CN107931728A - A kind of transport process assembly line of fixed length pipe - Google Patents

A kind of transport process assembly line of fixed length pipe Download PDF

Info

Publication number
CN107931728A
CN107931728A CN201711159012.9A CN201711159012A CN107931728A CN 107931728 A CN107931728 A CN 107931728A CN 201711159012 A CN201711159012 A CN 201711159012A CN 107931728 A CN107931728 A CN 107931728A
Authority
CN
China
Prior art keywords
placing table
pusher
lifting
fixed length
length pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711159012.9A
Other languages
Chinese (zh)
Other versions
CN107931728B (en
Inventor
张明
郑朝忠
范修凤
王琼
王淑玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xinzhou Steel Industry Co Ltd
Original Assignee
Anhui Xinzhou Steel Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Xinzhou Steel Industry Co Ltd filed Critical Anhui Xinzhou Steel Industry Co Ltd
Priority to CN201711159012.9A priority Critical patent/CN107931728B/en
Publication of CN107931728A publication Critical patent/CN107931728A/en
Application granted granted Critical
Publication of CN107931728B publication Critical patent/CN107931728B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23DPLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR
    • B23D79/00Methods, machines, or devices not covered elsewhere, for working metal by removal of material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G37/00Combinations of mechanical conveyors of the same kind, or of different kinds, of interest apart from their application in particular machines or use in particular manufacturing processes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/74Feeding, transfer, or discharging devices of particular kinds or types
    • B65G47/82Rotary or reciprocating members for direct action on articles or materials, e.g. pushers, rakes, shovels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G49/00Conveying systems characterised by their application for specified purposes not otherwise provided for
    • B65G49/02Conveying systems characterised by their application for specified purposes not otherwise provided for for conveying workpieces through baths of liquid
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23GCLEANING OR DE-GREASING OF METALLIC MATERIAL BY CHEMICAL METHODS OTHER THAN ELECTROLYSIS
    • C23G3/00Apparatus for cleaning or pickling metallic material
    • C23G3/04Apparatus for cleaning or pickling metallic material for cleaning pipes

Abstract

The present invention relates to steel pipe manufacture field, and in particular to a kind of transport process assembly line of fixed length pipe, including:Pipe installation, fixed length pipe conveying device, first placing table, pickling tube, second placing table and drainage rest stand, the pipe installation includes band to band transfer module and cutter, the fixed length pipe conveying device includes, delivery roll and transmission frame, the end of the transmission frame conveying direction is provided with circular arc guide surface, first placing table is arranged between the pickling tube and the fixed length pipe conveying device, the circular arc recess of the circular arc guide surface is set towards first placing table, the first pusher and the second pusher to stagger up and down is provided with first placing table, the drainage rest stand is completed from the first placing table to pickling tube again to the transfer successively of the second placing table by first pusher and the second pusher.

Description

A kind of transport process assembly line of fixed length pipe
Technical field
The present invention relates to steel pipe manufacture field, and in particular to a kind of transport process assembly line of fixed length pipe.
Background technology
In the production process of steel pipe, steel pipe is after fixed length cutting, it is necessary to by transfer and pickling.In traditional workshop, this Usually require to use driving to carry out lifting transfer during a, which adds the danger in workshop, and need to pacify The scheduling of car is ranked, have impact on the production efficiency in workshop, the degree of automation is low.
The content of the invention
The purpose of the present invention, is to solve the problems, such as in background technology, there is provided a kind of transport process flowing water of fixed length pipe Line.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of transport process assembly line of fixed length pipe, including:Pipe installation, fixed length pipe conveying device, the first placing table, pickling Pond, the second placing table and drainage rest stand, the pipe installation include band to band transfer module and cutter, the fixed length pipe conveying device bag Include, delivery roll and transmission frame, the end of the transmission frame conveying direction is provided with circular arc guide surface, and first placing table is set Between the pickling tube and the fixed length pipe conveying device, the circular arc recess of the circular arc guide surface is held towards described first Platform is set, and is provided with the first pusher and the second pusher to stagger up and down at first placing table, the drainage is put Frame is put to complete from the first placing table to pickling tube again to the second placing table by first pusher and the second pusher Transfer successively.
In the present solution, steel pipe is automatically fallen into the first placing table after fixed length cutting is completed by circular arc guide surface In drainage rest stand, and under the effect of the first pusher, automatically into pickling tube, filled after completing pickling by the second push Put and be pushed to the second placing table, whole process the degree of automation is high, and need not use driving.
Preferably, first placing table and second placing table are hoistable platform, and hoistable platform pass through it is more A lifting unit for being arranged in parallel is formed, first pusher and the second pusher be arranged on these lifting units it Between, the pickling tube is arranged between first placing table and the second placing table.
Preferably, first pusher and the second pusher are fixed high push cylinder, both push vapour Cylinder stagger setting, the level height of first pusher are more than the level height of second pusher, and described first Pusher distance and the distance of the pickling tube are more than the distance of second pusher and the pickling tube.
Include preferably, the pickling tube includes two long side walls and two short side walls, the long side wall, top is turned over Transfer part and the stop part of lower part, the stop part and the lower part of the short side wall link into an integrated entity, and turning part is arranged on institute The both sides of short side wall are stated, sealing strip is provided between turning part and the short side wall, turning part is controlled by cylinder Upset.
Preferably, being provided with lifting strut in the pickling tube, the lifting strut is provided at both ends with lifting device, The lifting device is fixed at the top of the short side wall.
Preferably, the lifting device includes, lifting motor and lifting rope chain, described lifting rope chain two are fixed respectively On the output revolving shaft and the lifting strut of lifting motor.
Preferably, the lifting strut upper surface is provided with supporting block, detent mechanism and guiding block, the guiding block is set The both ends on the lifting stay length direction are put, the guiding block is provided with guide ramp, and the supporting block top surface is set There is pulley.
Preferably, the detent mechanism includes, lifting positioning head, spring, locating piece, plenum chamber and aerating pipe port;Institute The top for stating lifting positioning head is tip, and the lifting positioning head bottom is provided with piston block.
In conclusion beneficial effects of the present invention:
1. a kind of transport process assembly line of fixed length pipe of the present invention, need not make in the whole transfer process of fixed length pipe With driving, the degree of automation is high, safe in workshop.
2. a kind of transport process assembly line of fixed length pipe of the present invention, sets lifting strut in pickling tube, can add The drainage rate of fast steel pipe, accelerates production.
Brief description of the drawings
Fig. 1 is the schematic top plan view of the present invention;
Fig. 2 is the horizontal schematic diagram of the present invention;
Fig. 3 is the structure diagram of pickling tube of the present invention;
Fig. 4 is the schematic top plan view of pickling tube of the present invention;
Fig. 5 is the structure diagram of detent mechanism of the present invention.
Embodiment
Specific examples below is only explanation of the invention, it is not limitation of the present invention, art technology Personnel as needed can make the present embodiment the modification of no creative contribution after this specification is read, but as long as All protected in scope of the presently claimed invention be subject to Patent Law.
With embodiment, the present invention is described in detail below in conjunction with the accompanying drawings.
Embodiment 1:
According to Fig. 1~Fig. 5, a kind of transport process assembly line of fixed length pipe, including:Pipe installation 1, fixed length pipe conveying device 2nd, the first placing table 3, pickling tube 4, the second placing table 5 and drainage rest stand 6, pipe installation 1 include band to band transfer module 11 and cutter 12, Fixed length pipe conveying device 2 includes, and delivery roll 21 and transmission frame 22, the end of 22 conveying direction of transmission frame are provided with circular arc guide surface 23, the first placing table 3 is arranged between pickling tube 4 and fixed length pipe conveying device 2, and the circular arc recess of circular arc guide surface 23 is towards the One placing table 3 is set, and the first pusher 31 and the second pusher 32 to stagger up and down is provided with the first placing table 3, filter Water rest stand 6 is completed from the first placing table 3 to pickling tube 4 again to second by the first pusher 31 and the second pusher 32 The transfer successively of placing table 5.
According to Fig. 2, the first placing table 3 and the second placing table 5 are hoistable platform, and hoistable platform passes through multiple put down The lifting unit that row is set is formed, and the first pusher 31 and the second pusher 32 are arranged between these lifting units, acid Wash pool 4 is arranged between the first placing table 3 and the second placing table 5.
First pusher 31 and the second pusher 32 are fixed high push cylinder, both push cylinders, which stagger, to be set Put, the level height of the first pusher 31 is more than the level height of the second pusher 32,31 distance of the first pusher with The distance of pickling tube 4 is more than the distance of the second pusher 32 and pickling tube 4.
According to Fig. 3, pickling tube 4, which includes two long side walls 41 and two short side walls 42, long side wall 41, to be included, top Turning part 411 and the stop part 412 of lower part, stop part 412 and the lower part of short side wall 42 link into an integrated entity, and turning part 411 is set In the both sides of short side wall 42, sealing strip is provided between turning part 411 and short side wall 42, turning part 411 is turned over by cylinder control Turn.
According to Fig. 4, lifting strut 43 is provided with pickling tube 4, lifting strut 43 is provided at both ends with lifting device 44, lifting device 44 is fixed on the top of short side wall 42.
Lifting device 44 includes, and lifting motor 441 and lifting rope chain 442,442 two of lifting rope chain is separately fixed at lifting On the output revolving shaft and lifting strut 43 of motor 441,43 upper surface of lifting strut is provided with supporting block 431,432 and of detent mechanism Guiding block 433, guiding block 433 are arranged on the both ends on lifting 43 length direction of strut, and guiding block 433 is provided with guide ramp 4331,431 top surface of supporting block is provided with pulley 4311.
According to Fig. 5, detent mechanism 432 includes, lifting positioning head 4321, spring 4322, locating piece 4323, plenum chamber 4324 and aerating pipe port 4325;The top for lifting positioning head 4321 is tip, and 4321 bottom of lifting positioning head is provided with piston block 43211。
At work, steel pipe, by after 12 fixed length cutting of cutter, passes through transmission frame 22 and circular arc to assembly line on band to band transfer module 11 The effect of guide surface 23, automatically falls into and is initially placed on the drainage rest stand 6 in the first placing table 3, then, turns down towards first The turning part 411 of placing table 3, pickling in pickling tube 4 is sent drainage rest stand 6 into by the first pusher 31, during, Drainage rest stand 6 is fixed by detent mechanism 432, after the completion of pickling, lifting strut 43 is lifted, overturns the turning part 411 of both sides, Drainage rest stand 6 is pushed into by the second placing table 5 by the second pusher 32.

Claims (8)

  1. A kind of 1. transport process assembly line of fixed length pipe, it is characterised in that including:Pipe installation(1), fixed length pipe conveying device (2), the first placing table(3), pickling tube(4), the second placing table(5)With drainage rest stand(6), the pipe installation(1)Including Band to band transfer module(11)And cutter(12), the fixed length pipe conveying device(2)Including delivery roll(21)And transmission frame(22), the biography Defeated frame(22)The end of conveying direction is provided with circular arc guide surface(23), first placing table(3)It is arranged on the pickling tube (4)With the fixed length pipe conveying device(2)Between, the circular arc guide surface(23)Circular arc recess towards first placing table (3)Set, first placing table(3)Place is provided with the first pusher to stagger up and down(31)With the second pusher (32), the drainage rest stand(6)Pass through first pusher(31)With the second pusher(32)Complete to contain from first Put platform(3)To pickling tube(4)Again to the second placing table(5)Transfer successively.
  2. A kind of 2. transport process assembly line of fixed length pipe according to claim 1, it is characterised in that first placing table (3)With second placing table(5)It is hoistable platform, and hoistable platform is made up of multiple lifting units being arranged in parallel, First pusher(31)With the second pusher(32)It is arranged between these lifting units, the pickling tube(4)If Put in first placing table(3)With the second placing table(5)Between.
  3. A kind of 3. transport process assembly line of fixed length pipe according to claim 2, it is characterised in that the first push dress Put(31)With the second pusher(32)For surely high push cylinder, both push cylinder stagger settings, first push Device(31)Level height be more than second pusher(32)Level height, first pusher(31)Distance With the pickling tube(4)Distance be more than second pusher(32)With the pickling tube(4)Distance.
  4. A kind of 4. transport process assembly line of fixed length pipe according to claim 1, it is characterised in that the pickling tube(4) Including two long side walls(41)With two short side walls(42), the long side wall(41)Including the turning part on top(411)And lower part Stop part(412), the stop part(412)With the short side wall(42)Lower part link into an integrated entity, turning part(411) It is arranged on the short side wall(42)Both sides, turning part(411)With the short side wall(42)Between be provided with sealing strip.
  5. A kind of 5. transport process assembly line of fixed length pipe according to claim 4, it is characterised in that the pickling tube(4) Inside it is provided with lifting strut(43), the lifting strut(43)Be provided at both ends with lifting device(44), the lifting device (44)It is fixed on the short side wall(42)Top.
  6. A kind of 6. transport process assembly line of fixed length pipe according to claim 5, it is characterised in that the lifting device (44)Including lifting motor(441)With lifting rope chain(442), the lifting rope chain(442)Two is separately fixed at lifting motor (441)Output revolving shaft and the lifting strut(43)On.
  7. A kind of 7. transport process assembly line of fixed length pipe according to claim 6, it is characterised in that the lifting strut (43)Upper surface is provided with supporting block(431), detent mechanism(432)And guiding block(433), the guiding block(433)It is arranged on The lifting strut(43)Both ends on length direction, the guiding block(433)It is provided with guide ramp(4331), the support Block(431)Top surface is provided with pulley(4311).
  8. A kind of 8. transport process assembly line of fixed length pipe according to claim 6, it is characterised in that the detent mechanism (432)Including lifting positioning head(4321), spring(4322), locating piece(4323), plenum chamber(4324)And aerating pipe port (4325);The lifting positioning head(4321)Top be tip, the lifting positioning head(4321)Bottom is provided with piston block (43211).
CN201711159012.9A 2017-11-20 2017-11-20 A kind of transport process assembly line of fixed length pipe Active CN107931728B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711159012.9A CN107931728B (en) 2017-11-20 2017-11-20 A kind of transport process assembly line of fixed length pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711159012.9A CN107931728B (en) 2017-11-20 2017-11-20 A kind of transport process assembly line of fixed length pipe

Publications (2)

Publication Number Publication Date
CN107931728A true CN107931728A (en) 2018-04-20
CN107931728B CN107931728B (en) 2019-04-12

Family

ID=61930314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711159012.9A Active CN107931728B (en) 2017-11-20 2017-11-20 A kind of transport process assembly line of fixed length pipe

Country Status (1)

Country Link
CN (1) CN107931728B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102122291B1 (en) * 2020-03-01 2020-06-12 김상희 Workpiece pickling device
CN111926341A (en) * 2020-09-04 2020-11-13 海盐金鼎钢管股份有限公司 Full-automatic steel pipe pickling line

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04289183A (en) * 1991-03-19 1992-10-14 Kawasaki Steel Corp Steel pipe pickling device
CN201201151Y (en) * 2008-05-12 2009-03-04 浙江正裕工业有限公司 Steel pipe blanking cleaning machine with three connecting line mechanisms
CN205474006U (en) * 2016-02-03 2016-08-17 上海神洲阳光特种钢管有限公司 Acid washing tank
JP5971664B1 (en) * 2015-05-27 2016-08-17 三菱電機株式会社 Cutting device
CN107283281A (en) * 2017-07-20 2017-10-24 禹州市新光铸造有限公司 A kind of conveying, cleaning and cutter device for blank tubing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04289183A (en) * 1991-03-19 1992-10-14 Kawasaki Steel Corp Steel pipe pickling device
CN201201151Y (en) * 2008-05-12 2009-03-04 浙江正裕工业有限公司 Steel pipe blanking cleaning machine with three connecting line mechanisms
JP5971664B1 (en) * 2015-05-27 2016-08-17 三菱電機株式会社 Cutting device
CN205474006U (en) * 2016-02-03 2016-08-17 上海神洲阳光特种钢管有限公司 Acid washing tank
CN107283281A (en) * 2017-07-20 2017-10-24 禹州市新光铸造有限公司 A kind of conveying, cleaning and cutter device for blank tubing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102122291B1 (en) * 2020-03-01 2020-06-12 김상희 Workpiece pickling device
CN111926341A (en) * 2020-09-04 2020-11-13 海盐金鼎钢管股份有限公司 Full-automatic steel pipe pickling line

Also Published As

Publication number Publication date
CN107931728B (en) 2019-04-12

Similar Documents

Publication Publication Date Title
CN105619489B (en) A kind of full-automatic garlic root cutter
CN107378604A (en) A kind of section steel cutting automatic charging device
CN107931728A (en) A kind of transport process assembly line of fixed length pipe
CN102703661A (en) Quenching device of stabilizer bar
CN107815697A (en) A kind of steel pipe acid pickling process
CN108642973A (en) The process units of disposable lunch-box
CN107900763A (en) A kind of fixed length pipe production line
CN107671635A (en) A kind of full-automatic silicon ingot chamfer equipment
CN107232614A (en) A kind of tubular type plum seeder
CN107649723B (en) A kind of steel pipe processing line
CN112753414A (en) Automatic flowerpot loading and unloading system for urban vertical greening
CN214401984U (en) Suspension type submersible mobile pump truck
CN206343513U (en) A kind of foil-hammering machine
CN104805265B (en) Automatic line for annealing end of saw blade
CN107841756A (en) A kind of acid cleaning of steel tube system
CN207748431U (en) A kind of domestic fungus culture basket transfering conveying device
CN204047882U (en) A kind of chrysanthemum steam inactivation machine
CN209830068U (en) Automatic feeding mechanism
CN207361218U (en) A kind of ribbon conveyer of anti-material leakage
CN207511452U (en) A kind of aluminium section material automatic piling system
CN209275528U (en) A kind of engine conveying device
CN208994609U (en) A kind of elevator with reversing arrangement
CN206634646U (en) A kind of transportation system for tea tree ethereal oil finished product
CN206605559U (en) A kind of cutting machine transmitting device
CN202999259U (en) Cold bleaching hoister

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant