CN107882329A - A kind of construction steel pipe travel(l)ing rest - Google Patents

A kind of construction steel pipe travel(l)ing rest Download PDF

Info

Publication number
CN107882329A
CN107882329A CN201711011817.9A CN201711011817A CN107882329A CN 107882329 A CN107882329 A CN 107882329A CN 201711011817 A CN201711011817 A CN 201711011817A CN 107882329 A CN107882329 A CN 107882329A
Authority
CN
China
Prior art keywords
arcuate movement
bars
easy
steel pipe
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711011817.9A
Other languages
Chinese (zh)
Other versions
CN107882329B (en
Inventor
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longyuan Mingzhu Science and Technology Co., Ltd.
Original Assignee
Zhengzhou Chenghe Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Chenghe Information Technology Co Ltd filed Critical Zhengzhou Chenghe Information Technology Co Ltd
Priority to CN201711011817.9A priority Critical patent/CN107882329B/en
Publication of CN107882329A publication Critical patent/CN107882329A/en
Application granted granted Critical
Publication of CN107882329B publication Critical patent/CN107882329B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/004Storage and transport racks for scaffolding components

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention provides a kind of construction steel pipe travel(l)ing rest, belong to the realm of building construction.Including main barred body;Circular cavity is provided among the main barred body;Two and half arcuate movement bars are socketed with inside the circular cavity and two and half arcuate movement bars are symmetrical set;Described two half arcuate movement bar lower ends are connected with two springs by arc;Both sides, which are tilted towards, on the outside of the half arcuate movement bar lower end is connected with two support bars;Described two support bars set main barred body lower surface through the first chute and the first chute;The half arcuate movement bar of the present invention is easy to do arcuate rotation in circular cavity;When two and half arcuate movement bars rotate down, half arcuate movement bar is easy to compression spring;Fixed block is easy to fix two springs;When two and half arcuate movement bars rotate downwards simultaneously, half arcuate movement bar drives two support bars to be rotated to centre, is easy to support bar to rise whole device;Support bar is easy to rotate in the first chute.

Description

A kind of construction steel pipe travel(l)ing rest
Technical field
The present invention relates to a kind of construction equipment, specifically a kind of construction steel pipe travel(l)ing rest.
Background technology
Construction industry is one of key pillars of the national economy industry at present, its development with whole national economy, people's people's livelihood Improvement living has close relationship, and China is in the transition stage developed from low income country to middle income country, Under the promotion that infrastructure construction and Process of Urbanization Construction dynamics continue to increase, Building Trade in China maintains good growth, Economic benefit is constantly improve, and the contribution to growth of the national economic is larger, in building trade as in this case, the missing of building implement A kind of really big short slab of building trade, it is reported that in building construction process, steel pipe needs support to go to handle steel pipe, therefore this Invention is designed with editor's steel pipe travel(l)ing rest.
The content of the invention
For above-mentioned the deficiencies in the prior art, the technical problem to be solved in the present invention is to provide a kind of the realm of building construction Construction steel pipe travel(l)ing rest.
In order to solve the above technical problems, the invention provides following technical scheme:
A kind of construction steel pipe travel(l)ing rest, including main barred body;Circular cavity is provided among the main barred body;The circle Shape cavity inside is socketed with two and half arcuate movement bars and two and half arcuate movement bars are symmetrical set;Described two half arcs Motion bar lower end is connected with two springs by arc;Both sides, which are tilted towards, on the outside of the half arcuate movement bar lower end is connected with two Individual support bar;Described two support bars set main barred body lower surface through the first chute and the first chute;Described two support bars Lower end is connected with two rubber pin by hinge vertically;Pass through two among described two half arcuate movement bar upper ends Hinge is connected with two control-rods vertically;Described two control-rods are arranged on main barred body upper table through the second chute and the second chute Face;Described two control-rod lower ends are provided with two and half curved splints and two and half curved splints are arranged on inside main barred body;Institute Half curved splint of right side is stated to be connected in half curved splint of left side;The curved splint lower end upper vertical of right side half is affixed There is sliding block;There is threaded rod by screw thread horizontal connection among described two half curved splints;Pass through between described two mobile bars Hinge horizontal connection has two thread bush;Described two thread bush by-levels are socketed with rotating bar.
As the further improvement project of the present invention:Described two spring by-levels are connected with fixed block and fixed block is consolidated It is connected on inside main barred body.
As further improvement project of the invention:Upper end is connected with the first rotation vertically among the threaded rod upper end Block.
As further improvement project of the invention:The curved splint lower end internal vertical of left side half is connected with gear Block.
As further improvement project of the invention:Rotating bar upper end center vertical is connected with the second moving block.
Compared with prior art, the beneficial effects of the invention are as follows:
The half arcuate movement bar of the present invention is easy to do arcuate rotation in circular cavity;When two and half arcuate movement bars rotate down When, half arcuate movement bar is easy to compression spring;Fixed block is easy to fix two springs;When two and half arcuate movement bars are simultaneously downward When side rotates, half arcuate movement bar drives two support bars to be rotated to centre, is easy to support bar to rise whole device;Support bar is just Rotated in the first chute;Rubber pin is easy to support two support bars;When two control-rods separate to both sides, control Bar is easy to drive two and half arcuate movement bars to rotate down, and when unclamping two control-rods, spring is easy to by half arcuate movement Bar pop-up control bar, is easy to control-rod to close;Control-rod is easy to slide in the second chute;Two and half curved splints are easy in master Two of fixed placement steel pipe, is easy to horizontal support steel pipe among barred body internal rotating and two and half curved splints;When right side half To during anticlockwise, two and half curved splints are easy to clamp middle steel pipe for curved splint lower end;Sliding block is easy to right side half arc folder Plate slides in the curved splint of left side half;Block is easy to block sliding block and avoids half curved splint of right side from departing from left side half arc folder Plate;When threaded rod is to during anticlockwise, threaded rod is easy to drive two and half curved splints to tighten up, when threaded rod is to during right rotation, spiral shell Rasp bar is easy to drive two and half curved splints to unclamp;First moving block is easy to drive threaded rod rotation;On described two control-rods End is connected with two mobile bars vertically, and when two mobile bars move laterally, two mobile bars are easy to drive two control-rods Move laterally;When individual thread bush is easy to drive two mobile bars to move left and right;When rotating bar is to during anticlockwise, rotating bar is easy to Two thread bush are driven to separate, when rotating bar is to during right rotation, rotating bar is easy to drive two thread bush closures;Second moving block It is easy to drive rotating bar rotation.
Brief description of the drawings
Fig. 1 is the structural representation of construction steel pipe travel(l)ing rest;
Fig. 2 is the structural representation that main barred body is overlooked in construction steel pipe travel(l)ing rest;
Fig. 3 is the structural representation of main barred body side view in construction steel pipe travel(l)ing rest;
In figure:The main barred bodies of 1-, 2- circular cavities, the arcuate movement bars of 3- half, the curved splints of 4- half, 5- threaded rods, 6- support bars, 7- Rubber pin, 8- springs, 9- fixed blocks, 10- control-rods, 11- mobile bars, the chutes of 12- second, 13- thread bush, 14- are rotated Bar, the moving blocks of 15- second, 16- sliding blocks, the chutes of 17- first, 18- blocks, the moving blocks of 19- first.
Embodiment
The technical scheme of this patent is described in more detail with reference to embodiment.
