CN107896396A - A kind of integrated control method towards smart city building landscape light - Google Patents
A kind of integrated control method towards smart city building landscape light Download PDFInfo
- Publication number
- CN107896396A CN107896396A CN201711046956.5A CN201711046956A CN107896396A CN 107896396 A CN107896396 A CN 107896396A CN 201711046956 A CN201711046956 A CN 201711046956A CN 107896396 A CN107896396 A CN 107896396A
- Authority
- CN
- China
- Prior art keywords
- information
- distribution box
- control method
- integrated control
- light
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05B—ELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
- H05B45/00—Circuit arrangements for operating light-emitting diodes [LED]
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05B—ELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
- H05B47/00—Circuit arrangements for operating light sources in general, i.e. where the type of light source is not relevant
- H05B47/10—Controlling the light source
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B20/00—Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
- Y02B20/30—Semiconductor lamps, e.g. solid state lamps [SSL] light emitting diodes [LED] or organic LED [OLED]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B20/00—Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
- Y02B20/40—Control techniques providing energy savings, e.g. smart controller or presence detection
Landscapes
- Circuit Arrangement For Electric Light Sources In General (AREA)
Abstract
The present invention is applied to illumination supervision technological improvement field, there is provided a kind of integrated control method towards smart city building landscape light, including:S1, in the enterprising portable lighter optical node information registering of service end platform and list information is set to inquire about the LED optical node put up;S2, the intelligent distribution box to remote control carry out distribution box information registering on service end platform and set list information to inquire about;S3, control adjustment in real time carried out to LED optical node and intelligent distribution box by the live-action data information that high-definition camera monitors in real time.Cooperation light animated content subscription time is crossed, goes to set intelligent electrical cabinet switch time, with the energy consumption of blank screen after the upper electricity of saving;And energy consumption when being played by analyzing different animated videos, provide energy consumption comparison data;So as to reduce the video playback time big to energy consumption.Overall budget section saves electricity more than 20%.
Description
Technical field
The invention belongs to illumination supervision technological improvement field, more particularly to it is a kind of towards smart city building landscape light
Integrated control method.
Background technology
As Hangzhou G20 summits in 2016 are held, the magnificent mansion effect that Hangzhou governmental input city illumination reaches, lead to
Cross urban lighting and improve Hangzhou City Brands image, after having pulled Hangzhou tourism GDP to increase.All parts of the country are directed in succession
City or two progress large area planning in city, such as gold brick meeting below, the linkage brightening of Shandong Rizhao whole city light etc. are big
Type project;Under such overall background, existing city illumination coordinated signals can not meet municipal administration needs.Light develops
Needs, on the basis of existing illumination IT solutions;Wisdom Lighting Control Assembly software and hardware is upgraded, by city scape
See light coordinated signals, heavy current box is controlled, monitoring camera-shooting control software and hardware function is integrated;Develop face the future, towards
The city illumination cloud platform of Internet of Things;Wherein employ mobile Internet APP technologies, Internet of Things mechanics of communication, the big number of cloud platform
According to technology.To improve the city illumination efficiency of management, the manpower and energy resources of city illumination are saved.
Have the CS structure internet-based controls that city building landscape coordinated signals are monomer, the existing more building LED in city
The linkage broadcasting of light animation is only capable of each storied building light node, is received by 4G linking Internets, and BTS clock sync identification devices
Enter the software management of master control CS structures, realize that more building linkages play.
Existing LED lamplight heavy current box remote management technologies are that independent CS infrastructure softwares are realized, pass through 4G or light mode
Internet is accessed, is realized to management function pipes such as the remote switch, remote meter reading, remote failure of each distribution box monitorings.
Prior art problem and defect description:1st, city storied building light coordinated signals master control end software is CS infrastructure softwares,
The requirement of the long-range access-in management whenever and wherever possible in internet can not be completed;Web end pipes reason, the ability of APP access-in managements are not provided;
2nd, city storied building light coordinated signals master control end software does not provide LED lamplight operating state data function of statistic analysis;3rd, city
LED lamplight work power supply management is independent CS infrastructure softwares, it is impossible to completes wanting for the long-range access-in management whenever and wherever possible in internet
Ask;4th, urban lighting content(Light current)Control, heavy-current control is independent software mutually, and actual LED powers electric control is
The LED lamp of same node;Increase server apparatus resources costs, and manpower maintenance cost.5th, urban lighting content(It is weak
Electricity)Control, heavy-current control is independent software mutually, example is not unfavorable for the analysis of light strong and weak electricity data cross in coordinated management;
Such as light fixture bright light duration, service life are calculated according to powers duration;When judging that light content plays according to forceful electric power on off state
Between it is whether reasonable;Counted according to intelligent electrical cabinet electricity consumption, calculate energy consumption when different animated contents play.
The content of the invention
It is an object of the invention to provide a kind of integrated control method towards smart city building landscape light, it is intended to solves
Certainly above-mentioned technical problem.
The present invention is achieved in that a kind of integrated control method towards smart city building landscape light, the collection
Comprise the following steps into control method:
S1, the LED optical node put up in the enterprising portable lighter optical node information registering of service end platform and set into list information
Inquiry;
S2, the intelligent distribution box to remote control carry out distribution box information registering on service end platform and set list information to look into
Ask;
S3, by the live-action data information that high-definition camera monitors in real time LED optical node and intelligent distribution box are carried out it is real-time
Control adjustment.
The present invention further technical scheme be:It is further comprising the steps of in the step S1:
S11, LED optical node is mapped on map monitored in real time;
S12, according to environmental feedback information by cloud platform to LED optical node play video be controlled;
S13, the history working condition of each LED optical node is subjected to storage filing;
S14, server thoroughly do away with the packet automatic reading capability of Light node picture element matrix and carry out cutting process transmission to playing video
Instruct node side to download and carry out real-time tracking to downloading.
The present invention further technical scheme be:It is further comprising the steps of in the step S2:
S21, distribution box is mapped on map monitored in real time and by the information of each distribution box of list records;
S22, reservation configuration completion distribution control is carried out to the working condition of distribution box by client.
The present invention further technical scheme be:Light node information registering includes network, geographical position in the step S1
Put, the information of sub-control, light fixture, company-information and real picture.
The present invention further technical scheme be:In the step S11 Light node monitoring include monitor Light node ought
Preceding broadcasting program, playback rate, sub-control number, master control number, the information of lamp data.
The present invention further technical scheme be:Data storage includes the bad lamp number of day part, plays boundary in the step S13
The data of face situation, its storage time are 3 ~ 5 years.
The present invention further technical scheme be:In the step S22 video break out control comprising single-unit mesh loop play,
The operation of all program shuffles, all program loop plays.
The present invention further technical scheme be:Distribution box information registering is believed comprising distribution box network in the step S2
Breath, geographical location information, output and loop corresponding relation, company-information, the information of real picture.
The present invention further technical scheme be:Distribution box monitoring in real time includes detecting distribution box position in the step S21
Put, failure, work state information.
The present invention further technical scheme be:Maximum picture as early as possible is 32 pictures in the step S3.
The beneficial effects of the invention are as follows:After integrated light content linkage, light forceful electric power, high-definition camera monitoring function,
30% server hardware resource can be saved;, can after integrated light content linkage, light forceful electric power, high-definition camera monitoring function
Save 50% municipal light management workload;Without more people while light working condition on duty.Only a people is needed to complete pair
Light Content Management, the light management of power use, the monitoring of light field failure situation;When being preengage by coordinating light animated content
Between, go to set intelligent electrical cabinet switch time, with the energy consumption of blank screen after the upper electricity of saving;And played by analyzing different animated videos
When energy consumption, provide energy consumption comparison data;So as to reduce the video playback time big to energy consumption.Overall budget section saves electricity
More than 20%.
Brief description of the drawings
Fig. 1 is the flow of the integrated control method provided in an embodiment of the present invention towards smart city building landscape light
Figure.
Embodiment
Fig. 1 shows face provided by the invention towards the flow of the integrated control method of smart city building landscape light
Figure, details are as follows for it:
Step S1, the LED optical node put up in the enterprising portable lighter optical node information registering of service end platform and is set into list
Information inquiry;The registration management to LED node essential informations is completed, includes network, geographical position, sub-control, light fixture, producer's letter
Breath, the registration of real picture information.And the inquiry of support list information, by inputting LED node serial numbers or title lookup pair
The nodal information answered.
