CN107905844B CN201711050265.2A CN201711050265A CN107905844B CN 107905844 B CN107905844 B CN 107905844B CN 201711050265 A CN201711050265 A CN 201711050265A CN 107905844 B CN107905844 B CN 107905844B
Authority
CN
China
Prior art keywords
chamber
new
old
brine
slagging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711050265.2A
Other languages
Chinese (zh)
Other versions
CN107905844A (en
Inventor
施锡林
李银平
马洪岭
杨春和
李金龙
陈涛
王同涛
刘伟
陈结
张楠
葛鑫博
尹洪武
陈祥胜
章雨豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN201711050265.2A priority Critical patent/CN107905844B/en
Publication of CN107905844A publication Critical patent/CN107905844A/en
Application granted granted Critical
Publication of CN107905844B publication Critical patent/CN107905844B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/16Modification of mine passages or chambers for storage purposes, especially for liquids or gases
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/122Gas lift

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses salt mine old chamber Quan Caidong space gas injections to arrange halogen method, it include: first to build new chamber, new chamber is connected to old chamber again, again to old chamber gas injection, the brine in old chamber is discharged from new chamber, form gas storage, sediment gap is finally occupied by gas substantially, realize gas injection row's halogen in sediment, solves the technical issues of brine in sediment gap can not being discharged in the prior art, it not only increases old chamber coelosis rate, increase the gas storage volume of old chamber, make the gas storage built up that can store more gases;And do not need to measure the configuration of old chamber, evade the difficult problem of the form detection of the old chamber of butt shaft in the prior art.Input-output ratio of the invention is high and construction speed is fast.

Description

Halogen method is arranged in salt mine old chamber Quan Caidong space gas injection
Technical field
The present invention relates to salt hole air reserved storeroom building technology fields more particularly to a kind of old chamber Quan Caidong space gas injection of salt mine to arrange Halogen method.
Background technique
China's natural gas lays in wretched insufficiency, meanwhile, with novel energy-storings modes such as compression energy accumulation power station hydrogen storages Development, there is an urgent need to build a large amount of large-scale underground natural gas storage tanks.China's salt well accident is with a long history, huge, salt ore mining A large amount of Underground Dissolved Cavity is formd after halogen, commonly referred to as these molten chambers are to adopt the old chamber of halogen (referred to as " old chamber ").
Currently, old chamber gas storage reconstruction in terms of halogen is arranged in gas injection, is primarily present following technical problem:
1) the sediment volume accounting adopted in space is high, and old chamber coelosis rate is low.
During adopting halogen, salt is dissolved in the brine formed after water and is plucked out of to ground, and the impurity for being insoluble in water is then stacked into Salt bottom of chamber portion is formed " sediment ".Paper " the more interlayer salt cave storage cavern sediment being published in 2013 in " mining industry research and development " Broken swollen-coefficient of expansion experimental study ", show that the broken swollen coefficient of the sediment of its studied salt mine is up to 1.701.It is broken swollen according to this Coefficient calculates, and when the synthesis soluble rate of salt mine is lower than 63%, adopting space will all be covered by sediment.However, China exists A large amount of comprehensive soluble rates are lower than 70% salt mine, adopt brine filling area accounting very little in space, are arranged using existing gas injection Halogen technology is only capable of forming small gas storage space.
2) halogen technology is arranged in current gas injection, and the brine in sediment gap can not be discharged.
Insoluble impurity in salt mine, generally mud stone, dolomite, sandstone, anhydrite etc., these insoluble matters are crushed after meeting water Expansion is finally stacked into salt cave bottom, contains a large amount of gaps in the sediment of accumulation.And existing gas injection row halogen technology cannot achieve Halogen is arranged in salt chamber Quan Caidong space gas injection, it means that only few volume is in a large amount of old chambers for gas storage, it is difficult to meet China Urgent need to gas storage.
3) old chamber form detection is difficult, and gas injection arranges halogen design and lacks foundation.