The embodiment of this patent is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached The embodiment of figure description is exemplary, is only used for explaining this patent, and it is not intended that limitation to this patent.
In the description of this patent, it is to be understood that term " " center ", " on ", " under ", "front", "rear", " left side ", The orientation or position relationship of the instruction such as " right side ", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are based on shown in the drawings Orientation or position relationship, are for only for ease of description this patent and simplify and describe, rather than instruction or imply signified device or Element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to this patent.
, it is necessary to illustrate in the description of this patent, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection ", " setting " should be interpreted broadly, for example, it may be being fixedly linked, setting or being detachably connected, set Put, or be integrally connected, set.For the ordinary skill in the art, it can understand that above-mentioned term exists with concrete condition Concrete meaning in this patent.
Fig. 1-3 are referred to, present embodiments provide a kind of construction steel pipe travel(l)ing rest, including main barred body 1;It is described Circular cavity 2 is provided among main barred body 1;Two and half arcuate movement bars 3 and two and half arcs are socketed with inside the circular cavity 2 Shape motion bar 3 is symmetrical set, and half arcuate movement bar 3 is easy to do arcuate rotation in circular cavity 2;Described two half arcs The lower end of motion bar 3 is connected with two springs 8 by arc, when two and half arcuate movement bars 3 rotate down, half arcuate movement bar 3 are easy to compression spring 8;Described two by-levels of spring 8 are connected with fixed block 9 and fixed block 9 is fixed in inside main barred body 1, Fixed block 9 is easy to fix two springs 8;Both sides, which are tilted towards, on the outside of the lower end of half arcuate movement bar 3 is connected with two supports Bar 6, when two and half arcuate movement bars 3 rotate downwards simultaneously, half arcuate movement bar 3 drives two support bars 6 to be revolved to centre Turn, be easy to support bar 6 to rise whole device;Described two support bars 6 set main rod through the first chute 17 and the first chute 17 The lower surface of body 1, support bar 6 are easy to rotate in the first chute 17;Described two lower ends of support bar 6 are connected vertically by hinge There are two rubber pin 7, rubber pin 7 is easy to support two support bars 6;Described two upper ends of half arcuate movement bar 3 Centre is connected with two control-rods 10 vertically by two hinges, and when two control-rods 10 separate to both sides, control-rod 10 is just In driving two and half arcuate movement bars 3 to rotate down, when unclamping two control-rods 10, spring 8 is easy to by half arcuate movement The pop-up control bar 10 of bar 3, is easy to control-rod 10 to close;Described two control-rods 10 are set through the second chute 12 and the second chute 12 Put in the main upper surface of barred body 1, control-rod 10 is easy to slide in the second chute 12;Described two lower ends of control-rod 10 are provided with two Individual half curved splint 4 and two and half curved splints 4 are arranged on inside main barred body 1, two and half curved splints 4 are easy in main barred body 1 Two of internal rotating and two and half curved splints, 4 middle fixed placement steel pipe, is easy to horizontal support steel pipe;The arc of right side half Clevis plate 4 is connected in half curved splint 4 of left side, and when the lower end of half curved splint of right side 4 is to during anticlockwise, two and half arcs press from both sides Plate 4 is easy to clamp middle steel pipe;The lower end upper vertical of half curved splint of right side 4 is connected with sliding block 16, and sliding block 16 is just Slided in the curved splint 4 of right side half in the curved splint 4 of left side half;The lower end internal vertical of half curved splint of left side 4 is affixed There is a block 18, block 18, which is easy to block sliding block 16, avoids half curved splint 4 of right side from departing from half curved splint 4 of left side;It is described two There is threaded rod 5 by screw thread horizontal connection among half curved splint 4, when threaded rod 5 is to during anticlockwise, threaded rod 5 is easy to drive Two and half curved splints 4 are tightened up, and when threaded rod 5 is to during right rotation, threaded rod 5 is easy to drive two and half curved splints 4 to unclamp;Institute State upper end among the upper end of threaded rod 5 and be connected with the first moving block 19 vertically, the first moving block 19 is easy to drive threaded rod 5 to rotate; Described two upper ends of control-rod 10 are connected with two mobile bars 11 vertically, when two mobile bars 11 move laterally, two shiftings Lever 11 is easy to drive two control-rods 10 to move laterally;Have two by hinge horizontal connection between described two mobile bars 11 Individual thread bush 13, when individual thread bush 13 is easy to drive two mobile bars 11 to move left and right;Described two by-levels of thread bush 13 Rotating bar 14 is socketed with, when rotating bar 14 is to during anticlockwise, rotating bar 14 is easy to drive two thread bush 13 to separate, and works as rotating bar 14 to during right rotation, and rotating bar 14 is easy to drive two thread bush 13 to close;The upper end center vertical of rotating bar 14 is connected with Second moving block 15, the second moving block 15 are easy to drive rotating bar 14 to rotate.
Specifically used mode:Whole device is moved to steel pipe process points first by person, then using two present apparatus, Between the both ends of steel pipe are injected into two and half curved splints 4, threaded rod 5 is then rotated by the first moving block 19, threaded rod 5 is just In driving two and half curved splints 4 to clamp steel pipe, then user drives rotating bar 14 to rotate by the second moving block 15, rotates Bar 14 drives two thread bush 13 outside, and then thread bush 13 drives two control-rods 10 to be rotated to both sides by mobile bar 11, Then half arcuate movement bar 3 of the drive of control-rod 10 left and right sides rotates down simultaneously and compression spring 8, spring 8 are easy to buffer, Then half arcuate movement bar 3 drives support bar 6 to gather to centre, is easy to jack up whole device, rubber pin 7 is easy to support Whole device and there is anti-skidding effect.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party Formula, can also be on the premise of this patent objective not be departed from one skilled in the relevant art's possessed knowledge Make a variety of changes.

Claims (5)

1. a kind of construction steel pipe travel(l)ing rest, including main barred body(1);It is characterized in that the main barred body(1)Centre is set There is circular cavity(2);The circular cavity(2)Inside is socketed with two and half arcuate movement bars(3)And two and half arcuate movement bar (3)It is symmetrical set;Described two half arcuate movement bars(3)Lower end is connected with two springs by arc(8);Half arc Shape motion bar(3)Both sides, which are tilted towards, on the outside of lower end is connected with two support bars(6);Described two support bars(6)Through first Chute(17)And first chute(17)Main barred body is set(1)Lower surface;Described two support bars(6)Lower end is vertical by hinge It is connected with two rubber pin(7);Described two half arcuate movement bars(3)Connected vertically by two hinges among upper end There are two control-rods(10);Described two control-rods(10)Through the second chute(12)And second chute(12)It is arranged on main barred body (1)Upper surface;Described two control-rods(10)Lower end is provided with two and half curved splints(4)And two and half curved splint(4)If Put in main barred body(1)It is internal;The curved splint of right side half(4)It is connected on half curved splint of left side(4)In;The right side half Curved splint(4)Lower end upper vertical is connected with sliding block(16);Described two half curved splints(4)It is middle horizontal by screw thread It is connected with threaded rod(5);Described two mobile bars(11)Between by hinge horizontal connection have two thread bush(13);Described two Individual thread bush(13)By-level is socketed with rotating bar(14).
2. construction according to claim 1 steel pipe travel(l)ing rest, it is characterized in that, described two springs(8)It is middle Level is connected with fixed block(9)And fixed block(9)It is fixed in main barred body(1)It is internal.
3. construction according to claim 1 steel pipe travel(l)ing rest, it is characterized in that, the threaded rod(5)In upper end Between upper end be connected with the first moving block vertically(19).
4. construction according to claim 1 steel pipe travel(l)ing rest, it is characterized in that, the curved splint of left side half (4)Lower end internal vertical is connected with block(18).
5. construction according to claim 1 steel pipe travel(l)ing rest, it is characterized in that, the rotating bar(14)In upper end Between be connected with the second moving block vertically(15).
CN201711011817.9A 2017-10-26 2017-10-26 A kind of construction steel pipe movable support Active CN107882329B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711011817.9A CN107882329B (en) 2017-10-26 2017-10-26 A kind of construction steel pipe movable support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711011817.9A CN107882329B (en) 2017-10-26 2017-10-26 A kind of construction steel pipe movable support

Publications (2)

Publication Number Publication Date
CN107882329A true CN107882329A (en) 2018-04-06
CN107882329B CN107882329B (en) 2019-11-08

Family

ID=61782370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711011817.9A Active CN107882329B (en) 2017-10-26 2017-10-26 A kind of construction steel pipe movable support

Country Status (1)

Country Link
CN (1) CN107882329B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748158A (en) * 2019-10-09 2020-02-04 石丽 Concrete formwork structure and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205298912U (en) * 2016-01-25 2016-06-08 六盘水师范学院 Larynx hoop that no spiral was restrainted
CN205331606U (en) * 2016-01-19 2016-06-22 乐清市华顿电子有限公司 Durable type clamp
CN205534614U (en) * 2016-01-27 2016-08-31 王丰 Oil pipeline shock attenuation mount
CN205852313U (en) * 2016-06-22 2017-01-04 中国建筑第七工程局有限公司 A kind of convenient steel tube fixing device
CN205867605U (en) * 2016-06-08 2017-01-11 张斌 Sports training is with striding hurdle with adjustable dismouting of being convenient for
CN206072533U (en) * 2016-10-12 2017-04-05 新煌集团湖南新煌石油设备制造有限公司 A kind of piping support structure for preventing pipeline from loosening
CN206458901U (en) * 2016-10-11 2017-09-01 河南大森机电股份有限公司 A kind of slidably high ferro suspension and support
CN107130788A (en) * 2017-04-19 2017-09-05 天长市华利机械实业有限公司 A kind of practical scaffold fixed mount

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205331606U (en) * 2016-01-19 2016-06-22 乐清市华顿电子有限公司 Durable type clamp
CN205298912U (en) * 2016-01-25 2016-06-08 六盘水师范学院 Larynx hoop that no spiral was restrainted
CN205534614U (en) * 2016-01-27 2016-08-31 王丰 Oil pipeline shock attenuation mount
CN205867605U (en) * 2016-06-08 2017-01-11 张斌 Sports training is with striding hurdle with adjustable dismouting of being convenient for
CN205852313U (en) * 2016-06-22 2017-01-04 中国建筑第七工程局有限公司 A kind of convenient steel tube fixing device
CN206458901U (en) * 2016-10-11 2017-09-01 河南大森机电股份有限公司 A kind of slidably high ferro suspension and support
CN206072533U (en) * 2016-10-12 2017-04-05 新煌集团湖南新煌石油设备制造有限公司 A kind of piping support structure for preventing pipeline from loosening
CN107130788A (en) * 2017-04-19 2017-09-05 天长市华利机械实业有限公司 A kind of practical scaffold fixed mount

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748158A (en) * 2019-10-09 2020-02-04 石丽 Concrete formwork structure and construction method
CN110748158B (en) * 2019-10-09 2021-09-21 石丽 Concrete formwork structure and construction method

Also Published As

Publication number Publication date
CN107882329B (en) 2019-11-08

Similar Documents

Publication Publication Date Title
CN206201201U (en) A kind of constructing road cement mortar Efficient Agitator
CN108993281B (en) A kind of microorganism multi-angle oscillation device
CN112158723A (en) A handling device for tubular pile
CN107882329A (en) A kind of construction steel pipe travel(l)ing rest
CN111301950A (en) Guide clamping and material guiding device for heavy type sleeper made of microcrystalline material
CN206030154U (en) Nonstandard cement component production facility
CN217703861U (en) Quick design mould of concrete
CN213008296U (en) Concrete material transporting device for construction
CN114644169A (en) A raw materials storage facilities for biological medicine production
CN210268228U (en) Be used for stabilizing charging devices for zirconia production
CN209144682U (en) A kind of construction thrustor of composite beam bridge
CN207466695U (en) A kind of construction Portable safety template transport vehicle
CN203360953U (en) Movable cast-in-place device for pouring ballastless track bed concrete
CN217869896U (en) Highway crack processing apparatus that highway engineering was used
CN211392221U (en) Quartz products processing is with conveyer that has protection architecture
CN117385135B (en) Pure iron vacuum refining device
CN213927109U (en) Road bridge construction reinforcing bar connecting device
CN109335281A (en) A kind of adjustable automobile-used LNG bottles of braced frame
CN217891404U (en) Concrete preparation batching feed mechanism
CN219686087U (en) Even pouring device of cinder for aerated concrete slab production
CN221274605U (en) Automatic lifting unloader convenient to installation
CN219519044U (en) Breaking device
CN217670076U (en) A slip casting device for jun porcelain production and processing
CN207511697U (en) It is a kind of can multi-angle rotation indoor small-sized crane
CN221872499U (en) Batching device for telegraph pole production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191015

Address after: 315812 Room 1514, No. 275 Xintuo Road, Daxie Development Zone, Ningbo City, Zhejiang Province

Applicant after: Longyuan Mingzhu Science and Technology Co., Ltd.

Address before: Ruida road 450000 high tech Industrial Development Zone, Henan city of Zhengzhou province No. 96 Business Center No. 1 building C260 room

Applicant before: Zhengzhou integrity Information Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant