CN107885755A - The control method and device of application resource information - Google Patents

The control method and device of application resource information Download PDF

Info

Publication number
CN107885755A
CN107885755A CN201610875903.3A CN201610875903A CN107885755A CN 107885755 A CN107885755 A CN 107885755A CN 201610875903 A CN201610875903 A CN 201610875903A CN 107885755 A CN107885755 A CN 107885755A
Authority
CN
China
Prior art keywords
resource information
target
information
application
resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610875903.3A
Other languages
Chinese (zh)
Other versions
CN107885755B (en
Inventor
徐身进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alibaba Group Holding Ltd
Original Assignee
Alibaba Group Holding Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alibaba Group Holding Ltd filed Critical Alibaba Group Holding Ltd
Priority to CN201610875903.3A priority Critical patent/CN107885755B/en
Publication of CN107885755A publication Critical patent/CN107885755A/en
Application granted granted Critical
Publication of CN107885755B publication Critical patent/CN107885755B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/95Retrieval from the web
    • G06F16/957Browsing optimisation, e.g. caching or content distillation
    • G06F16/9574Browsing optimisation, e.g. caching or content distillation of access to content, e.g. by caching
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/30Creation or generation of source code
    • G06F8/38Creation or generation of source code for implementing user interfaces
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/535Tracking the activity of the user

Abstract

The embodiment of the present application discloses the control method and device of application resource information, and this method can include:Read default resource information adjusting parameter and the loaded targets page;The adjusting parameter comprises at least the temporal information that the resource information of intended application in application server is adjusted, and adjustment gradient information;The target pages include the resource information management page for the intended application launched in the application server;By performing preset script, judge whether current time meets the time conditions for the carry out resource information adjustment that the temporal information determines, if satisfied, then positioning the target widget in the target pages;The target widget is used for the modification for controlling the resource information of intended application described in application server;Target resource information is determined, and preset operation is performed to the target widget, the resource information is revised as the target resource information.Pass through the embodiment of the present application, it is possible to increase the maintenance efficiency and quality of application resource information.

Description

The control method and device of application resource information
Technical field
The application is related to Mobile solution resource information management technical field, more particularly to the controlling party of application resource information Method and device.
Background technology
The equipment such as intelligentized portable terminal, smart mobile phone, tablet personal computer has obtained the popularization of large area, It is also more and more using the user of portable terminal.In these terminal devices, user can very easily install various The application software APP of function, using the application software APP installed in terminal device, internet information, and processing can be obtained Work transaction, carry out the activity of entertaining etc..In the prior art, the mode of Mobile solution is issued except can be in website to user There is provided installation kit download it is outer, main channel be by Mobile solution marketplace platform (hereinafter referred to as application server) to Family is promoted, i.e., after developer comes out Mobile solution software development, it will usually launch into each mobile application server, User can be interacted by application server client software with application server, to select the application needed for oneself, so It is installed to afterwards in the mobile terminal device of oneself.Application market such as current main flow includes, and predominantly iOS provides application software Apple application market, the Google Play application markets for providing application software for Android operation system terminal device etc. Deng, and the opening due to android system, many terminal equipment manufacturers are developed respectively based on primary android system Operating system derived from kind, and exploitation and maintenance have respective application server.
The various applications provided in the application server, free application and charge are can be largely classified into according to charge method Using two kinds, for downloading the toll collection applications used with compensation, it downloads cost of use generally by the exploitation network operator of Mobile solution It is determined that network operator will apply launch arrive application server when, can be to be bid, after user is according to the bid payment expense It can be installed and used with being downloaded.With the popularization of mobile terminal device, the download usage amount of various application software is typically It is very huge, and certain rule is generally presented in the download usage amount of application software with the time, for example, in units of day Measurement period in, generally exist and download peak period and low ebb phase, in the different periods, the gap of download may compare Substantially.For the above situation, the purpose of some Mobile solution operators are for balanced day part download, can take on appropriate The payment bid of peak period is adjusted, lowers the measures such as the payment bid of low-valley interval.And when taking this regulating measures, just produce The demand for the resource information that application has been launched in modification application server is given birth to.In actual applications, specific payment bid is logical Often with the linear characteristic in having time, this requires to usually require repeatedly adjustment payment bid step by step in the period is adjusted, with logical Finer adjustment is crossed to meet this property requirements.
In the prior art, it is necessary to complete the process of above-mentioned price adjustment by artificial mode, for example, needing to apply certain , it is necessary to enter in the back-stage management page of the application server when bid in server is adjusted, bid modification is carried out Operation, then re-start using dispensing.Especially if network operator launches multiple applications simultaneously, or it will apply and launch to multiple Application server, then carry out bid adjustment when, the big manual operation of the amount of progress and also process it is cumbersome, time precision and price body System is difficult to accomplish accurately to safeguard, has a strong impact on the maintenance quality of application resource information.
The content of the invention
This application provides the control method and device of application resource information, it is possible to increase the maintenance effect of application resource information Rate and quality.
This application provides following scheme:
A kind of control method of application resource information, including:
Resource adjustment server reads default resource information adjusting parameter and the loaded targets page;The adjusting parameter is extremely It is few to include being used for launching the temporal information being adjusted to the resource information of the intended application in application server, and adjustment ladder Spend information;It is the resource information management page that the intended application launched provides that the target pages, which include the application server, Face;
By performing preset script, judge whether current time meets the carry out resource information tune that the temporal information determines Whole time conditions, if satisfied, then positioning the target widget in the target pages;The target widget is used to control application clothes The modification for the resource information of intended application described in device of being engaged in;
Target resource information is determined, and preset operation is performed to the target widget, by repairing for the resource information It is changed to the target resource information.
A kind of control method of application resource information, including:
Resource adjustment client receives the resource adjusting parameter for intended application typing, and the intended application corresponds to Target pages, wherein, the adjusting parameter comprise at least be used for launch to the intended application in application server resource The temporal information that information is adjusted, and adjustment gradient information;The target pages include the application server to have launched Intended application provide the resource information management page;
By the adjusting parameter, and target pages information corresponding to the intended application is submitted to resource adjustment service Device, it is pre- by performing so that resource adjustment server reads default resource information adjusting parameter and the loaded targets page Script is put, judges whether current time meets the time conditions for the carry out resource information adjustment that the temporal information determines, if full Foot, then position the target widget in the target pages;The target widget is used to control target described in application server should The modification of resource information, target resource information is determined, and preset operation is performed to the target widget, by the money Source information is revised as the target resource information.
A kind of control device of application resource information, server is adjusted applied to resource, including:
Reading unit, for reading default resource information adjusting parameter and the loaded targets page;The adjusting parameter is extremely It is few to include being used for launching the temporal information being adjusted to the resource information of the intended application in application server, and adjustment ladder Spend information;It is the resource information management page that the intended application launched provides that the target pages, which include the application server, Face;
Control positioning unit, for by performing preset script, judging whether current time meets that the temporal information is true The time conditions of fixed carry out resource information adjustment, if satisfied, then positioning the target widget in the target pages;The target Control is used for the modification for controlling the resource information of intended application described in application server;
Unit is changed, preset operation is performed for determining target resource information, and to the target widget, by described in Resource information is revised as the target resource information.
A kind of control device of application resource information, client is adjusted applied to resource, including:
Adjustment information receiving unit, for receiving the resource adjusting parameter for intended application typing, and the target Using corresponding target pages, wherein, the adjusting parameter, which comprises at least, to be used to answer launching to the target in application server The temporal information that resource information is adjusted, and adjustment gradient information;The target pages include the application server The resource information management page provided for the intended application launched;
Adjustment information submits unit, and for by the adjusting parameter, and target pages corresponding to the intended application are believed Breath is submitted to resource adjustment server, so that resource adjustment server reads default resource information adjusting parameter and loads Target pages, by performing preset script, judge whether current time meets the carry out resource information that the temporal information determines The time conditions of adjustment, if satisfied, then positioning the target widget in the target pages;The target widget, which is used to control, to be applied The modification of the resource information of intended application described in server, target resource information is determined, and the target widget is performed Preset operation, the resource information is revised as the target resource information.
The specific embodiment provided according to the application, this application discloses following technique effect:
