CN107886210A - A kind of modularization automatic generation method of grid equipment account - Google Patents
A kind of modularization automatic generation method of grid equipment account Download PDFInfo
- Publication number
- CN107886210A CN107886210A CN201710587052.7A CN201710587052A CN107886210A CN 107886210 A CN107886210 A CN 107886210A CN 201710587052 A CN201710587052 A CN 201710587052A CN 107886210 A CN107886210 A CN 107886210A
- Authority
- CN
- China
- Prior art keywords
- account
- template
- voltage class
- region
- generation method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
The present invention is a kind of modularization automatic generation method of grid equipment account.Include following process:1)Transformer station's typical structure, the mode of connection and substation structure relation are analyzed, is established according to analysis result and equipment account standard criterion and solidifies " transformer station's general frame template, main transformer region template, 500kV voltage class area template, 220kV voltage class area template, 110kV voltage class area template, 35kV voltage class area template, public utility region template " template;2)Substation structure is divided into three parts, main transformer region, voltage class region and public utility region, using wizard-like, is divided into four steps and automatically generates account structure;3)The page of account, increase generation normal structure function can be increased or change newly in electronic transfer sheet, account Request for Change etc., and generation normal structure function should generate from wall.The present invention avoids account construction error, lifts account efficiency of inputting and accuracy, has ensured power grid enterprises' safety in production.
Description
Technical field
The present invention relates to a kind of modularization automatic generation method of grid equipment account, particularly one kind, belong to power network and set
The modularization automatic generation method innovative technology of standby account.
Background technology
Power grid enterprises' items production business is carried out on its information system at present, and grid equipment account is consistent
Property, integrality and accuracy be basis that every business is carried out, the equipment account quality of data will determine that power grid enterprises are every raw
Whether industry business normally can effectively be carried out, if the equipment account quality of data is low will to give power grid enterprises' work in every circulation efficiency
And safety in production brings very big negative effect.According to statistics, all kinds of production equipment total values of grid company account for power network total assets
More than 85%, as the foundation stone of enterprise operation, its account data quality becomes that power grid enterprises' safety in production is intelligent, lean
Change the basis of management.Current electric grid equipment account Data Enter is generally recorded by unit in charge of construction of bouw/infra according to construction drawing
Enter, and associated construction unit personnel is unfamiliar with account specification, drawing does not include account specification yet, and the typing of account needs to spend greatly
The time is measured, and the integrality of account typing, normalization, accuracy, uniformity can not be protected completely, have a strong impact on electricity
The quality of data of net equipment account, and follow-up account auditor and the huge workload of data quality management personnel are given, greatly
Waste of manpower, material resources.
The content of the invention
A kind of modularization side of automatically generating of grid equipment account is provided it is an object of the invention to consider above mentioned problem
Method, the present invention avoid account construction error, lift account efficiency of inputting and accuracy, so as to give power grid enterprises' items production business
Spread efficiency and bring significant increase, also ensure power grid enterprises' safety in production.
The technical scheme is that:The modularization automatic generation method of the grid equipment account of the present invention, including just like
Lower process:
1)Transformer station's typical structure, the mode of connection and substation structure relation are analyzed, according to analysis result and table of equipment
Account standard criterion establish and solidify " transformer station's general frame template, main transformer region template, 500kV voltage class area template,
220kV voltage class area template, 110kV voltage class area template, 35kV voltage class area template, public utility region template "
Template;
2)Substation structure is divided into three parts, main transformer region, voltage class region and public utility region, using guide
Formula, it is divided into four steps and automatically generates account structure;
3)The page of account can be increased or change newly in electronic transfer sheet, account Request for Change etc., increase generates normal structure function,
Generation normal structure function should generate from wall.
Above-mentioned steps 1)Also set up 20/10kV voltage class area template.
The present invention develops a kind of modularization automatic generation method of grid equipment account, of the invention from grid equipment account
Structural generation is set about, and the whole process of account management is monitored, to ensure the integrality of grid equipment account typing, specification
Property, accuracy, uniformity.By taking transformer station as an example, this method passes through analytical equipment account structure, bus arrangement mode and structure
Relation automatically generates substation equipment account standard knots, avoids account construction error, lifts account efficiency of inputting and accuracy,
Significant increase is brought so as to spread efficiency to power grid enterprises' items production business, has also ensured power grid enterprises' safety in production.This hair
Bright is a kind of modularization automatic generation method of convenient and practical grid equipment account.
Brief description of the drawings
Fig. 1 is the schematic diagram of 500KV transformer stations account nodule of the present invention generation;
Fig. 2 is the schematic diagram of transformer station's general frame;
Fig. 3 is the schematic diagram of main transformer regional structure.
Embodiment
Embodiment:
The modularization automatic generation method of the grid equipment account of the present invention, by taking transformer station as an example, this method passes through analytical equipment
Account structure, bus arrangement mode and structural relation automatically generate substation equipment account normal structure, reduce account knot
The vertical more adjustment time of structure, avoids account construction error, so as to lift account efficiency of inputting and accuracy.Particular content is as follows:
1st, transformer station's typical structure, the mode of connection and substation structure relation are analyzed, tied according to analysis and table of equipment
Account standard criterion establish and solidify " transformer station's general frame template, main transformer region template, 500kV voltage class area template,
220kV voltage class area template, 110kV voltage class area template, 35kV voltage class area template, 20/10kV voltage class area
The templates such as template, public utility region template ".
2nd, substation structure is divided into three parts, main transformer region, voltage class region and public utility region, using to
Conduction, it is divided into four steps and automatically generates account structure.
3rd, it can increase or change the page of account, increase generation normal structure newly in electronic transfer sheet, account Request for Change etc.
Function, generation normal structure function be able to should generate from wall.
System is realized:The account typing page increases such as electronic transfer, equipment account Request for Change automatically generate account structure
Function, and increase newly in systems general frame, generation main transformer region, 500kV voltage class area, 220kV voltage class area,
110kV voltage class area, 35kV voltage class area, 20kV voltage class area, 10kV voltage class area, public utility region mould
Version, filled in automatically into raw account structure by masterplate.Such as 500KV transformer stations account nodule generation step is as follows:
The first step:Generate general frame, second step:Generate main transformer region, the 3rd step:Generate voltage class region, the 4th step:It is raw
Into public utility region,
The first step:Transformer station's general frame generation
Transformer station's general frame is mainly to determine transformer station's region division, is closed by analyzing different voltage class transformer stations with region
System, clearly requires the part of user's typing and system automatically generates part, and then forms area of transformer station by typing key parameter
Domain layer tree structure.
Table 1 is transformer station's general frame(The table carries out frame shaping for the transformer station of different voltage class, such as
500kV transformer stations, it includes main transformer region, 500kV voltage class region etc.)
Main transformer region | 500kV voltage class region | 220kV voltage class region | 110kV voltage class region | 35kV voltage class region | 20/10kV voltage class region | Public utility region | |
500kV transformer stations | Have | Have | Have | Nothing | Have | May have | Have |
220kV transformer stations | Have | Nothing | Have | Have | May have | Have | Have |
110kV transformer stations | Have | Nothing | Nothing | Have | May have | Have | Have |
35kV transformer stations | Have | Nothing | Nothing | Nothing | Have | May have | Have |
1. the region for indicating " having " in form, system automatically generate structure;
2. the region for indicating " may have " in form, only need to select " having " or "None", given birth to automatically if selecting " having " system
Into structure.
Second step:Main transformer regional structure generates
Main transformer region mainly includes main transformer and related secondary device, and main transformer interval is determined by determining main transformer number of units
Division, main transformer regional structure generation masterplate are as follows:
3rd step:Voltage class plot structure generates
Different voltage class areas, there is some difference for its structure, need to consider respectively, for different voltage class areas using different
Structural generation scheme(Realization includes 500kV voltage class area, 220kV voltage class area, 110kV voltage class area, 35kV voltages
The masterplate in the areas such as grade area, 20kV voltage class area, 10kV voltage class area).
500kV voltage class area masterplate is as follows:
4th step:Public utility regional structure generates
Public utility regional structure generation typing masterplate is as follows:
The present invention is applied to power grid enterprises' information system, can automatically generate culvert according to bus arrangement mode, architectural feature etc.