Support that GIS Baidu maps are monitored in real time to Light node working condition, currently broadcast comprising monitoring Light node
Put the information such as program, playback rate, sub-control number, master control number, lamp data.
It can complete to play long-range Light node program by cloud control platform and control, realize single-unit mesh loop play, own
Program shuffle, all program loop plays etc. operate;And can timer reservation play, maximum can support 6 groups of reservations to play.
Platform supports the storage to all LED optical node history operating state datas, comprising the bad lamp number of day part, plays
The data such as interface conditions, data may be present 3 ~ 5 years;Record and show that failure corresponding to each Light node is believed by tabular form
Breath, and record the historical failure information of Light node;Removed in real time for the failure recovered.
Platform is supported to being grouped the automatic reading capability of Light node picture element matrix, and bitmap, Yi Jijie are connected up according to each node
The width of point feedback is high;The information such as the wide height of the node pixel got, source video file, node serial number is handed down to video by platform cuts
Server is cut, video cuts server and completes video cartoon cutting according to cutting input instruction;Platform receives video cutting service
After instruction is completed in the cutting that device returns, platform need to send the FTP that video download instruction passes through offer to node side, node side automatically
Path, FTP user's name, ftp password are downloaded;System real-time tracking file download progress.
Step S2, distribution box information registering is carried out on service end platform to the intelligent distribution box of remote control and row are set
Table information inquiry;Registration management to distribution box essential information is completed, comprising the distribution box network information, geographical location information, defeated
Go out the registration with loop corresponding relation, company-information, real picture information.And the inquiry of support list information, pass through input
Electronic box information corresponding to distribution box numbering or title lookup.
Support that GIS Baidu maps are monitored in real time to distribution box working condition, comprising detect distribution box position, failure,
Working condition(The parameters such as inlet wire, the electric current in loop, voltage, function)Information;Each distribution is recorded and shown by tabular form
Fault message corresponding to case, and record the historical failure information of electronic box;Removed in real time for the failure recovered.
Keeper can complete to preengage distribution box the scene setting of switch, such as on every Mondays ~ Wednesday by web management interface
Improve 19:00~24:00 turns on light, or the 00 of monthly No. 1 ~ No. 15:00~07:00 turns off the light.Keeper can pass through web interface
Complete to the switching manipulation immediately of distribution box batch, either to the switching manipulation immediately of single distribution box or some to single distribution box
Output carries out switching manipulation immediately.
Step S3, the live-action data information monitored in real time by high-definition camera is to LED optical node and intelligent distribution box
Carry out control adjustment in real time;Platform is supported to configure remote camera network attribute, completes the video of platform and high-definition camera
Monitoring docking, support to associate with node when high-definition camera configures, current monitor can be arrived with fast positioning by relation information
LED optical node;Platform outdoor scene monitoring interface supports more picture monitoring, as single-image side is big, 4 pictures, 9 pictures, 16 pictures prison
Control, maximum support the monitoring of 32 pictures.
On the basis of existing city building landscape links project experiences, to meet that municipal urban lighting manages needs, from
Technology and the angle of application are set out;Proved repeatedly by technology, invent integrated urban lighting video interlink control, light intelligence
Electronic box control, light outdoor scene high-definition monitoring software synthesis scheme;Meet that municipal administration department passes through interconnected network mode whenever and wherever possible
Realize:1st, light linkage effect control(Video frequency program switching, video frequency program reservation, light operating mode GIS detections, lighting fault pipe
Reason);2nd, light intelligent electrical cabinet controls(Long-range GIS operating modes detection, remotely immediately/reservation switch, remote meter reading, fault management);
3rd, by high-definition camera, realize that shooting head node associates with storied building light node;Complete long-range outdoor scene monitoring.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
All any modification, equivalent and improvement made within refreshing and principle etc., should be included in the scope of the protection.