Different from fining technique employed in the new chamber building course of salt hole air reserved storeroom, in salt mine butt shaft recovery process In, water flooding regime often irregularly changes, and the depth of halogen mining pipe column is also often due to the factors such as down-hole accident, pipe cutting operation Change, therefore, the form of the old chamber of butt shaft is extremely complex, along with sediment buries the factors such as horizontal channel, current test skill Art is only capable of measuring the salt chamber form at the top of straight well or inclined shaft, it is difficult to the configuration of old chamber is detected, to be difficult to find that properly Row's halogen point, and then old chamber gas injection row's halogen construction is caused to lack foundation, it is difficult to field conduct.
Summary of the invention
The present invention has evaded and having docked in the prior art by providing a kind of salt mine old chamber Quan Caidong space gas injection row halogen method The difficult problem of the form detection of the old chamber of well, solving in the prior art can not ask the technology that the brine in sediment gap is discharged Topic realizes the technical effect for improving old chamber coelosis rate and increasing gas storage volume.
The present invention provides a kind of old chamber Quan Caidong space gas injections of salt mine to arrange halogen method, comprising:
Build new chamber;
The new chamber is connected to old chamber;
To the old chamber gas injection, the brine in the old chamber is discharged from the new chamber, forms gas storage.
Further, in the building course of the new chamber, the boundary of the new chamber is at a distance from the boundary of the old chamber It is maintained at 10-20m.
It is further, described to build new chamber, comprising:
Bore the new well of a bite;
Solvent is injected into the new well, forms brine after making the solvent dissolution salt mine;
The brine is discharged to earth's surface.
Further, during the construction new chamber, further includes:
Diesel oil is injected into the new chamber, forms diesel oil bed course in the new top of chamber.
Further, it after the new top of chamber forms diesel oil bed course, removes the gred to the new chamber.
It is further, described to remove the gred to the new chamber, comprising:
The injection slagging-off acid solution into the new chamber, is that can be carried to by the brine by the sediment corrosion in the new chamber The particle on ground.
It is further, described to be connected to the new chamber with old chamber, comprising:
The new chamber after the slagging-off is connected to the old chamber by any one following mode:
Natural solution and communication, pressure burst communicatin or drilling well connection.
Further, the new chamber after the slagging-off is connected to by way of natural solution and communication with the old chamber, is specifically included:
The solvent is injected into the new chamber;
Whether monitor in the straight well or inclined shaft of the old chamber has brine outflow;
If so, illustrating that the new chamber after the slagging-off has been connected to the old chamber.
Further, the new chamber after the slagging-off is connected to by way of pressure burst communicatin with the old chamber, is specifically included:
It is passed through high pressure water into the new chamber after the slagging-off, the new chamber after making the slagging-off and old chamber distance are nearest Position is pressed off by the high pressure water, and the new chamber after making the slagging-off is connected to the old chamber.
Further, the new chamber after the slagging-off is connected in such a way that drilling well is connected to the old chamber, is specifically included:
In new chamber after drilling tool to be placed on to the slagging-off;
Drilled by the drilling tool from the new chamber after the slagging-off to the old chamber, the new chamber after making the slagging-off with it is described Old chamber connection.
One or more technical solution provided in the present invention, has at least the following technical effects or advantages:
New chamber is first built, then new chamber is connected to old chamber, then to old chamber gas injection, the brine in old chamber is discharged from new chamber, Gas storage is formed, sediment gap is finally occupied by gas substantially, realizes gas injection row's halogen in sediment, solves in the prior art It the technical issues of brine in sediment gap can not being discharged, not only increases old chamber coelosis rate, increase the storing gas of old chamber Product, makes the gas storage built up that can store more gases;And do not need to measure the configuration of old chamber, evade the prior art The difficult problem of the form detection of the middle old chamber of butt shaft.Input-output ratio of the invention is high and construction speed is fast.
Detailed description of the invention
Fig. 1 is the flow chart that halogen method is arranged in salt mine provided in an embodiment of the present invention old chamber Quan Caidong space gas injection;
Fig. 2 is to execute the step S110 in salt mine provided in an embodiment of the present invention old chamber Quan Caidong space gas injection row's halogen method Status diagram later;
Fig. 3 is to remove in salt mine provided in an embodiment of the present invention old chamber Quan Caidong space gas injection row's halogen method to new chamber The status diagram of slag process;
Fig. 4 is to inject bavin into new chamber in salt mine provided in an embodiment of the present invention old chamber Quan Caidong space gas injection row's halogen method The status diagram of oily process;
Fig. 5 is to execute the step S120 in salt mine provided in an embodiment of the present invention old chamber Quan Caidong space gas injection row's halogen method Status diagram later;
Fig. 6 is the view of the A-A ' section in Fig. 5;
Fig. 7 is that execution step S130 mistake in halogen method is arranged in salt mine provided in an embodiment of the present invention old chamber Quan Caidong space gas injection Status diagram in journey;
Fig. 8 is that salt mine provided in an embodiment of the present invention old chamber Quan Caidong space gas injection is arranged when running gas storage in halogen method Status diagram;
Wherein, the new well of 1-, 2- straight well, 3- inclined shaft, 4- protective casing, 5- central tube, 6- target spot, 7- salt mine top plate, 8- salt Mine bottom plate, the old chamber of 9-, 10- brine filling area, 11- brine and sediment filling area, 12- diesel oil bed course, the new chamber of 13-, the new chamber-of 14- Old chamber communicating passage, 15- salt mine, 16- gas and sediment filling area, 17- gas filling area.
Specific embodiment
The embodiment of the present invention has evaded the prior art by providing a kind of salt mine old chamber Quan Caidong space gas injection row halogen method The difficult problem of the form detection of the middle old chamber of butt shaft, solves the skill that the brine in sediment gap can not be discharged in the prior art Art problem realizes the technical effect for improving old chamber coelosis rate and increasing gas storage volume.
Technical solution in the embodiment of the present invention is to solve the above problems, general thought is as follows:
New chamber is first built, then new chamber is connected to old chamber, then to old chamber gas injection, the brine in old chamber is discharged from new chamber, Gas storage is formed, sediment gap is finally occupied by gas substantially, realizes gas injection row's halogen in sediment, solves in the prior art It the technical issues of brine in sediment gap can not being discharged, not only increases old chamber coelosis rate, increase the storing gas of old chamber Product, makes the gas storage built up that can store more gases;And do not need to measure the configuration of old chamber, evade the prior art The difficult problem of the form detection of the middle old chamber of butt shaft.The input-output ratio of the embodiment of the present invention is high and construction speed is fast.
Above-mentioned technical proposal in order to better understand, in conjunction with appended figures and specific embodiments to upper Technical solution is stated to be described in detail.
Before being illustrated to the embodiment of the present invention, first in the embodiment of the present invention " gas injection row halogen ", " adopt sky Between " and the concept in " space Quan Caidong " be illustrated:
" gas injection row halogen " refers to, the gas for needing to store to the old intracavitary injection in underground, while brine being discharged to the mistake on ground Journey.
" adopting space " refers to, the underground space that salt mine is formed after being dissolved in water, and can be divided into two class regions: the first kind Region is brine filling area, only has brine in the region, is free of sediment;Second class region is brine and sediment filling area, the area The mixture of brine and sediment is filled in domain.
" space Quan Caidong " refers to, whole spaces comprising above two class region.
Referring to Fig. 1, halogen method is arranged in salt mine old chamber Quan Caidong space gas injection provided in an embodiment of the present invention, comprising:
Step S110: new chamber 13 is built;
Referring to fig. 2, this step is illustrated:
The new well 1 of a bite is bored, and completes full well section well cementation;
Solvent is injected into new well 1, forms brine after so that solvent is dissolved salt mine 15;
Brine is discharged to earth's surface.
It should be noted that relative to inclined shaft end, since the salt chamber rule of development at straight well end is more visible, thus by new well 1 It is provided near the straight well 2 of old chamber 9, can be conducive to ensure going on smoothly for building course in this way.And if it is known that inclined shaft end New well 1 can be also opened near the inclined shaft 3 of old chamber 9 by clearly salt chamber form.
In order to guarantee that new well 1 and old chamber 9 keep reasonable distance and relative position, i.e. holding distance remote enough is to prevent New well 1 pierces old chamber 9 in drilling process, and holding distance close enough is to guarantee to connect as early as possible with old chamber 9 after new chamber 13 Logical, in the building course of new chamber 13, the boundary of new chamber 13 is maintained at 10-20m at a distance from the boundary of old chamber 9.
Further, salt mine top plate 7 is located at the top of salt mine 15, and salt mine bottom plate 8 is located at the lower section of salt mine 15.New well 1 bores Well target spot 6 is located at 8 or more 1-3m of salt mine bottom plate, and under the premise of can ensure formation seals, this is apart from smaller more advantageous.Newly The tubing string of well 1 includes: protective casing 4 and central tube 5.Wherein, the minimum point of protective casing 4 is located at the above 4-6m of target spot, technology The full well section well cementing of cement of casing 4;The minimum point of central tube 5 is located above 1m of target spot or so, and the purpose is to guarantee bottom salt mine energy It is enough sufficiently to be dissolved by solvent, it is old so as to be discharged to ensure to be connected to old chamber 9 in position low as far as possible after new chamber 13 More brine in chamber 9, to obtain bigger gas storage space.
In the present embodiment, solvent is injected from central tube 5, forms brine, brine warp after the solvent dissolution salt mine 15 of injection Ground installation is discharged to by the annular space between protective casing 4 and central tube 5.With the passage of dissolution time, new chamber 13 formed and by Flaring is big.
Wherein, the solvent of injection is the liquid that can dissolve salt mine 15, such as saliferous (such as NaCl, Na2SO4Deng) concentration is not H greater than 30g/L2O solution.
The embodiment of the present invention is illustrated, during building new chamber 13, further includes:
Diesel oil is injected into new chamber 13, diesel oil bed course 12 is formed at the top of new chamber 13, new chamber 13 not only can be avoided Too fast upward development, but also can be accumulated excessively to avoid the sediment of new 13 bottom of chamber, further ensure the transverse direction of new chamber 13 Extension, to be connected to as early as possible with old chamber 9.
Specifically, periodically the annular space between protective casing 4 and central tube 5 injects diesel oil.
After executing the step S110, further includes:
It removes the gred to new chamber 13;
Referring to Fig. 3 and Fig. 4, this step is illustrated:
Into new chamber 13, injection slagging-off acid solution, is that ground can be carried to by brine by the sediment corrosion in new chamber 13 Grain.
Further, slagging-off acid solution periodically is injected from central tube 5, so that being by the sediment corrosion in new chamber 13 can be by halogen Water is carried to the little particle on ground, can not only prevent sediment accumulation excessive and cause stifled well, but also be also possible to prevent sediment mistake Degree is accumulated and restricts the extending transversely of new chamber 13.
In the present embodiment, the proportion for the acid solution that removes the gred is determined according to the lithology of sediment, in generally easy and sediment Carbonatite, sandstone or clay reaction, but be not easy the acidic materials to react with salt mine 15 (main component NaCl).Tool Body, slagging-off acid solution can be hydrochloric acid (HCl), hydrofluoric acid (HF) and water (H2O mixed liquor).
Step S120: new chamber 13 is connected to old chamber 9, forms the old chamber communicating passage 14 of new chamber-;
Referring to figs. 5 and 6, this step is illustrated:
The new chamber 13 after slagging-off is connected to old chamber 9 by any one following mode:
Natural solution and communication, pressure burst communicatin or drilling well connection.
Specifically,
Whether the volume of the new chamber 13 after judging slagging-off reaches preset vol;
In the present embodiment, the volume of the new chamber 13 after being removed the gred by sonar contact.
If reached, illustrate that new chamber 13 has enough row's halogen space, then can connect the new chamber 13 after slagging-off with old chamber 9 It is logical;
If not up to, illustrating that new chamber 13 without enough row's halogen space, continues molten chamber.
Specifically,
The new chamber 13 after slagging-off is connected to old chamber 9 by way of natural solution and communication, is specifically included:
Solvent is injected into new chamber 13;
Whether monitor in the straight well 2 or inclined shaft 3 of old chamber 9 has brine outflow;
If so, illustrating that the new chamber 13 after slagging-off has been connected to old chamber 9;
Specifically, in the building course of new chamber 13, straight well 2 and 3 well head of inclined shaft are kept open, and to 2 He of straight well The brine flow of inclined shaft 3 is monitored.When monitor has brine persistently to flow out in straight well 2 or inclined shaft 3, illustrate new chamber 13 with it is old Chamber 9 has been connected to.At this point, close the valve on the protective casing 4 of new well 1, continue to inject solvent from central tube 5, the purpose is into One step expands the new old chamber communicating passage 14 of chamber-.
The new chamber 13 after slagging-off is connected to old chamber 9 by way of pressure burst communicatin, is specifically included:
High pressure water is passed through into the new chamber 13 after slagging-off, and (pressure is that the pressure of brine in new chamber 13 is made to be higher than stratum where it Fracture pressure 1-3MPa), the new chamber 13 after making slagging-off is pressed off apart from nearest position by high pressure water with old chamber 9, after making slagging-off New chamber 13 is connected to old chamber 9.
In the present embodiment, straight well 2 and 3 well head of inclined shaft are opened, the valve on the protective casing 4 of new well 1 is closed, from center Pipe 5 injects high pressure water, and the Controlling principle of water injection pressure is formation fracture pressure 1- where the pressure of brine in new chamber 13 is higher than it 3MPa.Since new chamber 13 and old chamber 9 are closer, thus they the distance between nearest position will be at first by high water pressure It opens, continues therefrom heart pipe 5 after pressing off and inject high pressure water, the purpose is to the old chamber communicating passages 14 of the new chamber-of further expansion.
The new chamber 13 after slagging-off is connected to old chamber 9 in such a way that drilling well is connected to, is specifically included:
Drilling tool is placed in the new chamber 13 after slagging-off;
It is drilled by drilling tool from the new chamber 13 after slagging-off to old chamber 9, the new chamber 13 after making slagging-off is connected to old chamber 9;
After drilling through, continue to inject high pressure water from central tube 5, the purpose is to the old chamber communicating passages of the new chamber-of further expansion 14。
In order to avoid expanding after old 14 excessive dissolution of chamber communicating passage of new chamber-, connect by the new chamber 13 after slagging-off with old chamber 9 After logical, further includes:
Continue the injection solvent of the new chamber 13 after slagging-off, and total injection control is in 100m3Within.
Step S130: to old 9 gas injection of chamber, the brine in old chamber 9 is discharged from the new chamber 13 after slagging-off, forms gas storage.
In the present embodiment, the gas of injection be it is following any one:
Natural gas, hydrogen, air, carbon dioxide.
Referring to Fig. 7, this step is illustrated:
The down-hole string of new chamber 13 and old chamber 9 is transform as hermetic seal tubular column system, wherein 5 tripping in of central tube of new well 1 The 13 above 1-2m in sediment face of new chamber, from inclined shaft 3 (or straight well 2 or straight well 2 and inclined shaft 3 are simultaneously) injection high pressure gas, (pressure is to make The air pressure of depth locating for gas-liquid interface is higher than saturated bittern head of liquid 1-3MPa), the pressure of brine in old chamber 9 in high pressure gas Under power effect, via the old chamber communicating passage 14 of new chamber-, returned by the central tube 5 of new well 1 to ground brine treatment factory.Finally, always The brine in brine filling area 10 and brine and sediment filling area 11 in chamber 9 is discharged substantially, forms gas and sediment filling Area 16 and gas filling area 17, to realize gas injection row's halogen in the space Quan Caidong of old chamber 9.
During halogen is arranged in gas injection, to prevent the salt in brine from crystallizing in central tube 5, the hair of pipe plugging by crystallization accident is caused It is raw, it needs to do crystallization-preventive processing to central tube 5.Specifically, every a couple of days (such as 7 days), solvent is injected to dissolve to central tube 5 The salt formed is crystallized, the salinity of solvent is not more than 30g/L, and the flow of solvent injection is not more than 20m3/ h, solvent injection 2-5 times of the pipe column volumes of pipe 5 centered on total amount.
After executing the step S130, further includes: gas storage operation.
Referring to Fig. 8, this step is illustrated:
After halogen is arranged in gas injection, the minimum point of the central tube 5 of new well 1 is promoted to inside protective casing 4, in preventing The bottom of heart pipe 5 is placed in brine for a long time to be corroded.Meanwhile the central tube 5 after promotion can also be used as gas and infuse the channel adopted. In the operational process of gas storage, not only gas production can be infused from any a well in new well 1, straight well 2 and inclined shaft 3, but also Gas production can also be infused from any two mouthfuls of wells in new well 1, straight well 2 and inclined shaft 3, note adopts efficiency and is increased to individual well gas storage in this way 2 times or so;Gas production can also be infused simultaneously from new well 1, straight well 2 and inclined shaft 3, note adopts efficiency and is increased to individual well gas storage in this way 3 times or so.
[technical effect]
1, first build new chamber 13, then new chamber 13 be connected to old chamber 9, then to old 9 gas injection of chamber, make brine in old chamber 9 from New chamber 13 is discharged, and forms gas storage, and sediment gap is finally occupied by gas substantially, realizes gas injection row's halogen in sediment, solves It the technical issues of brine in sediment gap can not being discharged in the prior art, not only increases old 9 coelosis rate of chamber, increase The gas storage volume of old chamber 9, makes the gas storage built up that can store more gases;And do not need to measure the configuration of old chamber 9, The difficult problem of the form detection of the old chamber of butt shaft in the prior art is evaded.The input-output ratio of the embodiment of the present invention is high and builds Speed is fast.
2, in the building course of new chamber 13, the boundary of new chamber 13 is maintained at 10-20m at a distance from the boundary of old chamber 9, because And ensure that new well 1 keeps reasonable distance and relative position with old chamber 9, i.e. holding distance remote enough is to prevent new well 1 from existing Old chamber 9 is pierced in drilling process, while keeping close enough distance to guarantee that new chamber 13 can be connected to as early as possible with old chamber 9 again.
3, after the construction of new chamber 13, diesel oil is injected into new chamber 13, forms diesel oil bed course 12 at the top of new chamber 13, no Only can be to avoid the too fast upward development of new chamber 13, but also can accumulate to avoid the sediment of new 13 bottom of chamber excessively, to ensure Newly chamber 13 is extending transversely, is connected to as early as possible with old chamber 9.
4, after being connected to new chamber 13 with old chamber 9, solvent is injected to new chamber 13, and total injection control is in 100m3With It is interior, so as to avoid expanding after old 14 excessive dissolution of chamber communicating passage of new chamber-.
5, the mode for being connected to new chamber 13 with old chamber 9 the embodiment of the invention provides three kinds, to improve of the invention real Apply the applicability of example.
The old chamber 9 that the embodiment of the present invention is applicable to adopt salt mine butt shaft halogen formation is reconstructed as natural gas, hydrogen storage cavern Or the construction engineering of compression energy accumulation power station gas storage.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (10)

1. halogen method is arranged in a kind of salt mine old chamber Quan Caidong space gas injection characterized by comprising
Build new chamber;
The new chamber is connected to old chamber;
To the old chamber gas injection, the brine in the old chamber is discharged from the new chamber, forms gas storage;
The down-hole string of new chamber and old chamber is transform as hermetic seal tubular column system, wherein the central tube tripping in new chamber sediment face of new well The above 1-2m injects high pressure gas from inclined shaft, and old intracavitary brine is under the pressure effect of high pressure gas, via the old chamber of new chamber- Communicating passage is returned by the central tube of new well to ground;Finally, in old intracavitary brine filling area and brine and sediment filling area Brine be discharged substantially, gas and sediment filling area and gas filling area are formed, to realize the space Quan Caidong of old chamber Halogen is arranged in gas injection.
2. the method as described in claim 1, which is characterized in that in the building course of the new chamber, the boundary of the new chamber 10-20m is maintained at a distance from the boundary of the old chamber.
3. the method as described in claim 1, which is characterized in that described to build new chamber, comprising:
Bore the new well of a bite;
Solvent is injected into the new well, forms brine after making the solvent dissolution salt mine;
The brine is discharged to earth's surface.
4. method as claimed in claim 3, which is characterized in that during the construction new chamber, further includes:
Diesel oil is injected into the new chamber, forms diesel oil bed course in the new top of chamber.
5. method as claimed in claim 4, which is characterized in that after the new top of chamber forms diesel oil bed course, to described New chamber removes the gred.
6. method as claimed in claim 5, which is characterized in that described to remove the gred to the new chamber, comprising:
The injection slagging-off acid solution into the new chamber, is that can be carried to ground by the brine by the sediment corrosion in the new chamber Particle.
7. method as claimed in claim 5, which is characterized in that described to be connected to the new chamber with old chamber, comprising:
The new chamber after the slagging-off is connected to the old chamber by any one following mode:
Natural solution and communication, pressure burst communicatin or drilling well connection.
8. the method for claim 7, which is characterized in that by way of natural solution and communication by after the slagging-off new chamber with The old chamber connection, specifically includes:
The solvent is injected into the new chamber;
Whether monitor in the straight well or inclined shaft of the old chamber has brine outflow;
If so, illustrating that the new chamber after the slagging-off has been connected to the old chamber.
9. the method for claim 7, which is characterized in that by way of pressure burst communicatin by after the slagging-off new chamber with The old chamber connection, specifically includes:
It is passed through high pressure water into the new chamber after the slagging-off, the new chamber after making the slagging-off and the old chamber are apart from nearest position It is pressed off by the high pressure water, the new chamber after making the slagging-off is connected to the old chamber.
10. the method for claim 7, which is characterized in that by the new chamber after the slagging-off in such a way that drilling well is connected to It is connected to, specifically includes with the old chamber:
In new chamber after drilling tool to be placed on to the slagging-off;
It is drilled by the drilling tool from the new chamber after the slagging-off to the old chamber, the new chamber and the old chamber after making the slagging-off Connection.
CN201711050265.2A 2017-10-31 2017-10-31 Halogen method is arranged in salt mine old chamber Quan Caidong space gas injection Active CN107905844B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711050265.2A CN107905844B (en) 2017-10-31 2017-10-31 Halogen method is arranged in salt mine old chamber Quan Caidong space gas injection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711050265.2A CN107905844B (en) 2017-10-31 2017-10-31 Halogen method is arranged in salt mine old chamber Quan Caidong space gas injection

Publications (2)

Publication Number Publication Date
CN107905844A CN107905844A (en) 2018-04-13
CN107905844B true CN107905844B (en) 2019-06-25

Family

ID=61843018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711050265.2A Active CN107905844B (en) 2017-10-31 2017-10-31 Halogen method is arranged in salt mine old chamber Quan Caidong space gas injection

Country Status (1)

Country Link
CN (1) CN107905844B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109630064A (en) * 2018-11-19 2019-04-16 湖北双环科技股份有限公司 A kind of old salt well remodeling method
CN111274662B (en) * 2018-12-03 2022-10-04 中国石油天然气股份有限公司 Screening method and device for convection-communicated old cavity
CN111749733A (en) * 2019-03-28 2020-10-09 中国石油天然气集团有限公司 Method for rebuilding gas storage warehouse by communicating old cavity
CN111852565B (en) * 2019-04-28 2022-06-03 中国石油天然气股份有限公司 Method for discharging brine in accumulated residues at bottom and communication section of salt cavity of old well cavity
CN110306951B (en) * 2019-07-05 2020-10-23 中国科学院武汉岩土力学研究所 Method for replacing bottom-laying natural gas of U-shaped salt cavern gas storage
CN112036027A (en) * 2020-08-28 2020-12-04 中国科学院武汉岩土力学研究所 Method for calculating volume of dischargeable brine in sediment gap of salt cavern gas storage
CN112227985B (en) * 2020-10-12 2021-10-22 中国科学院武汉岩土力学研究所 Ultra-deep salt mine butt-joint well bittern-mining full-horizontal-section groove expanding method
CN115324528A (en) * 2021-05-10 2022-11-11 中国石油天然气股份有限公司 Operation method for storing gas by utilizing residual void space of salt cavern gas storage
CN113588306B (en) * 2021-07-15 2022-07-19 江苏科技大学 Experimental device and experimental method for gas storage of residues in bottom pit of old cavity for salt mining
CN114542957B (en) * 2022-04-07 2024-03-22 重庆大学 Method for storing carbon dioxide by using layered salt karst cavity
CN115095388B (en) * 2022-06-23 2023-09-29 江苏苏盐井神股份有限公司 Gas injection and brine discharge method for communicating well salt cavern compressed gas energy storage
CN115434675A (en) * 2022-09-09 2022-12-06 中国科学院武汉岩土力学研究所 Sediment gap type gas storage bottomless gas injection and production device and operation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2120675A1 (en) * 1994-04-06 1994-08-29 Gregory D. Hladun Cavern Well Pressure Trap
EP1994995A1 (en) * 2007-05-21 2008-11-26 Kali-Umwelttechnik Sondershausen GmbH Method for safe long term custody of solution-filled cavities through sub-layers with industrial waste and further use of the displaced solution in industrial processes
CN102828778A (en) * 2012-09-24 2012-12-19 重庆大学 Complex salt rock underground and water dissolution joint cavity construction method
CN103850711A (en) * 2012-11-29 2014-06-11 中国石油天然气集团公司 Salt-cavern gas storage twin-well building method
CN106481360A (en) * 2016-05-11 2017-03-08 江苏井神盐化股份有限公司 Salt cave Tank Process quickly built by a kind of asymmetric halogen of adopting of twin-well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2120675A1 (en) * 1994-04-06 1994-08-29 Gregory D. Hladun Cavern Well Pressure Trap
EP1994995A1 (en) * 2007-05-21 2008-11-26 Kali-Umwelttechnik Sondershausen GmbH Method for safe long term custody of solution-filled cavities through sub-layers with industrial waste and further use of the displaced solution in industrial processes
CN102828778A (en) * 2012-09-24 2012-12-19 重庆大学 Complex salt rock underground and water dissolution joint cavity construction method
CN103850711A (en) * 2012-11-29 2014-06-11 中国石油天然气集团公司 Salt-cavern gas storage twin-well building method
CN106481360A (en) * 2016-05-11 2017-03-08 江苏井神盐化股份有限公司 Salt cave Tank Process quickly built by a kind of asymmetric halogen of adopting of twin-well

Also Published As

Publication number Publication date
CN107905844A (en) 2018-04-13

Similar Documents

Publication Publication Date Title
CN107905844B (en) Halogen method is arranged in salt mine old chamber Quan Caidong space gas injection
CN102942006B (en) The method of sequestration of carbon dioxide
WO2022252591A1 (en) Cracking permeability increasing method combining hydraulic fracturing and methane in-situ combustion explosion
CN103061730B (en) A kind of multielement hot fluid foam flooding is for coal bed methane exploring method
CN107701189B (en) Double-well construction method for large-scale gas storage of high-impurity salt mine
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN104790951B (en) Weaken the method and device away from the high-order tight roofs of 100 ~ 350m of coal seam
CN108868706B (en) Method for exploiting natural gas hydrate by directional drilling supercritical carbon dioxide fracturing and displacement
CN106545325B (en) Device and method for supporting marine natural gas hydrate production-increasing cracks
CN105138029B (en) The compress control method of note nitrogen volume increase coal bed gas
CN105443121A (en) Carbonate acidizing and fracturing simulation sample, preparation method, simulation device and method
CN107035343A (en) A kind of rock salt cavern method of construction and its application based on to the well exploitation old well of formula
CN109736752A (en) A kind of voltage drop method auxiliary temperature control CO2The recovery method of displacer gas hydrate
CN104912485A (en) Well completion method with shale gas layer radial jetting drilling and volume fracturing combined
CN108590595A (en) A method of it is exploited using F type well groups non-at lithotype gas hydrates
CN112796729B (en) Quasi-dry method liquid supercritical CO 2 Acid fracturing method
CN106640023A (en) Gas-containing coal permeation-increasing method adopting joint action of carbon dioxide detonation and acidification
CN105370256A (en) Method for increasing wetting radius of high-pressure water injection of low-air-permeability coal seams through sectioned pre-splitting
CN106194161A (en) A kind of based on freezing to block the method that rock mass high pressure crevice water measures coal-bed gas pressure
CN110924900A (en) Method for hydraulic power-liquid nitrogen composite uniform fracturing of coal body
CN102797448B (en) Retreating sectional type hydraulic cracking method
CN110005382A (en) A kind of coal seam liquid state CO2Fracturing technology method is cooperateed with active water
CN108487883A (en) A kind of technique using natural gas and the carbon dioxide mix displacement of reservoir oil
CN113738408B (en) Expansion method for double-well communicated salt cavern gas storage
CN114352252A (en) Permeability increasing technology for long drilling hole of underworkings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant