A kind of dry skiing floor tile and manufacture method
Technical field
The invention belongs to outdoor sports facility field, is related to a kind of dry skiing facility, and in particular to a kind of nonirrigated farmland
Skiing floor tile and manufacture method.
Background technology
In modern city life, the life stress of people is increasing, and dry skiing is a depth by vast juvenile youngster
The item of recreation that child welcomes.
The skifield occurred in the market is spliced with different types of Plastic ski floor tile splicing block, such as lump
Formula Plastic ski floor tile splicing block is spliced into slideway, and the upper surface of lump formula Plastic ski floor tile is provided with raised column, and people is sitting in
Plastic skis or air cushion slide from slideway eminence, are experienced using the frictional force of plastics is small to complete skiing.But this skiing
Mode causes skiing floor tile easily to damage because face contacts with face, changes frequent;When temperature is higher because friction causes plastics
Raised top end overheating deforming so that force of sliding friction is dramatically increased, and danger is caused to the personnel of sliding.
The content of the invention
In order to solve the above technical problems, the present invention proposes a kind of dry skiing floor tile, the dry skiing floor tile has
The advantages of wearability is good, impact resistance is strong.The present invention also proposes a kind of manufacture method, the party to above-mentioned dry skiing floor tile
Method can make dry skiing floor tile one-shot forming, and cost is low, time saving and energy saving.
Technical scheme provided by the invention is:A kind of dry skiing floor tile, including skiing floor tile body, its it is special it
It is in the skiing floor tile body upper surface is provided with round end column, and the quantity of the round end column is multiple;Multiple round ends
It is respectively and fixedly provided with column on metallic sheath, or part round end column and is fixed with metallic sheath and the quantity of metallic sheath is at least three.
It is above the basic structure of the present invention, based on the basic structure, the present invention also makes following Optimal improvements:
Further, above-mentioned metallic sheath top is curved surface and surface is smooth, and metallic sheath bottom is provided with flange, and the flange buries
In the inside of skiing floor tile body.
Further, above-mentioned skiing floor tile body, which is provided with, thickeies step;The thickening step is positioned at skiing floor tile
The upper surface and/or lower surface of body, the flange of the metallic sheath, which is arranged on, to be thickeied in step.
Further, the lower surface of above-mentioned skiing floor tile body sets multiple reinforcements, and the thickening step is with strengthening
Muscle intersects;Opened up on the flange of the metallic sheath jagged;The material of the metallic sheath is 304 stainless steels;The skiing
At least one through hole is additionally provided with floor tile body, the through hole is counterbore;The skiing floor tile body edges are additionally provided with card
Button and the neck with being clasped.
Further, above-mentioned metallic sheath is linearly distributed on skiing floor tile body, or only in skiing floor tile sheet
The subregion distribution of body, the either circumference uniform distribution or with floor tile sheet of skiing centered on the center for floor tile body of skiing
Multiple circumference uniform distribution centered on the center of body.
Further, the quantity of above-mentioned metallic sheath is 3,6,9 or 12;The top of the metallic sheath and remaining round end column
Top it is concordant or higher than the top of remaining round end column.
Further, the top of above-mentioned metallic sheath and the high 0.3-2mm in top of remaining round end column.
The present invention also proposes a kind of manufacture method of above-mentioned dry skiing floor tile, comprises the following steps:
1) metallic sheath is prepared;
2) by the opening up fixed position being fixed in the mould of dry skiing floor tile of at least three metallic sheaths;
3) matched moulds jet-out plastic, the flange of metallic sheath is made to be embedded in plastics, then hardened plastic;
4) mold and take out the dry skiing floor tile made.
Require that the inside of metallic sheath is filled with plastics in step 3);In step 2) dry skiing floor tile mould bottom
Magnet is placed in portion, and metallic sheath is fixed on mould fixed position by the gravity of itself and the suction of magnet.
Further, the fixed position of above-mentioned metallic sheath refers to that metallic sheath is linearly distributed on skiing floor tile body,
Either only in the subregion distribution of skiing floor tile body or centered on the center for floor tile body of skiing, circumference is equal
Cloth, or the multiple circumference uniform distribution centered on the center for floor tile body of skiing.
Advantages of the present invention:
1st, equal fixed cover is provided with metallic sheath, its heat conductivility, springform on dry skiing floor tile round end column of the present invention
Amount, intensity are significantly larger than polyethylene and common plasticses so that the heat dispersion of skiing ground board brick, shock resistance, heat-resisting quantity
Can, friction resistant performance arrived significant raising and improved, service life is elongated.
2nd, fixed cover is provided with the brick of metallic sheath on part round end column of the invention, the brick with being all fixed with metallic sheath
Compare, production and processing difficulty can be reduced, reduce production cost.
3rd, the height of metallic sheath of the present invention is more slightly higher 0.3-2mm than the height of remaining round end column, and the quantity of metallic sheath
With it is rationally distributed, skis can be allowed preferentially uniformly to be contacted with metallic sheath, frictional resistance is reduced while not changing comfortableness,
Improve bearing strength.
4th, the metallic sheath of dry skiing floor tile of the present invention is fixed and is set on round end column, is enriched inside metallic sheath, gold
Category set flange in the bottom is embedded in the inside of skiing floor tile body, and flange is buried on floor tile body of skiing provided with step is thickeied, is resisted
Impact is good.
5th, the present invention thickeies step and intersected with reinforcement, particularly thickeies the edge of centre bore and the side of reinforcement of step
Edge is circumscribed, while metallic sheath bearing strength is improved, ensure that the convenience of processing.
6th, the metallic sheath bottom that dry skiing floor tile of the present invention uses is provided with a circle flange, and flange is embedded in skiing ground
The inside of brick body, prevents metallic sheath from coming off.Set jagged on flange, can make to prevent metallic sheath from rotating in brick body, and
And when being molded dry skiing floor tile, breach is advantageous to plastics and flowed in mould.
7th, dry skiing floor tile of the present invention radiates relative to the skiing floor tile of traditional pure plastics after setting metallic sheath
Faster, skiing floor tile is effectively protected.
8th, when dry skiing floor tile of the present invention is assembled into ski trail, except passing through through hole by dry skiing ground with screw
Brick fixes on the ground, also needs to cooperate the buckle of two neighboring skiing floor tile and neck, prevents from being mutually shifted.
9th, the manufacture method of dry skiing floor tile of the present invention, using injection moulding process make dry skiing floor tile once into
Type, cost is low, time saving and energy saving.
10th, the present invention realizes stability during metallic sheath injection molding, prevents it from releasing, tilting by the way of magnetic force is attracting,
The yield rate of injection molding can be greatly improved.
Brief description of the drawings
Fig. 1 is that the present invention sets 6 metallic sheaths circumferentially uniform front view;
Fig. 2 is that the present invention sets 6 metallic sheaths circumferentially uniform rearview;
Fig. 3 is the direction view that the present invention sets 6 metallic sheaths circumferentially uniform stereochemical structure;
Fig. 4 is another direction view that the present invention sets 6 metallic sheaths circumferentially uniform stereochemical structure;
Fig. 5 is the direction view that the present invention sets 9 metallic sheaths to be in dual circumference uniform distribution stereochemical structure;
Fig. 6 is another direction view that the present invention sets 9 metallic sheaths to be in dual circumference uniform distribution stereochemical structure;
Fig. 7 is that the present invention sets 4 linear distributing front views of metallic sheath;
Fig. 8 is the sectional view of metallic sheath of the present invention;
Fig. 9 is the top view of metallic sheath of the present invention;
Figure 10 is the schematic diagram of the manufacture method of dry skiing floor tile of the present invention.
Wherein:1- skiing floor tile bodies;2- round end columns;3- metallic sheaths;31- flanges;4- thickeies step;5th, strengthen
Muscle;6th, centre bore;7- through holes;8- buckles;9- necks;10th, magnet;11st, upper mould;12nd, lower mould;13rd, metallic sheath putting hole.
Embodiment
The embodiment provided below in conjunction with the accompanying drawings is described in detail to the present invention:
Referring to Fig. 1-Fig. 9, a kind of dry skiing floor tile, including skiing floor tile body 1, ski on floor tile body 1
Surface is provided with round end column 2, and the quantity of round end column 2 is multiple, and metallic sheath 3 is respectively and fixedly provided with multiple round end columns 2;Or portion
The quantity that metallic sheath 3 and metallic sheath 3 are fixed with cyclotomy head column 2 is at least three.It can also be 6,9 or 12 etc..
The top of metallic sheath 3 is curved surface and surface is smooth, and the bottom of metallic sheath 3 is provided with flange 31, is opened up on flange 31 jagged;
Flange 31 is embedded in the inside of skiing floor tile body 1.The material of metallic sheath 3 is 304 stainless steels;Skiing floor tile body 1
Material be plastics.When being molded dry skiing floor tile, breach is advantageous to flowing of the plastics in mould, can shorten into production
Time, improve production efficiency.
Floor tile body 1 of skiing, which is provided with, thickeies step 4;Step 4 is thickeied positioned at the upper surface of skiing floor tile body 1
And/or lower surface, the flange 31 of metallic sheath, which is arranged on, to be thickeied in step 4.
The lower surface of skiing floor tile body 1 sets multiple reinforcements 5, thickeies step 4 and intersects with reinforcement 5.Thicken platform
Rank 4 is provided with centre bore 6, and when the edge of centre bore 6 and the circumscribed edge of reinforcement 5, its stability reaches maximum;Skiing ground
At least one through hole 7 is additionally provided with face brick body 1, through hole 7 is counterbore;The edge of skiing floor tile body 1 be additionally provided with buckle 5 and with
The neck 6 that buckle 5 coordinates.
Metallic sheath 3 is linearly distributed on skiing floor tile body 1, or only in the part area of skiing floor tile body 1
Domain is distributed, either circumference uniform distribution or the center with floor tile body 1 of skiing centered on the center for floor tile body 1 of skiing
Centered on multiple circumference uniform distribution, described linear distribution herein refer to linearly or curve distribution.
The top of metallic sheath 3 is concordant with the top of remaining round end column 2 or higher 0.3- than the top of remaining round end column 2
2mm, ensured by mould.When carrying out dry skiing, skis first contacts people with the metallic sheath top for floor tile of skiing,
Skis contacts with remaining column again after producing deformation, and metallic sheath bears most impulsive force, floor tile not rapid wear of skiing
It is bad, extend service life.
A through hole 7 is additionally provided with skiing floor tile body 1, through hole 7 is counterbore, and quantity is one, and positioned at skiing ground
The center of face brick body 1.
The edge of skiing floor tile body 1 is additionally provided with buckle 8 and the neck 9 coordinated with buckle 8.For regular hexagon structure
Skiing floor tile body 1, buckle 8 is three, is arranged on three adjacent sides, and its excess-three side sets neck.
Multiple skiing floor tiles are spliced into slideway or skifield, the buckle 8 and card of two neighboring skiing floor tile during splicing
Groove 9 is cooperated, and prevents from being mutually shifted, and after splicing is good, skiing floor tile body 1 is fixed on into cement through through hole 7 with screw
On ground.
The skiing floor tile body 1 of the present invention can make different shape to adapt to the demand in different places, such as can be with
It is rectangle or polygon, and in acclive slideway or has the slideway of rotary type structure, a skiing floor tile of the invention
Body 1 can make curved surface as needed.
Referring to Figure 10, a kind of manufacture method of dry skiing floor tile, it is characterised in that comprise the following steps:
1) metallic sheath 3 is prepared;
2) by least three metallic sheaths, the 3 opening up fixed position being fixed in the mould of dry skiing floor tile;
3) mould 11 and the matched moulds jet-out plastic of lower mould 12, make the flange 31 of metallic sheath 3 be embedded in plastics on, then solidification modeling
Material;
4) mold and take out the dry skiing floor tile made.
Wherein, require that the inside of metallic sheath 3 is filled with plastics in step 3.
In step 2, when multiple metallic sheaths 3 being put into the metallic sheath putting hole 13 of lower mould 12 before injection, metallic sheath 3 will
It is fitted close with metallic sheath putting hole 13, to prevent the slurry note melted during injection from arriving the outside of metallic sheath 3.In dry skiing
Magnet 10 is placed in the bottom of the mould of face brick, and metallic sheath 3 is fixed on mould and fixed by the gravity of itself and the suction of magnet 10
Opening position.
The fixed position of metallic sheath 3 refers to that metallic sheath 3 is linearly distributed on skiing floor tile body 1, or only in cunning
Snowfield face brick body 1 subregion distribution, either centered on the center for floor tile body 1 of skiing circumference uniform distribution or with
Multiple circumference uniform distribution centered on the center of skiing floor tile body 1.