CN107939283A - A kind of road equipment installs drilling device with deceleration strip - Google Patents

A kind of road equipment installs drilling device with deceleration strip Download PDF

Info

Publication number
CN107939283A
CN107939283A CN201711211654.9A CN201711211654A CN107939283A CN 107939283 A CN107939283 A CN 107939283A CN 201711211654 A CN201711211654 A CN 201711211654A CN 107939283 A CN107939283 A CN 107939283A
Authority
CN
China
Prior art keywords
babinet
plate
drill bit
deceleration strip
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711211654.9A
Other languages
Chinese (zh)
Other versions
CN107939283B (en
Inventor
林冰洁
骆云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hnceg Communications Construction Co ltd
Original Assignee
Nanchang Hua Xue Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang Hua Xue Science And Technology Co Ltd filed Critical Nanchang Hua Xue Science And Technology Co Ltd
Priority to CN201711211654.9A priority Critical patent/CN107939283B/en
Publication of CN107939283A publication Critical patent/CN107939283A/en
Application granted granted Critical
Publication of CN107939283B publication Critical patent/CN107939283B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/027Drills for drilling shallow holes, e.g. for taking soil samples or for drilling postholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B12/00Accessories for drilling tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of drilling device, more particularly to a kind of road equipment to install drilling device with deceleration strip.The technical problem to be solved in the present invention is to provide a kind of drilling effect it is good, save manpower, drill bit and do not allow road equipment easy to wear deceleration strip that drilling device is installed.In order to solve the above technical problem, the present invention provides such a road equipment deceleration strip to install drilling device, includes bottom plate etc.;Bottom base plate surrounding is provided with wheel, bottom plate crown center is connected with babinet, opening is provided with the middle part of the bottom of box and bottom plate, babinet internal upper part is equipped with lifting gear, the pressing component of lifting gear is located at the outer top of babinet, drilling equipment is installed, the wellbore part of drilling equipment passes through opening on the lifting part of lifting gear.The present invention is worked by starting drilling equipment, is pressed lifting gear still further below, is moved down the wellbore part of drilling equipment, drill, so as to reach easy to operate, drill bit is not easy to wear, labor-saving effect.

Description

A kind of road equipment installs drilling device with deceleration strip
Technical field
The present invention relates to a kind of drilling device, more particularly to a kind of road equipment to install drilling device with deceleration strip.
Background technology
Means of transportation refer to ensure safety the track that normal operation sets for Traffic Systems, including tunnel, overhead The facilities such as road, station, ventilation booth, electromechanical equipment, electric power system, signal of communication.Setting of the means of transportation in city be for Try to forestall traffic accidents, ensure traffic pleasantly.
, it is necessary to first drill when deceleration strip is installed, deceleration strip could be installed, existing deceleration strip installs drilling device There are drilling effect is poor, consumption manpower, drill bit is easy to wear the shortcomings that, therefore a kind of drilling effect is good, saves people there is an urgent need for researching and developing Power, drill bit do not allow road equipment easy to wear to install drilling device with deceleration strip.
The content of the invention
(1)Technical problems to be solved
The present invention in order to overcome existing deceleration strip installation drilling device there are drilling effect it is poor, consume manpower, drill bit is easily ground The shortcomings that damage, the technical problem to be solved in the present invention is to provide a kind of drilling effect it is good, save manpower, drill bit do not allow it is easy to wear Road equipment installs drilling device with deceleration strip.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a road equipment deceleration strip to install drilling device, bag Bottom plate, wheel, babinet, lifting gear and drilling equipment are included, bottom base plate surrounding is provided with wheel, the connection of bottom plate crown center There is babinet, be provided with opening in the middle part of the bottom of box and bottom plate, babinet internal upper part is equipped with lifting gear, the pressing component of lifting gear At the top of outside babinet, drilling equipment is installed on the lifting part of lifting gear, the wellbore part of drilling equipment passes through opening.
Preferably, lifting gear includes compression bar, the first in command, slide, sliding block, riser, connecting plate and the first spring, babinet The interior left and right sides is vertically-mounted a slide, and slidingtype is equipped with two sliding blocks on slide, the sliding block on the right side of the sliding block on the left side and the right Left side is respectively connected with riser, and connecting plate is connected between two pieces of risers, and left and right is symmetrically connected with the first spring, the first bullet at the top of connecting plate Spring top is connected with babinet inner top, and through hole is provided among casing top, and compression bar, compression bar bottom and connecting plate top are equipped with through hole Centre connection, compression bar top is connected with the first in command.
Preferably, drilling equipment includes motor, the first L-type plate, bearing block, bull stick, drill chuck and drill bit, connecting plate bottom Centre is provided with motor and the first L-type plate, and motor is located in the first L-type plate, and the first L-type plate bottom is provided with bearing block, bearing The output axis connection of bull stick, bull stick top and motor is connected with seat, bull stick bottom passes through opening, and bull stick bottom is connected with drill point Head, is provided with drill bit in drill chuck.
Preferably, air jet system has been further included, the riser lower right side on the left side is provided with air jet system, and air jet system includes There are cam, compression cylinder, piston, pressing plate, second spring, one-way cock and tracheae, bull stick top is connected with cam, the riser on the left side Lower right side is provided with compression cylinder, and piston is equipped with compression cylinder, and piston right side is symmetrical above and below to be connected with second spring, second spring Right side be connected in right end and compression cylinder, on the right side of piston among is connected with pressing plate, compression cylinder is pierced by the right side of pressing plate simultaneously and cam contact, Compression cylinder is all connected with one-way cock in both sides up and down, tracheae is connected with the one-way cock of compression cylinder bottom, tracheae end passes through In the middle part of the bottom of box and bottom plate and it is located at drill bit upper left side, tracheae end is directed at drill bit.
Preferably, further included water injector, water injector include water tank, lid, the second in command, water pump, water pipe and First valve, the bottom plate top leftmost side are equipped with water tank, and bottom is equipped with water pump in water tank, and water pipe, water pipe tail end are connected with water pump Connected through water tank left lower and with tracheae end, the first valve is installed on water pipe, tank top is equipped with lid, lid top Portion is connected with the second in command.
Preferably, the second L-type plate and nozzle have been further included, the second L-type plate, the second L-type plate are connected among bottom base plate Positioned at drill bit upper left side, the second L-type plate lower right side is hingedly connected with nozzle, and nozzle is fixedly connected with tracheae end.
Preferably, baffle and screw rod have been further included, compression bar top slidingtype is equipped with baffle, and baffle is provided with screw thread among right side Hole, movable in threaded hole to be equipped with screw rod, screw rod coordinates with threaded hole.
Operation principle:When needing to use the present invention, the present invention is moved to designated position by operating personnel, restarts drilling The driving part work of device, drives the wellbore part of drilling equipment to rotate, and at this time, operating personnel slowly press downwards lifting dress Put, the wellbore part of drilling equipment is slowly moved down, drill.After drilling, lifting gear is unclamped, is filled in lifting Under the action of the elasticity part put, the wellbore part of drilling equipment resets upwards, after reset, closes the drive division of drilling equipment Part.
Because lifting gear includes compression bar, the first in command, slide, sliding block, riser, connecting plate and the first spring, in babinet The left and right sides is vertically-mounted a slide, and slidingtype is equipped with two sliding blocks on slide, and the sliding block on the right side of the sliding block on the left side and the right is left Side is respectively connected with riser, and connecting plate is connected between two pieces of risers, and left and right is symmetrically connected with the first spring, the first spring at the top of connecting plate Top is connected with babinet inner top, is provided with through hole among casing top, is equipped with compression bar in through hole, compression bar bottom with connecting plate top Between connect, compression bar top is connected with the first in command.Operating personnel hold the first in command and slowly press downwards, drive compression bar slowly to Lower movement, drives connecting plate slowly to move down, drives the wellbore part of drilling equipment slowly to move down, drill.Drilling After, the first in command is unclamped, under the action of the first spring, the wellbore part of drilling equipment resets upwards.
Because drilling equipment includes motor, the first L-type plate, bearing block, bull stick, drill chuck and drill bit, in connecting plate bottom Between motor and the first L-type plate are installed, motor is located in the first L-type plate, and the first L-type plate bottom is provided with bearing block, bearing block The output axis connection of bull stick, bull stick top and motor is inside connected with, bull stick bottom passes through opening, and bull stick bottom is connected with drill point Head, is provided with drill bit in drill chuck.Start motor to rotate counterclockwise, drive bull stick to rotate counterclockwise, drill bit turns counterclockwise therewith Dynamic, at this time, operating personnel hold the first in command and slowly press downwards, drive drill bit slowly to move down, drill.Drill Bi Hou, unclamps the first in command, under the action of the first spring, drill bit resets upwards.
Because having further included air jet system, the riser lower right side on the left side is provided with air jet system, and air jet system includes Cam, compression cylinder, piston, pressing plate, second spring, one-way cock and tracheae, bull stick top are connected with cam, and the riser on the left side is right Side lower part is provided with compression cylinder, and piston is equipped with compression cylinder, and piston right side is symmetrical above and below to be connected with second spring, and second spring is right End be connected with right side in compression cylinder, on the right side of piston among is connected with pressing plate, compression cylinder is pierced by the right side of pressing plate simultaneously and cam contact, is pressed Contracting cylinder is all connected with one-way cock in both sides up and down, tracheae is connected with the one-way cock of compression cylinder bottom, tracheae end passes through case In the middle part of body bottom and bottom plate and it is located at drill bit upper left side, tracheae end is directed at drill bit.When initial, second spring, which is in, opens shape State, when motor rotate counterclockwise drive bull stick rotate counterclockwise when, band moving cam rotate counterclockwise, when cam projection portion with When pressing plate departs from, under the action of second spring, pressing plate moves right, and band piston moves right, by gas inspiration compression cylinder Interior, when the projection portion of cam is contacted with pressing plate, pressing plate is moved to the left, and band piston is moved to the left, the gas in compression cylinder Sprayed, be sprayed on drill bit by tracheae, so as to which remaining debris after drilling is blown away.
Because having further included water injector, water injector includes water tank, lid, the second in command, water pump, water pipe and first Valve, the bottom plate top leftmost side are equipped with water tank, and bottom is equipped with water pump in water tank, water pipe is connected with water pump, water pipe tail end passes through Water tank left lower is simultaneously connected with tracheae end, and the first valve is provided with water pipe, and tank top is equipped with lid, and cap top connects It is connected to the second in command.Operating personnel take away lid, then water is poured into water tank, after good, then lid are put back to original position, this When, operating personnel open the first valve, then start pump working, and the water of water tank is sprayed by water pipe, is sprayed on drill bit, so that The temperature of drill bit can be reduced, makes drill bit not easy to wear.After cooling has been got well, switch off the pump and the first valve.
Because having further included the second L-type plate and nozzle, the second L-type plate is connected among bottom base plate, the second L-type plate is located at Drill bit upper left side, the second L-type plate lower right side are hingedly connected with nozzle, and nozzle is fixedly connected with tracheae end.Operating personnel can Nozzle is held to cool down to whole drill bit.
Because having further included baffle and screw rod, compression bar top slidingtype is equipped with baffle, and baffle is provided with threaded hole among right side, Movable in threaded hole to be equipped with screw rod, screw rod coordinates with threaded hole.When initial, screw rod is in loosening state, and operating personnel can root According to the position of the depth adjustment baffle of drilling, after adjusting suitable position, screw rod is tightened, baffle is fixed.
(3)Beneficial effect
The present invention is worked by starting drilling equipment, presses lifting gear still further below, makes the wellbore part of drilling equipment to moving down It is dynamic, drill, so as to reach easy to operate, drill bit is not easy to wear, labor-saving effect.
Brief description of the drawings
Fig. 1 is the schematic cross-sectional view of the first front view of the present invention.
Fig. 2 is the schematic cross-sectional view of second of front view of the present invention.
Fig. 3 is the schematic cross-sectional view of the third front view of the present invention.
Fig. 4 is the schematic cross-sectional view of the 4th kind of front view of the present invention.
Mark in attached drawing for:1- bottom plates, 2- wheels, 3- babinets, 4- openings, 5- lifting gears, 51- through holes, 52- pressures Bar, the 53- first in command, 54- slides, 55- sliding blocks, 56- risers, 57- connecting plates, the first springs of 58-, 6- drilling equipments, 61- electricity Machine, 62- the first L-type plates, 63- bearing blocks, 64- bull sticks, 65- drill chucks, 66- drill bits, 7- air jet systems, 71- cams, 72- pressures Contracting cylinder, 73- pistons, 74- pressing plates, 75- second springs, 76- one-way cocks, 77- tracheaes, 8- water injectors, 81- water tanks, 82- lids Son, the 83- second in command, 84- water pumps, 85- water pipes, the first valves of 86-, 9- the second L-type plates, 10- nozzles, 11- baffles, 12- spiral shells Pit, 13- screw rods.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of road equipment installs drilling device with deceleration strip, as shown in Figs 1-4, includes bottom plate 1, wheel 2, babinet 3, lifting Device 5 and drilling equipment 6,1 bottom surrounding of bottom plate are provided with wheel 2, and 1 crown center of bottom plate is connected with babinet 3,3 bottom of babinet Opening 4 is provided with the middle part of bottom plate 1,3 internal upper part of babinet is equipped with lifting gear 5, and the pressing component of lifting gear 5 is located at babinet 3 Outer top, is provided with drilling equipment 6 on the lifting part of lifting gear 5, the wellbore part of drilling equipment 6 passes through opening 4.
Embodiment 2
A kind of road equipment installs drilling device with deceleration strip, as shown in Figs 1-4, includes bottom plate 1, wheel 2, babinet 3, lifting Device 5 and drilling equipment 6,1 bottom surrounding of bottom plate are provided with wheel 2, and 1 crown center of bottom plate is connected with babinet 3,3 bottom of babinet Opening 4 is provided with the middle part of bottom plate 1,3 internal upper part of babinet is equipped with lifting gear 5, and the pressing component of lifting gear 5 is located at babinet 3 Outer top, is provided with drilling equipment 6 on the lifting part of lifting gear 5, the wellbore part of drilling equipment 6 passes through opening 4.
Lifting gear 5 includes compression bar 52, the first in command 53, slide 54, sliding block 55, riser 56,57 and first bullet of connecting plate Spring 58, the left and right sides is vertically-mounted in babinet 3 slide 54, and slidingtype is equipped with two sliding blocks 55, the sliding block on the left side on slide 54 The left side of sliding block 55 on 55 right sides and the right is respectively connected with riser 56, and connecting plate 57, the top of connecting plate 57 are connected between two pieces of risers 56 Symmetrical to be connected with the first spring 58,58 top of the first spring is connected with 3 inner top of babinet, and 3 crown center of babinet is provided with logical Hole 51, through hole 51 is interior to be equipped with compression bar 52, and 52 bottom of compression bar is connected with 57 crown center of connecting plate, and 52 top of compression bar is connected with the first Hand 53.
Embodiment 3
A kind of road equipment installs drilling device with deceleration strip, as shown in Figs 1-4, includes bottom plate 1, wheel 2, babinet 3, lifting Device 5 and drilling equipment 6,1 bottom surrounding of bottom plate are provided with wheel 2, and 1 crown center of bottom plate is connected with babinet 3,3 bottom of babinet Opening 4 is provided with the middle part of bottom plate 1,3 internal upper part of babinet is equipped with lifting gear 5, and the pressing component of lifting gear 5 is located at babinet 3 Outer top, is provided with drilling equipment 6 on the lifting part of lifting gear 5, the wellbore part of drilling equipment 6 passes through opening 4.
Lifting gear 5 includes compression bar 52, the first in command 53, slide 54, sliding block 55, riser 56,57 and first bullet of connecting plate Spring 58, the left and right sides is vertically-mounted in babinet 3 slide 54, and slidingtype is equipped with two sliding blocks 55, the sliding block on the left side on slide 54 The left side of sliding block 55 on 55 right sides and the right is respectively connected with riser 56, and connecting plate 57, the top of connecting plate 57 are connected between two pieces of risers 56 Symmetrical to be connected with the first spring 58,58 top of the first spring is connected with 3 inner top of babinet, and 3 crown center of babinet is provided with logical Hole 51, through hole 51 is interior to be equipped with compression bar 52, and 52 bottom of compression bar is connected with 57 crown center of connecting plate, and 52 top of compression bar is connected with the first Hand 53.
Drilling equipment 6 includes motor 61, the first L-type plate 62, bearing block 63, bull stick 64, drill chuck 65 and drill bit 66, even 61 and first L-type plate 62 of motor is installed, motor 61 is located in the first L-type plate 62,62 bottom of the first L-type plate among 57 bottom of plate Bearing block 63 is installed, bull stick 64,64 top of bull stick and the output axis connection of motor 61,64 bottom of bull stick are connected with bearing block 63 End is connected with drill chuck 65, drill bit 66 is provided with drill chuck 65 through opening 4,64 bottom of bull stick.
Embodiment 4
A kind of road equipment installs drilling device with deceleration strip, as shown in Figs 1-4, includes bottom plate 1, wheel 2, babinet 3, lifting Device 5 and drilling equipment 6,1 bottom surrounding of bottom plate are provided with wheel 2, and 1 crown center of bottom plate is connected with babinet 3,3 bottom of babinet Opening 4 is provided with the middle part of bottom plate 1,3 internal upper part of babinet is equipped with lifting gear 5, and the pressing component of lifting gear 5 is located at babinet 3 Outer top, is provided with drilling equipment 6 on the lifting part of lifting gear 5, the wellbore part of drilling equipment 6 passes through opening 4.
Lifting gear 5 includes compression bar 52, the first in command 53, slide 54, sliding block 55, riser 56,57 and first bullet of connecting plate Spring 58, the left and right sides is vertically-mounted in babinet 3 slide 54, and slidingtype is equipped with two sliding blocks 55, the sliding block on the left side on slide 54 The left side of sliding block 55 on 55 right sides and the right is respectively connected with riser 56, and connecting plate 57, the top of connecting plate 57 are connected between two pieces of risers 56 Symmetrical to be connected with the first spring 58,58 top of the first spring is connected with 3 inner top of babinet, and 3 crown center of babinet is provided with logical Hole 51, through hole 51 is interior to be equipped with compression bar 52, and 52 bottom of compression bar is connected with 57 crown center of connecting plate, and 52 top of compression bar is connected with the first Hand 53.
Drilling equipment 6 includes motor 61, the first L-type plate 62, bearing block 63, bull stick 64, drill chuck 65 and drill bit 66, even 61 and first L-type plate 62 of motor is installed, motor 61 is located in the first L-type plate 62,62 bottom of the first L-type plate among 57 bottom of plate Bearing block 63 is installed, bull stick 64,64 top of bull stick and the output axis connection of motor 61,64 bottom of bull stick are connected with bearing block 63 End is connected with drill chuck 65, drill bit 66 is provided with drill chuck 65 through opening 4,64 bottom of bull stick.
Air jet system 7 is further included, 56 lower right side of riser on the left side is provided with air jet system 7, and air jet system 7 includes Cam 71, compression cylinder 72, piston 73, pressing plate 74, second spring 75, one-way cock 76 and tracheae 77,64 top of bull stick are connected with Cam 71,56 lower right side of riser on the left side are provided with compression cylinder 72, piston 73 are equipped with compression cylinder 72, the right side of piston 73 is up and down Second spring 75 is symmetrically connected with, 75 right end of second spring is connected with right side in compression cylinder 72, and piston 73 is connected among right side Pressing plate 74, the right side of pressing plate 74 are pierced by compression cylinder 72 and are contacted with cam 71, and compression cylinder is all connected with one-way cock in both sides about 72 76, it is connected with tracheae 77 on the one-way cock 76 of 72 bottom of compression cylinder, 77 end of tracheae is through 3 bottom of babinet and the middle part of bottom plate 1 And it is located at 66 upper left side of drill bit, 77 end of tracheae alignment drill bit 66.
Water injector 8 is further included, water injector 8 includes water tank 81, lid 82, the second in command 83, water pump 84, water pipe 85 and first valve 86, the 1 top leftmost side of bottom plate be equipped with water tank 81, bottom is equipped with water pump 84 in water tank 81, is connected on water pump 84 There is water pipe 85,85 tail end of water pipe is connected through 81 left lower of water tank and with 77 end of tracheae, and the first valve is provided with water pipe 85 Door 86, the top of water tank 81 are equipped with lid 82, and the top of lid 82 is connected with the second in command 83.
The second L-type plate 9 and nozzle 10 have been further included, the second L-type plate 9, the second L-type plate 9 are connected among 1 bottom of bottom plate In 66 upper left side of drill bit, 9 lower right side of the second L-type plate is hingedly connected with nozzle 10, and nozzle 10 is fixedly connected with 77 end of tracheae.
