CN107882105B - A kind of energy-saving water system for enterprise's office workshop - Google Patents

A kind of energy-saving water system for enterprise's office workshop Download PDF

Info

Publication number
CN107882105B
CN107882105B CN201711006641.8A CN201711006641A CN107882105B CN 107882105 B CN107882105 B CN 107882105B CN 201711006641 A CN201711006641 A CN 201711006641A CN 107882105 B CN107882105 B CN 107882105B
Authority
CN
China
Prior art keywords
water
pipe
valve
water inlet
inlet pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711006641.8A
Other languages
Chinese (zh)
Other versions
CN107882105A (en
Inventor
王正伟
孙中超
孙琳
褚东发
宋志刚
曹利红
梁白月
王虎一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tobacco Henan Industrial Co Ltd
Original Assignee
China Tobacco Henan Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tobacco Henan Industrial Co Ltd filed Critical China Tobacco Henan Industrial Co Ltd
Priority to CN201711006641.8A priority Critical patent/CN107882105B/en
Publication of CN107882105A publication Critical patent/CN107882105A/en
Application granted granted Critical
Publication of CN107882105B publication Critical patent/CN107882105B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply
    • E03B1/04Methods or layout of installations for water supply for domestic or like local supply
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply
    • E03B1/04Methods or layout of installations for water supply for domestic or like local supply
    • E03B1/041Greywater supply systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/04Domestic or like local pipe systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/07Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons or valves, in the pipe systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/07Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons or valves, in the pipe systems
    • E03B7/072Arrangement of flowmeters
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/07Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons or valves, in the pipe systems
    • E03B7/075Arrangement of devices for control of pressure or flow rate
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/07Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons or valves, in the pipe systems
    • E03B7/077Arrangement of backflow preventing devices
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply
    • E03B1/04Methods or layout of installations for water supply for domestic or like local supply
    • E03B1/041Greywater supply systems
    • E03B2001/045Greywater supply systems using household water

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Domestic Plumbing Installations (AREA)
  • Pipeline Systems (AREA)

Abstract

The invention discloses a kind of energy-saving water systems for enterprise's office workshop, including tank and along the main loop pipe of main loop road setting, the first water inlet pipe is successively arranged on main loop pipe, first valve, second water inlet pipe and the second valve, first water inlet pipe and the second water inlet pipe are connected with municipal water supplies, the first valve is successively equipped with along water inlet direction on the first water inlet pipe and the second water inlet pipe, first check-valve and flowmeter, fire hydrant is equipped at opposite position on main loop pipe, third water inlet pipe and the 4th water inlet pipe are equipped between tank and main loop pipe, the third water inlet pipe and the 4th water inlet pipe are located at the two sides of the first valve or the second valve, the second valve is successively equipped with along water inlet direction on third water inlet pipe and the 4th water inlet pipe, second check-valve;The maintenance of different sections is realized on main loop pipe, and does not influence in maintenance process the function that municipal water supplies are intake to tank 12.

Description

A kind of energy-saving water system for enterprise's office workshop
Technical field
It is the present invention relates to water system technical field, in particular to a kind of for the energy-saving for water system of enterprise's office workshop System.
Background technique
Industrial enterprise, which needs to be produced with water service, handled official business, water flowers, flush the toilet etc., uses water, and the lesser enterprise of scale is direct It just can satisfy full factory's water demand with the pressure water supply of municipal tap water, but use water for many larger enterprises It measures larger, due to municipal tap water insufficient pressure, tends not to meet needs.Therefore self-built tank is just needed, then led to again It crosses feed pump and supplies the water pressurization in tank to full factory and produce, handle official business, water flowers, flush the toilet etc. and use water, this water system is often It is to work independently, the operation that needs to work constantly is just able to satisfy full factory's water supply needs, and long-play not only wastes electric energy, water pump It is high to be also easy to failure maintenance cost, if while somewhere need full factory to cut off the water and seriously affect life when leak occur and needing repairing It produces.
Summary of the invention
It is a kind of for office factory, enterprise object of the present invention is to be proposed to solve above-mentioned problems of the prior art The energy-saving water system in room, the present invention are adopted the technical scheme that in order to achieve the above objectives:
A kind of energy-saving water system for enterprise's office workshop, including tank and along the master of main loop road setting Ring pipe, is successively arranged the first water inlet pipe, the first valve, the second water inlet pipe and the second valve on main loop pipe, and described first Water inlet pipe and the second water inlet pipe are connected with municipal water supplies, and the first water inlet pipe and the second water inlet pipe are diagonally arranged, It is successively equipped with the first valve, first check-valve and flowmeter along water inlet direction on one water inlet pipe and the second water inlet pipe, in main ring It is equipped with fire hydrant at opposite position on shape pipe, third water inlet pipe and the 4th water inlet are equipped between tank and main loop pipe Pipe, the third water inlet pipe and the 4th water inlet pipe are located at the two sides of the first valve or the second valve, in third water inlet pipe and The second valve, second check-valve are successively equipped with along water inlet direction on 4th water inlet pipe;Multiple first branchs are set on tank Pipe, is successively equipped with third valve, water pump, third check-valves and the 4th valve, more on first branch pipe along water discharging direction The end connection of a first branch pipe is equipped with main line and manages, and second to supply water for each workshop water system is equipped on the pipe of main line Lu Guan, is equipped with the 5th valve on second branch pipe, and each workshop water system is office building for water system by third bypass duct System supplies water, and the 6th valve is equipped in third bypass duct;The first bidirectional modulation machine is installed between main line pipe and main loop pipe Structure is equipped with the second bidirectional adjustment mechanism, first bidirectional adjustment mechanism between office building water system and main loop pipe It is bidirectional adjustment mechanism with the second bidirectional adjustment mechanism, the bidirectional adjustment mechanism includes the first connecting tube and the second connection Pipe, it is in parallel between the first connecting tube and the second connecting tube to be equipped with first branch connecting tube and second branch connecting tube, second Pressure sensor is installed in connecting tube, the 7th valve is sequentially installed in first branch connecting tube, motor-driven valve and the 4th stops Valve is returned, the 5th check-valves and the 8th valve are sequentially installed in second branch connecting tube, first bidirectional adjustment mechanism First connecting tube is connected to main loop pipe, and the second connecting tube of the first bidirectional adjustment mechanism is connected to main line pipe;Described second pair It is connected to the first connecting tube of regulating mechanism with main loop pipe, the second connecting tube and office building of the first bidirectional adjustment mechanism supply water System connectivity.
Preferably, including middle water station, the slight sewage that each workshop and office building generate pass through sewer or are laid with pipeline In flow direction in water station, between middle water station and main loop pipe be equipped with for middle water station supply water fresh water pipeline, on fresh water pipeline along Clear water flows into direction and is sequentially installed with motor-driven valve and the 6th check-valves, on middle water station be equipped with use water pipe, on water pipe along Water discharging direction is sequentially installed with the 9th valve, water pump, the 7th check-valves and the tenth valve, is being communicated with inner loop shape with water pipe end Pipe, is uniformly equipped with multiple 11st valves on secondary ring pipe, is equipped on secondary ring pipe for watering flowers, water sprinkling path or punching Lavatory water swivel.
Preferably, multiple 12nd valves are uniformly provided on the pipeline of workshop water system.
Preferably, the liquid level sensor for detecting liquid level is installed in middle water station.
The advantageous effect of present invention is that: (1) pass through third water inlet pipe, the 4th water inlet pipe, the first valve and second The mating reaction of valve, realizes the maintenance of different sections on main loop pipe, and municipal water supplies are not influenced in maintenance process The function of intaking to tank 12;
(2) municipal water supplies and tank are realized to each workshop for water system by the setting of bidirectional adjustment mechanism Free switching function between system, the water supply of office building water system;To balance the lance between municipal water supplies and demand Shield problem has been greatly reduced the operating cost of existing independent water system to greatly improve the utilization rate of water supply;
(3) it is uniformly provided with multiple 12nd valves on the pipeline of workshop water system, facilitates to its corresponding water supply The function that the maintenance and segmentation of pipeline difference section are supplied water.
It (4), can by main loop pipe when the liquid level sensor of water station detects that water is inadequate or needs with clear water in To be quickly that middle water station supplies water;
(5) making full use of for the slight sewage generated to workshop, office is realized by the setting of secondary ring pipe, thus greatly It reduces costs greatly, saves water source.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of specific embodiment one;
Fig. 2 is the structural schematic diagram of specific embodiment two.
Specific embodiment
The present invention is further described with reference to the accompanying drawing.
Specific embodiment 1: as shown in Figure 1, it is a kind of for enterprise office workshop energy-saving water system, including storage Pond 12 and the main loop pipe 5 being arranged along main loop road, are successively arranged the first water inlet pipe 4, the first valve on main loop pipe 5 8, the second water inlet pipe 23 and the second valve 29, first water inlet pipe 4 and the second water inlet pipe 23 are connected with municipal water supplies It is logical, the first water inlet pipe 4 and the second diagonally setting of water inlet pipe 23, along water inlet direction on the first water inlet pipe 4 and the second water inlet pipe 23 It is successively equipped with the first valve 3, first check-valve 2 and flowmeter 1, is equipped with fire-fighting at opposite position on main loop pipe 5 Bolt 6 is equipped with third water inlet pipe 7 and the 4th water inlet pipe 9, the third water inlet pipe 7 and the between tank 12 and main loop pipe 5 Four water inlet pipes 9 are located at the two sides of the first valve 8 or the second valve 29, on third water inlet pipe 7 and the 4th water inlet pipe 9 along into Water direction is successively equipped with the second valve 10, second check-valve 11;Multiple first branch pipes 13 are set on tank 12, first Third valve 15, water pump 16, third check-valves 17 and the 4th valve 18 are successively equipped in bypass duct 13 along water discharging direction, more The end connection of a first branch pipe 13 is equipped with main line pipe 14, and being equipped on main line pipe 14 is each workshop water system 21,37 The second branch pipe 19 of water supply, is equipped with the 5th valve 20 on second branch pipe 19, and each workshop water system 21,37 passes through the Three bypass ducts 33 are the water supply of office building water system 35, and the 6th valve 34 is equipped in third bypass duct 33;On main line pipe 14 with First bidirectional adjustment mechanism is installed between main loop pipe 5, is equipped between office building water system 35 and main loop pipe 5 Two bidirectional adjustment mechanisms, first bidirectional adjustment mechanism and the second bidirectional adjustment mechanism are bidirectional adjustment mechanism, described double It include the first connecting tube 28 and the second connecting tube 32, the parallel connection between the first connecting tube 28 and the second connecting tube 32 to regulating mechanism Equipped with first branch connecting tube and second branch connecting tube, pressure sensor 24 is installed in the second connecting tube, at first The 7th valve 27, motor-driven valve 26 and the 4th check-valves 25 are sequentially installed on connecting pipe, in second branch connecting tube successively 5th check-valves 30 and the 8th valve 31 are installed, the first connecting tube of first bidirectional adjustment mechanism is connected to main loop pipe 5, the second connecting tube of the first bidirectional adjustment mechanism is connected to main line pipe 14;First connecting tube of second bidirectional adjustment mechanism It is connected to main loop pipe 5, the second connecting tube of the first bidirectional adjustment mechanism is connected to office building water system 35.
For the ease of overhauling and being segmented water supply, multiple 12 are uniformly provided on the pipeline of workshop water system 21,37 Valve 22,36.
Have the beneficial effect that (1) passes through third water inlet pipe 7, the 4th water inlet pipe 9, the first valve 8 and the compared with prior art The mating reaction of two valves 29, realizes the maintenance of different sections on main loop pipe 5, and municipal water supply is not influenced in maintenance process The function that system is intake to tank 12;
(2) municipal water supplies and tank 12 are realized to each workshop for water system by the setting of bidirectional adjustment mechanism Free switching function between system 21,37, the water supply of office building water system 35;To balance municipal water supplies and demand it Between contradictory problems to greatly improve the utilization rate of water supply, be greatly reduced the operating cost of existing independent water system;
(3) it is uniformly provided with multiple 12nd valves 22 on the pipeline of workshop water system 21,37,36, it facilitates to it The function that the maintenance and segmentation of corresponding water supply line difference section are supplied water.
Specific embodiment 2: as shown in Fig. 2, state described in the specific embodiment one water system further include in water station 43, the slight sewage that each workshop and office building generate is by sewer or is laid with water station 43 in pipeline (not shown) flow direction It is interior, the fresh water pipeline 46 to supply water for middle water station 43 is equipped between middle water station 43 and main loop pipe 5, along clear on fresh water pipeline 46 Water flows into direction and is sequentially installed with motor-driven valve 45 and the 6th check-valves 44, is equipped on middle water station 43 and uses water pipe 38, with water pipe It is sequentially installed with the 9th valve 39, water pump 40, the 7th check-valves 41 and the tenth valve 42 along water discharging direction on 38, with water pipe 38 ends are communicated with secondary ring pipe 47, and multiple 11st valves 48 are uniformly equipped on secondary ring pipe 47, in secondary ring pipe 47 It is equipped with for watering flowers, water sprinkling path or water swivel 49 used of flushing the toilet.
Have the beneficial effect that compared with prior art the liquid level sensor of water station 43 in (4) detect water not enough or When needing with clear water, can quickly it be supplied water by main loop pipe 5 for middle water station 43;
(5) making full use of for the slight sewage generated to workshop, office is realized by the setting of secondary ring pipe 47, thus Cost is greatly reduced, water source is saved.
If the words such as " first ", " second " are used herein come if limiting components, those skilled in the art are answered This knows: the use of " first ", " second " is intended merely to facilitate the description present invention and simplifies description, does not in addition state such as, Above-mentioned word has no special meaning.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features, But these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (4)

1. a kind of energy-saving water system for enterprise's office workshop, which is characterized in that including tank and along main loop road The main loop pipe of road setting, is successively arranged the first water inlet pipe, the first valve, the second water inlet pipe and the second valve on main loop pipe Door, first water inlet pipe and the second water inlet pipe are connected with municipal water supplies, the first water inlet pipe and the second water inlet pipe pair Angle setting is successively equipped with the first inlet valve, first check-valve along water inlet direction on the first water inlet pipe and the second water inlet pipe And flowmeter, it is equipped with fire hydrant at opposite position on main loop pipe, third is equipped between tank and main loop pipe Water inlet pipe and the 4th water inlet pipe, the third water inlet pipe and the 4th water inlet pipe are located at the two of the first valve or the second valve Side is successively equipped with the second inlet valve, second check-valve along water inlet direction on third water inlet pipe and the 4th water inlet pipe;It is storing up Multiple first branch pipes are set on pond, are successively equipped with third valve, water pump, third along water discharging direction on first branch pipe and are stopped Valve and the 4th valve are returned, connection is equipped with main line and manages in the end of multiple first branch pipes, and being equipped on the pipe of main line is each workshop The second branch pipe that water system supplies water, is equipped with the 5th valve on second branch pipe, and each workshop water system passes through third Bypass duct is the water supply of office building water system, and the 6th valve is equipped in third bypass duct;Between main line pipe and main loop pipe First bidirectional adjustment mechanism is installed, the second bidirectional adjustment mechanism is installed between office building water system and main loop pipe, First bidirectional adjustment mechanism and the second bidirectional adjustment mechanism are bidirectional adjustment mechanism, and the bidirectional adjustment mechanism includes the One connecting tube and the second connecting tube, it is in parallel between the first connecting tube and the second connecting tube to be equipped with first branch connecting tube and second Branch connecting pipe is equipped with pressure sensor in the second connecting tube, and the 7th valve is sequentially installed in first branch connecting tube Door, motor-driven valve and the 4th check-valves, are sequentially installed with the 5th check-valves and the 8th valve in second branch connecting tube, and described the First connecting tube of one bidirectional adjustment mechanism is connected to main loop pipe, and the second connecting tube of the first bidirectional adjustment mechanism and main line are managed Connection;First connecting tube of second bidirectional adjustment mechanism is connected to main loop pipe, and the second of the first bidirectional adjustment mechanism connects Adapter tube is connected to office building water system.
2. the energy-saving water system according to claim 1 for enterprise's office workshop, which is characterized in that including middle water It stands, the slight sewage that each workshop and office building generate is by sewer or is laid in pipeline flow-direction in water station, middle water station and master It is equipped with the fresh water pipeline to supply water for middle water station between ring pipe, flows into direction along clear water on fresh water pipeline and is sequentially installed with electricity Dynamic valve and the 6th check-valves, are equipped on middle water station and use water pipe, be sequentially installed with the 9th valve along water discharging direction on water pipe Door, water pump, the 7th check-valves and the tenth valve are being communicated with secondary ring pipe with water pipe end, are uniformly installing on secondary ring pipe There are multiple 11st valves, is equipped on secondary ring pipe for watering flowers, water sprinkling path or water swivel used of flushing the toilet.
3. the energy-saving water system according to claim 1 or 2 for enterprise's office workshop, which is characterized in that in factory Multiple 12nd valves are uniformly provided on the pipeline of room water system.
4. the energy-saving water system according to claim 2 for enterprise's office workshop, which is characterized in that in middle water station Liquid level sensor for detecting liquid level is inside installed.
CN201711006641.8A 2017-10-25 2017-10-25 A kind of energy-saving water system for enterprise's office workshop Active CN107882105B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711006641.8A CN107882105B (en) 2017-10-25 2017-10-25 A kind of energy-saving water system for enterprise's office workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711006641.8A CN107882105B (en) 2017-10-25 2017-10-25 A kind of energy-saving water system for enterprise's office workshop

Publications (2)

Publication Number Publication Date
CN107882105A CN107882105A (en) 2018-04-06
CN107882105B true CN107882105B (en) 2019-10-29

Family

ID=61782184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711006641.8A Active CN107882105B (en) 2017-10-25 2017-10-25 A kind of energy-saving water system for enterprise's office workshop

Country Status (1)

Country Link
CN (1) CN107882105B (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203247648U (en) * 2013-04-27 2013-10-23 河南中烟工业有限责任公司 Municipal water supply and secondary supercharging water supply pipe network automatic switching device
CN203383284U (en) * 2013-07-18 2014-01-08 河南中烟工业有限责任公司 Reclaimed water utilization system provided with tap water conversion system
CN104846918A (en) * 2014-10-22 2015-08-19 青岛万力科技有限公司 Living and fire fighting shared pipe network pressure-superposed water supply system
CN104878805B (en) * 2015-06-25 2017-02-22 江苏明纯给排水设备有限公司 Annular water guide device for box type non-negative-pressure secondary water supply tank

Also Published As

Publication number Publication date
CN107882105A (en) 2018-04-06

Similar Documents

Publication Publication Date Title
CN215053447U (en) Pipe network pressure-superposed matched high-level regulation and storage water supply device
CN105201045A (en) Box-type pressure-superposed variable-frequency energy-saving water supplying system
CN205617483U (en) Bring water flow control's box no negative pressure water supply equipment into
CN201206253Y (en) Full-automatic case type energy-saving supercharging water-supply installation
CN110805007B (en) Whole-plant public water supply method and system
CN201152429Y (en) High pressure water current flow concentrating or dividing device
CN107882105B (en) A kind of energy-saving water system for enterprise's office workshop
CN209958434U (en) Secondary water supply equipment
CN111173072B (en) Urban water supply system and method based on big data
CN201776404U (en) Pressure-maintaining overflow device used for pressure-maintaining water system
CN204940422U (en) A kind of energy-saving water supply system of box pressure-superposed variable frequency
CN108980506B (en) Two-way supercharging system of pipeline
CN211624533U (en) T-shaped energy dissipater and drainage system of rear bypass pipe of small hydropower station dam
CN211116763U (en) Mechanical seal water supply device and corresponding horizontal split horizontal single-stage centrifugal pump
CN201433423Y (en) Tank-type pipe network pressure-superposed water supply device
CN106049597A (en) Anchor-block drain tap well applicable to long-distance large-diameter exposed-laying water pipe
CN205804467U (en) Be suitable to the anchor block formula drain tap well of long-distance large-caliber surface aqueduct
CN220352952U (en) Pressurized water supply pipeline system for recycling without energy consumption
CN206956779U (en) A kind of water supply project overhauls valve well construction
CN205604353U (en) Intelligent frequency conversion control system device
CN212026412U (en) Industrial water and domestic water comprehensive water supply system
CN220620303U (en) Non-negative pressure water supply system for transformer substation
CN211285821U (en) Water level pressure regulator for pipeline system
CN209556025U (en) Distance water supply pressure pipeline in a kind of water supply pumping plant
CN205242492U (en) Multichannel water supply system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant