation system
CN106238243A (en) * 2016-08-26 2016-12-21 无锡市恒达矿山机械有限公司 The spraying machine that a kind of mine uses
CN107191217A (en) * 2017-07-19 2017-09-22 广州市欧伊若科技有限公司 A kind of mining mist-spraying cooling fan

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109209469A (en) * 2018-10-25 2019-01-15 付耀文 A kind of new-type coal mine atomizing de-dusting apparatus

Also Published As

Publication number Publication date
CN107939437B (en) 2019-06-04

Similar Documents

Publication Publication Date Title
CN206617187U (en) Colliery gun diging face automatic spray dust removal device
CN206647132U (en) A kind of portable mine wet shot dust arrester
CN205176775U (en) Laptop heat dissipation device
CN107939437B (en) A kind of constructing tunnel building site dust-extraction unit
CN203384004U (en) Pneumatic water pump
CN205660666U (en) High -efficient negative pressure workbench
CN103046959A (en) Full negative pressure automatic water-discharging device
CN203585812U (en) Instrument air supply device
CN103191895A (en) Wall-climbing robot capable of turning around vertically
CN206670478U (en) A kind of explosion dust suppression water pot
CN2212099Y (en) Vacuum negative pressure device
CN113090319B (en) Automatic gas explosion-proof system and method for underground coal mine
CN210993504U (en) Environment-friendly dust collector for construction
CN207700274U (en) Integral type pressurized watering device
CN204099156U (en) Water piston takes out air feeder
CN104649082A (en) Flexible duct opening caliber and position automatic adjusting vehicle
CN208475495U (en) A kind of library's energy-saving fresh system humidifying structure
CN203824281U (en) Heat conduction oil hot air fan emission type drying equipment
CN206988196U (en) A kind of new high-lift hydraulic valve
CN203476840U (en) Pneumatic circulation type pump and wind power valley electricity energy storage pneumatic circulation type water pumping system
CN207680255U (en) A kind of high pressure spraying machine for reducing concrete dust
CN207329751U (en) A kind of plane material sucker conveying device
CN205476614U (en) Cement dress chartered plane laboratory bench electric appliance control box
CN206084643U (en) Pipeline is mobile device for sander
CN210385243U (en) Small-size earthwork transport vehicle with humidifying structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190424

Address after: 325005 No. 5 Building of Jinchan Group 10, Xinqiao, Ouhai District, Wenzhou City, Zhejiang Province

Applicant after: Chen Hailu

Address before: 430074 No. 388 Lu Lu, Hongshan District, Hubei, Wuhan

Applicant before: Zhang Luoyue

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190509

Address after: Room 105-39996, No. 6 Baohua Road, Hengqin New District, Zhuhai City, Guangdong Province

Applicant after: Zhuhai Gree Municipal Engineering Co., Ltd.

Address before: 325005 No. 5 Building of Jinchan Group 10, Xinqiao, Ouhai District, Wenzhou City, Zhejiang Province

Applicant before: Chen Hailu

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room 217, 2 / F, building 3, science and Technology Innovation Park, No.1 harbor, No.1 Jintang Road, Tangjiawan Town, Zhuhai City, Guangdong Province

Patentee after: Guangdong Changzheng Construction Co.,Ltd.

Address before: Room 105-39996, No. 6 Baohua Road, Hengqin New District, Zhuhai City, Guangdong Province

Patentee before: Zhuhai Gree Municipal Engineering Co.,Ltd.