CN107893381A - A kind of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform - Google Patents

A kind of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform Download PDF

Info

Publication number
CN107893381A
CN107893381A CN201711244049.1A CN201711244049A CN107893381A CN 107893381 A CN107893381 A CN 107893381A CN 201711244049 A CN201711244049 A CN 201711244049A CN 107893381 A CN107893381 A CN 107893381A
Authority
CN
China
Prior art keywords
platform
vertical shift
girder
hanging basket
bed die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711244049.1A
Other languages
Chinese (zh)
Inventor
夏敦宁
张加阳
陈亮
易旺
杨慧鹏
曹鹏
巩晓雷
王思宇
童金平
刘万伟
张锐
于洋
汤俊聪
冯永正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing City Public Engineering Construction Center
China Railway Major Bridge Engineering Group Co Ltd MBEC
2nd Engineering Co Ltd of MBEC
Original Assignee
Nanjing City Public Engineering Construction Center
China Railway Major Bridge Engineering Group Co Ltd MBEC
2nd Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing City Public Engineering Construction Center, China Railway Major Bridge Engineering Group Co Ltd MBEC, 2nd Engineering Co Ltd of MBEC filed Critical Nanjing City Public Engineering Construction Center
Priority to CN201711244049.1A priority Critical patent/CN107893381A/en
Publication of CN107893381A publication Critical patent/CN107893381A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of double width cantilever casting beam Hanging Basket bed die system vertically and horizontally to slide wheel platform, and its structure includes 2 vertical shift platform structure , Transverse and moves girder, 2 bottom platforms;Wherein 2 vertical shift platform structures are parallel to each other on two construction bridge floors, and each vertical shift platform structure is provided with 1 bottom platform , Transverse and moves girder located at the top of 2 vertical shift platform structures.Advantage:1)The security risk that Hanging Basket depends on main truss traveling is evaded, has facilitated falling for left and right width bridge Hanging Basket and removed with later stage Hanging Basket;2)Simple for structure, easy to operation, speed of application is fast.3)Cost is low, fast and convenient, securely and reliably, little for span, and especially double width cantilever casting beam construction has larger promotional value.

Description

A kind of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform
Technical field
The present invention relates to a kind of double width cantilever casting beam Hanging Basket bed die system vertically and horizontally to slide wheel platform, belongs to bridge and applies Work technical field.
Background technology
In existing double width cantilever casting beam cradle construction, Hanging Basket bed die system typically depends on platform, buoyancy tank or pontoon etc. Complete to fall to use between assembled, lifting, whereabouts and left and right width bridge, depend on synchronization or split movement before and after main truss is completed.For width Larger box beam is spent, depends on main truss cradle traveling, it is necessary to the larger rear sill of rigidity, causes Hanging Basket from great;Rely on buoyancy tank Or falling with, it is necessary to compared with strong power equipment and complicated safety precautions between the nearly left and right width of pontoon, cost input is big, and construction is numerous It is trivial.
The content of the invention
A kind of double width cantilever casting beam Hanging Basket bed die system proposed by the present invention vertically and horizontally slides wheel platform, is using assembled Bailey beam group is stress main truss, and laying type steel tie and rail, are erected on steel-pipe pile distribution beam or platform thereon.The platform collection The assembly of Hanging Basket bottom die platform system, lifting, whereabouts, the longitudinal direction traveling of single width bridge, beam bottom automatic spray curing system sliding platform, a left side Right width bridge falls with six functions of platform in the slideway platform of one, is there is double width cantilever casting beam construction safety, quality and environmental protection Effect control.
The technical solution of the present invention:A kind of double width cantilever casting beam Hanging Basket bed die system vertically and horizontally slides wheel platform, its Structure includes 2 vertical shift platform structure , Transverse and moves 2,2 bottom platforms 6 of girder;Wherein 2 vertical shift platform structures, which are parallel to each other, is located at On two construction bridge floors, each vertical shift platform structure is provided with the 1 , Transverse of bottom platform 6 shifting girder 2 and is located at 2 vertical shift platform structures Top.
Its installation method, comprises the following steps:
(1)Vertical shift girder 1 is installed in the distribution beam 4 and branch trestle 5 outside platform pile tube 3, horizontal-associate is installed between vertical shift girder 1 8 are reinforced;
(2)The steel rail laying 7 on vertical shift girder 1, assembled bottom platform 6, start the construction of cantilever beam section;
(3)Bottom platform 6 is transferred to vertical shift girder 1, main truss cradle reach, after bottom platform 6 moves forward in place, bottom platform 6 is lifted, applies The next block of work;
(4)After the completion of the construction of single width cantilever casting beam, bottom platform 6 is transferred to vertical shift girder 1, Tong Guo Transverse and moves 2 horizontal integrally dragging of girder, Mobile platform Bailey beam main truss, platform and bed die system are laterally moved to another width bridge, repeat the above steps construction.
Advantages of the present invention:1)Evade the security risk that Hanging Basket depends on main truss traveling, facilitate left and right width bridge Hanging Basket Fall with and later stage Hanging Basket remove;
2)Simple for structure, easy to operation, speed of application is fast.
3)Cost is low, fast and convenient, securely and reliably, little for span, and especially double width cantilever casting beam construction has larger push away Wide value.
Brief description of the drawings
Accompanying drawing 1 is double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform structural representation.
Accompanying drawing 2 is double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform 1-1 profiles.
Accompanying drawing 3-1,3-2,3-3 are the signals of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform construction procedure Figure.
1 in figure it is vertical shift girder, 2 be traversing girder, 3 be platform pile tube, 4 be distribution beam, 5 be branch trestle, 6 is that bottom is put down Platform, 7 be rail, 8 be horizontal-associate.
Embodiment
Accompanying drawing 1 is compareed, a kind of double width cantilever casting beam Hanging Basket bed die system vertically and horizontally slides wheel platform, and its structure includes 2 Vertical shift platform structure , Transverse move 2,2 bottom platforms 6 of girder;Wherein 2 vertical shift platform structures are parallel to each other located at two construction bridge floors On, each vertical shift platform structure is provided with 1 , Transverse of bottom platform 6 and moves girder 2 located at the top of 2 vertical shift platform structures.
Compare accompanying drawing 2, described vertical shift platform structure include vertical shift girder 1, platform pile tube 3, distribution beam 4, branch trestle 5, Rail 7, horizontal-associate 8;Wherein 1 pair of vertical shift girder 1 is disposed in parallel relation to one another, the left end connection distribution beam 4 of vertical shift girder 1, vertical shift girder 1 Right-hand member connection branch trestle 5;Some horizontal-associates 8 are connected between 1 pair of vertical shift girder 1, the upper surface of vertical shift girder 1 is provided with rail 7;Point Inside with beam 4 is provided with platform pile tube 3.
Double width cantilever casting beam Hanging Basket bed die system vertically and horizontally slides the installation method of wheel platform, comprises the following steps:
(1)Vertical shift girder 1 is installed in the distribution beam 4 and branch trestle 5 outside platform pile tube 3, horizontal-associate is installed between vertical shift girder 1 8 are reinforced;
(2)The steel rail laying 7 on vertical shift girder 1, assembled bottom platform 6, start the construction of cantilever beam section;
(3)Bottom platform 6 is transferred to vertical shift girder 1, main truss cradle reach, after bottom platform 6 moves forward in place, bottom platform 6 is lifted, applies The next block of work;
(4)After the completion of the construction of single width cantilever casting beam, bottom platform 6 is transferred to vertical shift girder 1, and vertical shift girder 1 and bottom die platform is interim Locking, Tong Guo Transverse move 2 horizontal integrally dragging of girder, mobile platform Bailey beam main truss, platform and bed die system are laterally moved to another Width bridge, repeat the above steps construction.

Claims (3)

1. a kind of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform, it is characterized in that including 2 vertical shift platform structures, Transverse moves girder, 2 bottom platforms;Wherein 2 vertical shift platform structures are parallel to each other on two construction bridge floors, each vertical shift platform Structure is provided with 1 bottom platform , Transverse and moves girder located at the top of 2 vertical shift platform structures.
2. double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform according to claim 1, it is characterized in that described Vertical shift platform structure include vertical shift girder, platform pile tube, distribution beam, branch trestle, rail, horizontal-associate;Wherein 1 pair of vertical shift girder is mutual Parallel setting, the left end connection distribution beam of vertical shift girder, the right-hand member connection branch trestle of vertical shift girder;Between 1 pair of vertical shift girder Some horizontal-associates are connected, the upper surface of vertical shift girder is provided with rail;The inside of distribution beam is provided with platform pile tube.
3. the installation method of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform as claimed in claim 1, it is special Sign is to comprise the following steps:
(1)Vertical shift girder is installed, installing horizontal-associate between vertical shift girder is carried out in the distribution beam and branch trestle outside platform pile tube Reinforce;
(2)The steel rail laying on vertical shift girder, assembled bottom platform, start the construction of cantilever beam section;
(3)Bottom platform is transferred to vertical shift girder, main truss cradle reach, after the reach in place of bottom platform, bottom platform is lifted, under construction One block;
(4)After the completion of the construction of single width cantilever casting beam, bottom platform is transferred to vertical shift girder, Tong Guo Transverse and moves girder transverse direction integrally dragging, is moved Moving platform Bailey beam main truss, platform and bed die system are laterally moved to another width bridge, ibid step is constructed.
CN201711244049.1A 2017-11-30 2017-11-30 A kind of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform Pending CN107893381A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711244049.1A CN107893381A (en) 2017-11-30 2017-11-30 A kind of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711244049.1A CN107893381A (en) 2017-11-30 2017-11-30 A kind of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform

Publications (1)

Publication Number Publication Date
CN107893381A true CN107893381A (en) 2018-04-10

Family

ID=61806535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711244049.1A Pending CN107893381A (en) 2017-11-30 2017-11-30 A kind of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform

Country Status (1)

Country Link
CN (1) CN107893381A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056534A (en) * 2018-07-19 2018-12-21 中铁大桥局第九工程有限公司 A kind of movable type bored pile construction platform and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1390732A (en) * 2001-06-12 2003-01-15 毛勒·索尼公司 Supporting system and support
CN2767494Y (en) * 2004-11-29 2006-03-29 北京万桥兴业机械有限公司 Conveying and erecting integrated bridge girder erection equipment
CN101177933A (en) * 2007-11-28 2008-05-14 贵州省桥梁工程总公司 Bridge rib hoisting and supporting rack integral construction method and device
CN203188126U (en) * 2013-04-18 2013-09-11 中国建筑土木建设有限公司路桥分公司 Rail-type bridge floor concrete-paving material-distributing machine
CN204224995U (en) * 2014-09-24 2015-03-25 中铁六局集团有限公司 Fortune frame railway D beam one chassis
CN105735141A (en) * 2016-05-05 2016-07-06 中铁上海工程局集团有限公司 Gliding device with box beam side template and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1390732A (en) * 2001-06-12 2003-01-15 毛勒·索尼公司 Supporting system and support
CN2767494Y (en) * 2004-11-29 2006-03-29 北京万桥兴业机械有限公司 Conveying and erecting integrated bridge girder erection equipment
CN101177933A (en) * 2007-11-28 2008-05-14 贵州省桥梁工程总公司 Bridge rib hoisting and supporting rack integral construction method and device
CN203188126U (en) * 2013-04-18 2013-09-11 中国建筑土木建设有限公司路桥分公司 Rail-type bridge floor concrete-paving material-distributing machine
CN204224995U (en) * 2014-09-24 2015-03-25 中铁六局集团有限公司 Fortune frame railway D beam one chassis
CN105735141A (en) * 2016-05-05 2016-07-06 中铁上海工程局集团有限公司 Gliding device with box beam side template and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中铁大桥局二公司: ""集团公司效能监察检查组到平潭A9项目开展项目成本管理效能监察检查指导工作",中铁大桥局二公司微信公众号,中铁大桥局二公司" *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056534A (en) * 2018-07-19 2018-12-21 中铁大桥局第九工程有限公司 A kind of movable type bored pile construction platform and method
CN109056534B (en) * 2018-07-19 2021-07-20 中铁大桥局第九工程有限公司 Movable cast-in-situ bored pile construction platform and method

Similar Documents

Publication Publication Date Title
CN102182147B (en) Steel box girder erection method
CN100476076C (en) Mobile integral construction platform, construction method thereof and special sling for the same
CN204266134U (en) Heavy duty longspan steel truss girder walking type pushing device
CN202039858U (en) Automatically-folded multifunctional tunnel construction scaffolding
CN103194977B (en) Integration of transporting and building formula Bridge Erector sets up first hole case beam front launching nose machine installation method
CN101831888A (en) 1200 tonner water conservancy aqueduct transportation and erection equipment
CN106087768B (en) A kind of method of the assembled mobile formwork in the narrow short transition time section of bridge tunnel
CN107761582A (en) The sliding hanging method and sliding auxiliary hoisting device of restricted clearance installation steel box-girder
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN109778713A (en) A kind of steel truss girder bridge scene suspension and slipping assembly device and method
CN102134832A (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN103924528A (en) Overall long-distance pushing slippage construction method for large-span bridge box girder structure of large-span bridge
CN105970822B (en) 50m double-width upward moving type movable formwork and corresponding beam manufacturing construction method thereof
CN103866699A (en) Rail-free type walking hanging basket
CN107893381A (en) A kind of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform
CN203419675U (en) Traveling track for girder crane
CN106192761B (en) A kind of method for disassembling mobile formwork in the narrow short transition time section of bridge tunnel
CN205874987U (en) Simply put up bridge crane
CN207944360U (en) A kind of double width cantilever casting beam Hanging Basket bed die system longitudinal and lateral movement wheel platform
CN105421246A (en) Installation method of towing cable hanging baskets
CN204059202U (en) A kind of case beam transverse-moving mechanism
CN104164838A (en) Light combined type beam moving trolley
CN203613465U (en) Inner side move support disassembling device used after joining of coastal area separated-type bridges
CN103194978B (en) Erecting method for last three-span box girders in railway bridging
CN204224995U (en) Fortune frame railway D beam one chassis

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180410

RJ01 Rejection of invention patent application after publication