CN107916960A - Nuclear power turbine-generator unit dual-gripper spring discharges and locking logical method and system - Google Patents

Nuclear power turbine-generator unit dual-gripper spring discharges and locking logical method and system Download PDF

Info

Publication number
CN107916960A
CN107916960A CN201711318369.7A CN201711318369A CN107916960A CN 107916960 A CN107916960 A CN 107916960A CN 201711318369 A CN201711318369 A CN 201711318369A CN 107916960 A CN107916960 A CN 107916960A
Authority
CN
China
Prior art keywords
condenser
spring
water
basic
generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711318369.7A
Other languages
Chinese (zh)
Inventor
张建涛
孙振平
蒋仕锦
高伟
丁佳鹏
单世超
侯志蓉
褚孝荣
彭钦春
刘伟
王威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201711318369.7A priority Critical patent/CN107916960A/en
Publication of CN107916960A publication Critical patent/CN107916960A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D15/00Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
    • F01D15/10Adaptations for driving, or combinations with, electric generators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/04Antivibration arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K11/00Plants characterised by the engines being structurally combined with boilers or condensers
    • F01K11/02Plants characterised by the engines being structurally combined with boilers or condensers the engines being turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

The invention discloses a kind of release of nuclear power turbine-generator unit dual-gripper spring and locking logical method, including:Complete to install and after carrying out water filling test in condenser, condenser is discharged water to the water heavy load distributed designed by condenser spring, discharges condenser spring;The lp outer casing of the condenser and the steam turbine is connected, condenser is poured water water weight is always run to condenser, discharges basic spring;Centering steam turbine and generator shaft, lock condenser spring and the basic spring successively, and empties the water in condenser;After completing Turbo-generator Set installation and debugging, condenser spring and the basic spring are discharged successively, to prepare to start Turbo-generator Set.The invention also discloses a kind of release of nuclear power turbine-generator unit dual-gripper spring and locking flogic system.The present invention can specify the technical requirements and release conditions of dual-gripper spring, it is ensured that effective guidance of site operation quality and progress.

Description

Nuclear power turbine-generator unit dual-gripper spring discharges and locking logical method and system
Technical field
The present invention relates to technical field of nuclear power, more particularly to a kind of release of nuclear power turbine-generator unit dual-gripper spring and lock Gu logical method and system.
Background technology
Turbo-generator Set elastic foundation technical solution has frequency modulation, prevents from resonating;Antidetonation;Compensate differential settlement;Soil The advantages such as construction valency is low, are large-scale Half Speed nuclear power turbine-generator unit mainstream Foundation selection schemes in world wide.And steam turbine Generating set basis and condenser dual spring support technology are then wherein representative schemes, and the program advantageously reduces vapour Turbine generator group foundation load.
Condenser spring discharges and basic spring discharges the installation main line for running through Turbo-generator Set, in order to ensure condenser Accurate sharing of load between spring and basic spring, ensures Turbo-generator Set equipment installment quality, coordinates two branch of release Support system is very crucial.During domestic Construction of Nuclear Electricity, steam turbine, condenser, basic spring and condenser spring usually by Different producer's supplies of material, the installation guide file that each equipment supplier provides are confined to equipment in itself scope of supply, and from whole Lack unified, complete condenser spring on body and basic spring coordinates release logic, release conditions are indefinite, and technical requirements are not It is clear, cause site operation lack technology input, also often result in scene can not continuously construct, the work holdup, cause construction quality and Progress double risks.
The content of the invention
The present invention is directed to problems of the prior art, there is provided a kind of nuclear power turbine-generator unit dual-gripper spring is released Put and lock logical method and system, the technical requirements and release conditions of support spring can be specified, it is ensured that site operation quality Effective with progress instructs.
The technical solution that the present invention is proposed with regard to above-mentioned technical problem is as follows:
On the one hand, the present invention provides a kind of nuclear power turbine-generator unit dual-gripper spring release and locking logical method, institute Stating Turbo-generator Set includes condenser, steam turbine and generator, and the dual-gripper spring includes condenser spring and steamer is sent out Electric crew base spring, the described method includes:
After the condenser is completed to install and carries out water filling test, the condenser is discharged water to the condenser spring The water heavy load of designed distribution, discharges the condenser spring;
The lp outer casing of the condenser and the steam turbine is connected, the condenser is poured water to the condenser and is always transported Row water weight, discharges the basic spring;
The steam turbine to described in and generator shaft, lock the condenser spring and the basic spring successively, and empties Water in the condenser;
After completing the Turbo-generator Set installation and debugging, the condenser spring and the basic bullet are discharged successively Spring, to prepare to start the Turbo-generator Set.
Further, it is described after condenser is completed to install and carries out water filling test, the condenser is discharged water to condensing Before the water heavy load of the designed distribution of device spring, further include:
Complete the installation of the condenser;
Review and validate the condenser spring and be in its pre-compressed state, and pour water the condenser;
The condenser is poured water to tube bank top preset height, and maintains preset duration, checks the institute of the condenser There are housing weld seam and tube-tube plate weld seam ne-leakage, to complete water filling test.
Further, the method further includes:
Dial gauge is set up under condenser bottom plate;
In the water-pouring process of the condenser, pass through the deflection of condenser and deformation described in the centimeter check Amount;
If the deflection of the condenser bottom plate was looked into more than the height tolerance of the first preset value or both sides condenser spring Second preset value, then stop pouring water, and is continuing to pour water after taking measures.
Further, the condenser is discharged water to the water heavy load distributed designed by condenser spring, discharged described solidifying Vapour device spring, specifically includes:
The condenser is discharged water to the water heavy load distributed designed by condenser spring, control the condenser spring from Centre is discharged to both sides in symmetrical great-jump-forward;
According to the pre compressed magnitude of the condenser spring, the pad between the condenser spring and condenser bottom plate is adjusted Piece, reaches designed elevation to adjust the condenser bottom plate;
Check and record the height of the condenser spring.
Further, the connection condenser and the lp outer casing of the steam turbine, specifically include:
Review and validate the basic spring and be in its pre-compressed state;
The condenser and the lp outer casing lower half are welded, and check the height of the condenser spring after welding Degree;
According to the height change of the condenser spring, adjust between the condenser spring and the condenser bottom plate Gasket, makes the condenser bottom plate reply original absolute altitude.
Further, the method further includes:
Dial gauge is set up at the basic spring in the condenser spring and lp outer casing region;
During the welding of the condenser and the lp outer casing lower half, sent out by steamer described in the centimeter check The height change of electric crew base;
If the height change exceedes default changing value, judge that the steam turbine-generatot set foundation has sinkage, stop Only weld job.
Further, before the steam turbine to described in and generator shaft, further include:
After the basic spring release, according to the pre compressed magnitude and platen height change of the basic spring, institute is adjusted The gasket between basic spring and the platen is stated, capital datum mark relative elevation is changed afterwards before releasing in default model In enclosing.
Further, after Turbo-generator Set installation and debugging is completed, discharge successively the condenser spring and Before the basis spring, further include:
The installation and debugging of the Turbo-generator Set are completed, condensate pump is put into operation, hot well maintains normal level, makes to follow Ring water pump bringing normally into operation.
Further, the method further includes:
In the Turbo-generator Set during normal operation, if need to shut down or stop water circulating pump, lock in advance described solidifying Vapour device spring;Machine is opened after shutdown again, then after water circulating pump bringing normally into operation, discharges the condenser spring;
When the Turbo-generator Set is overhauled, if basic platform upper-part weight change exceedes preset weight, lock The basis spring.
Further, the method further includes:
During the condenser is installed with the Turbo-generator Set during normal operation, if occurring in the condenser Water is less than the situation of the water heavy load of the designed distribution of the condenser spring again, then lock the condenser spring.
On the other hand, the present invention provides one kind and realizes that the above-mentioned release of nuclear power turbine-generator unit dual-gripper spring and locking are patrolled The system for the method for collecting, the Turbo-generator Set include condenser, steam turbine and generator, and the dual-gripper spring includes condensing Device spring and steam turbine-generatot set foundation spring, the system comprises:
Condenser spring release module, for completing to install and after carrying out water filling test in condenser, by the condenser Discharge water to the water heavy load distributed designed by condenser spring, discharge the condenser spring;
Basic spring release module, for connecting the lp outer casing of the condenser and the steam turbine, by the condensing Device is poured water always runs water weight to the condenser, discharges the basic spring;
Lock fixing module, for the steam turbine to described in and generator shaft, lock the condenser spring and the base successively Plinth spring, and empty the water in the condenser;And
The final release module of dual-gripper spring, after completing the Turbo-generator Set installation and debugging, discharges successively The condenser spring and the basic spring, to prepare to start the Turbo-generator Set.
The beneficial effect that technical solution provided in an embodiment of the present invention is brought is:
Condenser carries out water filling test after installation is complete, discharges water after experiment to the water heavy burden distributed designed by condenser spring Carry, the release of condenser spring, and then condenser is welded with lp outer casing, pours water after welding and water weight is always run to condenser, basis Spring discharges, and before condenser discharges water, locking condenser spring and basic spring, so Turbo-generator Set complete installation and After debugging, first discharge condenser spring, then discharge the basic spring, you can open machine, specify support spring technical requirements and Release conditions, it is ensured that effective guidance of site operation quality and progress, avoids during site operation because of spring release logic not Completely, release conditions are indefinite, technical requirements are not known and cause the live work holdup and installation quality potential risk.
Brief description of the drawings
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, without creative efforts, other can also be obtained according to these attached drawings Attached drawing.
Fig. 1 is the release of nuclear power turbine-generator unit dual-gripper spring and locking logical method that the embodiment of the present invention one provides Flow diagram;
Fig. 2 is the release of nuclear power turbine-generator unit dual-gripper spring and locking logical method that the embodiment of the present invention one provides Middle condenser load distributes schematic diagram;
Fig. 3 is the release of nuclear power turbine-generator unit dual-gripper spring and locking logical method that the embodiment of the present invention one provides Idiographic flow schematic diagram;
Fig. 4 is the structural representation of the control system of nuclear power turbine-generator unit support spring provided by Embodiment 2 of the present invention Figure.
Embodiment
It is endless in order to solve nuclear power turbine-generator unit dual-gripper spring release existing in the prior art and locking logic The whole, technical problem such as release conditions are indefinite, technical requirements are not known, the present invention is intended to provide a kind of nuclear power turbine-generator unit Dual-gripper spring discharges and locking logical method, its core concept are:Condenser carries out water filling test after installation is complete, after experiment Discharge water to the water heavy load distributed designed by condenser spring, the release of condenser spring, and then condenser is welded with lp outer casing, Pour water after welding and water weight is always run to condenser, basic spring release, and before condenser discharges water, lock condenser spring and base Plinth spring, and then after Turbo-generator Set completion installation and debugging, condenser spring is first discharged, then the basic spring is discharged, Machine can be opened, specifies the technical requirements and release conditions of support spring, it is ensured that effective guidance of site operation quality and progress.
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention Formula is described in further detail.
Embodiment one
An embodiment of the present invention provides a kind of release of nuclear power turbine-generator unit dual-gripper spring and locking logical method, institute Stating Turbo-generator Set includes condenser, steam turbine and generator, and the dual-gripper spring includes condenser spring and steamer is sent out Electric crew base spring, referring to Fig. 1, this method includes:
S1, in the condenser complete to install and after carrying out water filling test, and the condenser is discharged water to the condenser The water heavy load of the designed distribution of spring, discharges the condenser spring;
S2, the connection condenser and the lp outer casing of the steam turbine, the condenser is poured water to the condenser Total operation water weight, discharges the basic spring;
S3, the steam turbine to described in and generator shaft, lock the condenser spring and the basic spring successively, and clearly Water in the empty condenser;
S4, after completing the Turbo-generator Set installation and debugging, discharge the condenser spring and the basis successively Spring, to prepare to start the Turbo-generator Set.
It should be noted that in a typical turbine LP rotors spring supporting system, steam turbine is using landing Formula bearing, low pressure (LP) cylinder landing, foundation sole plate are supported by basic spring 2.Condenser be rigidly connected with lp outer casing to be formed one it is whole Body, influences, condenser bottom sets condenser spring 1 and supports from pull of vacuum.Condenser is suspended on lp outer casing lower half, 72.6% load is by its own spring supporting, and 27.4% load is added on lp outer casing to be supported by basic spring 2, such as Fig. 2 Shown, which need to ensure the stability of low pressure (LP) cylinder during condenser unilateral operation, while also ensure that steam turbine will not be lifted off Basis.Basic spring undertakes whole turbine generator machine equipment and pipe load, also to undertake condenser and be added on lp outer casing Load.
Condenser spring discharges and basic spring release is through Turbo-generator Set installation main line, is installation of conventional island key Path node, has a major impact Turbo-generator Set installation progress and quality.The installation of Turbo-generator Set body is broadly divided into Three aspects, i.e.,:Condenser, steam turbine and generator.The present embodiment is systemic first, intactly proposes a kind of condenser bullet Spring and basic spring coordinate release, the logical method of locking.
Further, it is before step S1, i.e., described after condenser is completed to install and carries out water filling test, will be described solidifying Vapour device discharges water to before the water heavy load distributed designed by condenser spring, further includes:
Complete the installation of the condenser;
Review and validate the condenser spring and be in its pre-compressed state, and pour water the condenser;
The condenser is poured water to tube bank top preset height, and maintains preset duration, checks the institute of the condenser There are housing weld seam and tube-tube plate weld seam ne-leakage, to complete water filling test.
It should be noted that the installation of condenser includes bank of condenser pipes housing, connects neck, is hot well, outlet pipeline, hydrophobic vertical The installation of pipe, annex etc..Meanwhile the valve below water level line on all external pipelines is closed, these valves during water filling test It must not leak.In addition, installation temporary support and limiting device, supporting point must be in condenser bars positions below Housing Base On, during water filling test, condenser spring lock bolt must not loosen, i.e., the load that condenser spring is born is no more than Precommpression load, increased additional water weight of pouring water are supported by temporary support and limiting device.
Need to carry out water filling test after the completion of condenser and annex scene welding equipment, to examine housing and tube-tube plate weld seam matter Amount, ensures condenser tightness.Water filling test uses clean water, height of pouring water preset height, such as 1m above top layer heat exchanger tube.
In water-pouring process, condenser pour water to distribute designed by condenser spring water heavy load (it is related with type, this Embodiment is 168t) when, pause is poured water, and measures condenser spring heights.Condenser, which is poured water to condenser, always runs water weight (with machine Type is related, the present embodiment 568t) when, pause is poured water, and measures spring heights.Condenser is poured water to tube bank top preset height, During such as 1m, stop pouring water, measure condenser spring heights, and maintain preset duration when small (generally 24), check all housings Weld seam and tube-tube plate weld seam ne-leakage, that is, complete water filling test.After the completion of condenser water filling test, it can discharge water to condenser bullet The water heavy load (can be judged according to liquid level in hot well) of the designed distribution of spring, does for the release of next step condenser spring It is good to prepare.
Further, the method further includes:
Dial gauge is set up under condenser bottom plate;
In the water-pouring process of the condenser, pass through the deflection of condenser and deformation described in the centimeter check Amount;
If the deflection of the condenser bottom plate was looked into more than the height tolerance of the first preset value or both sides condenser spring Second preset value, then stop pouring water, and is continuing to pour water after taking measures.
It should be noted that setting up dial gauge under condenser bottom plate, condenser deflection and deformation are monitored in water-pouring process Amount, if bottom deformation is more than the first preset value (generally 2mm), pause water inlet, or if spring both sides deviation of reading More than the second preset value (generally 3mm), then pause water inlet, analyzes reason and can continue to pour water after taking measures.
Further, the condenser is discharged water to the water heavy load distributed designed by condenser spring, discharged described solidifying Vapour device spring, specifically includes:
The condenser is discharged water to the water heavy load distributed designed by condenser spring, control the condenser spring from Centre is discharged to both sides in symmetrical great-jump-forward;
According to the pre compressed magnitude of the condenser spring, the pad between the condenser spring and condenser bottom plate is adjusted Piece, reaches designed elevation to adjust the condenser bottom plate;
Check and record the height of the condenser spring.
It should be noted that before the release of condenser spring, it need to first meet prerequisite:Bank of condenser pipes module assembled is complete Into, connect the completion of neck welding equipment, duplex it is low plus, the installation of all component such as extraction line, hydroecium it is in place;All condenser external pipes break Connection is opened, if any expansion joint, then needs to unclamp expansion joint caging bolt, it is ensured that condenser is from external force;Condenser water filling test is complete Into, and the water heavy load (related with type, the present embodiment 168t) of the designed distribution of condenser spring is left in condenser.
And then condenser spring lock bolt is unlocked, discharge condenser spring.The release of condenser spring order from centre to The symmetrical great-jump-forward release in both sides, reduces the stress that release produces to greatest extent.Gasket is pumped according to spring pre compressed magnitude, adjustment is solidifying Vapour device floor level, it is allowed to error ± 1mm, condenser relative altitude error ± 5mm.Each condenser spring heights of inspection record, The elemental height characterize units' installation complete after, open the load under spring cold conditions before machine.In addition, installed in condenser Cheng Zhong, as long as water is less than the water heavy load of the designed distribution of condenser spring in condenser, it is necessary to lock condenser spring.
Further, in step s 2, the lp outer casing of the condenser and the steam turbine is connected, is specifically included:
Review and validate the basic spring and be in its pre-compressed state;
The condenser and the lp outer casing lower half are welded, and check the height of the condenser spring after welding Degree;
According to the height change of the condenser spring, adjust between the condenser spring and the condenser bottom plate Gasket, makes the condenser bottom plate reply original absolute altitude.
It should be noted that before condenser is connected with lp outer casing, the total weight of lp outer casing (including outside low pressure Cylinder upper half) it should fall on steam turbine-generatot set foundation, check that basic spring is in locking condition.Condenser water filling test is completed Afterwards, discharge water to the water heavy load (related with type, the present embodiment 168t) distributed designed by condenser spring, condenser spring It is in the unlocked state.Condenser spring undertakes design load at this time, including condenser net weight, low plus net weight add adjustment water weight, That is 798+94+168=1060t.
Implement condenser to weld with lp outer casing lower half, condenser is connected with lp outer casing.After the completion of welding, detection Condenser spring heights, change increase and decrease adjust pad according to condenser spring heights, spring heights is returned to original absolute altitude.Root According to engineering experience, condenser can shrink 2-3mm with lp outer casing weld seam.If condenser spring is in locking condition, then because Weld contraction, whole condenser weight (including low adduction adjustment water weight, common 1060t) are all suspended on lp outer casing, cause The local overload in Steam Turbine basis, while excessive tension be easy to cause weld seam tear.Therefore condenser is welded with lp outer casing Need first to discharge condenser spring before connecing.Weld contraction, condenser spring " are sprung back " therewith, and condenser major part weight is still by spring Undertake, avoid adversely affecting basis and weld seam.
Further, the method further includes:
Dial gauge is set up at the basic spring in the condenser spring and lp outer casing region;
During the welding of the condenser and the lp outer casing lower half, sent out by steamer described in the centimeter check The height change of electric crew base;
If the height change exceedes default changing value, judge that the steam turbine-generatot set foundation has sinkage, stop Only weld job.
It should be noted that in condenser and lp outer casing lower half welding process, dial gauge is monitored, once find steamer There is sinkage on generating set basis, stops weld job immediately.After the completion of welding, condenser and basic dial gauge are checked.
In step s 2, discharging basic spring has prerequisite:It is arranged in equipment on steam turbine-generatot set foundation, pipe In place (including simulation insulation weight), all wt is (all to load the component not loaded on the basis of being carried in road Weight is no more than 100t);High pressure cylinder pipeline, stop valve and the connection of main steam lead road finish, and low pressure (LP) cylinder pipeline stays last Road weld bond;High pressure cylinder sharing of load is completed;Turbine shafting essence looks for middle completion;Basic spring is in its pre-compressed state;Condenser Pour water to condenser and always run water weight (related with type, the present embodiment 568t);Condenser lock bolt is unclamped, makes condenser Spring is in free state, repetition measurement condenser absolute altitude, and is contrasted with original absolute altitude, error such as occurs again by spring heights tune It is whole to arrive reset condition.
And then basic spring lock bolt is unlocked, discharge basic spring.Basic spring release is that a circulation is progressive, anti- The whole process of polyphony.
Further, before the steam turbine described in described pair and generator shaft, further include:
After the basic spring release, according to the pre compressed magnitude and platen height change of the basic spring, institute is adjusted The gasket between basic spring and the platen is stated, capital datum mark relative elevation is changed afterwards before releasing in default model In enclosing.
It should be noted that pumping gasket according to basic spring pre compressed magnitude and platen height change, measure capital Datum mark relative elevation changes in preset range (generally ± 0.3mm) afterwards before releasing, to ensure turbine shafting precision. Meanwhile record basic spring heights.
In step s3, after during the final essence of Turbo-generator Set is looked for, basic spring and condenser spring heights, unit are marked Easy to monitoring spring heights change during operation.Moreover, before condenser discharges water, must first lock basic spring and condenser bullet again Spring.
It should be noted that water always runs water less than condenser and weighs that (related with type, the present embodiment is in the condenser , must the basic spring of locking when 568t);(lp outer casing is such as hung when basic platform upper-part weight change is more than 100t), palpus First lock basic spring.
Further, before step S 4, i.e., released successively after the completion Turbo-generator Set installation and debugging Before putting the condenser spring and the basic spring, further include:
The installation and debugging of the Turbo-generator Set are completed, condensate pump is put into operation, hot well maintains normal level, makes to follow Ring water pump bringing normally into operation.
It should be noted that before Turbo-generator Set red switch, last time discharges condenser spring and basic spring, makes It is in free working status.Release order is rear to discharge basic spring first to discharge condenser spring.And released in condenser spring Before putting, all installation is complete for Turbo-generator Set equipment and annex, and coupling of shaft system is completed, and platform weight is all in place;Condensation water Pump puts into operation, and hot well maintains normal level;Water circulating pump bringing normally into operation (hydroecium liquid level gauge shows that hydroecium is full of water), at this time, condensing Device spring bears design load.
Further, the method further includes:
In the Turbo-generator Set during normal operation, if need to shut down or stop water circulating pump, lock in advance described solidifying Vapour device spring;Machine is opened after shutdown again, then after water circulating pump bringing normally into operation, discharges the condenser spring;
When the Turbo-generator Set is overhauled, if basic platform upper-part weight change exceedes preset weight, lock The basis spring.
Further, the method further includes:
During the condenser is installed with the Turbo-generator Set during normal operation, if occurring in the condenser Water is less than the situation for the water heavy load that the condenser spring is distributed again, then lock the condenser spring.
It should be noted that Turbo-generator Set is during normal operation, condenser spring and basic spring are in release shape State, bears rated load.If needing Turbo-generator Set to shut down or stop water circulating pump, need to lock condenser spring in advance;After shutdown Machine is opened again, after two water circulating pump bringing normally into operation (condenser is full of water), can discharge condenser spring.Compressor emergency shutdown overhauls When, if basic platform upper-part weight change must first lock basic spring more than 100t.Turbo-generator Set is sent out during running Situations such as raw chaser, it is not required to lock basic spring.When again water is less than the water heavy burden distributed designed by condenser spring in condenser When carrying (related with type, the present embodiment 168t), then condenser spring must be locked, prevents that cylinder from being jacked up.
It is nuclear power turbine-generator unit dual-gripper spring release provided in an embodiment of the present invention and locking logic referring to Fig. 3 The idiographic flow schematic diagram of method, this method include:
S01, jump to step S07 after performing step S11 to S18 in condenser side;
S02, jump to step S06 after performing step S21 to S25 in the low-voltage module side of steam turbine;
S03, jump to step S06 after performing step S31 to S33 in the high-pressure modular side of steam turbine;
S04, jump to step S06 after generator side performs step S41 to S44;
S05, lp outer casing button cylinder, and jump to step S07;
During S06, shafting essence are looked for;
S07, basic spring release.
Wherein, the step S11 to S18 performed in condenser side includes:
It is S11, bank of condenser pipes block combiner, in place;
S12, condenser throat weld assembly are all in place;
S13, condenser water filling test are poured water to tube bank above 1m;
S14, condenser discharge water to 168t;
S15, condenser spring discharge adjustment first, record spring heights;
S16, condenser and lp outer casing connect;
S17, adjustment condenser spring to original height;
S18, condenser are poured water to 568t.
Include in the step S21 to S25 that the low-voltage module side of steam turbine performs:
Lower half combination is in place on S21, lp outer casing, is welded with condenser;
S22, low-pressure internal cylinder are in place, centering;
S23, low pressure rotor lifting are in place;
S24, the tight bolt of low-pressure internal cylinder buckle closure heat;
S25, low-pressure internal cylinder sharing of load.
Include in the step S31 to S33 that the high-pressure modular side of steam turbine performs:
S31, high-pressure modular are in place, centering;
S32, high pressure cylinder Pipe installing;
S33, high pressure cylinder sharing of load.
Include in the step S41 to S44 that generator side performs:
S41, stator hoisting are in place;
S42, generator wear rotor;
S43, exciter are in place;
S44, hydrogen cooler installation.
The embodiment of the present invention can carry out water filling test after installation is complete in condenser, discharge water after experiment to condenser spring The water heavy load of designed distribution, the release of condenser spring, and then condenser is welded with lp outer casing, is poured water after welding to condensing Device always runs water weight, basic spring release, and before condenser discharges water, lock condenser spring and basic spring, and then steamer After generating set completes installation and debugging, condenser spring is first discharged, then discharges the basic spring, you can opens machine, clearly props up Support the technical requirements and release conditions of spring, it is ensured that effective guidance of site operation quality and progress, avoids site operation process It is middle to cause the live work holdup and installation matter because spring release logic is imperfect, release conditions are indefinite, technical requirements are not known Measure potential risk.
Embodiment two
Realize that the above-mentioned release of nuclear power turbine-generator unit dual-gripper spring and locking are patrolled an embodiment of the present invention provides one kind The system for collecting all flows of method, the Turbo-generator Set include condenser, steam turbine and generator, the dual-gripper spring Including condenser spring and steam turbine-generatot set foundation spring, referring to Fig. 4, the system comprises:
Condenser spring release module 41, for completing to install and after carrying out water filling test in condenser, by the condensing Device discharges water to the water heavy load distributed designed by condenser spring, discharges the condenser spring;
Basic spring release module 42, will be described solidifying for connecting the lp outer casing of the condenser and the steam turbine Vapour device is poured water always runs water weight to the condenser, discharges the basic spring;
Lock fixing module 43, for the steam turbine to described in and generator shaft, lock the condenser spring and described successively Basic spring, and empty the water in the condenser;And
The final release module 44 of dual-gripper spring, after completing the Turbo-generator Set installation and debugging, is released successively The condenser spring and the basic spring are put, to prepare to start the Turbo-generator Set.
The embodiment of the present invention can carry out water filling test after installation is complete in condenser, discharge water after experiment to condenser spring The water heavy load distributed, the release of condenser spring, and then condenser is welded with lp outer casing, is poured water after welding total to condenser Water weight, basic spring release are run, and before condenser discharges water, lock condenser spring and basic spring, and then turbine generator After unit completes installation and debugging, condenser spring is first discharged, then discharges the basic spring, you can opens machine, clearly supports bullet The technical requirements and release conditions of spring, it is ensured that effective guidance of site operation quality and progress, avoid during site operation because Spring release logic is imperfect, release conditions are indefinite, technical requirements are not known and cause the live work holdup and installation quality to be dived In risk.
In conclusion the present invention proposes a kind of nuclear power turbine-generator unit dual-gripper spring release and locking logical method And system, it is with preferable practical function:First systematicness, intactly propose Turbo-generator Set installation, debugging and fortune Row order section condenser spring and basic spring discharge, the logical method of locking;The technology for specifying condenser water filling test process will Point and corresponding condenser spring Stateful Inspection requirement, condenser spring discharge prerequisite and technical requirements first, condenser To lp outer casing interconnection technique requirement and corresponding condenser spring Stateful Inspection requirement, basic spring discharge first prerequisite with When technical requirements, carry out condenser spring before unit red switch and basic spring finally discharges work, during Unit Commitment machine When spring locking and release work are carried out;Using first release condenser spring, then carry out condenser and welded with lp outer casing cylinder The method connect, avoids the local overload of weld seam tear and basis between condenser and lp outer casing;Using steam turbine and condensing Device is installed respectively, first release condenser spring, and after lp outer casing and condenser cylinder, the totality for finally discharging basic spring again is patrolled Thinking is collected, easy to accurately simulate the distribution of condenser load;Condenser spring adjustment height error ± 1mm is controlled, so as to avoid coagulating Vapour device bottom deformation;Steam turbine basis spring alignment error ± 0.3mm is controlled, to ensure turbine shafting precision.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent replacement, improvement and so on, should all be included in the protection scope of the present invention.

Claims (11)

1. a kind of nuclear power turbine-generator unit dual-gripper spring release and locking logical method, the Turbo-generator Set include solidifying Vapour device, steam turbine and generator, the dual-gripper spring include condenser spring and steam turbine-generatot set foundation spring, its feature It is, the described method includes:
Complete to install and after carrying out water filling test in the condenser, the condenser is discharged water to set by the condenser spring The water heavy load that score is matched somebody with somebody, discharges the condenser spring;
The lp outer casing of the condenser and the steam turbine is connected, the condenser is poured water and always runs water to the condenser Weight, discharges the basic spring;
The steam turbine to described in and generator shaft, lock the condenser spring and the basic spring successively, and empties described Water in condenser;
After completing the Turbo-generator Set installation and debugging, the condenser spring and the basic spring are discharged successively, with Prepare to start the Turbo-generator Set.
2. nuclear power turbine-generator unit dual-gripper spring release as claimed in claim 1 and locking logical method, its feature exist In, it is described after condenser is completed to install and carries out water filling test, the condenser is discharged water to score set by condenser spring Before the water heavy load matched somebody with somebody, further include:
Complete the installation of the condenser;
Review and validate the condenser spring and be in its pre-compressed state, and pour water the condenser;
The condenser is poured water to tube bank top preset height, and maintains preset duration, checks all shells of the condenser Body weld seam and tube-tube plate weld seam ne-leakage, to complete water filling test.
3. nuclear power turbine-generator unit dual-gripper spring release as claimed in claim 2 and locking logical method, its feature exist In the method further includes:
Dial gauge is set up under condenser bottom plate;
In the water-pouring process of the condenser, pass through the deflection and deflection of condenser described in the centimeter check;
If the deflection of the condenser bottom plate looked into second more than the height tolerance of the first preset value or both sides condenser spring Preset value, then stop pouring water, and is continuing to pour water after taking measures.
4. nuclear power turbine-generator unit dual-gripper spring release as claimed in claim 1 and locking logical method, its feature exist In, it is described that the condenser discharges water to the water heavy load distributed designed by condenser spring, the condenser spring is discharged, is had Body includes:
The condenser is discharged water to the water heavy load distributed designed by condenser spring, controls the condenser spring from centre Discharged to both sides in symmetrical great-jump-forward;
According to the pre compressed magnitude of the condenser spring, the gasket between the condenser spring and condenser bottom plate is adjusted, with Adjust the condenser bottom plate and reach designed elevation;
Check and record the height of the condenser spring.
5. nuclear power turbine-generator unit dual-gripper spring release as claimed in claim 4 and locking logical method, its feature exist In the connection condenser and the lp outer casing of the steam turbine, specifically include:
Review and validate the basic spring and be in its pre-compressed state;
The condenser and the lp outer casing lower half are welded, and check the height of the condenser spring after welding;
According to the height change of the condenser spring, the pad between the condenser spring and the condenser bottom plate is adjusted Piece, makes the condenser bottom plate reply original absolute altitude.
6. nuclear power turbine-generator unit dual-gripper spring release as claimed in claim 5 and locking logical method, its feature exist In the method further includes:
Dial gauge is set up at the basic spring in the condenser spring and lp outer casing region;
During the welding of the condenser and the lp outer casing lower half, pass through steam turbine generator described in the centimeter check The height change on group basis;
If the height change exceedes default changing value, judge that the steam turbine-generatot set foundation has sinkage, stop weldering Connect operation.
7. nuclear power turbine-generator unit dual-gripper spring release as claimed in claim 1 and locking logical method, its feature exist In before the steam turbine described in described pair and generator shaft, further including:
After the basic spring release, according to the pre compressed magnitude and platen height change of the basic spring, the base is adjusted Gasket between plinth spring and the platen, makes capital datum mark relative elevation change afterwards in preset range before releasing It is interior.
8. nuclear power turbine-generator unit dual-gripper spring release as claimed in claim 1 and locking logical method, its feature exist In, it is described complete Turbo-generator Set installation and debugging after, discharge the condenser spring and the basic bullet successively Before spring, further include:
The installation and debugging of the Turbo-generator Set are completed, condensate pump is put into operation, hot well maintains normal level, makes recirculated water Pump bringing normally into operation.
9. nuclear power turbine-generator unit dual-gripper spring release as claimed in claim 1 and locking logical method, its feature exist In the method further includes:
In the Turbo-generator Set during normal operation, if need to shut down or stop water circulating pump, lock the condenser in advance Spring;Machine is opened after shutdown again, then after water circulating pump bringing normally into operation, discharges the condenser spring;
When the Turbo-generator Set is overhauled, if basic platform upper-part weight change exceedes preset weight, described in locking Basic spring.
10. nuclear power turbine-generator unit dual-gripper spring release as claimed in claim 1 and locking logical method, its feature exist In the method further includes:
During the condenser is installed with the Turbo-generator Set during normal operation, if there is water weight in the condenser Less than the situation of the water heavy load distributed designed by the condenser spring, then lock the condenser spring.
11. one kind is realized as claims 1 to 10 any one of them nuclear power turbine-generator unit dual-gripper spring discharges and locks Gu the system of logical method, the Turbo-generator Set includes condenser, steam turbine and generator, and the dual-gripper spring includes Condenser spring and steam turbine-generatot set foundation spring, it is characterised in that the system comprises:
Condenser spring release module, for after condenser is completed to install and carries out water filling test, the condenser to be discharged water To the water heavy load distributed designed by condenser spring, the condenser spring is discharged;
Basic spring release module, for connecting the lp outer casing of the condenser and the steam turbine, the condenser is filled Water to the condenser always runs water weight, discharges the basic spring;
Lock fixing module, for the steam turbine to described in and generator shaft, lock the condenser spring and the basic bullet successively Spring, and empty the water in the condenser;And
The final release module of dual-gripper spring, after completing the Turbo-generator Set installation and debugging, successively described in release Condenser spring and the basic spring, to prepare to start the Turbo-generator Set.
CN201711318369.7A 2017-12-12 2017-12-12 Nuclear power turbine-generator unit dual-gripper spring discharges and locking logical method and system Withdrawn CN107916960A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711318369.7A CN107916960A (en) 2017-12-12 2017-12-12 Nuclear power turbine-generator unit dual-gripper spring discharges and locking logical method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711318369.7A CN107916960A (en) 2017-12-12 2017-12-12 Nuclear power turbine-generator unit dual-gripper spring discharges and locking logical method and system

Publications (1)

Publication Number Publication Date
CN107916960A true CN107916960A (en) 2018-04-17

Family

ID=61893067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711318369.7A Withdrawn CN107916960A (en) 2017-12-12 2017-12-12 Nuclear power turbine-generator unit dual-gripper spring discharges and locking logical method and system

Country Status (1)

Country Link
CN (1) CN107916960A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905610A (en) * 2019-10-24 2020-03-24 广东粤华发电有限责任公司 Steam turbine warming system and warming method
CN110985140A (en) * 2019-12-20 2020-04-10 哈尔滨汽轮机厂有限责任公司 Method for judging anti-seismic performance of steam turbine thrust bearing system
CN111425268A (en) * 2020-03-31 2020-07-17 江苏核电有限公司 Installation method of double-elastic-base steam turbine with independently supported inner cylinder

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102588020A (en) * 2011-01-07 2012-07-18 中国电力工程顾问集团公司 Solar power generation and thermal power generation combined turbine-generator unit and realizing method
CN102900799A (en) * 2012-09-26 2013-01-30 上海电气电站设备有限公司 Spring support of condenser of 1,000MW nuclear power unit
CN103148316A (en) * 2013-03-21 2013-06-12 中国电力工程顾问集团华东电力设计院 Base supporting system of secondary reheating steam turbine generator unit
CN103306302A (en) * 2012-03-07 2013-09-18 江苏核电有限公司 Shafting load preadjusting method of metered spring base
CN103939156A (en) * 2014-05-14 2014-07-23 山东电力建设第三工程公司 Method for installing nuclear power half-speed steam turbine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102588020A (en) * 2011-01-07 2012-07-18 中国电力工程顾问集团公司 Solar power generation and thermal power generation combined turbine-generator unit and realizing method
CN103306302A (en) * 2012-03-07 2013-09-18 江苏核电有限公司 Shafting load preadjusting method of metered spring base
CN102900799A (en) * 2012-09-26 2013-01-30 上海电气电站设备有限公司 Spring support of condenser of 1,000MW nuclear power unit
CN103148316A (en) * 2013-03-21 2013-06-12 中国电力工程顾问集团华东电力设计院 Base supporting system of secondary reheating steam turbine generator unit
CN103939156A (en) * 2014-05-14 2014-07-23 山东电力建设第三工程公司 Method for installing nuclear power half-speed steam turbine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张建涛等: "核电汽轮发电机组双弹簧支撑技术应用及弹簧释放逻辑研究", 《汽轮机技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905610A (en) * 2019-10-24 2020-03-24 广东粤华发电有限责任公司 Steam turbine warming system and warming method
CN110985140A (en) * 2019-12-20 2020-04-10 哈尔滨汽轮机厂有限责任公司 Method for judging anti-seismic performance of steam turbine thrust bearing system
CN111425268A (en) * 2020-03-31 2020-07-17 江苏核电有限公司 Installation method of double-elastic-base steam turbine with independently supported inner cylinder

Similar Documents

Publication Publication Date Title
CN107916960A (en) Nuclear power turbine-generator unit dual-gripper spring discharges and locking logical method and system
CN103939156B (en) Method for installing nuclear power half-speed steam turbine
CN106531238B (en) A kind of main pump pressure vessel of bilayer sleeve
CN106836836B (en) A kind of secondary hydraulic lifting installation method of Flue Gas Desulphurization for Coal-burning Power Plant tower transformation
CN106098116A (en) A kind of passive PWR nuclear power plant reactor coolant loop is arranged
CN107384474B (en) Installation and construction method of combined gasification furnace
CN105333056B (en) Mitigate the method and vibration absorber used of high pressure gas machine vibration
CN217735585U (en) Skid-mounted blast furnace gas turbine power generation device
CN102359398B (en) Suspension type high-position steam turbine generator platform system and steam turbine generating structure system
CN102901608A (en) Method for checking leakage of vertical cooler of hydrogen cooled generator for nuclear power plant
JP3188379B2 (en) Integrated fast neutron reactor with removable internal structural elements
Srinivasan et al. Structural design approach of steam generator made of modified 9Cr-1Mo for high temperature operation
CN110030046B (en) Condensate water system for steam turbine generator unit and operation method
CN110459332B (en) Nuclear power station fire-fighting pipe network system and nuclear power station fire-fighting pipe network online optimization method
CN207229515U (en) Construction machinery hydraulic system Portable type pipeline rinses and filtration apparatus
CN204532670U (en) The suspending apparatus of blowdown pipe end under a kind of fixing large hydropower station unit
CN202300539U (en) Suspended high-position steam turbine generator platform system and steam turbine power generation structure system
CN110196216A (en) No. three sealing filter test methods of main pump, system and device
CN110448844B (en) Method for synchronously replacing fire-fighting water isolation valves of peripheral plants of nuclear power station
CN220301509U (en) Take special prefabricated pump station of smashing grid of water resource
CN206656615U (en) A kind of condenser supporting construction of pouring water
CN217950571U (en) Standby cooling device for thrust bearing of running water turbine generator set
CN111928218A (en) 500m2Sintering plant waste heat boiler installation construction method
Chen et al. Vibration stress reduction and modification evaluation of jet pipes on emergency diesel generator
CN101928576A (en) Installation method of dry-quenching secondary dust cleaner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180417