Claims (10)
- A kind of 1. integrated control method towards smart city building landscape light, it is characterised in that the integrated control method Comprise the following steps:S1, the LED optical node put up in the enterprising portable lighter optical node information registering of service end platform and set into list information Inquiry;S2, the intelligent distribution box to remote control carry out distribution box information registering on service end platform and set list information to look into Ask;S3, by the live-action data information that high-definition camera monitors in real time LED optical node and intelligent distribution box are carried out it is real-time Monitoring and control adjustment.
- 2. integrated control method according to claim 1, it is characterised in that further comprising the steps of in the step S1:S11, LED optical node is mapped on map monitored in real time;S12, according to environmental feedback information by cloud platform to LED optical node play video be controlled;S13, the history working condition of each LED optical node is subjected to storage filing;S14, server carry out cutting process transmission according to the packet automatic reading capability of Light node picture element matrix to playing video Instruct node side to download and carry out real-time tracking to downloading.
- 3. integrated control method according to claim 2, it is characterised in that further comprising the steps of in the step S2:S21, distribution box is mapped on map monitored in real time and by the information of each distribution box of list records;S22, reservation configuration completion distribution control is carried out to the working condition of distribution box by client.
- 4. integrated control method according to claim 3, it is characterised in that Light node information registering in the step S1 Include the information of network, geographical position, sub-control, light fixture, company-information and real picture.
- 5. integrated control method according to claim 4, it is characterised in that Light node monitoring bag in the step S11 Include monitoring Light node current playing program, playback rate, sub-control number, master control number, the information of lamp data.
- 6. integrated control method according to claim 5, it is characterised in that data storage includes each in the step S13 Period bad lamp number, the data of broadcast interface situation, its storage time are 3 ~ 5 years.
- 7. integrated control method according to claim 6, it is characterised in that video, which breaks out, in the step S22 controls bag The operation of the loop play of mesh containing single-unit, all program shuffles, all program loop plays.
- 8. integrated control method according to claim 1, it is characterised in that distribution box information registering bag in the step S2 The network information containing distribution box, geographical location information, output and loop corresponding relation, company-information, the information of real picture.
- 9. integrated control method according to claim 8, it is characterised in that distribution box monitors in real time in the step S21 Including detection distribution box position, failure, work state information.
- 10. integrated control method according to claim 1, it is characterised in that maximum picture as early as possible is in the step S3 32 pictures.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711046956.5A CN107896396B (en) | 2017-10-31 | 2017-10-31 | Integrated control method for building landscape light of smart city |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711046956.5A CN107896396B (en) | 2017-10-31 | 2017-10-31 | Integrated control method for building landscape light of smart city |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107896396A true CN107896396A (en) | 2018-04-10 |
CN107896396B CN107896396B (en) | 2020-02-14 |
Family
ID=61802934
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711046956.5A Active CN107896396B (en) | 2017-10-31 | 2017-10-31 | Integrated control method for building landscape light of smart city |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107896396B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109686298A (en) * | 2019-01-21 | 2019-04-26 | 章结伟 | A kind of interaction LED screen control system |
CN109862402A (en) * | 2019-01-31 | 2019-06-07 | 深圳爱克莱特科技股份有限公司 | Based on parallel and edge calculations lamp light control system apparatus for processing multimedia data |
CN111010784A (en) * | 2019-12-26 | 2020-04-14 | 浙江创意声光电科技有限公司 | Linkage control integrated management platform |
CN114867174A (en) * | 2021-02-04 | 2022-08-05 | 深圳市奥拓电子股份有限公司 | Lighting control system, device and method for smart city |
