CN107905512A - A kind of Wall or floor tile based on BIM becomes more meticulous construction - Google Patents

A kind of Wall or floor tile based on BIM becomes more meticulous construction Download PDF

Info

Publication number
CN107905512A
CN107905512A CN201711012103.XA CN201711012103A CN107905512A CN 107905512 A CN107905512 A CN 107905512A CN 201711012103 A CN201711012103 A CN 201711012103A CN 107905512 A CN107905512 A CN 107905512A
Authority
CN
China
Prior art keywords
bim
wall
floor tile
construction
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711012103.XA
Other languages
Chinese (zh)
Inventor
王晓辉
欧阳骏驰
邹雨
邱立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
No 3 Construction Co Ltd of Chongqing Construction Engineering Group
Original Assignee
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd filed Critical CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority to CN201711012103.XA priority Critical patent/CN107905512A/en
Publication of CN107905512A publication Critical patent/CN107905512A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/20Implements for finishing work on buildings for laying flooring
    • E04F21/22Implements for finishing work on buildings for laying flooring of single elements, e.g. flooring cramps ; flexible webs

Abstract

The present invention provides a kind of Wall or floor tile based on BIM and becomes more meticulous construction, on the basis of traditional Wall or floor tile subdivisional work construction method, the characteristic that BIM technology is visualized and parameterized is made full use of to be improved the technological process such as space of a whole page arrangement, ceramic tile dispensing, on-site cutting, solve common quality defect, work efficiency is improved, reduces engineering cost.The mode of production to become more meticulous by using BIM technology and the control means quantified are improved existing construction method, with the effect for reducing spillage of material, reducing labor intensity, improving construction quality, have obvious economic benefit and social benefit.

Description

A kind of Wall or floor tile based on BIM becomes more meticulous construction
Technical field
The present invention relates to technical field of building construction, more particularly to a kind of Wall or floor tile based on BIM becomes more meticulous construction.
Background technology
Important component of the Wall or floor tile subitem construction as the engineering later stage, such as the skin of people, its quality is with seeing Sense has close ties.The skill that the Forming Quality of existing construction method depends on operating personnel is horizontal, subjective And there are larger uncertainty.Therefore, above-mentioned deficiency is directed to, how to pass through the mode of production to become more meticulous and the control of quantization It is those skilled in the art's technical problem urgently to be resolved hurrily that means, which are improved existing construction method,.
The content of the invention
In view of this, the technical problems to be solved by the invention are:How the mode of production to become more meticulous and quantization passed through Control means are improved existing construction method, with the effect for reducing spillage of material, reducing labor intensity, improving construction quality Fruit, has obvious economic benefit and social benefit.
To achieve the above object, the present invention provides a kind of Wall or floor tile based on BIM and becomes more meticulous construction, the construction party Method comprises the following steps successively:S10, the construction drawing provided according to design side determine that BIM models standard;S20, establish BIM moulds Type simultaneously carries out collision detection, and the teat position that liquidates optimizes and changes;S30, in agent structure implementation phase, according to by BIM Designing scheme after optimization is constructed;S40, in Wall or floor tile structure implementation phase, according to the design side after BIM optimizes Case is constructed.
Compared with correlation technique, the present invention provides a kind of Wall or floor tile based on BIM and becomes more meticulous construction, in conventional wall On the basis of brick subdivisional work construction method, the characteristic that BIM technology is visualized and parameterized is made full use of to space of a whole page arrangement, ceramic tile The technological processes such as dispensing, on-site cutting are improved, and solve common quality defect, improve work efficiency, reduce engineering cost.By adopting The mode of production to be become more meticulous with BIM technology and the control means quantified are improved existing construction method, to reduce material Loss, the effect for reducing labor intensity, improving construction quality, have obvious economic benefit and social benefit.
Brief description of the drawings
Fig. 1 is the step schematic diagram of construction method in the embodiment of the present invention.
Embodiment
The present invention is described in further details with reference to the accompanying drawings and detailed description.Refer to shown in Fig. 1, this Inventive embodiments provide a kind of Wall or floor tile based on BIM and become more meticulous construction, and the construction method comprises the following steps successively:
S10, the construction drawing provided according to design side determine that BIM models standard.Using BIM technology, it is actual to measure engineering Size is modeled as real, and typesetting efficiency can be made to have a distinct increment, space of a whole page neat appearance, and mortar joint is anyhow logical straight, effectively avoids bar brick Slip tile floor appearance.At the same time, additionally it is possible to by the model amount of carrying, relatively accurately determine material utilization amount, reduce the waste of material.
Wherein, specifically, the construction drawing that the S10 is provided according to design side determines that BIM models standard, specifically include:
The BIM components race according to product appearance, lines, aberration and the pattern that producer provides establish ceramic tile, then successively Different ceramic tile races are imported in the BIM models sequenced and are rendered, and therefrom determine to choose the best alternatives.It is in addition, sharp The amount of putting forward is carried out with the BIM models and calculates material, and the dispensing figure of extraction is submitted into supplier and is processed;Each piece of plate portion position is carried out Coding, and typesetting figure is exported with guiding construction.
S20, establish BIM models and carry out collision detection, and the teat position that liquidates optimizes and changes.Wherein, BIM moulds are utilized Type carries out the amount of putting forward and calculates material, and the dispensing figure of extraction is submitted to supplier and is processed;Each piece of plate portion position is encoded, and is exported Typesetting figure is with guiding construction.
S30, in agent structure implementation phase, construct according to the designing scheme after BIM optimizes.
S40, in Wall or floor tile structure implementation phase, construct according to the designing scheme after BIM optimizes.Wherein, have Body, the S40 was constructed according to the designing scheme after BIM optimizes in Wall or floor tile structure implementation phase, wherein, should Step specifically includes:
Implement Wall or floor tile structure using full sized brick mould preparation principle and according to the modulo relationship of topology layout and Wall or floor tile;
It is described in Wall or floor tile structure implementation phase, rationally design piece Deepen Design;
It is described in Wall or floor tile structure implementation phase, wall brick seam, brickwork joint and furred ceiling seam three-dimensional opposite joint is carried out by BIM technology Lead to room latitude and longitude and pass through alignment;
Electric switch box and the suitable for reading of socket are alignd with horizontal joint, and both sides are parallel with perps;
Ground leak is located at floor tile center, and floor tile is cut along ground drain edge cutting on the cross to form " returning " font and inside flowing water looks for slope;
Wash platform is suitable for reading to align with wall brick horizontal joint;The facade baffle of platen side aligns with wall brick perps.
Specifically, the construction drawing that the S10 is provided according to design side determines that BIM models standard, specifically include:
The amount of putting forward is carried out using the BIM models and calculates material, and the dispensing figure of extraction is submitted into supplier and is processed;To each piece Plate portion position is encoded, and exports typesetting figure with guiding construction.
The construction in conclusion a kind of Wall or floor tile based on BIM of present invention offer becomes more meticulous, itemizes in traditional Wall or floor tile On the basis of engineering construction method, make full use of BIM technology visualize and parametrization characteristic to space of a whole page arrangement, ceramic tile dispensing, The technological processes such as on-site cutting are improved, and solve common quality defect, improve work efficiency, reduce engineering cost.By using BIM The mode of production that technology becomes more meticulous and the control means quantified are improved existing construction method, with reduce spillage of material, Reduce labor intensity, improve the effect of construction quality, there is obvious economic benefit and social benefit.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:It still may be used To modify to the technical solution described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic; And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical solution spirit and Scope.

Claims (4)

  1. The construction 1. a kind of Wall or floor tile based on BIM becomes more meticulous, it is characterised in that the construction method includes following step successively Suddenly:
    S10, the construction drawing provided according to design side determine that BIM models standard;
    S20, establish BIM models and carry out collision detection, and the teat position that liquidates optimizes and changes;
    S30, in agent structure implementation phase, construct according to the designing scheme after BIM optimizes;
    S40, in Wall or floor tile structure implementation phase, construct according to the designing scheme after BIM optimizes.
  2. 2. construction method as claimed in claim 1, it is characterised in that the S40 is in Wall or floor tile structure implementation phase, according to warp The designing scheme crossed after BIM optimizations is constructed, wherein, which specifically includes:
    Implement Wall or floor tile structure using full sized brick mould preparation principle and according to the modulo relationship of topology layout and Wall or floor tile;
    It is described in Wall or floor tile structure implementation phase, rationally design piece Deepen Design;
    It is described in Wall or floor tile structure implementation phase, wall brick seam, brickwork joint and furred ceiling seam three-dimensional opposite joint is carried out by BIM technology and makes room Between latitude and longitude lead to and pass through alignment;
    Electric switch box and the suitable for reading of socket are alignd with horizontal joint, and both sides are parallel with perps;
    Ground leak is located at floor tile center, and floor tile is cut along ground drain edge cutting on the cross to form " returning " font and inside flowing water looks for slope;
    Wash platform is suitable for reading to align with wall brick horizontal joint;The facade baffle of platen side aligns with wall brick perps.
  3. 3. construction method as claimed in claim 1, it is characterised in that the construction drawing that the S10 is provided according to design side is true Determine BIM modeling standards, specifically include:
    The BIM components race according to product appearance, lines, aberration and the pattern that producer provides establish ceramic tile, successively will not then Import in the BIM models sequenced and rendered with ceramic tile race, and therefrom determine to choose the best alternatives.
  4. 4. construction method as claimed in claim 1, it is characterised in that the construction drawing that the S10 is provided according to design side is true Determine BIM modeling standards, specifically include:
    The amount of putting forward is carried out using the BIM models and calculates material, and the dispensing figure of extraction is submitted into supplier and is processed;To each piece of plate portion Position is encoded, and exports typesetting figure with guiding construction.
CN201711012103.XA 2017-10-25 2017-10-25 A kind of Wall or floor tile based on BIM becomes more meticulous construction Pending CN107905512A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711012103.XA CN107905512A (en) 2017-10-25 2017-10-25 A kind of Wall or floor tile based on BIM becomes more meticulous construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711012103.XA CN107905512A (en) 2017-10-25 2017-10-25 A kind of Wall or floor tile based on BIM becomes more meticulous construction

Publications (1)

Publication Number Publication Date
CN107905512A true CN107905512A (en) 2018-04-13

Family

ID=61840800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711012103.XA Pending CN107905512A (en) 2017-10-25 2017-10-25 A kind of Wall or floor tile based on BIM becomes more meticulous construction

Country Status (1)

Country Link
CN (1) CN107905512A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842782A (en) * 2018-07-17 2018-11-20 中铁九局集团第七工程有限公司 Based on BIM technology deep pit digging and construction method for supporting
CN110424204A (en) * 2019-08-08 2019-11-08 江苏山水环境建设集团股份有限公司 Large Square pavement construction method based on BIM technology
CN111814245A (en) * 2020-09-02 2020-10-23 广东博智林机器人有限公司 Ceiling joint layout acquisition method and device, electronic equipment and storage medium
CN112982913A (en) * 2021-03-15 2021-06-18 中建八局装饰工程有限公司 Ceramic tile batch processing accurate typesetting and positioning construction process based on Internet of things
WO2021169031A1 (en) * 2020-02-27 2021-09-02 杭州群核信息技术有限公司 Cutting system and method by means of tile model in cloud computing environment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712076A (en) * 2015-02-06 2015-06-17 崔新明 Autoclaved sand aerated concrete block wall construction method based on BIM technique
CN105781064A (en) * 2016-03-04 2016-07-20 上海宝冶集团有限公司 Floor tile laying construction method based on building information modeling (BIM)
CN105930600A (en) * 2016-04-28 2016-09-07 广联达软件股份有限公司 Masonry configuration method and masonry configuration system
CN106886654A (en) * 2017-03-14 2017-06-23 中国建筑第八工程局有限公司 A kind of row's of building by laying bricks or stones brick method based on BIM technology
CN107016625A (en) * 2017-03-13 2017-08-04 同济大学 A kind of total bag enterprise B IM authorizing standard methods of architectural engineering
CN107292058A (en) * 2017-07-28 2017-10-24 成都智建新业建筑设计咨询有限公司 A kind of brickwork method based on BIM technology
CN107292065A (en) * 2017-08-11 2017-10-24 中国建筑第八工程局有限公司 A kind of quick composing system of floor tile based on BIM technology and method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712076A (en) * 2015-02-06 2015-06-17 崔新明 Autoclaved sand aerated concrete block wall construction method based on BIM technique
CN105781064A (en) * 2016-03-04 2016-07-20 上海宝冶集团有限公司 Floor tile laying construction method based on building information modeling (BIM)
CN105930600A (en) * 2016-04-28 2016-09-07 广联达软件股份有限公司 Masonry configuration method and masonry configuration system
CN107016625A (en) * 2017-03-13 2017-08-04 同济大学 A kind of total bag enterprise B IM authorizing standard methods of architectural engineering
CN106886654A (en) * 2017-03-14 2017-06-23 中国建筑第八工程局有限公司 A kind of row's of building by laying bricks or stones brick method based on BIM technology
CN107292058A (en) * 2017-07-28 2017-10-24 成都智建新业建筑设计咨询有限公司 A kind of brickwork method based on BIM technology
CN107292065A (en) * 2017-08-11 2017-10-24 中国建筑第八工程局有限公司 A kind of quick composing system of floor tile based on BIM technology and method

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
叶献国: "《建筑结构CAD及工程应用》", 31 July 2015, 合肥工业大学出版社 *
吴子昊: "BIM技术在建筑施工进程中的碰撞研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *
斯科特·康威尔,杜建东: "砌体信息建模技术(BIM-M)模型的简化与规范——基于墙体结构系统数据库的砌体墙用BIM-M", 《建筑砌块与砌块建筑》 *
李邵建: "《欧特克BIM标准丛书 BIM纲要》", 30 November 2015, 同济大学出版社 *
王凤来,杨新聪: "应用BIM技术提高混凝土砌块砌体的设计施工效率", 《建筑砌块与砌块建筑》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842782A (en) * 2018-07-17 2018-11-20 中铁九局集团第七工程有限公司 Based on BIM technology deep pit digging and construction method for supporting
CN110424204A (en) * 2019-08-08 2019-11-08 江苏山水环境建设集团股份有限公司 Large Square pavement construction method based on BIM technology
WO2021169031A1 (en) * 2020-02-27 2021-09-02 杭州群核信息技术有限公司 Cutting system and method by means of tile model in cloud computing environment
CN111814245A (en) * 2020-09-02 2020-10-23 广东博智林机器人有限公司 Ceiling joint layout acquisition method and device, electronic equipment and storage medium
CN112982913A (en) * 2021-03-15 2021-06-18 中建八局装饰工程有限公司 Ceramic tile batch processing accurate typesetting and positioning construction process based on Internet of things

Similar Documents

Publication Publication Date Title
CN107905512A (en) A kind of Wall or floor tile based on BIM becomes more meticulous construction
CN104850709B (en) Building decoration engineering construction three-dimensional simulation method
CN105550386B (en) A kind of precast concrete Deepen Design method based on Revit
CN108427814B (en) Assembled wall steel bar data processing method and device
CN104252558B (en) A kind of non-standard construction fender member digital control processing preprocess method based on BIM platform
CN110117994A (en) A kind of constructing construction method based on BIM technology
CN107558642A (en) A kind of method in the large-scale open stone curtain wall installation based on BIM
CN107235119B (en) The method for fairing of molded line is built on a kind of
CN106202831A (en) A kind of pipeline layout optimization method based on BIM
CN107451350B (en) Spatial three-dimensional special-shaped bridge pier template construction method based on BIM modeling technology
CN104765936A (en) Operation method of three-dimensional modeling expansion and lofting coordinate generation based on Autodesk inventor software
CN107844677A (en) Method for three-dimensional reinforcing bar editing and updating
CN105930600A (en) Masonry configuration method and masonry configuration system
CN110405837A (en) Technique processing method, device and process equipment
CN108647404A (en) Masonry Intelligentized design method based on BIM and its device
CN110309624A (en) A kind of laminated floor slab production method
WO2021103399A1 (en) Cloud computing-based cross-surface complex paving unified designing method
CN106914969A (en) A kind of 3D printing method of concrete component
CN100474191C (en) Bending-torsional non-linear variable-diameter tube pressed mould manufacture method
ATE446534T1 (en) VIRTUAL PROGRAMMING OF MOLDING LINES
CN107390642A (en) The deburring cutter block of computer-readable recording medium and the application medium produces lathes
CN103996218A (en) Method for establishing flexible three-dimensional part model database
CN107895065A (en) A kind of plant design method based on 3-D technology
CN103886143B (en) A kind of method that framework girder steel construction drawing is quickly generated by node
MX2022015682A (en) Work method to design for thickening time by tailoring additives.

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180413

RJ01 Rejection of invention patent application after publication