Lid whole station functional location, the account structure of production equipment, engineering staff's modeling efficiency can be improved energetically, improve grid equipment platform
Account technical parameter uniformity, integrality and accuracy.Production efficiency is improved to power grid enterprises, ensures power grid enterprises' account card thing
Uniformity etc. has significant increase effect.
The present invention is based on power grid enterprises' production information system, can be as one under system " equipment account management " module
Individual functional module, carry out the automated modular generation work of corresponding transformer station account structure.
(1)The present invention forms a kind of modularization automatic generation method of grid equipment account, by taking transformer station as an example, with reference to
Bus arrangement mode, architectural feature etc. generate the full station equipment account structure under each functional location of the transformer station, greatly
Improve modeling efficiency and quality of data accuracy;
(2)Grid equipment account data quality will be greatly improved in the implementation of the present invention, and then improves power grid enterprises' safe operation
And production efficiency.
Claims (7)
1. a kind of modularization automatic generation method of grid equipment account, it is characterised in that include following process:
1)Transformer station's typical structure, the mode of connection and substation structure relation are analyzed, according to analysis result and table of equipment
Account standard criterion establish and solidify " transformer station's general frame template, main transformer region template, 500kV voltage class area template,
220kV voltage class area template, 110kV voltage class area template, 35kV voltage class area template, public utility region template "
Template;
2)Substation structure is divided into three parts, main transformer region, voltage class region and public utility region, using guide
Formula, it is divided into four steps and automatically generates account structure;
3)The page of account can be increased or change newly in electronic transfer sheet, account Request for Change etc., increase generates normal structure function,
Generation normal structure function should generate from wall.
2. the modularization automatic generation method of grid equipment account according to claim 1, it is characterised in that above-mentioned steps
1)Also set up 20/10kV voltage class area template.
3. the modularization automatic generation method of grid equipment account according to claim 1, it is characterised in that above-mentioned steps
2)Wizard-like is that mode is that system can generate account structure by step automatically according to transformer station's actual conditions.
4. the modularization automatic generation method of grid equipment account according to claim 3, it is characterised in that above-mentioned power transformation
Actual conditions of standing include disengaging number of lines, voltage class, the mode of connection, comprise the concrete steps that:Input transformer station disengaging number of lines,
Voltage class, mode of connection key parameter, automatically generate each region template.
5. the modularization automatic generation method of the grid equipment account according to any one of Claims 1-4, it is characterised in that
Above-mentioned steps 3)Generation normal structure function should generate from wall.
6. the modularization automatic generation method of grid equipment account according to claim 5, it is characterised in that above-mentioned steps
3)From wall generation method be:Transformer station is divided into different intervals by functional area, according to transformer station's actual conditions, guide
Formula generates different spacer structure templates.
7. the modularization automatic generation method of grid equipment account according to claim 6, it is characterised in that above-mentioned interval
Include main transformer interval, bus interval.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710587052.7A CN107886210A (en) | 2017-07-18 | 2017-07-18 | A kind of modularization automatic generation method of grid equipment account |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710587052.7A CN107886210A (en) | 2017-07-18 | 2017-07-18 | A kind of modularization automatic generation method of grid equipment account |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107886210A true CN107886210A (en) | 2018-04-06 |
Family
ID=61780474
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710587052.7A Pending CN107886210A (en) | 2017-07-18 | 2017-07-18 | A kind of modularization automatic generation method of grid equipment account |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107886210A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109408495A (en) * | 2018-11-02 | 2019-03-01 | 北京亿友科技有限公司 | The automatically generating of communication engineering project account manages and display systems |
CN113451988A (en) * | 2021-06-02 | 2021-09-28 | 合占电力有限公司 | Modeling based on upgrading and transforming system equipment |
CN114840504A (en) * | 2022-03-16 | 2022-08-02 | 国网山东省电力公司泰安供电公司 | Transformer equipment standing book automatic generation method, equipment and medium based on image recognition |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104050541A (en) * | 2014-06-27 | 2014-09-17 | 国家电网公司 | Maintenance cycle management system for grid equipment |
CN104077727A (en) * | 2014-06-27 | 2014-10-01 | 中国能源建设集团广东省电力设计研究院 | Substation electric equipment machine account intelligent type-in method and system |
CN105303472A (en) * | 2015-12-02 | 2016-02-03 | 国家电网公司 | Low voltage machine account data processing system and method |
CN105912567A (en) * | 2016-03-25 | 2016-08-31 | 北京用尚科技股份有限公司 | Power equipment monitoring information point table automatic generation method |
-
2017
- 2017-07-18 CN CN201710587052.7A patent/CN107886210A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104050541A (en) * | 2014-06-27 | 2014-09-17 | 国家电网公司 | Maintenance cycle management system for grid equipment |
CN104077727A (en) * | 2014-06-27 | 2014-10-01 | 中国能源建设集团广东省电力设计研究院 | Substation electric equipment machine account intelligent type-in method and system |
CN105303472A (en) * | 2015-12-02 | 2016-02-03 | 国家电网公司 | Low voltage machine account data processing system and method |
CN105912567A (en) * | 2016-03-25 | 2016-08-31 | 北京用尚科技股份有限公司 | Power equipment monitoring information point table automatic generation method |
Non-Patent Citations (1)
Title |
---|
包毅: "电网设备智能建模全过程管控研究", 《贵州电力技术》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109408495A (en) * | 2018-11-02 | 2019-03-01 | 北京亿友科技有限公司 | The automatically generating of communication engineering project account manages and display systems |
CN113451988A (en) * | 2021-06-02 | 2021-09-28 | 合占电力有限公司 | Modeling based on upgrading and transforming system equipment |
CN113451988B (en) * | 2021-06-02 | 2022-05-27 | 合占电力有限公司 | Modeling method based on upgrading and modifying system equipment |
CN114840504A (en) * | 2022-03-16 | 2022-08-02 | 国网山东省电力公司泰安供电公司 | Transformer equipment standing book automatic generation method, equipment and medium based on image recognition |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106815373B (en) | Distribution network first-aid repair big data display method and system based on BI analysis | |
CN110378809A (en) | A kind of intelligent check method of supervisory control of substation information table information data | |
CN103279832B (en) | Substation project construction quality supervises analysis system | |
CN202167018U (en) | Power supply reliability data statistical treatment device suitable for power system | |
CN104573947A (en) | Comprehensive evaluation method for low-voltage transformer areas of regional intelligent distribution network | |
CN104463439A (en) | Highway engineering project managing system and method | |
CN107886210A (en) | A kind of modularization automatic generation method of grid equipment account | |
CN104933631A (en) | Power distribution network operation online analysis and evaluation system | |
CN103927693A (en) | Distribution network line loss management system | |
CN108345739A (en) | Recognize the method that CIME and SVG model file information realizations protection definite value on-line testing function obtains model | |
CN108448721A (en) | The method of electric system main station monitoring signal and standard signal Auto-matching | |
CN103093391A (en) | City power distribution network arranging method | |
CN104682560A (en) | Graphical verifying method for power distribution network model transaction | |
CN110427392A (en) | A kind of power distribution network grid-based management information system based on cloud platform | |
CN102799746B (en) | Power grid information checking method and system, and power grid planning auxiliary system | |
CN104123588A (en) | Comprehensive evaluation system and method of smart distribution grid | |
CN105225058A (en) | Petroleum chemical industry green technology appraisal procedure | |
CN112653194A (en) | New energy source limit consumption capacity evaluation method | |
CN109840646A (en) | Voltage monitoring method based on big data processing | |
CN110310048B (en) | Distribution network planning overall process evaluation method and device | |
CN103218758B (en) | Electric power communication device method for maintaining and system | |
CN202650332U (en) | Virtual simulation training system of distributed transformer substation based on province, prefecture and county level networks | |
CN105631552A (en) | Power distribution automation engineering economic benefit assessment method based on whole life cycle | |
Lühn et al. | Multi-criteria analysis of grid expansion concepts on the low voltage level | |
CN106451425B (en) | A kind of method for automatic modeling and device of micro-capacitance sensor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180406 |
|
WD01 | Invention patent application deemed withdrawn after publication |