By the embodiment of the present application, default resource information adjusting parameter and the loaded targets page can be read, is being met When carrying out the time conditions of resource information adjustment, by performing preset script, the target widget in target pages is positioned, to being marked Control performs preset operation, so as to which resource information is revised as into target resource information.It is achieved thereby that a kind of automation is answered With the control method of resource information in server, when the application launched in application server carries out resource information adjustment, nothing Manual intervention is needed, it is simple to operate, especially multi-platform, in the resource information maintenance task applied more, dimension can be significantly improved The time precision that nurse makees, ensure that the pricing system of application is stable.Simultaneously as this process employs script technology, based on pin Originally what is had is easy to maintain, the characteristic of using flexible so that this method is provided with good adaptability and flexibility.In addition, this Kind mode can ensure the accuracy of resource information modification, relative to manual operation, can reduce error probability.
Certainly, any product for implementing the application it is not absolutely required to reach all the above advantage simultaneously.
Brief description of the drawings
, below will be to institute in embodiment in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only some implementations of the application Example, for those of ordinary skill in the art, on the premise of not paying creative work, can also be obtained according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is the application scenarios Organization Chart that the embodiment of the present application provides;
Fig. 2 is the flow chart for the first method that the embodiment of the present application provides;
Fig. 3 is the flow chart for the second method that the embodiment of the present application provides;
Fig. 4 is the schematic diagram for the first device that the embodiment of the present application provides;
Fig. 5 is the schematic diagram for the second device that the embodiment of the present application provides.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present application, the technical scheme in the embodiment of the present application is carried out clear, complete Site preparation describes, it is clear that described embodiment is only some embodiments of the present application, rather than whole embodiments.It is based on Embodiment in the application, the every other embodiment that those of ordinary skill in the art are obtained, belong to the application protection Scope.
The embodiment of the present application provides the control method of application resource information, can apply to network operator and is being applied for it The management of the resource information for the application that server is launched, the resource information of frequently modification application especially is being needed, and pair with repairing When changing operation has higher time precision requirement, a kind of control method of automation can be provided, to reduce cost of labor, carried The control efficiency of high resource information, and improve accuracy and maintenance quality that resource information is safeguarded.When it is implemented, this method It can be realized by a variety of frameworks, for example, with reference to Fig. 1, corresponding resource can be provided to network operator and adjust instrument 11, such as run Resource in local adjusts tool software, the customization intended services that can also be provided by server, is provided to application network operator The control function of resource information or service etc..For example, in certain sales platform, resource adjustment instrument 11, can by Corresponding function is provided in certain integrative management platform to realize, the integrative management platform can melt automatization testing technique In multiple industries such as operation, full, it is possible to achieve turned based on regular, repeated operation of the user under destination OS Automation mechanized operation is melted into, for example commodity automation restocking, the automation of undercarriage, message are pushed, the automation of commodity effect is followed the trail of, The collection of information, the management of system resource, automation download pictures, automation P figures etc..In the embodiment of the present application, at this In the case of resource adjustment instrument 11 is provided in integrative management platform, you can instrument 11 is adjusted by the resource, can be right The resource information for the intended application launched in multiple application servers 12 carries out automatic management, that is, can provide in advance Parameter configuration is carried out in source adjustment instrument 11, and generates corresponding script, specifically when carrying out automatic management to resource information, Can be read by parameter, script perform etc. mode, realize the intended application launched in application server 12 resource letter Breath carries out automation modification, so as to realize that the resource information of " one-touch " adjusts, without taking excessive human resources again, and And this mode can ensure the accuracy of resource information modification, relative to manual operation, can reduce error probability.
Concrete implementation mode is described in detail below.
Embodiment one
Referring to Fig. 2, the flow chart of the control method of the application resource information provided for the embodiment of the present application, as shown in Fig. 2 This method may comprise steps of:
S201:Resource adjustment server reads default resource information adjusting parameter and the loaded targets page;The adjustment Parameter comprises at least the temporal information for being used for being adjusted to the resource information of dispensing to the intended application in application server, and Adjust gradient information;It is the resource information pipe that the intended application launched provides that the target pages, which include the application server, Manage the page;
Wherein, target pages can be the resource information management page for the intended application launched in concrete application server The information such as face, the address on the page, it can be pre-stored in resource information management instrument 11.An if intended application quilt Multiple application servers are launched, then can preserve the address of multiple target pages, and carry out corresponding page loading operation.
Configured and preserved on resource information adjusting parameter or in advance in resource adjusts instrument 11.Example Such as, it can be waited by operation personnel and the corresponding adjusting parameter of client typing is adjusted by resource, then be submitted to resource adjustment clothes Business device is preserved.Wherein, on same intended application, different resource informations can be used in different application servers Adjustment mode, can be daily 13 for example, in application server A:00 to 18:00, resource information is carried every 15 minutes Rise once, every time 0.2 yuan of lifting;And in application server B, can be daily 14:00 to 18:00, will every 20 minutes Resource information is lifted once, every time 0.2 yuan, etc. of lifting.In a word, specifically can be according under the user in each application server The data such as performance are carried to be configured accordingly.
When needing the resource information for having launched application of application server to be adjusted, can read first default The adjusting parameter of resource information.On the one hand adjusting parameter can operate the external condition performed to judge to adjust, for example, according to Adjusting parameter judges whether to meet time conditions of adjustment operation execution etc.;Other adjusting parameter can also provide adjustment operation institute The execution parameter needed, such as resource information adjustment numerical value etc..
The composition of adjusting parameter, can be real according to actual task and the demand flexible configuration of tool operation, such as in one kind Apply under mode, the time letter that the resource information that adjusting parameter can comprise at least intended application in application server is adjusted Breath, and adjustment gradient information.Temporal information in adjusting parameter, it can be used for realizing the time control of resource information regulation and control task System, in some resource information regulation and control tasks, temporal information can include the time point for being adjusted operation, i.e. temporal information is anti- What is reflected is in the corresponding adjustment operation of which time point execution;Or temporal information can include the initial time of adjustment operation And the end time.
And for some regulation and control tasks, the resource information being adjusted has regular linear characteristic in time, such as right To be bid this kind of resource information in payment, corresponding regulation and control task, which can be included in, to be downloaded peak period and progressively raises payment bid, And payment bid is gradually reduced downloading low-valley interval, specific regulation and control task is for example:
Task example one:15:00–20:00 this download peak period, perform the tune every 0.2 yuan of up-regulation in 15 minutes It is whole.
Task example two:00:00–05:00 this download low-valley interval, perform every 15 minutes tune for reducing by 0.2 yuan It is whole.
In this regulation and control task, the linearly characteristic of task can be controlled by adjusting parameter, and temporal information can be with Include in the initial time of adjustment operation, end time, and period from initial time to end time, operate every time Time interval etc..Adjusting parameter can also include adjustment gradient information, such as when this kind of resource information of bid is paid in adjustment, adjust Whole gradient information may include the adjustment increment of payment bid.
It is as shown in table 1 below for time parameter that in above-mentioned task example, adjusting parameter includes and adjustment gradient information:
Table 1
Initial time End time Operating time interval Adjust gradient information
15:00 20:00 15’ + 0.2 (member)
00:00 05:00 15’ - 0.2 (member)
Wherein, adjustment gradient information takes negative value to represent the amount for bidding to reduce of paying.Adjusting parameter can appoint according to actual Business application needs different acquisition patterns, such as can be obtained by the configuration for receiving user, by management tool or server Functional module automatically generates, application configuration template etc. mode.
Application server would generally provide the resource management page, interact medium as application server and network operator, lead to The interface crossed in the page can realize the resource information management operation for the intended application launched.In the embodiment of the present application, may be used With the automatic loaded targets page, i.e., the resource information management page for the intended application launched in loading application server.Specifically , loading page can be come with the address for the browser access target pages installed in calling system;If there is page in management tool Face loads function, and loading page is carried out in the address that target pages can also be opened directly in management tool.Target pages address can To there is a variety of different acquisition patterns, vertical figure target pages address can be included in adjusting parameter, when reading adjusting parameter It is automatic to read, can also be after user login management instrument, the intended application that is managed automatically according to the network operator of login obtains Target pages address corresponding to taking.
S202:By performing preset script, judge whether current time meets the carry out resource that the temporal information determines The time conditions of information adjustment, if satisfied, then positioning the target widget in the target pages;The target widget is used to control The modification of the resource information of intended application described in application server;
As it was previously stated, the regulation and control task of resource information usually needs to meet that specific time conditions can be just performed, such as Cited task example in step s 201.For this generic task, it is necessary to judge whether satisfaction one before adjustment operation is performed Fixed time conditions.And during for being adjusted similar to this kind of resource information of payment bid, resource information tune is being carried out every time Before whole, current time can be determined first, such as system time can be read as current time, so according to current time with And the temporal information in adjusting parameter, judge whether to meet the time conditions for carrying out resource information adjustment.
Include the initial time of adjustment operation in temporal information, end time, and from initial time to end time In period, during the information such as time interval operated every time, it can first determine whether current time is initial time, or whether For the time point in the period since initial time and using the time interval that this is specified as stepping, if being then judged as meeting The time conditions.Such as in task example one, according to temporal information can determine perform payment bid adjustment task when Between point include each time point as shown in table 2:
Table 2
Initial time The time point of stepping
15:00 15:15;15:30;15:45;……;19:45
The initial time shown in table two is reached every time in current time, or during the time point of stepping, it is possible to perform The modification of the resource information of intended application, that is, perform the adjustment every 0.2 yuan of up-regulation in 15 minutes.
Judge whether current time meets the time conditions for carrying out resource information adjustment, can be by performing preset script Carry out.Judge current time meet carry out resource information adjustment time conditions when, can by performing the preset script, Position the target widget in target pages.Preset script can be managed instrument and explain and perform, during execution, in advance The effect of target widget in positioning webpage can be played by putting script, wherein, target widget can be used for controlling in application server The modification of the resource information of intended application.
In the embodiment of the present application, preset script can use scripting language, have and realize flexibly, easy to maintenance, The features such as being seamlessly connected with operating system.Preset script can obtain in the following way, first can be by way of recording The handle of the target widget in target pages, and the control object using the handle of target widget as preset script are captured, so as to The control to target widget is realized, further, the cycle criterion of time conditions, adjustment ginseng can also be realized in preset script Number receives, and the function such as control to target widget., can be in target pages be captured under a kind of preferred embodiment Target widget handle, and the handle of target widget to grab adds preset label, and is generated according to preset label pre- Script is put, so, when by performing the target widget in preset script positioning target pages, it is possible to by performing preset pin This, according to label corresponding with target widget handle, the target widget in positioning and the control targe page, with more easily Realize the positioning to target widget and control operation.
S203:By performing the preset script, target resource information is determined, and the target widget is performed preset Operation, the target resource information is revised as by the resource information.
By performing preset script, judge that current time meets the time conditions of resource information adjustment, and located After target widget in target pages, target resource information can be determined, and target widget is held by performing preset script The preset operation of row, resource information is revised as target resource information to realize.
Wherein it is determined that target resource information can have a variety of implementations, for example, a kind of mode can be:Determine first Starting resource information, starting resource information can be the original of intended application in the application server before current regulation and control task starts Initial value.When preset script is run, the starting resource information in target pages can be read first and is stored in a variable, mesh Mark resource information can repeatedly add up on the basis of starting resource information and adjust gradient information acquisition.Another implementation It is, in each execution adjustment operation, to obtain Current resource information, Current resource information, it may be possible in the base of original value Adjusted value on plinth, thus only to being operated effectively when previous adjustment, can be by Current resource information plus adjustment gradient Information obtains target resource information.Such as the adjustment gradient information shown in table 1, include the direction being adjusted to resource information And amplitude, wherein numerical value represent the amplitude of adjustment, the positive and negative direction for representing adjustment, and it is determined that during target resource information, then may be used Direction that then can be according to adjustment gradient information to determine starting resource information or Current resource information and amplitude, are provided to starting Source information or Current resource information are increased or decreased, to determine target resource information.
Under a kind of embodiment, target widget can include being used for the input frame control for inputting target resource information, with And for submitting the submission operational controls of target resource information;It is determined that after target resource information, preset script can be passed through Further perform, input operation is performed to input frame control, target resource information is input to input frame control;Perform to submitting The operation of the preset type of operational controls, such as when it is a submitting button to submit operational controls, can perform to the button Clicking operation, to submit target resource information to application server, so as to complete the adjustment operation of this resource information.
In addition, for some tasks, the resource information of intended application can be revised as originating after regulation and control task terminates Resource information, such as above-mentioned task instances one, in current time more than 20:, can be by the payment of intended application when 00 Bid is revised as starting payment bid.At this point it is possible to starting resource information is determined first, when reaching the end time, by resource Information is revised as starting resource information.
The control method of resource information is described in detail in the application server provided above the embodiment of the present application, With it, default resource information adjusting parameter and the loaded targets page can be read, meeting to carry out resource information tune During whole time conditions, by performing preset script, the target widget in target pages is positioned, to the preset behaviour of mark control execution Make, so as to which resource information is revised as into target resource information.A kind of it is achieved thereby that resource in application server of automation The control method of information, when the application launched in application server carries out resource information adjustment, without manual intervention, operation Simply, especially multi-platform, in the resource information maintenance task applied more, the time essence of maintenance work can be significantly improved Degree, ensure that the pricing system of application is stable.Simultaneously as this process employs script technology, it is easy to tie up based on what script had Shield, the characteristic of using flexible so that this method is provided with good adaptability and flexibility.In addition, this mode can ensure The accuracy of resource information modification, relative to manual operation, can reduce error probability.
Embodiment two
The embodiment two is corresponding with embodiment one, is introduced from the angle of resource adjustment client, needs here It is noted that the user of resource adjustment client can be specifically operation personnel of intended application etc., that is to say, that operation people Member is after intended application is launched to application server, it may not be necessary to which manual entry should for the target into application server The resource information management page carries out resource adjustment, and only needs to adjust the specific adjusting parameter of client typing by resource Etc. information, so, resource adjustment server can adjust according to the resource that this parameter is automated.
Specifically, referring to Fig. 3, the embodiment two provides a kind of control method of application resource information, it is characterised in that Including:
S301:Resource adjustment client receives the resource adjusting parameter for intended application typing, and the target should With corresponding target pages, wherein, the adjusting parameter, which comprises at least, to be used for launching to the intended application in application server The temporal information that is adjusted of resource information, and adjustment gradient information;The target pages are including the application server The resource information management page that the intended application launched provides;
S302:By the adjusting parameter, and target pages information corresponding to the intended application is submitted to resource adjustment Server, so that resource adjustment server reads default resource information adjusting parameter and the loaded targets page, by holding Row preset script, judges whether current time meets the time conditions for the carry out resource information adjustment that the temporal information determines, If satisfied, then position the target widget in the target pages;The target widget is used to control mesh described in application server The modification of the resource information of application is marked, determines target resource information, and preset operation is performed to the target widget, by institute That states resource information is revised as the target resource information.
Because the embodiment two is corresponding with embodiment one, therefore, related specific implementation may refer to embodiment one In introduction, repeat no more here.
Corresponding with embodiment one, the embodiment of the present application additionally provides a kind of control device of application resource information, the dress Put applied to resource adjustment server, referring to Fig. 4, the device can specifically include:
Reading unit 401, for reading default resource information adjusting parameter and the loaded targets page;The adjusting parameter Including at least for launching the temporal information being adjusted to the resource information of the intended application in application server, and adjustment Gradient information;It is the resource information management page that the intended application launched provides that the target pages, which include the application server, Face;
Control positioning unit 402, for by performing preset script, judging whether current time meets the temporal information The time conditions of the carry out resource information adjustment of determination, if satisfied, then positioning the target widget in the target pages;The mesh Mark control is used for the modification for controlling the resource information of intended application described in application server;
Unit 403 is changed, preset operation is performed for determining target resource information, and to the target widget, will The resource information is revised as the target resource information.
During specific implementation, the device can also include:
Handle placement unit, for capturing the handle of the target widget in the target pages, and it is the target widget Handle add preset label, and the preset script is generated according to the preset label;
The control positioning unit is specifically used for:
By performing the preset script, according to the label corresponding with the target widget handle, described in positioning Target widget in target pages.
Wherein, the temporal information includes:Adjust the initial time of operation, the end time, and from the initial time Into the period of the end time, the time interval that operates every time;
The control positioning unit is specifically used for:
Judge whether current time is the initial time, or whether be that the period is interior since the initial time And the time point using the time interval as stepping, if so, being then judged to meeting the time conditions.
During specific implementation, the device can also include:
Starting resource information determination unit, for determining starting resource information;
Resource recovery unit, for when reaching the end time, the resource information to be revised as into the starting Resource information.
Wherein, the target widget includes:For inputting the input frame control of target resource information, and for submitting mesh Mark the submission operational controls of resource information;
The modification unit 403 is specifically used for:
Target resource information is determined, input operation is performed to the input frame control, the target resource information is inputted To the input frame control;
The operation of the preset type to the submission operational controls is performed, to submit the target resource information.
Wherein, the adjustment gradient information includes direction and the amplitude being adjusted to the resource information, the modification Unit 403 specifically can be also used for:
Determine starting resource information or Current resource information;
According to the direction and amplitude, the starting resource information or Current resource information are increased or decreased, with Determine the target resource information.
Corresponding with embodiment two, the embodiment of the present application additionally provides a kind of control device of application resource information, the dress Put applied to resource adjustment client, referring to Fig. 5, the device can include:
Adjustment information receiving unit 501, for receiving the resource adjusting parameter for intended application typing, and the mesh Target pages corresponding to mark application, wherein, the adjusting parameter, which comprises at least, to be used for launching to the target in application server The temporal information that the resource information of application is adjusted, and adjustment gradient information;The target pages include the application service Device is the resource information management page that the intended application launched provides;
Adjustment information submits unit 502, for by the adjusting parameter, and target pages corresponding to the intended application Information is submitted to resource adjustment server, so that resource adjustment server reads default resource information adjusting parameter and adds Target pages are carried, by performing preset script, judge whether current time meets the carry out resource letter that the temporal information determines The time conditions of adjustment are ceased, if satisfied, then positioning the target widget in the target pages;The target widget, which is used to control, answers The modification of the resource information of the intended application described in server, target resource information is determined, and the target widget is held The preset operation of row, the target resource information is revised as by the resource information.By the embodiment of the present application, can read Default resource information adjusting parameter and the loaded targets page, when meeting to carry out the time conditions of resource information adjustment, pass through Preset script is performed, positions the target widget in target pages, preset operation is performed to mark control, so that by resource information It is revised as target resource information.It is achieved thereby that in a kind of application server of automation resource information control method, right It is simple to operate without manual intervention when the application launched in application server carries out resource information adjustment, especially more flat Platform, in the resource information maintenance task applied more, the time precision of maintenance work can be significantly improved, ensures the price body of application System is stable.Simultaneously as this process employs script technology, had based on script easy to maintain, the characteristic of using flexible, made Obtain this method and be provided with good adaptability and flexibility.In addition, this mode can ensure the accuracy of resource information modification, Relative to manual operation, error probability can be reduced.
As seen through the above description of the embodiments, those skilled in the art can be understood that the application can Realized by the mode of software plus required general hardware platform.Based on such understanding, the technical scheme essence of the application On the part that is contributed in other words to prior art can be embodied in the form of software product, the computer software product It can be stored in storage medium, such as ROM/RAM, magnetic disc, CD, including some instructions are causing a computer equipment (can be personal computer, server, either network equipment etc.) performs some of each embodiment of the application or embodiment Method described in part.
Each embodiment in this specification is described by the way of progressive, identical similar portion between each embodiment Divide mutually referring to what each embodiment stressed is the difference with other embodiment.Especially for system or For system embodiment, because it is substantially similar to embodiment of the method, so describing fairly simple, related part is referring to method The part explanation of embodiment.System and system embodiment described above is only schematical, wherein the conduct The unit that separating component illustrates can be or may not be it is physically separate, can be as the part that unit is shown or Person may not be physical location, you can with positioned at a place, or can also be distributed on multiple NEs.Can root Factually border needs to select some or all of module therein realize the purpose of this embodiment scheme.Ordinary skill Personnel are without creative efforts, you can to understand and implement.
Above to the control method and device of application resource information provided herein, it is described in detail, herein In apply specific case the principle and embodiment of the application be set forth, the explanation of above example is only intended to help Assistant solves the present processes and its core concept;Meanwhile for those of ordinary skill in the art, the think of according to the application Think, in specific embodiments and applications there will be changes.In summary, this specification content should not be construed as pair The limitation of the application.

Claims (10)

  1. A kind of 1. control method of application resource information, it is characterised in that including:
    Resource adjustment server reads default resource information adjusting parameter and the loaded targets page;The adjusting parameter is at least wrapped Include for launching the temporal information being adjusted to the resource information of the intended application in application server, and adjustment gradient letter Breath;It is the resource information management page that the intended application launched provides that the target pages, which include the application server,;
    By performing preset script, judge whether current time meets the carry out resource information adjustment that the temporal information determines Time conditions, if satisfied, then positioning the target widget in the target pages;The target widget is used to control application server Described in intended application resource information modification;
    Target resource information is determined, and preset operation is performed to the target widget, by being revised as the resource information The target resource information.
  2. 2. according to the method for claim 1, it is characterised in that also include:
    The handle of the target widget in the target pages is captured, and preset label is added for the handle of the target widget, and The preset script is generated according to the preset label;
    Target widget in the positioning target pages, including:
    By performing the preset script, according to the label corresponding with the target widget handle, the target is positioned Target widget in the page.
  3. 3. according to the method for claim 1, it is characterised in that the temporal information includes:The initial time of operation is adjusted, End time, and from the initial time to the period of the end time in, the time interval that operates every time;
    It is described to judge whether current time meets the time conditions for the carry out resource information adjustment that the temporal information determines, bag Include:
    Judge whether current time is the initial time, or whether be in the period since the initial time and with The time interval is the time point of stepping, if so, being then judged to meeting the time conditions.
  4. 4. according to the method for claim 3, it is characterised in that also include:
    Determine starting resource information;
    When reaching the end time, the resource information is revised as the starting resource information.
  5. 5. according to the method for claim 1, it is characterised in that the target widget includes:For inputting target resource letter The input frame control of breath, and for submitting the submission operational controls of target resource information;
    The determination target resource information, and preset operation is performed to the target widget, by repairing for the resource information The target resource information is changed to, including:
    Target resource information is determined, input operation is performed to the input frame control, the target resource information is input to institute State input frame control;
    The operation of the preset type to the submission operational controls is performed, to submit the target resource information.
  6. 6. according to the method described in claim any one of 1-5, it is characterised in that the adjustment gradient information is included to the money The direction and amplitude that source information is adjusted, the determination target resource information, including:
    Determine starting resource information or Current resource information;
    According to the direction and amplitude, the starting resource information or Current resource information are increased or decreased, to determine The target resource information.
  7. A kind of 7. control method of application resource information, it is characterised in that including:
    Resource adjustment client receives the resource adjusting parameter for intended application typing, and mesh corresponding to the intended application The page is marked, wherein, the adjusting parameter, which comprises at least, to be used for launching the resource information to the intended application in application server The temporal information being adjusted, and adjustment gradient information;It is the mesh launched that the target pages, which include the application server, The resource information management page that mark application provides;
    By the adjusting parameter, and target pages information corresponding to the intended application is submitted to resource adjustment server, with Toilet states resource adjustment server and reads default resource information adjusting parameter and the loaded targets page, by performing preset pin This, judges whether current time meets the time conditions for the carry out resource information adjustment that the temporal information determines, if satisfied, then Position the target widget in the target pages;The target widget is used for the money for controlling intended application described in application server The modification of source information, target resource information is determined, and preset operation is performed to the target widget, by the resource information Be revised as the target resource information.
  8. A kind of 8. control device of application resource information, it is characterised in that server is adjusted applied to resource, including:
    Reading unit, for reading default resource information adjusting parameter and the loaded targets page;The adjusting parameter is at least wrapped Include for launching the temporal information being adjusted to the resource information of the intended application in application server, and adjustment gradient letter Breath;It is the resource information management page that the intended application launched provides that the target pages, which include the application server,;
    Control positioning unit, for by performing preset script, judging whether current time meets what the temporal information determined The time conditions of resource information adjustment are carried out, if satisfied, then positioning the target widget in the target pages;The target widget For the modification for the resource information for controlling intended application described in application server;
    Unit is changed, preset operation is performed for determining target resource information, and to the target widget, by the resource Information is revised as the target resource information.
  9. 9. device according to claim 8, it is characterised in that also include:
    Handle placement unit, for capturing the handle of the target widget in the target pages, and it is the sentence of the target widget Handle adds preset label, and generates the preset script according to the preset label;
    The control positioning unit is specifically used for:
    By performing the preset script, according to the label corresponding with the target widget handle, the target is positioned Target widget in the page.
  10. A kind of 10. control device of application resource information, it is characterised in that client is adjusted applied to resource, including:
    Adjustment information receiving unit, for receiving the resource adjusting parameter for intended application typing, and the intended application Corresponding target pages, wherein, the adjusting parameter, which comprises at least, to be used for launching to the intended application in application server The temporal information that resource information is adjusted, and adjustment gradient information;The target pages include the application server for The resource information management page that the intended application of dispensing provides;
    Adjustment information submits unit, and for by the adjusting parameter, and target pages information carries corresponding to the intended application Resource adjustment server is sent to, so that resource adjustment server reads default resource information adjusting parameter and loaded targets The page, by performing preset script, judge whether current time meets the carry out resource information adjustment that the temporal information determines Time conditions, if satisfied, then positioning the target widget in the target pages;The target widget is used to control application service The modification of the resource information of intended application described in device, target resource information is determined, and the target widget is performed preset Operation, the target resource information is revised as by the resource information.
CN201610875903.3A 2016-09-30 2016-09-30 Control method and device of application resource information Active CN107885755B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610875903.3A CN107885755B (en) 2016-09-30 2016-09-30 Control method and device of application resource information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610875903.3A CN107885755B (en) 2016-09-30 2016-09-30 Control method and device of application resource information

Publications (2)

Publication Number Publication Date
CN107885755A true CN107885755A (en) 2018-04-06
CN107885755B CN107885755B (en) 2021-10-22

Family

ID=61769759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610875903.3A Active CN107885755B (en) 2016-09-30 2016-09-30 Control method and device of application resource information

Country Status (1)

Country Link
CN (1) CN107885755B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110472177A (en) * 2019-07-12 2019-11-19 平安普惠企业管理有限公司 Page info method for uploading, system, computer equipment and storage medium
CN114130016A (en) * 2021-12-07 2022-03-04 腾讯科技(深圳)有限公司 Control resource management method and related device

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080301754A1 (en) * 2007-05-31 2008-12-04 Sanehiro Furuichi Management of Mandatory Access Control For Graphical User Interface Applications
CN102647462A (en) * 2012-03-29 2012-08-22 奇智软件(北京)有限公司 Application acquisition and sending method and device
CN103377064A (en) * 2012-04-28 2013-10-30 阿里巴巴集团控股有限公司 Page script loading method and page script loading device
CN103473117A (en) * 2013-09-18 2013-12-25 北京思特奇信息技术股份有限公司 Cloud-mode virtualization method
US8661131B1 (en) * 2009-06-26 2014-02-25 VMTurbo, Inc. Managing resources in virtualization systems
CN103634301A (en) * 2013-11-14 2014-03-12 新浪网技术(中国)有限公司 Client side and method for accessing private data stored in server by user
CN103902311A (en) * 2012-12-27 2014-07-02 中国电信股份有限公司 Method for adjusting application download lists, special recording client and application download platform
CN104123143A (en) * 2013-04-24 2014-10-29 鸿富锦精密工业(深圳)有限公司 User control loading system and method
CN104615448A (en) * 2013-11-05 2015-05-13 北大方正集团有限公司 Software channel packet update method, management method and equipment
US20150195747A1 (en) * 2000-07-14 2015-07-09 At&T Intellectual Property Ii, L.P. ADMISSION CONTROL FOR QoS-DRIVEN WIRELESS LANS
CN105407133A (en) * 2015-10-19 2016-03-16 珠海金山网络游戏科技有限公司 Method and system for mobile application automation release
CN105608145A (en) * 2015-12-17 2016-05-25 北京奇虎科技有限公司 Method and device for carrying out statistics on downloading amount of application software on the basis of downloading channel

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150195747A1 (en) * 2000-07-14 2015-07-09 At&T Intellectual Property Ii, L.P. ADMISSION CONTROL FOR QoS-DRIVEN WIRELESS LANS
US20080301754A1 (en) * 2007-05-31 2008-12-04 Sanehiro Furuichi Management of Mandatory Access Control For Graphical User Interface Applications
US8661131B1 (en) * 2009-06-26 2014-02-25 VMTurbo, Inc. Managing resources in virtualization systems
CN102647462A (en) * 2012-03-29 2012-08-22 奇智软件(北京)有限公司 Application acquisition and sending method and device
CN103377064A (en) * 2012-04-28 2013-10-30 阿里巴巴集团控股有限公司 Page script loading method and page script loading device
CN103902311A (en) * 2012-12-27 2014-07-02 中国电信股份有限公司 Method for adjusting application download lists, special recording client and application download platform
CN104123143A (en) * 2013-04-24 2014-10-29 鸿富锦精密工业(深圳)有限公司 User control loading system and method
CN103473117A (en) * 2013-09-18 2013-12-25 北京思特奇信息技术股份有限公司 Cloud-mode virtualization method
CN104615448A (en) * 2013-11-05 2015-05-13 北大方正集团有限公司 Software channel packet update method, management method and equipment
CN103634301A (en) * 2013-11-14 2014-03-12 新浪网技术(中国)有限公司 Client side and method for accessing private data stored in server by user
CN105407133A (en) * 2015-10-19 2016-03-16 珠海金山网络游戏科技有限公司 Method and system for mobile application automation release
CN105608145A (en) * 2015-12-17 2016-05-25 北京奇虎科技有限公司 Method and device for carrying out statistics on downloading amount of application software on the basis of downloading channel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
HE LIDUO 等: ""Design and implementation resource-oriented concurrency control based on J2EE multi-tier architecture,"", 《2010 THE 2ND INTERNATIONAL CONFERENCE ON COMPUTER AND AUTOMATION ENGINEERING 》 *
赵宏伟: ""基于改进粒子群算法的云计算资源调度模型的研究"", 《沈阳大学学报(自然科学版) 》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110472177A (en) * 2019-07-12 2019-11-19 平安普惠企业管理有限公司 Page info method for uploading, system, computer equipment and storage medium
CN114130016A (en) * 2021-12-07 2022-03-04 腾讯科技(深圳)有限公司 Control resource management method and related device
CN114130016B (en) * 2021-12-07 2023-07-14 腾讯科技(深圳)有限公司 Control resource management method and related device

Also Published As

Publication number Publication date
CN107885755B (en) 2021-10-22

Similar Documents

Publication Publication Date Title
US9959198B1 (en) Simulated testing of API
CN107133816A (en) A kind of e-book reading control method and device
CN112036577B (en) Method and device for applying machine learning based on data form and electronic equipment
KR20180020248A (en) Method and device for obtaining payment threshold
CN107896244A (en) A kind of distribution method of version file, client and server
CN107295607A (en) Method and apparatus for connecting WAP
CN109582556A (en) Test method, the device and system of a kind of application program in running of mobile terminal situation
CN110162464A (en) Mcok test method and system, electronic equipment and readable storage medium storing program for executing
CN108958711A (en) A kind of implementation method and device of interface platform
CN112711640A (en) Method and device for configuring business handling process
KR20180017211A (en) Method and system for modifying machine instructions in compiled software
CN110532559B (en) Rule processing method and device
CN109615384A (en) Generation method, device and the server of timeliness verification rule
US20210182767A1 (en) Scoring platform and engine for software engineering contributions
CN107885755A (en) The control method and device of application resource information
US20160034265A1 (en) Method for Bulk App Loading on Mobile Devices
CN109408092A (en) Method and device, storage medium and the electronic equipment of front end version publication
CN108279923A (en) Program tenant management method and system can be read and deposit medium
CN109062578B (en) Development platform based on APP modularization
WO2013054296A2 (en) Enterprise resource planning system
CN110795671A (en) Data filling method, computing device and storage medium
US10176062B2 (en) Cloud servers and methods for handling dysfunctional cloud services
CN110413421A (en) Business data processing method and device, transaction data processing method and device
CN106407109A (en) Automatic test method and device for realizing popularization information control
CN106886432A (en) A kind of variable parameter condition triggering method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1253260

Country of ref document: HK

GR01 Patent grant
GR01 Patent grant