Baffle 11 and screw rod 13 are further included, 52 top slidingtype of compression bar is equipped with baffle 11, and baffle 11 is provided among right side Threaded hole 12, movable in threaded hole 12 to be equipped with screw rod 13, screw rod 13 coordinates with threaded hole 12.
Operation principle:When needing to use the present invention, the present invention is moved to designated position by operating personnel, restarts drilling The driving part work of device 6, drives the wellbore part of drilling equipment 6 to rotate, at this time, operating personnel slowly press downwards lifting Device 5, makes the wellbore part of drilling equipment 6 slowly move down, drills.After drilling, lifting gear 5 is unclamped, Under the action of the elasticity part of lifting gear 5, the wellbore part of drilling equipment 6 resets upwards, after reset, closes drilling equipment 6 Driving part.
Because lifting gear 5 includes compression bar 52, the first in command 53, slide 54, sliding block 55, riser 56, connecting plate 57 and One spring 58, the left and right sides is vertically-mounted in babinet 3 slide 54, and slidingtype is equipped with two sliding blocks 55 on slide 54, the left side The left side of sliding block 55 on the right side of sliding block 55 and the right is respectively connected with riser 56, and connecting plate 57, connecting plate 57 are connected between two pieces of risers 56 Top or so is symmetrically connected with the first spring 58, and 58 top of the first spring is connected with 3 inner top of babinet, and 3 crown center of babinet is opened There is a through hole 51, compression bar 52 is equipped with through hole 51,52 bottom of compression bar is connected with 57 crown center of connecting plate, and 52 top of compression bar is connected with the Leader 53.Operating personnel hold the first in command 53 and slowly press downwards, drive compression bar 52 slowly to move down, and drive connecting plate 57 Slowly move down, drive the wellbore part of drilling equipment 6 slowly to move down, drill.After drilling, first is unclamped Handle 53, under the action of the first spring 58, the wellbore part of drilling equipment 6 resets upwards.
Because drilling equipment 6 includes motor 61, the first L-type plate 62, bearing block 63, bull stick 64, drill chuck 65 and drill bit 66,61 and first L-type plate 62 of motor is installed among 57 bottom of connecting plate, motor 61 is located in the first L-type plate 62, the first L-type plate 62 bottoms are provided with bearing block 63, and bull stick 64,64 top of bull stick and the output axis connection of motor 61 are connected with bearing block 63, is turned 64 bottom of bar passes through opening 4, and 64 bottom of bull stick is connected with drill chuck 65, drill bit 66 is provided with drill chuck 65.Start motor 61 Rotate counterclockwise, drive bull stick 64 to rotate counterclockwise, drill bit 66 rotates counterclockwise therewith, and at this time, operating personnel hold the first Hand 53 is slowly pressed downwards, is driven drill bit 66 slowly to move down, is drilled.After drilling, the first in command 53 is unclamped, Under the action of first spring 58, drill bit 66 resets upwards.
Because having further included air jet system 7,56 lower right side of riser on the left side is provided with air jet system 7, and air jet system 7 wraps Cam 71, compression cylinder 72, piston 73, pressing plate 74, second spring 75, one-way cock 76 and tracheae 77 are included, 64 top of bull stick connects Cam 71 is connected to, 56 lower right side of riser on the left side is provided with compression cylinder 72, and piston 73, the right side of piston 73 are equipped with compression cylinder 72 Symmetrical above and below to be connected with second spring 75,75 right end of second spring is connected with right side in compression cylinder 72, and piston 73 connects among right side Pressing plate 74 is connected to, the right side of pressing plate 74 is pierced by compression cylinder 72 and is contacted with cam 71, and compression cylinder is all connected with unidirectionally both sides about 72 Valve 76, is connected with tracheae 77 on the one-way cock 76 of 72 bottom of compression cylinder, 77 end of tracheae passes through 3 bottom of babinet and bottom plate 1 Middle part is simultaneously located at 66 upper left side of drill bit, 77 end of tracheae alignment drill bit 66.When initial, second spring 75 is in open configuration, when Motor 61, which rotates counterclockwise, drives bull stick 64 when rotating counterclockwise, and band moving cam 71 rotates counterclockwise, when the lug boss of cam 71 When dividing with the disengaging of pressing plate 74, under the action of second spring 75, pressing plate 74 moves right, and band piston 73 moves right, by gas In body inspiration compression cylinder 72, when the projection portion of cam 71 is contacted with pressing plate 74, pressing plate 74 is moved to the left, band piston 73 to Move left, the gas in compression cylinder 72 is sprayed by tracheae 77, is sprayed on drill bit 66, so as to which remaining debris after drilling is blown Walk.
Because having further included water injector 8, water injector 8 include water tank 81, lid 82, the second in command 83, water pump 84, 85 and first valve 86 of water pipe, the 1 top leftmost side of bottom plate are equipped with water tank 81, and bottom is equipped with water pump 84 in water tank 81, on water pump 84 It is connected with water pipe 85,85 tail end of water pipe is connected through 81 left lower of water tank and with 77 end of tracheae, and the is provided with water pipe 85 One valve 86, the top of water tank 81 are equipped with lid 82, and the top of lid 82 is connected with the second in command 83.Operating personnel take lid 82 Open, then water is poured into water tank 81, after good, then lid 82 put back to original position, at this time, operating personnel open the first valve 86, Then start water pump 84 to work, the water of water tank 81 is sprayed by water pipe 85, is sprayed on drill bit 66, so as to reduce the temperature of drill bit 66 Degree, makes drill bit 66 not easy to wear.After cooling has been got well, switch off the pump 84 and first valve 86.
Because having further included the second L-type plate 9 and nozzle 10, the second L-type plate 9, the second L-type are connected among 1 bottom of bottom plate Plate 9 is located at 66 upper left side of drill bit, and 9 lower right side of the second L-type plate is hingedly connected with nozzle 10, and nozzle 10 is fixed with 77 end of tracheae Connection.Operating personnel can hold nozzle 10 and cool down to whole drill bit 66.
Because having further included baffle 11 and screw rod 13,52 top slidingtype of compression bar is equipped with baffle 11, and the right side of baffle 11 is middle It is provided with threaded hole 12, movable in threaded hole 12 to be equipped with screw rod 13, screw rod 13 coordinates with threaded hole 12.When initial, at screw rod 13 In the state of loosening, operating personnel after adjusting suitable position, can tighten screw rod according to the position of the depth adjustment baffle 11 of drilling 13, baffle 11 is fixed.
Embodiment described above only expresses the preferred embodiment of the present invention, its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (7)

1. a kind of road equipment installs drilling device with deceleration strip, it is characterised in that includes bottom plate(1), wheel(2), babinet (3), lifting gear(5)And drilling equipment(6), bottom plate(1)Bottom surrounding is provided with wheel(2), bottom plate(1)Crown center connects There is babinet(3), babinet(3)Bottom and bottom plate(1)Middle part is provided with opening(4), babinet(3)Internal upper part is equipped with lifting gear(5), Lifting gear(5)Pressing component be located at babinet(3)Outer top, lifting gear(5)Lifting part on drilling equipment is installed (6), drilling equipment(6)Wellbore part pass through opening(4).
2. a kind of road equipment according to claim 1 installs drilling device with deceleration strip, it is characterised in that lifting gear (5)Include compression bar(52), the first in command(53), slide(54), sliding block(55), riser(56), connecting plate(57)With the first spring (58), babinet(3)The interior left and right sides is vertically-mounted slide(54), slide(54)Upper slidingtype is equipped with two sliding blocks(55), it is left The sliding block on side(55)Right side and the sliding block on the right(55)Left side is respectively connected with riser(56), two pieces of risers(56)Between be connected with Plate(57), connecting plate(57)Top or so is symmetrically connected with the first spring(58), the first spring(58)Top and babinet(3)Inner top Connection, babinet(3)Crown center is provided with through hole(51), through hole(51)It is interior to be equipped with compression bar(52), compression bar(52)Bottom and connecting plate (57)Crown center connects, compression bar(52)Top is connected with the first in command(53).
3. a kind of road equipment according to claim 2 installs drilling device with deceleration strip, it is characterised in that drilling equipment (6)Include motor(61), the first L-type plate(62), bearing block(63), bull stick(64), drill chuck(65)And drill bit(66), connecting plate (57)Motor is installed among bottom(61)With the first L-type plate(62), motor(61)Positioned at the first L-type plate(62)It is interior, the first L-type Plate(62)Bottom is provided with bearing block(63), bearing block(63)Inside it is connected with bull stick(64), bull stick(64)Top and motor(61) Output axis connection, bull stick(64)Bottom passes through opening(4), bull stick(64)Bottom is connected with drill chuck(65), drill chuck(65) Drill bit is inside installed(66).
4. a kind of road equipment according to claim 3 installs drilling device with deceleration strip, it is characterised in that has further included Air jet system(7), the riser on the left side(56)Lower right side is provided with air jet system(7), air jet system(7)Include cam (71), compression cylinder(72), piston(73), pressing plate(74), second spring(75), one-way cock(76)And tracheae(77), bull stick (64)Top is connected with cam(71), the riser on the left side(56)Lower right side is provided with compression cylinder(72), compression cylinder(72)Inside set There is piston(73), piston(73)Right side is symmetrical above and below to be connected with second spring(75), second spring(75)Right end and compression cylinder (72)Interior right side connection, piston(73)Pressing plate is connected among right side(74), pressing plate(74)Right side is pierced by compression cylinder(72)And with Cam(71)Contact, compression cylinder(72)Upper and lower both sides are all connected with one-way cock(76), compression cylinder(72)The one-way cock of bottom (76)On be connected with tracheae(77), tracheae(77)End passes through babinet(3)Bottom and bottom plate(1)Middle part is simultaneously located at drill bit(66)It is left Top, tracheae(77)End is directed at drill bit(66).
5. a kind of road equipment according to claim 4 installs drilling device with deceleration strip, it is characterised in that has further included Water injector(8), water injector(8)Include water tank(81), lid(82), the second in command(83), water pump(84), water pipe(85) With the first valve(86), bottom plate(1)The top leftmost side is equipped with water tank(81), water tank(81)Interior bottom is equipped with water pump(84), water pump (84)On be connected with water pipe(85), water pipe(85)Tail end passes through water tank(81)Left lower and and tracheae(77)End connects, water Pipe(85)On the first valve is installed(86), water tank(81)Top is equipped with lid(82), lid(82)Top is connected with second Hand(83).
6. a kind of road equipment according to claim 5 installs drilling device with deceleration strip, it is characterised in that has further included Second L-type plate(9)And nozzle(10), bottom plate(1)The second L-type plate is connected among bottom(9), the second L-type plate(9)Positioned at drill bit (66)Upper left side, the second L-type plate(9)Lower right side is hingedly connected with nozzle(10), nozzle(10)With tracheae(77)End is fixed Connection.
7. a kind of road equipment according to claim 6 installs drilling device with deceleration strip, it is characterised in that has further included Baffle(11)And screw rod(13), compression bar(52)Top slidingtype is equipped with baffle(11), baffle(11)Threaded hole is provided among right side (12), threaded hole(12)It is interior movable to be equipped with screw rod(13), screw rod(13)With threaded hole(12)Coordinate.
CN201711211654.9A 2017-11-28 2017-11-28 A kind of road equipment deceleration strip installation drilling device Expired - Fee Related CN107939283B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711211654.9A CN107939283B (en) 2017-11-28 2017-11-28 A kind of road equipment deceleration strip installation drilling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711211654.9A CN107939283B (en) 2017-11-28 2017-11-28 A kind of road equipment deceleration strip installation drilling device

Publications (2)

Publication Number Publication Date
CN107939283A true CN107939283A (en) 2018-04-20
CN107939283B CN107939283B (en) 2019-07-05

Family

ID=61949290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711211654.9A Expired - Fee Related CN107939283B (en) 2017-11-28 2017-11-28 A kind of road equipment deceleration strip installation drilling device

Country Status (1)

Country Link
CN (1) CN107939283B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612470A (en) * 2018-04-27 2018-10-02 邓珍珍 A kind of oil exploitation drilling equipment
CN108661552A (en) * 2018-05-03 2018-10-16 李静娴 A kind of coal mining equipment
CN108746740A (en) * 2018-06-21 2018-11-06 郑州默尔电子信息技术有限公司 A kind of communication battery plate processing automatic drilling device of turning
CN108871122A (en) * 2018-06-14 2018-11-23 贵州大学 A kind of engineering explosion mounting device for facilitating detonator fixed point to place
CN109162637A (en) * 2018-09-17 2019-01-08 宛兴友 Drilling rig is used in a kind of mining
CN109322627A (en) * 2018-11-06 2019-02-12 中建五局土木工程有限公司 The fixation device fixed for rock drill
CN111485507A (en) * 2020-05-11 2020-08-04 济南惠满汽车用品有限公司 Traffic deceleration strip laying device
CN111676854A (en) * 2020-07-06 2020-09-18 武汉雅阁市政建设工程有限公司 Parking area gate road deceleration strip auxiliary erection equipment
CN112195809A (en) * 2020-09-16 2021-01-08 毕健勇 Automatic mounting device for highway deceleration strip

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108544668A (en) * 2018-04-23 2018-09-18 蒋孟春 A kind of building monitoring monitoring mark installation drilling device

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1162825A (en) * 1966-09-08 1969-08-27 Duncan Stewart Bonnybridge Ltd Support for a Powered Device for Cutting, Drilling or Breaking Rock, Concrete or like material
CN2379597Y (en) * 1998-12-10 2000-05-24 宣化采掘机械厂机械配件厂 Machine for drilling holes for collision-proof protective railing for high performance high way
CN201056979Y (en) * 2007-06-28 2008-05-07 武汉世纪金道石油技术开发有限公司 Manual super-light drilling rig
CN101806192A (en) * 2010-03-12 2010-08-18 中铁一局集团有限公司 Drilling machine water and gas simultaneously entering impact system
CN103711434A (en) * 2014-01-08 2014-04-09 丁敬荣 Mobile highway stand column horizontal drilling machine
CN203961787U (en) * 2014-07-24 2014-11-26 铜陵长江金刚石工具有限责任公司 A kind of highway petrol power auger
CN204754767U (en) * 2015-06-29 2015-11-11 冯海 Concrete boring machine
CN106382094A (en) * 2016-11-30 2017-02-08 防城港市宝兴工艺品有限公司 Soil drilling device for mounting string bamboo fence
CN106437509A (en) * 2016-08-29 2017-02-22 彭满意 Efficient drilling device for industrial exploitation
CN206091872U (en) * 2016-10-10 2017-04-12 中交一公局第五工程有限公司 Elevation keyhole equipment
CN106869787A (en) * 2015-12-11 2017-06-20 重庆达设科技有限公司 A kind of ground punching equipment

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1162825A (en) * 1966-09-08 1969-08-27 Duncan Stewart Bonnybridge Ltd Support for a Powered Device for Cutting, Drilling or Breaking Rock, Concrete or like material
CN2379597Y (en) * 1998-12-10 2000-05-24 宣化采掘机械厂机械配件厂 Machine for drilling holes for collision-proof protective railing for high performance high way
CN201056979Y (en) * 2007-06-28 2008-05-07 武汉世纪金道石油技术开发有限公司 Manual super-light drilling rig
CN101806192A (en) * 2010-03-12 2010-08-18 中铁一局集团有限公司 Drilling machine water and gas simultaneously entering impact system
CN103711434A (en) * 2014-01-08 2014-04-09 丁敬荣 Mobile highway stand column horizontal drilling machine
CN203961787U (en) * 2014-07-24 2014-11-26 铜陵长江金刚石工具有限责任公司 A kind of highway petrol power auger
CN204754767U (en) * 2015-06-29 2015-11-11 冯海 Concrete boring machine
CN106869787A (en) * 2015-12-11 2017-06-20 重庆达设科技有限公司 A kind of ground punching equipment
CN106437509A (en) * 2016-08-29 2017-02-22 彭满意 Efficient drilling device for industrial exploitation
CN206091872U (en) * 2016-10-10 2017-04-12 中交一公局第五工程有限公司 Elevation keyhole equipment
CN106382094A (en) * 2016-11-30 2017-02-08 防城港市宝兴工艺品有限公司 Soil drilling device for mounting string bamboo fence

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612470A (en) * 2018-04-27 2018-10-02 邓珍珍 A kind of oil exploitation drilling equipment
CN108661552A (en) * 2018-05-03 2018-10-16 李静娴 A kind of coal mining equipment
CN108871122A (en) * 2018-06-14 2018-11-23 贵州大学 A kind of engineering explosion mounting device for facilitating detonator fixed point to place
CN108871122B (en) * 2018-06-14 2020-06-16 贵州大学 Make things convenient for engineering blasting that detonator fixed point was placed to use installation device
CN108746740A (en) * 2018-06-21 2018-11-06 郑州默尔电子信息技术有限公司 A kind of communication battery plate processing automatic drilling device of turning
CN109162637A (en) * 2018-09-17 2019-01-08 宛兴友 Drilling rig is used in a kind of mining
CN109322627A (en) * 2018-11-06 2019-02-12 中建五局土木工程有限公司 The fixation device fixed for rock drill
CN111485507A (en) * 2020-05-11 2020-08-04 济南惠满汽车用品有限公司 Traffic deceleration strip laying device
CN111485507B (en) * 2020-05-11 2020-12-15 浙江融通环保科技有限公司 Traffic deceleration strip laying device
CN111676854A (en) * 2020-07-06 2020-09-18 武汉雅阁市政建设工程有限公司 Parking area gate road deceleration strip auxiliary erection equipment
CN112195809A (en) * 2020-09-16 2021-01-08 毕健勇 Automatic mounting device for highway deceleration strip
CN112195809B (en) * 2020-09-16 2022-08-23 中咨华科交通建设技术有限公司 Automatic mounting device for highway deceleration strip

Also Published As

Publication number Publication date
CN107939283B (en) 2019-07-05

Similar Documents

Publication Publication Date Title
CN107939283A (en) A kind of road equipment installs drilling device with deceleration strip
CN107185750A (en) A kind of traffic bridge circle Anti-collision barrel high-efficency spraying device
CN107386184A (en) A kind of construction site environmental protection dust control equipment
CN108839265A (en) A kind of convenient and fast Cast-in-place Bent Cap construction method
CN201050339Y (en) Down-hole switch for pump recovery well snubbing environment-friendly operation
CN109057702B (en) Down-the-hole drill with dustproof function and use method thereof
CN201306119Y (en) Pressurized petroleum wellhead driller
CN204312002U (en) A kind of waterpower internal cutter cutting accident drill rod
CN106078586A (en) A kind of narrow and small place, high-altitude bolt clamp device
CN205805513U (en) Pneumatic drain pump
CN210829067U (en) Hydrogeological exploration drilling tool
CN202252269U (en) Pneumatic valve
CN203769673U (en) Damping fluid guiding device of screw drill
CN203321407U (en) Christmas tree cap
CN207701072U (en) A kind of three arm rock drilling jumbos of large cross-section tunnel with geological analysis function
CN203881489U (en) Pressure gauge antifreezing filling device
CN202767940U (en) Self-service slurry grouting device
CN206538820U (en) A kind of burglarproof type outdoor fire hydrant and spanner
CN106168129A (en) An a kind of step closing well method based on well control system
CN207879291U (en) Expand pipe connected pipe column
CN105927188B (en) Pneumatic drain pump
CN206562918U (en) Oil field Special anti-theft can allowing pressurized maintenance blowout preventer
CN206836928U (en) One kind bores bone automatic water filling device
CN110159214A (en) Oil-well rig drilling rig
CN104260694B (en) Spray cleaning method and system of underground mining vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190419

Address after: 230000 B-1512, west of Ganquan Road, Shushan District, Hefei, Anhui.

Applicant after: ANHUI YINGLONG INDUSTRIAL DESIGN Co.,Ltd.

Address before: 330000 Nanchang High-tech Industrial Development Zone, Nanchang City, Jiangxi Province, 313, Second Floor, 899 Torch Fifth Road

Applicant before: NANCHANG HUAXUE TECHNOLOGY CO.,LTD.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190612

Address after: 410000 Writing Room 121-1232, 12th Floor, New Town Complex Building, 788 Section of Furong South Road, Tianxin District, Changsha City, Hunan Province

Applicant after: HNCEG COMMUNICATIONS CONSTRUCTION CO.,LTD.

Address before: 230000 B-1512, west of Ganquan Road, Shushan District, Hefei, Anhui.

Applicant before: ANHUI YINGLONG INDUSTRIAL DESIGN Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190705