CN117042264A (en) * | 2023-10-10 | 2023-11-10 | 深圳市恒欣达照明有限公司 | Flood lighting group control method and system for building facade |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105006887A (en) * | 2014-12-01 | 2015-10-28 | 西安百利信息科技有限公司 | System and method for remote monitoring of intelligent power distribution |
CN105050224A (en) * | 2015-01-07 | 2015-11-11 | 泰华智慧产业集团股份有限公司 | System for supervising street lamps and landscape lighting and supervising method |
CN105550818A (en) * | 2015-12-28 | 2016-05-04 | 上海五零盛同信息科技有限公司 | Road illumination facility comprehensive utilization based information management platform |
CN205265973U (en) * | 2015-11-02 | 2016-05-25 | 王立伟 | Street lamp illumination control system |
-
2017
- 2017-10-31 CN CN201711046956.5A patent/CN107896396B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105006887A (en) * | 2014-12-01 | 2015-10-28 | 西安百利信息科技有限公司 | System and method for remote monitoring of intelligent power distribution |
CN105050224A (en) * | 2015-01-07 | 2015-11-11 | 泰华智慧产业集团股份有限公司 | System for supervising street lamps and landscape lighting and supervising method |
CN205265973U (en) * | 2015-11-02 | 2016-05-25 | 王立伟 | Street lamp illumination control system |
CN105550818A (en) * | 2015-12-28 | 2016-05-04 | 上海五零盛同信息科技有限公司 | Road illumination facility comprehensive utilization based information management platform |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109686298A (en) * | 2019-01-21 | 2019-04-26 | 章结伟 | A kind of interaction LED screen control system |
CN109862402A (en) * | 2019-01-31 | 2019-06-07 | 深圳爱克莱特科技股份有限公司 | Based on parallel and edge calculations lamp light control system apparatus for processing multimedia data |
CN111010784A (en) * | 2019-12-26 | 2020-04-14 | 浙江创意声光电科技有限公司 | Linkage control integrated management platform |
CN114867174A (en) * | 2021-02-04 | 2022-08-05 | 深圳市奥拓电子股份有限公司 | Lighting control system, device and method for smart city |
CN117042264A (en) * | 2023-10-10 | 2023-11-10 | 深圳市恒欣达照明有限公司 | Flood lighting group control method and system for building facade |
CN117042264B (en) * | 2023-10-10 | 2023-12-15 | 深圳市恒欣达照明有限公司 | Flood lighting group control method and system for building facade |
Also Published As
Publication number | Publication date |
---|---|
CN107896396B (en) | 2020-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107896396A (en) | A kind of integrated control method towards smart city building landscape light | |
US11202355B2 (en) | Outdoor lighting fixture and camera systems | |
CN105050224B (en) | A kind of street lamp and landscape brightening supervisory systems and monitoring and managing method | |
CN206771199U (en) | General wisdom streetlamp management system based on cloud computing and Internet of Things | |
KR20130004494A (en) | Method and system for automated lighting control and monitoring | |
CN108024098A (en) | Field intelligent video monitoring analysis system | |
CN108257362B (en) | GIS-based interactive electronic security police guard method, system and device | |
CN110708808A (en) | Wisdom urban lighting ecosystem | |
CN210951042U (en) | Multi-functional wisdom lamp pole | |
CN209944158U (en) | Multi-functional lamp pole based on thing networking | |
CN205678547U (en) | A kind of Multifunctional smart street lamp | |
CN107948607B (en) | Display method of intelligent lamp pole management system | |
CN114553892A (en) | Intelligent lamp pole management method and system | |
CN112396833B (en) | Application method and device of intelligent street lamp, computer equipment and storage medium | |
CN110851498A (en) | Data management and decision making system of smart city lighting system | |
CN101895584A (en) | System and method for realizing bidirectional digital television set top box remote management and control | |
CN113606521A (en) | Multifunctional intelligent street lamp | |
CN205405608U (en) | Be used for intelligent platform in wisdom city | |
CN114189659A (en) | Video monitoring system | |
CN113079613A (en) | Intelligent lamp pole centralized dispatching method | |
CN106304580A (en) | A kind of Landscape Lighting remote intelligent control system | |
CN111918439A (en) | Intelligent street lamp management system and method | |
CN103096568A (en) | Intelligent networking street lamp illumination management system | |
CN116580573A (en) | Intelligent traffic guidance system for cross construction of multiple working surfaces of tunnel | |
CN109067831A (en) | A kind of monitoring method for road lamps, device, server, system and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180719 Address after: 518000, 3 floor of No. 2 factory, crane Chau Industrial Park, crane community, Baoan District City, Shenzhen, Guangdong. Applicant after: Shenzhen Lei Fei Lighting Technology Co., Ltd. Address before: 518000 Jinshan Pavilion, Hai Hui building, Nanshan District, Guangdong Province, Shenzhen, Guangdong, 7D Applicant before: SHENZHEN LEIMAI LIGHTING TECHNOLOGY CO., LTD. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |