CN107938523A - A kind of bridge coping Construction Support device - Google Patents

A kind of bridge coping Construction Support device Download PDF

Info

Publication number
CN107938523A
CN107938523A CN201711490290.2A CN201711490290A CN107938523A CN 107938523 A CN107938523 A CN 107938523A CN 201711490290 A CN201711490290 A CN 201711490290A CN 107938523 A CN107938523 A CN 107938523A
Authority
CN
China
Prior art keywords
iron
chock
mounting hole
pull rod
iron chock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711490290.2A
Other languages
Chinese (zh)
Inventor
刘烨
张嵩
贺翔
王祥
雷杨
李帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Fifth Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority to CN201711490290.2A priority Critical patent/CN107938523A/en
Publication of CN107938523A publication Critical patent/CN107938523A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses a kind of bridge coping Construction Support device, including iron case, large through-hole is offered in the middle part of the iron case, the threaded hole with being connected outside iron case is offered on the side side wall of the large through-hole, the threaded hole internal thread is connected with bolt, the upper side wall of the iron case is equipped with lower iron chock, the upper end of the lower iron chock is equipped with upper iron chock, mounting hole is offered on the lower iron chock and upper iron chock, the inside of the mounting hole is connected with to pull rod jointly, the both ends to pull rod outside mounting hole are equipped with nut, both sides outside each mounting hole are equipped with stiffened steel plates, and stiffened steel plates are installed in the madial wall of lower iron chock and upper iron chock.Stable structure of the present invention, easy to operate, design is scientific and reasonable, with short production cycle, and low manufacture cost, produces once, can long-time service, repeatedly turnover is without amortization, has not only evaded the insecurity of jack, but can easy adjustment and dismounting, meet production and safety requirements.

Description

A kind of bridge coping Construction Support device
Technical field
The present invention relates to building template supporting structure technical field, more particularly to a kind of bridge coping Construction Support device.
Background technology
In bridge construction, most commonly seen in lid (being) beam construction is to wear rod iron method and Hold Hoop method, and traditional construction Jack and sandbox often use in technique as supporting, jack is and husky in use there are larger insecurity Case adjusts highly more difficult and is not easy to remove in use, for this reason, it is proposed that.
The content of the invention
The problem of the purpose of the present invention is to solve in background technology, and a kind of bridge coping Construction Support dress proposed Put.
To achieve these goals, present invention employs following technical solution:
A kind of bridge coping Construction Support device, including iron case, large through-hole is offered in the middle part of the iron case, described big logical The threaded hole with being connected outside iron case is offered on the side side wall in hole, the threaded hole internal thread is connected with bolt, the iron The upper side wall of case is equipped with lower iron chock, and the upper end of the lower iron chock is equipped with upper iron chock, the lower iron chock and upper iron chock On offer mounting hole, the inside of the mounting hole is connected with to pull rod jointly, and described outside mounting hole is to pull rod Both ends are equipped with nut, and the both sides outside each mounting hole are equipped with stiffened steel plates, and stiffened steel plates are installed in lower iron chock In the madial wall of upper iron chock, the outer middle part of the mounting hole is additionally provided with backing plate, and pull rod is set through backing plate, and spiral shell Cap is also disposed at the outside of backing plate.
Preferably, the lower iron chock and upper iron chock are T-type structure, and the inclined side of lower iron chock and upper iron chock Offset.
Preferably, the height of the mounting hole is more than the diameter to pull rod, the width of the mounting hole and to the straight of pull rod Footpath is identical.
Preferably, described to be equipped with screw thread to pull rod, the nut is connected by screw thread with to pull rod screw.
Preferably, the lower iron chock and upper iron chock are welded using 2cm steel plates, short side steel plate specification for 20cm × 5cm × 2cm, long side steel plate specification are 20cm × 20cm × 2cm, and middle part is welded with stiffened steel plates.
Preferably, it is described that fining twisted steels are justified using 25 to pull rod.
In the present invention, rod iron preformed hole is stayed before construction, by taking 2m cylinder piers as an example, penetrates 3m long steel bars, both sides are respectively stayed Go out 50cm, iron case is inserted on rod iron, tightening firm screw on iron case prevents iron case from sliding.After fixing iron case, iron chock is placed, By adjusting the absolute altitude of iron chock to pull rod, fining twisted steel adds backing plate and nut right overhead, increases essence by rotary nut Roll screw-thread steel length, so as to reduce iron cleat height, light form removal, and be not directed in the device part with prior art phase It can be realized together or using the prior art.Stable structure of the present invention, easy to operate, design is scientific and reasonable, with short production cycle, system It is low to make cost, produces once, can long-time service, repeatedly turnover not only evaded the insecurity of jack without amortization, but also can be light Pine adjusts and removes, and meets production and safety requirements.
Brief description of the drawings
Fig. 1 is a kind of overall structure diagram of bridge coping Construction Support device proposed by the present invention;
Fig. 2 is a kind of part-structure side schematic view of bridge coping Construction Support device proposed by the present invention.
In figure:1 iron case, 2 bolts, 3 times iron chocks, iron chock, 5 pairs of pull rods, 6 nuts, 7 stiffened steel plates, 8 backing plates on 4.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.
In the description of the present invention, it is to be understood that term " on ", " under ", "front", "rear", "left", "right", " top ", The orientation or position relationship of the instruction such as " bottom ", " interior ", " outer " are based on orientation shown in the drawings or position relationship, merely to just In the description present invention and simplify description, rather than instruction or imply signified device or element must have specific orientation, with Specific azimuth configuration and operation, therefore be not considered as limiting the invention.
With reference to Fig. 1-2, a kind of bridge coping Construction Support device, including iron case 1, the middle part of iron case 1 offer large through-hole, The threaded hole connected with the outside of iron case 1 is offered on the side side wall of large through-hole, threaded hole internal thread is connected with bolt 2, iron case 1 Upper side wall be equipped with lower iron chock 3, the upper end of lower iron chock 3 is equipped with upper iron chock 4, is opened on lower iron chock 3 and upper iron chock 4 Equipped with mounting hole, the inside of mounting hole is connected with to pull rod 5 jointly, and the both ends to pull rod 5 outside mounting hole are equipped with spiral shell Cap 6, the both sides outside each mounting hole are equipped with stiffened steel plates 7, and stiffened steel plates 7 are installed in lower iron chock 3 and upper iron chock 4 In madial wall, the outer middle part of mounting hole is additionally provided with backing plate 8, and pull rod 5 is set through backing plate 8, and nut 6 is also disposed at pad The outside of plate 8;
Lower iron chock 3 and upper iron chock 4 are T-type structure, and the inclined side of lower iron chock 3 and upper iron chock 4 offsets, peace The height in hole is filled more than the diameter to pull rod 5, the width of mounting hole is identical with the diameter to pull rod 5, and spiral shell is equipped with to pull rod 5 Line, nut 6 are connected by screw thread with to pull rod screw, and lower iron chock 3 and upper iron chock 4 are welded using 2cm steel plates, short side steel Plate gauge lattice are 20cm × 5cm × 2cm, and long side steel plate specification is 20cm × 20cm × 2cm, and middle part is welded with stiffened steel plates 7, right Pull rod 5 is using 25 circle fining twisted steels.
In the present invention, iron case 1 is to make the circular contact face of rod iron be converted to plane contact, is avoided in installation iron chock When produce sliding rotate, so as to cause safety problem.Bolt 2 is set up on iron case 1 in advance.Iron case is consolidated by this bolt 2 Be scheduled on rod iron, bolt 2 is the core position of 1 device of iron case, can by twist bolt 2 make iron case 1 on rod iron it is more firm, Platform consolidates during meeting to place iron chock, I-steel and template in construction, ensures construction safety, the device is easy to connect, Firmly, can be right to reach the height of adjustment I-steel by adjusting the height of iron chock to the elastic of nut 6 during use Formwork elevation measuring is adjusted and plays a supporting role, and installation, easy removal, suitably use in various conditions.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (6)

1. a kind of bridge coping Construction Support device, including iron case (1), it is characterised in that offered in the middle part of the iron case (1) Large through-hole, offer on the side side wall of the large through-hole and iron case (1) outside the threaded hole that connects, the threaded hole internal thread Bolt (2) is connected with, the upper side wall of the iron case (1) is equipped with lower iron chock (3), and the upper end of the lower iron chock (3) is equipped with upper Iron chock (4), offers mounting hole on the lower iron chock (3) and upper iron chock (4), the inside of the mounting hole connects jointly It is connected to pull rod (5), the both ends to pull rod (5) outside mounting hole are equipped with nut (6), outside each mounting hole Both sides be equipped with stiffened steel plates (7), and stiffened steel plates (7) are installed in the madial wall of lower iron chock (3) and upper iron chock (4) In, the outer middle part of the mounting hole is additionally provided with backing plate (8), and pull rod (5) is set through backing plate (8), and nut (6) is also set Put in the outside of backing plate (8).
A kind of 2. bridge coping Construction Support device according to claim 1, it is characterised in that the lower iron chock (3) It is T-type structure with upper iron chock (4), and the inclined side of lower iron chock (3) and upper iron chock (4) offsets.
A kind of 3. bridge coping Construction Support device according to claim 1, it is characterised in that the height of the mounting hole More than the diameter to pull rod (5), the width of the mounting hole is identical with the diameter to pull rod (5).
4. a kind of bridge coping Construction Support device according to claim 1, it is characterised in that described on pull rod (5) Equipped with screw thread, the nut (6) is connected by screw thread with to pull rod screw.
A kind of 5. bridge coping Construction Support device according to claim 1, it is characterised in that the lower iron chock (3) It is welded with upper iron chock (4) using 2cm steel plates, short side steel plate specification is 20cm × 5cm × 2cm, and long side steel plate specification is 20cm × 20cm × 2cm, middle part are welded with stiffened steel plates (7).
6. a kind of bridge coping Construction Support device according to claim 1, it is characterised in that described to be adopted to pull rod (5) With 25 circle fining twisted steels.
CN201711490290.2A 2017-12-30 2017-12-30 A kind of bridge coping Construction Support device Pending CN107938523A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711490290.2A CN107938523A (en) 2017-12-30 2017-12-30 A kind of bridge coping Construction Support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711490290.2A CN107938523A (en) 2017-12-30 2017-12-30 A kind of bridge coping Construction Support device

Publications (1)

Publication Number Publication Date
CN107938523A true CN107938523A (en) 2018-04-20

Family

ID=61937205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711490290.2A Pending CN107938523A (en) 2017-12-30 2017-12-30 A kind of bridge coping Construction Support device

Country Status (1)

Country Link
CN (1) CN107938523A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842590A (en) * 2018-09-18 2018-11-20 王燕春 The method and bridge of bridge are built for the stiffness bearer of bridge construction, without bracket

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11229323A (en) * 1998-02-19 1999-08-24 East Japan Railway Co Method for constructing repeatedly elevatable bridge girder bearing part by quick elevation and steel form
CN202181511U (en) * 2011-06-21 2012-04-04 汕头市达濠市政建设有限公司 Device for adjusting and dismantling pier coping beam template
CN204325926U (en) * 2014-11-14 2015-05-13 中铁六局集团海外工程有限公司 Set a roof beam in place and push up iron device
CN105332341A (en) * 2014-08-08 2016-02-17 葛洲坝集团第六工程有限公司 Bailey truss installation and dismounting apparatus
CN206784186U (en) * 2017-05-26 2017-12-22 中国十九冶集团有限公司 Bent cap beam support
CN207739153U (en) * 2017-12-30 2018-08-17 中建四局第五建筑工程有限公司 A kind of bridge coping Construction Support device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11229323A (en) * 1998-02-19 1999-08-24 East Japan Railway Co Method for constructing repeatedly elevatable bridge girder bearing part by quick elevation and steel form
CN202181511U (en) * 2011-06-21 2012-04-04 汕头市达濠市政建设有限公司 Device for adjusting and dismantling pier coping beam template
CN105332341A (en) * 2014-08-08 2016-02-17 葛洲坝集团第六工程有限公司 Bailey truss installation and dismounting apparatus
CN204325926U (en) * 2014-11-14 2015-05-13 中铁六局集团海外工程有限公司 Set a roof beam in place and push up iron device
CN206784186U (en) * 2017-05-26 2017-12-22 中国十九冶集团有限公司 Bent cap beam support
CN207739153U (en) * 2017-12-30 2018-08-17 中建四局第五建筑工程有限公司 A kind of bridge coping Construction Support device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842590A (en) * 2018-09-18 2018-11-20 王燕春 The method and bridge of bridge are built for the stiffness bearer of bridge construction, without bracket

Similar Documents

Publication Publication Date Title
US1903907A (en) Metal pole with reenforcing pipes
CN204589822U (en) The two cantilever bent cap anchor ear Construction Support system of a kind of solely post
CN108590199A (en) A kind of bottom bolt single layer steel column installation interim stabilization structure and its antihunt means
CN204715225U (en) A kind of bridge jacking platform based on steel hoop
CN108751076A (en) A kind of capacitor replacement platform
CN107938523A (en) A kind of bridge coping Construction Support device
CN206625651U (en) A kind of guard rail for construction
CN108086485A (en) A kind of steel construction large-sized bolt gusset plate installation closing device and installation method
CN105552757B (en) Portable distribution transformer mast-up
CN103469735B (en) The mounting method of curve ultrahigh hollow column plate type pier top solid section template
CN207739153U (en) A kind of bridge coping Construction Support device
CN206522590U (en) A kind of multi-functional monitoring device mounting bracket
CN205177594U (en) Formula transformer rack on same group
CN208981155U (en) A kind of pin-connected panel support frame of round pier capping beam
CN204644878U (en) A kind of transom pier steel truss girder lifting construction device
CN109404380A (en) The big load anchor ear device of cylinder
CN211007872U (en) Electric iron tower reinforcing apparatus convenient to installation
CN104843143A (en) Semi-automatic fire work pressure frame
CN204876084U (en) Steel column foot crab -bolt fixed bolster
CN207143753U (en) A kind of auxiliary body of steel box-girder swivel
CN209670316U (en) Movable Scaffold chassis
CN207110418U (en) A kind of railway pier top encloses hanging basket safe operation platform
CN202073877U (en) Cable-rope-free clamp with independent masts special for hoisting rigid steel column
CN206379690U (en) One kind is exempted to weld flexible crane span structure
CN209227403U (en) A kind of T erection monolithic beam anti-dumping bracing means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination