CN107938687A - A kind of mining area slope soil erosion maintenance device and its method - Google Patents

A kind of mining area slope soil erosion maintenance device and its method Download PDF

Info

Publication number
CN107938687A
CN107938687A CN201711137070.1A CN201711137070A CN107938687A CN 107938687 A CN107938687 A CN 107938687A CN 201711137070 A CN201711137070 A CN 201711137070A CN 107938687 A CN107938687 A CN 107938687A
Authority
CN
China
Prior art keywords
rod
mining area
clamp
soil erosion
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711137070.1A
Other languages
Chinese (zh)
Inventor
张传琦
牛杏杏
明桂林
孙忠伟
王代飞
秦月琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI JINLIAN GEOLOGY AND MINERAL RESOURCES TECHNOLOGY Co Ltd
Original Assignee
ANHUI JINLIAN GEOLOGY AND MINERAL RESOURCES TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI JINLIAN GEOLOGY AND MINERAL RESOURCES TECHNOLOGY Co Ltd filed Critical ANHUI JINLIAN GEOLOGY AND MINERAL RESOURCES TECHNOLOGY Co Ltd
Priority to CN201711137070.1A priority Critical patent/CN107938687A/en
Publication of CN107938687A publication Critical patent/CN107938687A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles

Abstract

The invention discloses a kind of mining area slope soil erosion maintenance device and its method.It is related to soil erosion protective device technical field.Including the body of rod and fixing glue, the both ends of the body of rod are respectively equipped with clamp, auxiliary clamp;Through hole is equipped with clamp, auxiliary clamp;Fixing glue includes ailhead;One surface of ailhead is equipped with card column, the first cylinder, the second cylinder, incline, conehead successively;All sides of second cylinder are evenly equipped with four inclines;One auxiliary clamp clearance fit of the clamp body of rod adjacent thereto of the body of rod, is locked by fixing glue.The present invention carries out a variety of arrangements by multiple bodies of rod, forms variform polygon, is arranged, and adapts to a variety of mining area mining areas of different shapes and uses, and is fixed by fixing glue, and the process of installation is convenient, easy to the transport to original paper.

Description

A kind of mining area slope soil erosion maintenance device and its method
Technical field
The invention belongs to soil erosion protective device technical field, is safeguarded more particularly to a kind of soil erosion of mining area slope Devices and methods therefor.
Background technology
China is one of country the most serious of soil erosion in the world, and soil erosion is large in number and widely distributed.According to the whole nation for the first time Water conservancy generally investigates achievement, 294.91 ten thousand square kilometres of the existing soil erosion area in China.Serious soil erosion, is that China's ecology is disliked The concentrated reflection of change, threatens National Ecological Security, safe drinking water, flood control safety and grain security, restricts mountainous region and hills area, shadow Ring all-round construction process.
The vegetation deterioration in mining area is serious, and the degree of soil erosion can aggravate, and the protection for mining area soil and water loss is mining area One key subjects of environmental improvement, existing mining area slope soil erosion protective device volume is big, weight weight, it has not been convenient to transport case Installation.
The content of the invention
It is an object of the invention to provide a kind of mining area slope soil erosion maintenance device and its method, pass through multiple bodies of rod A variety of arrangements is carried out, variform polygon is formed, is arranged, adapting to a variety of mining area mining areas of different shapes makes With, and be fixed by fixing glue, the process of installation is convenient, easy to the transport to original paper..
In order to solve the above technical problems, the present invention is achieved by the following technical solutions:
The present invention is a kind of mining area slope soil erosion maintenance device and its method, including the body of rod and fixing glue, the bar The both ends of body are respectively equipped with clamp, auxiliary clamp;Through hole is equipped with the clamp, auxiliary clamp;The fixing glue includes nail Head;One surface of ailhead is equipped with card column, the first cylinder, the second cylinder, incline, conehead successively;The side of second cylinder Face is evenly equipped with four inclines;One auxiliary clamp clearance fit of the clamp body of rod adjacent thereto of the body of rod, passes through fixing glue Locking.
Further, the angle between the two adjacent bodies of rod is between 60 ° -180 °;The body of rod uses steel bar system Into.
Further, the diameter of first cylinder is more than the diameter of the second cylinder;The card column is polymorphic structure;It is described The via clearance that card column is equipped with auxiliary clamp coordinates.
Further, the body of rod is equipped with multiple, forms regular polygon, different polygon.
A kind of mining area slope soil erosion maintenance device installation method, includes the following steps:
Step 1:Mining area slope is modified, stone, weeds on removing mining area slope so that mining area slope ensures It is smooth;
Step 2:According to the area of the green plant of fabric, selection forms the side number of polygon, head and the tail phase between the two different bodies of rod Even, and it is fixed on the slope of mining area by fixing glue, two adjacent polygon close-packed arrays, in the place for running into barrier, is led to The angle for changing adjacent two body of rod is crossed, barrier is avoided;
Step 3:The centre of polygon is being formed, green plant is being planted, mining area slope is protected.
Further, it is described.
The invention has the advantages that:
1st, the present invention carries out a variety of arrangements by multiple bodies of rod, forms variform polygon, is arranged, can be fitted Answer a variety of mining area mining areas of different shapes to use, and be fixed by fixing glue, the process of installation is convenient, easy to original paper Transport.
2nd, fixing glue of the present invention is equipped with incline, avoids the fixing glue after installation from rotating, in addition the cylinder of fixing glue is in platform Scalariform, effectively prevents the loosening of fixing glue.
Certainly, implement any of the products of the present invention and do not necessarily require achieving all the advantages described above at the same time.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, embodiment will be described below required Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is the bar structure schematic diagram of the present invention;
Fig. 2 is the structure diagram of the fixing glue of the present invention;
Fig. 3 is body of rod connection diagram of the present invention;
In attached drawing, parts list represented by the reference numerals is as follows:
The 1- bodies of rod, 2- fixing glues, 101- clamps, 102- auxiliary clamps, 201- ailheads, 202- card columns, the first columns of 203- Body, the second cylinders of 204-, 205- inclines, 206- coneheads.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained all other without creative efforts Embodiment, belongs to the scope of protection of the invention.
In the description of the present invention, it is to be understood that term " perforate ", " on ", " under ", " thickness ", " top ", " in ", Indicating position or the position relationship such as " length ", " interior ", " surrounding ", are for only for ease of the description present invention and simplify description, without It is that the component of instruction or hint meaning or element must have specific orientation, with specific azimuth configuration and operation, therefore not It is understood that as limitation of the present invention.
Please refer to Fig.1 shown in -3, the present invention is a kind of mining area slope soil erosion maintenance device and its method, including the body of rod 1 and fixing glue 2, the both ends of the body of rod 1 are respectively equipped with clamp 101, auxiliary clamp 102;It is equipped with clamp 101, auxiliary clamp 102 Through hole;Fixing glue 2 includes ailhead 201;201 1 surface of ailhead successively be equipped with card column 202, the first cylinder 203, the second cylinder 204, Incline 205, conehead 206;All sides of second cylinder 204 are evenly equipped with four inclines 205;One clamp 101 of the body of rod 1 is adjacent thereto One auxiliary 102 clearance fit of clamp of the body of rod 1, is locked by fixing glue 2.
Wherein, the angle between the two adjacent bodies of rod 1 is between 60 ° -180 °;The body of rod 1 is made of steel bar.
Wherein, the diameter of the first cylinder 203 is more than the diameter of the second cylinder 204;Card column 202 is polymorphic structure;Card column 202 The via clearance being equipped with auxiliary clamp 102 coordinates.
Wherein, the body of rod 1 is equipped with multiple, forms regular polygon, different polygon.
A kind of mining area slope soil erosion maintenance device installation method, includes the following steps:
Step 1:Mining area slope is modified, stone, weeds on removing mining area slope so that mining area slope ensures It is smooth;
Step 2:According to the area of the green plant of fabric, selection forms the side number of polygon, head and the tail between the two different bodies of rod 1 It is connected, and is fixed on by fixing glue 2 on the slope of mining area, two adjacent polygon close-packed arrays, in the place for running into barrier, By varying the angle of adjacent two body of rod 1, barrier is avoided;
Step 3:The centre of polygon is being formed, green plant is being planted, mining area slope is protected.
Embodiment 1:
Put the body of rod 1 is end to end, be fixed on the slope of mining area in level, it is green per planting between two rows of equipped with multiple rows of Plant, the slope in mining area is protected, avoids the loss of water and soil, in the card column being equipped with during installation in fixing glue 1 202 In the through hole of auxiliary clamp 102, the body of rod 1 is avoided to rotate after fixed.
Embodiment 2:
The body of rod 1 is end to end, it is at a certain angle between the adjacent body of rod 1, polygon is formed, close-packed arrays, are fixed on On the slope of mining area, green plant is planted among polygon, the slope in mining area is protected, avoids the loss of water and soil, in the mistake of installation The card column 202 that fixing glue 1 is equipped with journey avoids the body of rod 1 from rotating in the through hole of auxiliary clamp 102 after fixed.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means At least one implementation of the present invention is contained in reference to the embodiment or example particular features, structures, materials, or characteristics described In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example. Moreover, particular features, structures, materials, or characteristics described can close in any one or more embodiments or example Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help and illustrates the present invention.Preferred embodiment is not detailed All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification, It can make many modifications and variations.This specification is chosen and specifically describes these embodiments, is in order to preferably explain the present invention Principle and practical application so that skilled artisan can be best understood by and utilize the present invention.The present invention is only Limited by claims and its four corner and equivalent.

Claims (5)

  1. A kind of 1. mining area slope soil erosion maintenance device, it is characterised in that:Including the body of rod (1) and fixing glue (2),
    The both ends of the body of rod (1) are respectively equipped with clamp (101), auxiliary clamp (102);The clamp (101), auxiliary clamp (102) through hole is equipped with;
    The fixing glue (2) includes ailhead (201);(201) one surface of ailhead is equipped with card column (202), the first cylinder successively (203), the second cylinder (204), incline (205), conehead (206);All sides of second cylinder (204) are evenly equipped with four sides Rib (205);
    Auxiliary clamp (102) clearance fit for a clamp (101) body of rod adjacent thereto (1) of the body of rod (1), passes through fixation Follow closely (2) locking.
  2. 2. a kind of mining area slope soil erosion maintenance device according to claim 1, it is characterised in that described in adjacent two Angle between the body of rod (1) is between 60 ° -180 °;The body of rod (1) is made of steel bar.
  3. A kind of 3. mining area slope soil erosion maintenance device according to claim 1, it is characterised in that first cylinder (203) diameter is more than the diameter of the second cylinder (204);The card column (202) is polymorphic structure;The card column (202) with it is auxiliary The via clearance that clamp (102) is equipped with is helped to coordinate.
  4. A kind of 4. mining area slope soil erosion maintenance device according to claim 1, it is characterised in that the body of rod (1) Form regular polygon, different polygon.
  5. 5. such as a kind of mining area slope soil erosion maintenance device installation method of claim 1-4 any one, it is characterised in that bag Include following steps:
    Step 1:Mining area slope is modified, stone, weeds on removing mining area slope so that mining area slope ensures smooth;
    Step 2:According to the area of the green plant of fabric, selection forms the side number of polygon, head and the tail phase between different two bodies of rod (1) Even, and it is fixed on by fixing glue (2) on the slope of mining area, two adjacent polygon close-packed arrays, in the place for running into barrier, By varying the angle of adjacent two body of rod (1), barrier is avoided;
    Step 3:The centre of polygon is being formed, green plant is being planted, mining area slope is protected.
CN201711137070.1A 2017-11-16 2017-11-16 A kind of mining area slope soil erosion maintenance device and its method Pending CN107938687A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711137070.1A CN107938687A (en) 2017-11-16 2017-11-16 A kind of mining area slope soil erosion maintenance device and its method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711137070.1A CN107938687A (en) 2017-11-16 2017-11-16 A kind of mining area slope soil erosion maintenance device and its method

Publications (1)

Publication Number Publication Date
CN107938687A true CN107938687A (en) 2018-04-20

Family

ID=61931449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711137070.1A Pending CN107938687A (en) 2017-11-16 2017-11-16 A kind of mining area slope soil erosion maintenance device and its method

Country Status (1)

Country Link
CN (1) CN107938687A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201078937Y (en) * 2007-08-14 2008-07-02 张宇顺 Reinforcement slope greening structure
CN201794091U (en) * 2010-09-25 2011-04-13 东莞市奥达绿保环保科技有限公司 Sand bag protective wall connecting nail plate
CN205077358U (en) * 2015-10-27 2016-03-09 台州市金地园林市政工程有限公司 Gardens massif greening brick
CN205530126U (en) * 2016-04-11 2016-08-31 江西水利职业学院 Novel ecological slope protection net
CN205776265U (en) * 2015-09-02 2016-12-07 三峡大学 For smooth domatic plate from plant wastes structure
CN205894022U (en) * 2016-07-15 2017-01-18 云南建工水利水电建设有限公司 Water conservancy slope protection net
CN106836173A (en) * 2016-10-13 2017-06-13 中国科学院寒区旱区环境与工程研究所 Grid type sand-fixing device
CN107012877A (en) * 2017-04-10 2017-08-04 江苏建筑职业技术学院 A kind of vegetation ecological concrete presser type protective slope structure and construction method
CN206620551U (en) * 2017-02-24 2017-11-10 聂凯 One kind can planting garden slope protection prevention device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201078937Y (en) * 2007-08-14 2008-07-02 张宇顺 Reinforcement slope greening structure
CN201794091U (en) * 2010-09-25 2011-04-13 东莞市奥达绿保环保科技有限公司 Sand bag protective wall connecting nail plate
CN205776265U (en) * 2015-09-02 2016-12-07 三峡大学 For smooth domatic plate from plant wastes structure
CN205077358U (en) * 2015-10-27 2016-03-09 台州市金地园林市政工程有限公司 Gardens massif greening brick
CN205530126U (en) * 2016-04-11 2016-08-31 江西水利职业学院 Novel ecological slope protection net
CN205894022U (en) * 2016-07-15 2017-01-18 云南建工水利水电建设有限公司 Water conservancy slope protection net
CN106836173A (en) * 2016-10-13 2017-06-13 中国科学院寒区旱区环境与工程研究所 Grid type sand-fixing device
CN206620551U (en) * 2017-02-24 2017-11-10 聂凯 One kind can planting garden slope protection prevention device
CN107012877A (en) * 2017-04-10 2017-08-04 江苏建筑职业技术学院 A kind of vegetation ecological concrete presser type protective slope structure and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
余新晓,毕华兴主编: "《水土保持学 第3版》", 28 February 2013 *

Similar Documents

Publication Publication Date Title
CN103891578B (en) Construction and creation method of indigenous mangrove protection forest on foreshore unsuitable for afforestation
CN107119701A (en) A kind of low-carbon ecological guard system of rock slope
CN204225137U (en) For the radial well dewatering structure of contaminated water and soil integration in-situ immobilization
CN107938687A (en) A kind of mining area slope soil erosion maintenance device and its method
CN206956743U (en) A kind of low-carbon ecological guard system of rock slope
CN117243039A (en) High-gravel-content gobi ecological management system and method based on natural force
CN204540076U (en) A kind of energy-conservation cliff greening system
CN207484492U (en) A kind of anti-erosion slope protection structure of high soil slope
CN103669475B (en) Desert-governance greening system capable of forming desert underground reservoir
CN207348076U (en) The municipal civil engineering side slope reinforcing apparatus of one kind building
CN206629610U (en) A kind of tree anti-tilting support system
CN108005092A (en) It is a kind of to be used for the multiple green safety device of slope surface and its method
CN207296612U (en) Combine fence in a kind of gardens
CN206971234U (en) It is a kind of can natural degradation environment protection slope grass blanket
CN107938686A (en) Green body Slope greening method is answered based on drought and waterlogging area self application
CN211297899U (en) Anti-skidding slope structure suitable for prickly ash hillside is planted
Hauser et al. Root distribution of Dactyladenia (Acioa) barteri and Senna (Cassia) siamea in alley cropping on Ultisol. II. Impact on water regime and consequences for experimental design
CN207260165U (en) Composite space landslide retaining structure
CN106401084A (en) Green roof system
CN214939834U (en) Side slope protection structure
CN206616544U (en) A kind of system of utilization riverway sludge Desert Control
CN105059476B (en) The interim bollard of mooring of self-elevating drilling platform
CN105625296B (en) A kind of liquid sand-consolidating agent is sprayed and bonding course cutter device
CN102383435A (en) High-fall levee double-row piles
CN214430443U (en) Tree planting hole structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180420