CN107938826B - A kind of building balcony - Google Patents

A kind of building balcony Download PDF

Info

Publication number
CN107938826B
CN107938826B CN201710979370.8A CN201710979370A CN107938826B CN 107938826 B CN107938826 B CN 107938826B CN 201710979370 A CN201710979370 A CN 201710979370A CN 107938826 B CN107938826 B CN 107938826B
Authority
CN
China
Prior art keywords
glass blocks
glass
guardrail
fixing groove
holding firmware
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710979370.8A
Other languages
Chinese (zh)
Other versions
CN107938826A (en
Inventor
茹咪娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pujiang Yijing Decoration Engineering Co., Ltd.
Original Assignee
Pujiang Yijing Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pujiang Yijing Decoration Engineering Co Ltd filed Critical Pujiang Yijing Decoration Engineering Co Ltd
Priority to CN201710979370.8A priority Critical patent/CN107938826B/en
Publication of CN107938826A publication Critical patent/CN107938826A/en
Application granted granted Critical
Publication of CN107938826B publication Critical patent/CN107938826B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1817Connections therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1851Filling panels, e.g. concrete, sheet metal panels
    • E04F11/1853Glass panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1817Connections therefor
    • E04F2011/1831Connections therefor between balustrade filling members, e.g. panels, and balustrade posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F2011/1868Miscellaneous features of handrails not otherwise provided for
    • E04F2011/1872Miscellaneous features of handrails not otherwise provided for illuminated
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F2011/1885Handrails or balusters characterized by the use of specific materials
    • E04F2011/1891Handrails or balusters characterized by the use of specific materials mainly of stone or stone like materials, e.g. concrete; mainly of glass
    • E04F2011/1895Handrails or balusters characterized by the use of specific materials mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of glass

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a kind of building balconies, including balcony ground, enclose the glass guardrail set on balcony ground, set on the landfill portion on balcony ground, the glass guardrail is spliced by multiple groups guardrail module, and each guardrail module includes pedestal, glass blocks, two opposite disposed heel post, the cross bars for being used to install glass blocks;Cross bar is removably connected to edge-on column end;The heel post both sides have extended outward to form retaining lugs and lock-bit protrusion, which offers the lock-bit slot for limiting glass blocks, which offers fixing groove, and the fixing groove is opening setting;It further include the holding firmware for cooperating fixed glass blocks with fixing groove, the holding firmware includes being opened in the through slot passed through for glass blocks in the middle part of holding firmware, the holding section extended outward to form by holding firmware peripheral wall.Structure of the invention is stablized, and glass blocks can be installed again after pedestal, heel post are installed, and assembly is easy, not cracky, and stability is high.

Description

A kind of building balcony
The application is divisional application, and the applying date of original application is on February 25th, 2016, application No. is 201610101329.6 entitled " the safety-type balcony " of innovation and creation.
Technical field
The present invention relates to fixed buildings fields, more particularly, to a kind of building balcony.
Background technique
In guardrail, shield window, the fields such as balcony, for the beauty of appearance and generous, often used in the assembly of guardrail Glass is packed into glass blocks between two columns, so that the part becomes transparent configuration, so that guardrail ensures safety, It is again beautiful.In the prior art, the installation of this kind of glass guardrail is usually all card slot or connector by being arranged on column Glass is fixed, however this has resulted in glass and must connect in the assembling process of column convenient for the column of wherein side It connects, if after the column of two sides is all installed, glass will be unable to be placed in.Therefore, in this kind assembly, glass fills after cannot achieve, Not only complex installation process, and glass is easy breakage, causes to waste.
Summary of the invention
The present invention for overcome the deficiencies in the prior art, provides a kind of glass fixation, the easy building sun of assembly Platform.
To achieve the goals above, the invention adopts the following technical scheme: a kind of building balcony, including balcony ground, The glass guardrail set on balcony ground, the landfill portion set on balcony ground are enclosed, the glass guardrail is spelled by multiple groups guardrail module It connects, each guardrail module includes pedestal, glass blocks, two opposite disposed heel post, the cross bars for being used to install glass blocks; The heel post both sides have extended outward to form retaining lugs and lock-bit protrusion, which is equipped with for limiting glass The lock-bit slot of block, the retaining lugs are equipped with fixing groove;It further include the holding firmware for cooperating fixed glass blocks with fixing groove, the fixing Part is in glass blocks periphery or so activity;The holding firmware include be opened in the through slot passed through for glass blocks in the middle part of holding firmware, by The holding section that holding firmware peripheral wall extends outward to form;The pedestal lower part is equipped with built-in fitting, which, which is equipped with, reinforces protrusion; The outer peripheral surface reinforced protrusion and be spirally distributed in built-in fitting, the reinforcing protrusion are to be obliquely installed upwards;The reinforcing Angle between protrusion and built-in fitting is 60 °;Anticreep column is formed at the heel post top, and the cross bar lower part is equipped with for preventing The limited post slot of anticreep column abjection.Heel post setting lock-bit slot and fixing groove, glass blocks are installed in two heel posts in the present invention One end is placed in the lock-bit slot of left side column by Cheng Hou, and the other end is arranged by the opening of fixing groove, directly merging right side uprights Fixing groove in installed;Realize that glass blocks is installed again after heel post is installed, it is easy to assembly, and glass blocks It is not easy to occur in assembling process damaged;Glass realized by holding firmware with the connection of fixing groove, and through slot in holding firmware is by glass Glass block is limited in holding firmware, is prevented in other module assembling process, is shaken before and after glass there are gap, reduce glass with Shock between column is reduced damaged;Holding section and card slot realize the connection of holding firmware and fixing groove, stable structure, fix tightly It leans on, compares screw locking, be not in loosen, long service life;Base bottom connects built-in fitting, more steady with the connection on ground Fixed, long-time service is also not susceptible to move, and performance is stablized, and maintenance rate is low;Protrusion is reinforced in built-in fitting setting, and it is embedded to increase built-in fitting When contact area, built-in fitting can withstand more force without being detached from from ground, maintain guardrail and vertical state always, work as shield It when column is by larger external force, is not susceptible to topple over, security performance is high;It reinforces protrusion to be obliquely installed upwards, so that reinforcing convex When portion is embedded in ground, the active force that can bear increases at least twice, and guardrail is not easy skew, enhances guardrail stability, extends Service life saves maintenance cost;Anticreep column matches effectively fixed heel post and cross bar with limited post slot.
Further, the heel post is fixed on pedestal, and cross bar is removably connected to edge-on column end;The fixing groove side Wall is equipped with the card slot for being matched with holding section, and the holding section, which is spaced apart, is equipped with through-hole, and the fixing groove corresponds to the lead to the hole site and opens Equipped with threaded hole.
Further, the cross bar upper surface is smooth arc-shaped surface setting, and the cross bar lower surface is arranged at intervals with light bulb appearance Receive chamber, which opens up internal screw thread;The light bulb accommodating chamber of cross bar lower surface can accommodate light bulb, and night can illuminate shield The presence of people's guardrail of night flight or navigation is reminded on column, reduces security risk.
In conclusion structure of the invention is stablized, glass blocks can be installed again after pedestal, heel post are installed, and fill With simplicity, cracky, stability is not high.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structural schematic diagram of heel post of the invention.
Fig. 3 is the cross-sectional view in Fig. 2 along line A-A.
Fig. 4 is the structural schematic diagram of holding firmware.
Specific embodiment
In order to make those skilled in the art better understand the present invention program, below in conjunction in the embodiment of the present invention Attached drawing, the technical scheme in the embodiment of the invention is clearly and completely described.
As shown in Figs 1-4, a kind of building balcony including balcony ground, encloses the glass guardrail set on balcony ground, sets In the landfill portion on balcony ground, the glass guardrail is spliced by multiple groups guardrail module, specifically, each guardrail module is equal Including pedestal 1, glass blocks 2, heel post 3 and cross bar 4, the heel post 3 is fixedly connected on pedestal 1, specifically, the pedestal 1 and heel post 3 weld;Cross bar 4 is removably connected to 3 end of heel post;Specifically, the heel post 3 is connected by screw to cross Bar 4, heel post top formed anticreep column 33,4 lower part of cross bar be equipped with for prevent anticreep column 33 deviate from limited post slot=. The upper surface of the cross bar 4 is smooth arc-shaped surface setting, and 4 lower surface of cross bar is arranged at intervals with light bulb accommodating chamber 41;Specifically, The side wall of the light bulb accommodating chamber 41 opens up internal screw thread, and light bulb can be screwed on the screw thread, thus be placed in light bulb accommodating chamber 41, Light bulb can illuminate guardrail at night, remind the presence of people's guardrail of night flight or navigation, reduce security risk;41 roof of light bulb accommodating chamber is equipped with Light bulb contact chip 42, the light bulb contact chip 42 are connected to power supply by electric wire.The heel post 3 is set as two, and opposed Setting is for installing glass blocks 2;In order to be matched with glass blocks to dispose glass blocks 2, the both sides difference of the heel post 3 Retaining lugs 31 and lock-bit protrusion 32 are extended outward to form.Specifically, the lock-bit protrusion 32 is located at right side, lock is offered thereon Position slot 321, the lock-bit slot 321 can be used for limiting glass blocks 2;The retaining lugs 31 offers fixing groove 311, the fixing groove 311 be opening setting.
In order to facilitate the connection of glass blocks 2 and retaining lugs 31, the glass blocks is equipped with a holding firmware 5, the fixing Part 5 can be in glass blocks periphery or so activity;Specifically, the holding firmware 5 is used to cooperate fixed glass blocks 2, institute with fixing groove 311 Stating holding firmware 5 includes through slot 51, holding section 52, and the holding section 52, which is spaced apart, is equipped with through-hole 521;The through slot 51 is opened in card 5 middle part of firmware, the setting of through-hole 51 is so that glass blocks 2 may pass through holding firmware;The holding section 52 is from 5 peripheral wall of holding firmware to extension It stretches to be formed;311 side wall of fixing groove is equipped with the card slot 53 for being matched with holding section 52, the corresponding through-hole 521 of the fixing groove 311 Position offers threaded hole 522.
Since guardrail needs frequent stress in use, it is inevitably easy to happen inclination, and if guardrail inclination is just lost It has been gone to ensure the effect of safety.So we are provided with built-in fitting 6 on the guardrail, it can be embedded in landfill portion and carry out pedestal 1.Specifically, the wherein one end of the built-in fitting 6 is provided with screw thread, so as to be threadedly connected to pedestal 1, the other end, which is equipped with, to be added The reinforcing protrusion 61 of strong built-in fitting 6 and the embedded connection on ground;The protrusion 61 that reinforces is spirally distributed in the outer of built-in fitting 6 Circumferential surface, and the reinforcing protrusion 61 is to be obliquely installed upwards;So that protrusion is reinforced when being embedded in ground, the effect that can bear Power increases at least twice, and guardrail is not easy skew, enhances guardrail stability, prolongs the service life, and saves maintenance cost.As preferred , the angle reinforced between protrusion 61 and built-in fitting 6 is 60 °.
Obviously, described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment should fall within the scope of the present invention.

Claims (3)

1. a kind of building balcony, including balcony ground, the glass guardrail enclosed on balcony ground, filling out set on balcony ground Bury portion, it is characterised in that: the glass guardrail is spliced by multiple groups guardrail module, and each guardrail module includes pedestal (1), glass blocks (2), the two opposite disposed heel posts (3) and cross bar (4) for being used to install glass blocks (2);On the heel post (3) Equipped with retaining lugs (31) and lock-bit protrusion (32), which is equipped with the lock-bit slot for limiting glass blocks (2) (321), which is equipped with fixing groove (311);It further include cooperating fixed glass blocks (2) with fixing groove (311) Holding firmware (5), the holding firmware (5) is in glass blocks periphery or so activity;The holding firmware (5) includes being opened in holding firmware (5) The through slot (51) passed through for glass blocks in portion, the holding section (52) extended outward to form by holding firmware (5) peripheral wall;The pedestal (1) lower part is equipped with built-in fitting (6), which, which is equipped with, reinforces protrusion (61);The reinforcing protrusion (61) is divided in the shape of a spiral It is distributed in the outer peripheral surface of built-in fitting (6), the reinforcing protrusion (61) is to be obliquely installed upwards;The reinforcing protrusion (61) and built-in fitting (6) angle between is 60 °;Anticreep column (33) are formed at the heel post top, and cross bar (4) lower part is equipped with for preventing The limited post slot of de- column (33) abjection.
2. building balcony according to claim 1, it is characterised in that: the heel post (3) is fixed on pedestal (1), horizontal Bar (4) is removably connected to heel post (3) end;Fixing groove (311) side wall is equipped with the card slot for being matched with holding section (52) (53), the holding section (52), which is spaced apart, is equipped with through-hole (521), and corresponding through-hole (521) position of the fixing groove (311) opens up There are threaded hole (522).
3. building balcony according to claim 1, it is characterised in that: cross bar (4) upper surface sets for smooth arc-shaped surface It sets, cross bar (4) lower surface is arranged at intervals with light bulb accommodating chamber (41), which opens up internal screw thread.
CN201710979370.8A 2016-02-25 2016-02-25 A kind of building balcony Active CN107938826B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710979370.8A CN107938826B (en) 2016-02-25 2016-02-25 A kind of building balcony

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610101329.6A CN105525677B (en) 2016-02-25 2016-02-25 Safety-type balcony
CN201710979370.8A CN107938826B (en) 2016-02-25 2016-02-25 A kind of building balcony

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610101329.6A Division CN105525677B (en) 2016-02-25 2016-02-25 Safety-type balcony

Publications (2)

Publication Number Publication Date
CN107938826A CN107938826A (en) 2018-04-20
CN107938826B true CN107938826B (en) 2019-11-05

Family

ID=55768172

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201710979370.8A Active CN107938826B (en) 2016-02-25 2016-02-25 A kind of building balcony
CN201610101329.6A Expired - Fee Related CN105525677B (en) 2016-02-25 2016-02-25 Safety-type balcony

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610101329.6A Expired - Fee Related CN105525677B (en) 2016-02-25 2016-02-25 Safety-type balcony

Country Status (1)

Country Link
CN (2) CN107938826B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816126B (en) * 2017-10-26 2023-10-03 张延年 Assembled concrete embedded prefabricated column and prefabricated balcony
CN111501992A (en) * 2020-04-20 2020-08-07 安徽筑砼装配式建筑研究院有限公司 Prefabricated balcony slab

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2684706B1 (en) * 1991-12-10 1994-10-28 Eric Guignier MODULAR BALUSTRADE.
CN2908647Y (en) * 2006-04-29 2007-06-06 台山市金桥铝型材厂有限公司 Railing
CN200949290Y (en) * 2006-08-13 2007-09-19 周吉文 Composite detachable safety guards
JP5357437B2 (en) * 2008-03-24 2013-12-04 久米工業株式会社 Handrail fence
CN202787772U (en) * 2012-07-25 2013-03-13 李存立 Colored aluminum alloy glass artistic balustrade
CN103233560B (en) * 2013-04-10 2016-01-20 中山大学 A kind of photovoltaic devices of integrated building guardrail integral
CN103967235A (en) * 2014-05-15 2014-08-06 浙江盛丰科技有限公司 Novel guardrail
CN204475720U (en) * 2015-02-13 2015-07-15 山东森科门窗工程有限公司 Balcony glass railing
CN205035900U (en) * 2015-09-15 2016-02-17 广州科技职业技术学院 Balcony guardrail

Also Published As

Publication number Publication date
CN107938826A (en) 2018-04-20
CN105525677B (en) 2017-11-28
CN105525677A (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN107938826B (en) A kind of building balcony
CN105604261B (en) Stable type glass guardrail
CN204645453U (en) For the connector that stair railing cross bar is installed
CN207553675U (en) A kind of gardens guardrail being easily installed
KR200350282Y1 (en) A fence having constuction type support
CN207245045U (en) A kind of fence stairwell protection network
CN104775668B (en) Climbing section protective fence column
CN204590803U (en) Climbing section protective fence column
CN208563179U (en) Adjustable-angle combines guardrail
CN207526384U (en) A kind of sash for being easily installed protective fence
CN210857526U (en) Assembly type building element connection structure
CN204418061U (en) The tiltable modular railing of a kind of transverse tube
KR101474720B1 (en) Guardrail Post of Deck
KR101205544B1 (en) cap for pillar
CN206513111U (en) A kind of assembly type building safety guardrail
CN112386035A (en) Supporting beam structure and row chair
CN203321070U (en) Guardrail
CN206971604U (en) A kind of novel invisible guardrail
CN210398541U (en) Novel swimming pool lamp structure
CN104110607B (en) There is the lamp assembly of Simple installation support
CN205592900U (en) LED lamp and installation cassette thereof
CN204738599U (en) Protection rail stand
CN108265653A (en) A kind of guardrail cross beams bindiny mechanism
CN205336196U (en) Solar photovoltaic board installed part
CN104895402A (en) Protective fence stand column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191012

Address after: 322200 No.35 Shiling, Shunyan village, Puyang Street, Pujiang County, Zhejiang Province

Applicant after: Pujiang Yijing Decoration Engineering Co., Ltd.

Address before: 312099 Zhejiang province Shaoxing City West Village building 32 Room 601 room

Applicant before: Ru Mai Na

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant