CN107908731A - Based on PSD BPA Guangxi Power Grids barrier load data batch modification method - Google Patents

Based on PSD BPA Guangxi Power Grids barrier load data batch modification method Download PDF

Info

Publication number
CN107908731A
CN107908731A CN201711123263.1A CN201711123263A CN107908731A CN 107908731 A CN107908731 A CN 107908731A CN 201711123263 A CN201711123263 A CN 201711123263A CN 107908731 A CN107908731 A CN 107908731A
Authority
CN
China
Prior art keywords
load
name
power
load bus
bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711123263.1A
Other languages
Chinese (zh)
Other versions
CN107908731B (en
Inventor
刘光时
孙志媛
窦骞
梁水莹
刘默斯
王晓明
丘浩
张翌晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangxi Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority to CN201711123263.1A priority Critical patent/CN107908731B/en
Publication of CN107908731A publication Critical patent/CN107908731A/en
Application granted granted Critical
Publication of CN107908731B publication Critical patent/CN107908731B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/16File or folder operations, e.g. details of user interfaces specifically adapted to file systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)
  • Human Computer Interaction (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses one kind to be based on PSD BPA Guangxi Power Grids barrier load data batch modification method, is related to technical field of power systems.The method based on PSD BPA Guangxi Power Grids barrier load data batch modification, pass through reading, extract BPA power flow files, SCADA typical case's daily load data file and load bus title management file, and carry out matching generation plant stand load modification database, to carry out mass change to power grid barrier active reactive load value, avoid management and running personnel and active reactive load is changed using manual mode one by one, on the basis of accuracy rate is ensured, considerably reduce the workload of staff, shorten the time of data modification, greatly improve work efficiency, by staff from repeatedly, free in cumbersome work.

Description

Based on PSD-BPA Guangxi Power Grids barrier load data batch modification method
Technical field
The invention belongs to technical field of power systems, more particularly to a kind of Guangxi Power Grid barrier load based on PSD-BPA Batch data amending method.
Background technology
PSD-BPA Load Flow Programs are the electric power that electric system power grid mode calculates, programming and planning, management and running are general Network analysis software.Dispatching of power netwoks department all needs before working out annual, monthly mode and calculating data and carry out maintenance repair calculating The load card in each barrier in BPA data is updated according to SCADA typical case's daily load data.At present, mode calculates Personnel's Normal practice is to export all factories of the whole network, the load data stood from SCADA system, one set form of formation Data, are then inputted load card corresponding to BPA data by excel forms one by one manually.In each barrier of Guangxi Power Grid Load bus up to more than 250, if using aforesaid way input data, not only heavy workload, efficiency is low, is also significantly greatly increased The probability of error.
For this reason, there is an urgent need for find one kind can fast and automatically, accurately, power grid barrier load in batch modification BPA power flow files The method of data.
The content of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of based on PSD-BPA Guangxi Power Grids barrier load data batch Amending method.
The present invention is to solve above-mentioned technical problem by the following technical solutions:One kind is based on PSD-BPA Guangxi electricity Net barrier load data batch modification method, including following steps:
(1)Read the nodal information of power grid barrier load in BPA power flow files .DAT, including load bus name, load bus electricity Press grade, active power and reactive power;
(2)SCADA typical case's daily load data file is read in, and is analyzed file and extracted data, the data packet extracted Chinese name containing load bus, the information such as high-pressure side is active, high-pressure side is idle;
(3)Load bus title management file is read in, extracts load bus Pinyin abbreviation name and corresponding Chinese name;
(4)At BPA power flow files .DAT, SCADA typical case's daily load data files and load bus title management file Reason, to BPA power flow files(.DAT)The active power and reactive power of middle power grid barrier load bus carry out batch modification operation.
Further, the step(1)The nodal information of Guangxi Power Grid barrier load in BPA power flow files is read, including Following steps:
(1.1)Read and record the first trip line number and footline line number of power grid barrier load bus in BPA power flow files .DAT;
(1.2)In the scope that first trip line number and footline line number determine, the load bus name that all type of card are " B " is read, Load bus voltage class, active power and reactive power.
Further, the step(2)Read in SCADA typical case's daily load data file, including following sub-step:
(2.1)Substation's load data is included to SCADA typical case's daily load data file and large user's load data is analyzed;
(2.2)For substation's load data, read that plant stand Chinese name, high-pressure side be active and the idle data in high-pressure side respectively;
(2.3)For large user's load data, read that plant stand Chinese name, high-pressure side be active and the idle data in high-pressure side respectively.
Further, the step(3)Read in load bus title management file, extract load bus Pinyin abbreviation name and Corresponding Chinese name, including following sub-step:
(3.1)Load bus title management file, the load bus Pinyin abbreviation name and step that every a line the 1st is arranged are read line by line (1)The load bus name is matched;
(3.2)By the load bus Chinese name of every a line the 2nd row and the step(2)Plant stand Chinese name matched;
(3.3)Matching result automatically generates plant stand load modification database, which includes load bus Chinese name, load section Point Pinyin abbreviation name, burden with power to be modified, load or burden without work to be modified, SCADA burdens with power, SCADA load or burden without work.
Further, the step(4)Including following sub-step:
(4.1)In the scope that first and last row determines, the step is read line by line(1)In power flow files, and judge to be read in Whether row is B cards;
(4.2)If it is not, then jumping out judgement, the step is carried out to the next line in power flow files(4.1)Operation;If It is then to judge whether the row zone name is " VP "(" VP " represents large user's load);
(4.3)If the row zone name is not " VP ", by the load bus name, load bus voltage class, wattful power of the row Rate and reactive power are write to substation's load database;If the row subregion is entitled " VP ", by the load bus name of the row, Load bus voltage class, active power and reactive power are write to large user's load database;
(4.4)For substation's load database, the load bus name repeated is determined whether, if it is not, then judgment step(3) Whether load bus Pinyin abbreviation name matches with load bus name in substation load database in plant stand load modification database; If it is, the corresponding SCADA active reactives load of load bus Pinyin abbreviation name is substituted for substation's load database The corresponding active reactive load of middle load bus name, if it is not, then judging next load bus name;
(4.5)For substation's load database, the load bus name repeated is determined whether, if it is, statistics repeat number Amount, judgment step(3)In middle plant stand load modification database load bus Pinyin abbreviation name whether with substation's load database Middle load bus name matching;If it is, by the corresponding SCADA active reactives load of load bus Pinyin abbreviation name divided by again Phasor, then by this results modification be the corresponding active reactive load of substation's load database load bus name, if it is not, then Judge next load bus name;
(4.6)For large user's load database, judgment step(3)Load bus Pinyin abbreviation in plant stand load modification database Whether name matches with load bus name in large user's load database;If it is, the load bus Pinyin abbreviation name is corresponded to SCADA active reactive loads be substituted for the corresponding active reactive load of load bus name in large user's load database, if It is no, then judge next load bus name;
(4.7)The step is carried out line by line to all rows of power flow files of reading(4.1)To step(4.6)Operation, that is, complete To the batch modification of BPA load data card active reactive loads.
Further, it is a kind of to be based on PSD-BPA power grids barrier load data batch modification system, including the first first trip footline Input module, for determining the scope in power flow files where network load node;Second file read module, for reading respectively SCADA typical case's daily load data file, line name management file and power flow files are taken, and generate plant stand load modification data Storehouse;3rd batch processing module, the operation for network load node active reactive load value in batch modification power flow files;The Four displays and generation module, the load bus active reactive load front and rear for showing modification, and generate modification overload node The power flow files .DAT files of active reactive load.
Compared with prior art, the side provided by the present invention based on PSD-BPA power grids barrier load data batch modification Method, by reading in, extracting BPA power flow files, SCADA typical case's daily load data file and load bus title management file, and Matching generation plant stand load modification database is carried out, mass change is carried out to power grid barrier active reactive load value, is avoided Management and running personnel change active reactive load one by one using manual mode, on the basis of accuracy rate is ensured, greatly reduce The workload of staff, shortens the time of data modification, greatly improves work efficiency, by staff from repeat, Free in cumbersome work.
Brief description of the drawings
, below will be to attached drawing needed in embodiment description in order to illustrate more clearly of technical scheme It is briefly described, it should be apparent that, drawings in the following description are only one embodiment of the present of invention, general for this area For logical technical staff, without creative efforts, other attached drawings can also be obtained according to these attached drawings.
Fig. 1 is the flow chart of the invention based on PSD-BPA Guangxi Power Grids barrier load data batch modification method.
Embodiment
With reference to the attached drawing in the embodiment of the present invention, the technical solution in the present invention is clearly and completely described, Obviously, described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.Based in the present invention Embodiment, those of ordinary skill in the art's all other embodiments obtained on the premise of creative work is not made, Belong to the scope of protection of the invention.
As shown in Figure 1, one kind provided by the present invention is based on PSD-BPA Guangxi Power Grids barrier load data batch modification side Method, including following steps:
(1)Read the nodal information of power grid barrier load in BPA power flow files .DAT, including load bus name, load bus electricity Press grade, active power and reactive power.
The nodal information of Guangxi Power Grid barrier load in BPA power flow files is read, is comprised the following steps:
(1.1)Read and record the first trip line number and footline line number of power grid barrier load bus in BPA power flow files .DAT, first trip Line number and footline line number initial value are respectively 3108 and 3296;
(1.2)In the scope that first trip line number and footline line number determine, the load bus name that all type of card are " B " is read, Load bus voltage class, active power and reactive power.
(2)SCADA typical case's daily load data file is read in, and is analyzed file and extracted data, the number extracted According to including load bus Chinese name, the information such as high-pressure side is active, high-pressure side is idle.
Read in SCADA typical case's daily load data file, including following sub-step:
(2.1)Substation's load data is included to SCADA typical case's daily load data file and large user's load data is analyzed;
(2.2)For substation's load data, the row of reading the 2nd, the plant stand Chinese name of the 4th row and the 5th row, high-pressure side are active respectively With the idle data in high-pressure side;
(2.3)For large user's load data, the row of reading the 1st, the plant stand Chinese name of the 4th row and the 5th row, high-pressure side are active respectively With the idle data in high-pressure side.
(3)Load bus title management file is read in, extracts load bus Pinyin abbreviation name and corresponding Chinese name.
Reading load bus title management file, extraction load bus Pinyin abbreviation name and corresponding Chinese name, including with Lower sub-step:
(3.1)Load bus title management file, the load bus Pinyin abbreviation name and step that every a line the 1st is arranged are read line by line (1.2)Load bus name matched;
(3.2)By the load bus Chinese name and step of every a line the 2nd row(2)Plant stand Chinese name matched;
(3.3)Matching result automatically generates plant stand load modification database, which includes load bus Chinese name, load section Point Pinyin abbreviation name, burden with power to be modified, load or burden without work to be modified, SCADA burdens with power, SCADA load or burden without work.
(4)BPA power flow files .DAT, SCADA typical case's daily load data files and load bus title are managed file into Row processing, to BPA power flow files(.DAT)The active power and reactive power of middle power grid barrier load bus carry out batch modification Operation.
Step(4)Including following sub-step:
(4.1)In the scope that first and last row determines, read step line by line(1)In power flow files, and judge that read in row is No is B cards;
(4.2)If it is not, then jumping out judgement, step is carried out to the next line in power flow files(4.1)Operation;If it is, Judge whether the row zone name is " VP "(" VP " represents large user's load);
(4.3)If the row zone name is not " VP ", by the load bus name, load bus voltage class, wattful power of the row Rate and reactive power are write to substation's load database;If the row subregion is entitled " VP ", by the load bus name of the row, Load bus voltage class, active power and reactive power are write to large user's load database;
(4.4)For substation's load database, the load bus name repeated is determined whether, if it is not, then judgment step (3.3)In plant stand load modification database load bus Pinyin abbreviation name whether with load bus name in substation load database Matching;If it is, the corresponding SCADA active reactives load of load bus Pinyin abbreviation name is substituted for substation's load number According to the corresponding active reactive load of load bus name in storehouse, if it is not, then judging next load bus name;
(4.5)For substation's load database, the load bus name repeated is determined whether, if it is, statistics repeat number Amount, judgment step(3.3)In middle plant stand load modification database load bus Pinyin abbreviation name whether with substation's load data Load bus name matches in storehouse;If it is, by the corresponding SCADA active reactives load of load bus Pinyin abbreviation name divided by Number of iterations, then by this results modification be the corresponding active reactive load of substation's load database load bus name, if not, Then judge next load bus name;
(4.6)For large user's load database, judgment step(3.3)Load bus phonetic contracts in plant stand load modification database Write whether name matches with load bus name in large user's load database;It is if it is, the load bus Pinyin abbreviation name is right The SCADA active reactive loads answered are substituted for the corresponding active reactive load of load bus name in large user's load database, such as Fruit is no, then judges next load bus name;
(4.7)Step is carried out line by line to all rows of power flow files of reading(4.1)To step(4.6)Operation, that is, complete to BPA The batch modification of load data card active reactive load.
One kind is based on PSD-BPA Guangxi Power Grids barrier load data batch modification system, including the input of the first first trip footline Module, for determining the scope in power flow files where network load node;Second file read module, for reading respectively SCADA typical case's daily load data file, line name management file and power flow files, and generate plant stand load modification database; 3rd batch processing module, the operation for network load node active reactive load value in batch modification power flow files;4th Display and generation module, the load bus active reactive load front and rear for showing modification, and generate modification overload node and have The power flow files .DAT files of work(load or burden without work.
Above disclosed is only the embodiment of the present invention, but protection scope of the present invention is not limited thereto, Any one skilled in the art the invention discloses technical scope in, change or modification can be readily occurred in, all It is covered by the protection scope of the present invention.

Claims (6)

1. one kind is based on PSD-BPA Guangxi Power Grids barrier load data batch modification method, it is characterised in that including following Step:
(1)Read the nodal information of power grid barrier load in BPA power flow files .DAT, including load bus name, load bus electricity Press grade, active power and reactive power;
(2)SCADA typical case's daily load data file is read in, and is analyzed file and extracted data, the data packet extracted Chinese name containing load bus, high-pressure side is active, high-pressure side is idle;
(3)Load bus title management file is read in, extracts load bus Pinyin abbreviation name and corresponding Chinese name;
(4)At BPA power flow files .DAT, SCADA typical case's daily load data files and load bus title management file Reason, active power and reactive power to power grid barrier load bus in BPA power flow files .DAT carry out batch modification operation.
2. being based on PSD-BPA Guangxi Power Grids barrier load data batch modification method as claimed in claim 1, its feature exists In the step(1)The nodal information of Guangxi Power Grid barrier load in BPA power flow files is read, is comprised the following steps:
(1.1)Read and record the first trip line number and footline line number of power grid barrier load bus in BPA power flow files .DAT;
(1.2)In the scope that first trip line number and footline line number determine, the load bus name that all type of card are " B " is read, Load bus voltage class, active power and reactive power.
3. being based on PSD-BPA Guangxi Power Grids barrier load data batch modification method as claimed in claim 1, its feature exists In the step(2)Read in SCADA typical case's daily load data file, including following sub-step:
(2.1)Substation's load data is included to SCADA typical case's daily load data file and large user's load data is analyzed;
(2.2)For substation's load data, read that plant stand Chinese name, high-pressure side be active and the idle data in high-pressure side respectively;
(2.3)For large user's load data, read that plant stand Chinese name, high-pressure side be active and the idle data in high-pressure side respectively.
4. being based on PSD-BPA Guangxi Power Grids barrier load data batch modification method as claimed in claim 1, its feature exists In the step(3)Load bus title management file is read in, extracts load bus Pinyin abbreviation name and corresponding Chinese name, Including following sub-step:
(3.1)Load bus title management file, the load bus Pinyin abbreviation name and step that every a line the 1st is arranged are read line by line (1)The load bus name is matched;
(3.2)By the load bus Chinese name of every a line the 2nd row and the step(2)Plant stand Chinese name matched;
(3.3)Matching result automatically generates plant stand load modification database, which includes load bus Chinese name, load section Point Pinyin abbreviation name, burden with power to be modified, load or burden without work to be modified, SCADA burdens with power, SCADA load or burden without work.
5. being based on PSD-BPA Guangxi Power Grids barrier load data batch modification method as claimed in claim 1, its feature exists In the step(4)Including following sub-step:
(4.1)In the scope that first and last row determines, the step is read line by line(1)In power flow files, and judge to be read in Whether row is B cards;
(4.2)If it is not, then jumping out judgement, the step is carried out to the next line in power flow files(4.1)Operation;If It is then to judge whether the row zone name is " VP ";
(4.3)If the row zone name is not " VP ", by the load bus name, load bus voltage class, wattful power of the row Rate and reactive power are write to substation's load database;If the row subregion is entitled " VP ", by the load bus name of the row, Load bus voltage class, active power and reactive power are write to large user's load database;
(4.4)For substation's load database, the load bus name repeated is determined whether, if it is not, then judgment step(3) Whether load bus Pinyin abbreviation name matches with load bus name in substation load database in plant stand load modification database; If it is, the corresponding SCADA active reactives load of load bus Pinyin abbreviation name is substituted for substation's load database The corresponding active reactive load of middle load bus name, if it is not, then judging next load bus name;
(4.5)For substation's load database, the load bus name repeated is determined whether, if it is, statistics repeat number Amount, judgment step(3)In middle plant stand load modification database load bus Pinyin abbreviation name whether with substation's load database Middle load bus name matching;If it is, by the corresponding SCADA active reactives load of load bus Pinyin abbreviation name divided by again Phasor, then by this results modification be the corresponding active reactive load of substation's load database load bus name, if it is not, then Judge next load bus name;
(4.6)For large user's load database, judgment step(3)Load bus Pinyin abbreviation in plant stand load modification database Whether name matches with load bus name in large user's load database;If it is, the load bus Pinyin abbreviation name is corresponded to SCADA active reactive loads be substituted for the corresponding active reactive load of load bus name in large user's load database, if It is no, then judge next load bus name;
(4.7)The step is carried out line by line to all rows of power flow files of reading(4.1)To step(4.6)Operation, that is, complete To the batch modification of BPA load data card active reactive loads.
6. one kind is based on PSD-BPA Guangxi Power Grids barrier load data batch modification system, it is characterised in that:Including the first first trip Footline input module, for determining the scope in power flow files where network load node;Second file read module, for dividing Not Du Qu SCADA typical case's daily load data file, line name management file and power flow files, and generate plant stand load modification number According to storehouse;3rd batch processing module, the operation for network load node active reactive load value in batch modification power flow files; 4th display and generation module, the load bus active reactive load front and rear for showing modification, and generate modification overload section The power flow files .DAT files of point active reactive load.
CN201711123263.1A 2017-11-14 2017-11-14 PSD-BPA-based Guangxi power grid area load data batch modification method Active CN107908731B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711123263.1A CN107908731B (en) 2017-11-14 2017-11-14 PSD-BPA-based Guangxi power grid area load data batch modification method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711123263.1A CN107908731B (en) 2017-11-14 2017-11-14 PSD-BPA-based Guangxi power grid area load data batch modification method

Publications (2)

Publication Number Publication Date
CN107908731A true CN107908731A (en) 2018-04-13
CN107908731B CN107908731B (en) 2021-06-18

Family

ID=61844045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711123263.1A Active CN107908731B (en) 2017-11-14 2017-11-14 PSD-BPA-based Guangxi power grid area load data batch modification method

Country Status (1)

Country Link
CN (1) CN107908731B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109446722A (en) * 2018-11-21 2019-03-08 广西电网有限责任公司电力科学研究院 Transforming plant main transformer Zero sequence parameter batch processing calculation method based on PSD
CN109470973A (en) * 2018-11-30 2019-03-15 广西电网有限责任公司电力科学研究院 A kind of failure card library method for building up based on PSD-BPA
CN109698504A (en) * 2019-03-08 2019-04-30 张文韬 Calculation of tidal current analysis method and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7111018B1 (en) * 2000-10-30 2006-09-19 Margaret E Goodrich System and method for integrating electrical power grid and related data from various proprietary raw data formats into a single maintainable electrically connected database
CN103729557A (en) * 2013-12-25 2014-04-16 大连理工大学 Static N-X batch processing method on basis of PSD-BPA
CN105260570A (en) * 2015-11-09 2016-01-20 广西电网有限责任公司电力科学研究院 PSD-BPA flow data element editing and bus switching method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7111018B1 (en) * 2000-10-30 2006-09-19 Margaret E Goodrich System and method for integrating electrical power grid and related data from various proprietary raw data formats into a single maintainable electrically connected database
CN103729557A (en) * 2013-12-25 2014-04-16 大连理工大学 Static N-X batch processing method on basis of PSD-BPA
CN105260570A (en) * 2015-11-09 2016-01-20 广西电网有限责任公司电力科学研究院 PSD-BPA flow data element editing and bus switching method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
RAFTOYIANNIS I G.: "Dynamic Buckling of a Simple Geometrically Imperfect Frame Using Catastrophe Theory", 《INTERNATIONAL JOURNAL OF MECHANICAL SCIENCES》 *
中国电力科学研究院: "PSD-BPA潮流和暂态稳定程序4.0版用户手册", 《HTTP://WWW.DOCIN.COM/P-434699993.HTML》 *
易杨 等: "PSD-BPA潮流计算数据卡的自动批量生成和修改", 《电力系统自动化》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109446722A (en) * 2018-11-21 2019-03-08 广西电网有限责任公司电力科学研究院 Transforming plant main transformer Zero sequence parameter batch processing calculation method based on PSD
CN109470973A (en) * 2018-11-30 2019-03-15 广西电网有限责任公司电力科学研究院 A kind of failure card library method for building up based on PSD-BPA
CN109470973B (en) * 2018-11-30 2020-11-13 广西电网有限责任公司电力科学研究院 Fault card library establishing method based on PSD-BPA
CN109698504A (en) * 2019-03-08 2019-04-30 张文韬 Calculation of tidal current analysis method and system

Also Published As

Publication number Publication date
CN107908731B (en) 2021-06-18

Similar Documents

Publication Publication Date Title
CN107591800A (en) The Forecasting Methodology of running status containing distributed power distribution network based on scene analysis
CN107330056A (en) Wind power plant SCADA system and its operation method based on big data cloud computing platform
CN107908731A (en) Based on PSD BPA Guangxi Power Grids barrier load data batch modification method
CN103927693A (en) Distribution network line loss management system
CN103218448B (en) Self-service report form generation method, device and system
CN112910012B (en) Power distribution system elasticity improvement evaluation method, storage medium and computing equipment
CN104992297A (en) Electricity fee collection risk assessment device based on big data platform clustering algorithm and method thereof
Li et al. Investment optimization of grid-scale energy storage for supporting different wind power utilization levels
CN105914755B (en) Electrical power system dynamic reactive power Optimal Configuration Method and system
CN103927694A (en) Real-time analysis and decision system of regional loads of urban power grid and working method thereof
CN105207197B (en) Model in Reliability Evaluation of Power Systems method comprising wind power plant
CN111079972A (en) Method, device and medium for planning reliability of active power distribution network
CN109995023A (en) The judgment method and system of stability of power system based on spectral clustering region division
CN113269468A (en) Power dispatching system based on block chain and data processing method thereof
CN106684917A (en) Positional dynamic optimization and allowed capacity calculating method and system for distributed power supplies
CN106354803A (en) Bad load data detection algorithm for power transmission and transformation equipment based on index of characteristic
CN114021425B (en) Power system operation data modeling and feature selection method and device, electronic equipment and storage medium
CN108230183A (en) A kind of processing method of the grid equipment various dimensions comprehensive warning based on time scale measurement
CN114330923A (en) Photovoltaic power generation power prediction method based on public meteorological data
CN114676931B (en) Electric quantity prediction system based on data center technology
CN107402541A (en) Wind power generating set reliability analysis system and its method
CN106953338A (en) A kind of var Optimization Method in Network Distribution and device
CN107276093A (en) Power system probability load flow calculation method based on scene reduction
CN115809718B (en) Cascade power station power generation and ecological cooperative optimization method and system based on multi-objective competition relationship quantification
CN111008769A (en) Energy transformation optimization method and system considering power blockage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant