CN107879549A - A kind of river sewage integrated treatment unit and its processing method - Google Patents
A kind of river sewage integrated treatment unit and its processing method Download PDFInfo
- Publication number
- CN107879549A CN107879549A CN201711035336.1A CN201711035336A CN107879549A CN 107879549 A CN107879549 A CN 107879549A CN 201711035336 A CN201711035336 A CN 201711035336A CN 107879549 A CN107879549 A CN 107879549A
- Authority
- CN
- China
- Prior art keywords
- sewage
- cavity
- river
- river course
- drainpipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F9/00—Multistage treatment of water, waste water or sewage
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/001—Processes for the treatment of water whereby the filtration technique is of importance
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/28—Treatment of water, waste water, or sewage by sorption
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/50—Treatment of water, waste water, or sewage by addition or application of a germicide or by oligodynamic treatment
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2103/00—Nature of the water, waste water, sewage or sludge to be treated
- C02F2103/007—Contaminated open waterways, rivers, lakes or ponds
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2303/00—Specific treatment goals
- C02F2303/14—Maintenance of water treatment installations
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F3/00—Biological treatment of water, waste water, or sewage
- C02F3/34—Biological treatment of water, waste water, or sewage characterised by the microorganisms used
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Water Supply & Treatment (AREA)
- Chemical & Material Sciences (AREA)
- Organic Chemistry (AREA)
- Biological Treatment Of Waste Water (AREA)
- Treatment Of Water By Oxidation Or Reduction (AREA)
Abstract
The invention discloses a kind of river sewage integrated treatment unit, including treatment box, adjusting bracket and running gear, treatment box is internally provided with the first cavity, the second cavity and the 3rd cavity, filter layer, adsorption layer and purification pipe are provided with first cavity and the 3rd cavity, second cavity is partitioned into medicament chamber and stir chamber by sealing plate, delivery pump is provided with the top surface of medicament chamber, one end of delivery pump is connected with medicament chamber, the other end of delivery pump is provided with medicine spraying tube group, stirring motor is provided with stir chamber, the processing method comprises the following steps:(1) the installation positioning of device;(2) sewage disposal;(3) cleaning is repaired with checking.The present invention is simple in construction, practical, small volume, simple operation, device is directly placed in river course sewage is handled so that device directly contacts with sewage, improves the processing speed of sewage, reduces energy loss, improves comprehensive utilization ratio.
Description
Technical field
The present invention relates to a kind of river sewage integrated treatment unit and its method.
Background technology
In the formation and development in city, river is related to city existence, restricted as important resource and environment support
Urban development, is an important factor for influenceing Urban style and beautifying urban environment.Urban river has supply water source, offer green
Every ecological functions such as ground, environmental protection, communications and transportation and culture and education.Construction, expansion development of urban space side in city
Face shows irreplaceable meaning.And with the quickening of Chinese Urbanization paces, river two sides land development and utilization, city river
Stream function is damaged, and a large amount of industry, sanitary sewage are directly discharged into korneforos without processing, cause pollution of estuary, water quality deterioration, river
Stream ecological environment is destroyed.Existing sewage-treatment plant is bulky, and cost is higher, and practical operation is complicated, inconvenience
In the maintenance and cleaning in later stage.And existing sewage-treatment plant is generally located on bank, then is taken out sewage using suction pump
Enter and handled into sewage-treatment plant, required high energy consumption, improve cost.
The content of the invention
Present invention aims at provide a kind of river sewage integrated treatment for the deficiency present in prior art to fill
The technical scheme put, small volume, simple operation, device is directly placed in river course sewage is handled so that device with
Sewage directly contacts, and improves the processing speed of sewage, reduces energy loss, improves comprehensive utilization ratio.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:
A kind of river sewage integrated treatment unit, it is characterised in that:Including treatment box, adjusting bracket and running gear, place
Manage and be provided with water inlet pipe and drainpipe in the left and right sides of case, drainpipe is located at the top of water inlet pipe, set on drainpipe
There is an injector head, treatment box is internally provided with the first cavity, the second cavity and the 3rd cavity, in the first cavity and the 3rd cavity
It is provided with filter layer, adsorption layer and purification pipe, the second cavity and medicament chamber and stir chamber, the top of medicament chamber is partitioned into by sealing plate
Delivery pump is provided with face, one end of delivery pump is connected with medicament chamber, and the other end of delivery pump is provided with medicine spraying tube group, medicament
Intracavitary is provided with disinfectant, and stirring motor is provided with stir chamber, and the agitating shaft of stirring motor extends to the bottom surface for the treatment of box,
The bottom of agitating shaft is provided with agitator arm, and adjusting bracket includes fixed mount and travelling carriage, and travelling carriage is set on fixed mount, along admittedly
Determine frame to move up and down, the top of travelling carriage is connected by pull rope with fixed mount, and treatment box is connected with travelling carriage, walking dress
Put and be located at including support baseboard and mobile devices, fixed mount on support baseboard, mobile devices are symmetricly set on the bottom of support baseboard
At left and right sides of face.
Further, purify pipe spiral to set, purify in pipe and be provided with microbe stuffing, the upper end for purifying pipe passes through upper fixation
Plate is connected with the madial wall of the first cavity, the 3rd cavity, and the lower end for purifying pipe passes through bottom plate and the first cavity, the 3rd chamber
The madial wall of body is connected, and permeable hole is evenly arranged with bottom plate, the design of microbe stuffing can be micro- to sewage progress
Biological treatment, the organic substance in sewage of degrading, the design of upper mounted plate and bottom plate can put in order to purify the installation of pipe
Put, can be designed so that for permeable hole forms a buffering area on bottom plate between upper mounted plate and bottom plate, slows down dirt
Water manages second-class impact dynamics to purification, and design is more reasonable.
Further, filter layer is corrugated, and the come design of layer of corrugated can increase the contact surface of sewage and filter layer
Product, the quality after sewage water filtration is improved, while impact of the current to filter layer can be slowed down again.
Further, fixed mount includes telescopic fixing rod and limiting plate, and limiting plate includes upper limit plate and lower limiting board, stretches
For fix bar between upper limit plate and lower limiting board, the design of upper limit plate and lower limiting board can be in order to telescopic fixing rod
Installation, while can be fixed again in order to the installation between fixed mount and support baseboard.
Further, support clamp is provided with the bottom surface of travelling carriage, treatment box is connected in support clamp, and passes through screw
Spacing fixation, support and microorganism band is evenly arranged with the bottom surface of clamp, support the design of clamp can be in order to the card for the treatment of box
Installation is connect, the design of screw may insure the performance that firmly installs for the treatment of box, and connection is flexible, convenient disassembly, effectively improves device
Stability, processing of the device to sewage of being more convenient for.
Further, the left and right ends of travelling carriage are provided with fixed hanger, the design of fixed hanger can in order to device with
Installation between other equipment.
Further, mobile devices include driving wheel and driven pulley, and driving wheel is connected by connecting shaft with driven pulley, actively
Wheel is more convenient using operating by the rotation of balata belt drive driven pulley, overall construction design more compact and reasonable.
Further, drive cylinder is provided with support baseboard, the piston rod of drive cylinder is connected with lower limiting board, support
Chute is provided with bottom plate, lower limiting board is connected in chute, is moved along chute, and drive cylinder can be with by the movement of piston rod
Drive position of the adjusting bracket on support baseboard so that barycentre steadiness of the adjusting bracket on support baseboard, avoid centre-of gravity shift from making
Into the unstable of device.
Using a kind of processing method of river sewage integrated treatment unit as described above, it is characterised in that:Including following step
Suddenly:
1) the installation positioning of device:
(1) water inlet pipe and drainpipe are installed in the left and right sides for the treatment of box according to the size for the treatment of box, it is ensured that draining
Then pipe installs injector head, then the inside for the treatment of box is installed, root positioned at the top of water inlet pipe according to the length of drainpipe
The internal part of the first cavity and the second cavity is installed according to the actual installation position of water inlet pipe and drainpipe, successively incited somebody to action
Filtering layer, adsorption layer and purification pipe are installed in the first cavity and the second cavity, it is ensured that sewage enters the first cavity from water inlet pipe
With in the second cavity after have to pass through filter layer, adsorption layer and purify pipe processing after again from drainpipe injector head spray,
The internal part of the 3rd cavity is installed again, according to the size of stirring motor, is partitioned into the 3rd cavity by sealing plate
Medicament chamber and stir chamber, stirring motor is installed in stir chamber, then agitator arm is installed on agitating shaft, then will sterilization
Medicament is added to medicament intracavitary, it is ensured that and the disinfectant of medicament intracavitary is full of, consequently facilitating subsequently water quality is disinfected, then
Delivery pump is installed on the top surface of the 3rd cavity,;
(2) treatment box is fixed on adjusting bracket, and microorganism band is installed on the bottom surface of support clamp, then basis
The length of the actual water level regulation telescopic fixing rod in river course so that the length of telescopic fixing rod is higher than river water level height, then leads to
The length of pull rope is overregulated, changes height of the travelling carriage on fixed mount, it is ensured that the lower submerged for the treatment of box is in river course, row
Water pipe is located above water level, then adjusting bracket is fixed on support baseboard, and then drive cylinder is connected with lower limiting board, then
Position of the adjusting bracket on support baseboard is adjusted by drive cylinder so that the structure of whole device is more stable, avoids locating
Reason case is located at the side of adjusting bracket, and causes whole device crank,
(3) after device installs, river course is carried out by equitable subsection according to river course physical length, in each processing river course section
The good device of one assembly is installed, spud pile is set at the both ends of processing river course section first, then by steel wire rope by both ends
Connected between spud pile, and ensure the fixation hanger on steel wire penetrating travelling carriage so that direction of the device along steel wire rope
Move, so that it is guaranteed that in river course sewage processing quality;
2) sewage disposal:
(1) after device is put into river course, the sewage in river course is entered in the first cavity and the second cavity from water inlet pipe,
By being handled while the first cavity and the second cavity, effectively accelerate sewage processing speed, sewage enter the first cavity and
In second cavity, first pass around filter layer and remove the impurity in sewage, then by the peculiar smell in adsorption layer absorption effluent, improve
Water quality after river sewage processing, then sewage, which enters, purifies pipe, by purifying the processing of pipe, sewage is carried out further
Processing so that the water quality after sewage disposal is more preferable, and the sewage after then handling sprays from the injector head on drainpipe, increases sewage
With the contact area of air, the oxygen content in sewage is improved, simultaneously because having a certain distance between drainpipe and water level, is made
It is more preferable to obtain the drop effect of sewage, processing quality of further increasing water quality;
(2) while medicament intracavitary disinfectant is transported in medicine spraying tube group by delivery pump, then is sprayed onto river from medicine spraying tube group
In road, carried out disinfection processing to the sewage in river course, and the stirring motor in stir chamber is opened, and stirring motor passes through agitating shaft
The rotation of agitator arm is driven, so as to be stirred to the sewage in river course, increases the mobile performance of sewage in river course, more favorably
In the growth and breeding of microorganism in river course, the self-purification capacity in river course is improved, causes to be sufficiently mixed between disinfectant and sewage again
Stirring, accelerate the processing speed of sewage;
(3) while treatment box is handled the sewage in river course, the microorganism band on clamp bottom surface is supported to sewage
Microbiological treatment is carried out, by the new into metabolism of microorganism, degrades and utilize the harmful substance in sewage so that sewage obtains only
Change is handled;
(4) device drives driving wheel to rotate, driving wheel passes through again after same position handles a period of time by driver
Balata belt drives driven pulley to rotate so that device moves along steel wire rope, changes position of the device in river course, so as to river
Sewage in road carries out processing in all directions, is more automated using operation;
3) cleaning is repaired with checking:
The inside of regular device is repaired and cleared up, so that it is guaranteed that device uses the longevity to sewage disposal, extension fixture
Life.
The present invention is by adopting the above-described technical solution, have the advantages that:
Sewage handle simultaneously by the first cavity in treatment box and the second cavity in the present invention, accelerates sewage
Processing speed, it is countless enter the first cavity and the second cavity after, successively by filter layer, adsorption layer and purify pipe processing,
By the contaminant filter in sewage, peculiar smell and greasy dirt in absorption effluent, then the harmful substance in sewage is degraded, effectively carry
Quality after high sewage disposal, the sewage after processing spray from the injector head on drainpipe again, contact of the increase sewage with air
Area, the oxygen content in sewage is effectively improved, while the disinfectant of medicament intracavitary is sprayed onto river by delivery pump from medicine spraying tube group
In road, carry out disinfection sterilization processing to the sewage in river course, and stirring motor drives the rotation of agitator arm by agitating shaft, so as to
The mobile performance of sewage in river course is improved, the disinfectant for being is sufficiently mixed with sewage, improves the Disinfection Effect of sewage, and lead to
Cross microorganism band and microbial degradation processing is carried out to the sewage in river course, further improve the self-purification capacity in river course, finally by
Mobile devices change position of the device in river course, the process range of aggrandizement apparatus, are more automated using operation, structure is set
Meter also more compact and reasonable;
The present invention is simple in construction, practical, small volume, simple operation, device is directly placed in river course to sewage
Handled so that device directly contacts with sewage, improves the processing speed of sewage, reduces energy loss, improves comprehensive utilization
Rate.
Brief description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is a kind of structural representation of sludge heat drying system of the present invention;
Fig. 2 is the structure chart of adjusting bracket in the present invention;
Fig. 3 is the cut-away view for the treatment of box in the present invention;
Fig. 4 is the partial enlarged drawing at I in Fig. 3.
In figure:1- treatment boxes;2- adjusting brackets;3- running gears;4- water inlet pipes;5- drainpipes;6- injector heads;The chambers of 7- first
Body;The cavitys of 8- the 3rd;9- sealing plates;10- medicament chambers;11- stir chambers;12- delivery pumps;13- medicine spraying tube groups;14- disinfectants
Agent;15- stirring motors;16- agitating shafts;17- agitator arms;18- fixed mounts;19- travelling carriages;20- pull ropes;21- supports bottom
Plate;22- microbe stuffings;23- upper mounted plates;24- bottom plates;25- permeable holes;26- telescopic fixing rods;27- upper limits
Plate;28- lower limiting boards;29- supports clamp;30- screws;31- microorganism bands;32- fixes hanger;33- driving wheels;34- is driven
Wheel;35- connecting shafts;36- balata belts;37- drive cylinders;38- piston rods;39- chutes;40- filter layers;41- adsorption layers;
42- purification pipes.
Embodiment
As shown in Figures 1 to 4, it is a kind of river sewage integrated treatment unit of the present invention, including treatment box 1, adjusting bracket 2
With running gear 3, water inlet pipe 4 and drainpipe 5 are provided with the left and right sides for the treatment of box 1, drainpipe 5 is located at water inlet pipe 4
Top, the design of water inlet pipe 4 and drainpipe 5 can be reasonable in design in order to the disengaging of sewage, and injection is provided with drainpipe 5
First 6, the design of injector head 6 can say that sewage is sprayed into river course, increase the contact area of sewage and air, improve in sewage
Oxygen content, treatment box 1 are internally provided with the first cavity 7, the second cavity and the 3rd cavity 8, the first cavity 7 and the 3rd cavity 8
Filter layer 40, adsorption layer 41 and purification pipe 42 are inside provided with, filter layer 40 is corrugated, and corrugated comes the design of layer can be with
Increase the contact area of sewage and filter layer 40, improve the quality after sewage water filtration, while current can be slowed down again to filter layer
40 impact, purification pipe 42 spiral are set, and purify and microbe stuffing 22 is provided with pipe 42, and the upper end of purification pipe 42 passes through upper solid
Fixed board 23 is connected with the madial wall of the first cavity 7, the 3rd cavity 8, and the lower end of purification pipe 42 passes through bottom plate 24 and first
Cavity 7, the madial wall of the 3rd cavity 8 are connected, and permeable hole 25 is evenly arranged with bottom plate 24, and microbe stuffing 22 is set
Meter can carry out microbiological treatment to sewage, the organic substance in sewage of degrading, the design of upper mounted plate 23 and bottom plate 24
It can be placed in order to purify the installation of pipe 42, permeable hole 25 can be designed so that upper mounted plate 23 and lower solid on bottom plate 24
A buffering area is formed between fixed board 24, slows down sewage to purifying the second-class impact dynamics of pipe 42, design is more reasonable, by the
The Duplex treatment of one cavity 7 and the 3rd cavity 8, effectively accelerates the processing speed of sewage, and the second cavity is partitioned into by sealing plate 9
Medicament chamber 10 and stir chamber 11, delivery pump 12, one end and the phase of medicament chamber 10 of delivery pump 12 are provided with the top surface of medicament chamber 10
Connection, the other end of delivery pump 12 is provided with medicine spraying tube group 13, is provided with disinfectant 14 in medicament chamber 10, in stir chamber 11
Stirring motor 15 is provided with, the agitating shaft 16 of stirring motor 15 extends to the bottom surface for the treatment of box 1, and the bottom of agitating shaft 16 is set
There is agitator arm 17, adjusting bracket 2 includes fixed mount 18 and travelling carriage 19, and travelling carriage 19 is set on fixed mount 18, along fixed mount
18 move up and down, and travelling carriage 19 can be fixed in order to the installation for the treatment of box 1, fixed mount 18 can in order to travelling carriage 19 installation and
Mobile, reasonable in design, using simple operation, the top of travelling carriage 19 is connected by pull rope 20 with fixed mount 18, is led
The design of messenger 20 can change upper-lower position of the travelling carriage 19 on fixed mount 18, so that device is applied to different river courses
Sewage disposal, the height for the treatment of box 1 can according to reality water level amount be adjusted, treatment box 1 is connected with travelling carriage 19, OK
Walking apparatus 3 includes support baseboard 21 and mobile devices, and fixed mount 18 is located on support baseboard 21, and drive is provided with support baseboard 21
Take offence cylinder 37, the piston rod 38 of drive cylinder 37 is connected with lower limiting board 28, and chute 39, lower limit are provided with support baseboard 21
Position plate 28 is connected in chute 39, is moved along chute 39, drive cylinder 37 can drive adjusting bracket by the movement of piston rod 38
2 position on support baseboard 21 so that barycentre steadiness of the adjusting bracket 2 on support baseboard 21, avoid centre-of gravity shift from causing to fill
That puts is unstable, and fixed mount 18 includes telescopic fixing rod 26 and limiting plate, and limiting plate includes upper limit plate 27 and lower limiting board 28,
For telescopic fixing rod 26 between upper limit plate 27 and lower limiting board 28, the design of upper limit plate 27 and lower limiting board 28 can be so as to
In the installation of telescopic fixing rod 26, while can be fixed again in order to the installation between fixed mount 18 and support baseboard 21, travelling carriage
Support clamp 29 is provided with 19 bottom surface, treatment box 1 is connected in support clamp 29, and passes through 30 spacing fixation of screw, branch
Support and microorganism band 31 is evenly arranged with the bottom surface of clamp 29, the design of support clamp 29 can be pacified in order to the clamping for the treatment of box 1
Dress, the design of screw 30 may insure the performance that firmly installs for the treatment of box 1, and connection is flexible, convenient disassembly, effectively improves device
Stability, processing of the device to sewage of being more convenient for, the left and right ends of travelling carriage 19 are provided with fixed hanger 32, fixed hanger
32 design can be in order to the installation between device and other equipment, and the bottom surface that mobile devices are symmetricly set on support baseboard 21 is left
Right both sides, mobile devices include driving wheel 33 and driven pulley 34, and driving wheel 33 is connected by connecting shaft 35 with driven pulley 34,
Driving wheel 33 drives the rotation of driven pulley 34 by balata belt 36, overall construction design more compact and reasonable, uses operation
More just
Using a kind of processing method of river sewage integrated treatment unit as described above, it is characterised in that:Including following step
Suddenly:
1) the installation positioning of device:
(1) water inlet pipe 4 and drainpipe 5 are installed in the left and right sides for the treatment of box 1 according to the size for the treatment of box 1, it is ensured that
Drainpipe 5 is located at the top of water inlet pipe 4, then installs injector head 6, then the inside to treatment box 1 according to the length of drainpipe 5
Installed, the internal part of first cavity 7 and the second cavity is entered according to the actual installation position of water inlet pipe 4 and drainpipe 5
Row installation, successively filter layer 40, adsorption layer 41 and purification pipe 42 are installed in the first cavity 7 and the second cavity, it is ensured that sewage
Filter layer 40, adsorption layer 41 and purification pipe 42 are had to pass through after being entered from water inlet pipe 4 in the first cavity 7 and the second cavity
Sprayed again from the injector head 6 on drainpipe 5 after processing, then the internal part of the 3rd cavity 8 is installed, according to stirring motor
15 size, the 3rd cavity 8 is partitioned into by medicament chamber 10 and stir chamber 11 by sealing plate 9, stirring motor 15 is installed to and stirred
Mix in chamber 11, then agitator arm 17 be installed on agitating shaft 16, then disinfectant 14 is added in medicament chamber 10, it is ensured that
Disinfectant 14 in medicament chamber 10 is full of, consequently facilitating subsequently water quality is disinfected, then on the top surface of the 3rd cavity 8
Delivery pump 12 is installed,;
(2) treatment box 1 is fixed on adjusting bracket 2, and microorganism band 31 is installed on the bottom surface of support clamp 29, so
The length of telescopic fixing rod 26 is adjusted according to the actual water level in river course afterwards so that the length of telescopic fixing rod 26 is higher than river water level
Highly, then by adjusting the length of pull rope 20, height of the travelling carriage 19 on fixed mount 18 is changed, it is ensured that the bottom for the treatment of box 1
Portion is immersed in river course, and drainpipe 5 is located above water level, then adjusting bracket 2 is fixed on support baseboard 21, then by driving gas
Cylinder 37 is connected with lower limiting board 28, then adjusts position of the adjusting bracket 2 on support baseboard 21 by drive cylinder 37 so that
The structure of whole device is more stable, avoids treatment box 1 from being located at the side of adjusting bracket 2, and causes whole device crank,
(3) after device installs, river course is carried out by equitable subsection according to river course physical length, in each processing river course section
The good device of one assembly is installed, spud pile is set at the both ends of processing river course section first, then by steel wire rope by both ends
Connected between spud pile, and ensure the fixation hanger 32 on steel wire penetrating travelling carriage 19 so that device is along steel wire rope
Direction moves, so that it is guaranteed that in river course sewage processing quality;
2) sewage disposal:
(1) after device is put into river course, the sewage in river course enters the first cavity 7 and the second cavity from water inlet pipe 4
It is interior, by being handled while the first cavity 7 and the second cavity, effectively accelerate the processing speed of sewage, sewage enters the first chamber
In the cavity of body 7 and second, first pass around filter layer 40 and remove the impurity in sewage, then by the absorption effluent of adsorption layer 41
Peculiar smell, the water quality after river sewage processing is improved, then sewage enters purification pipe 42, by purifying the processing of pipe 42, to dirt
Water is further processed so that the water quality after sewage disposal is more preferable, and the sewage after then handling is from the injection on drainpipe 5
First 6 spray, and increase the contact area of sewage and air, the oxygen content in sewage are improved, simultaneously because between drainpipe 5 and water level
With a certain distance so that the drop effect of sewage is more preferable, processing quality of further increasing water quality;
(2) while disinfectant 14 in medicament chamber 10 is transported in medicine spraying tube group 13 by delivery pump 12, then from medicine spraying tube group
13 are sprayed onto in river course, and carried out disinfection processing to the sewage in river course, and the stirring motor 15 in stir chamber 11 is opened, and is stirred
The rotation that motor 15 drives agitator arm 17 by agitating shaft 16 is mixed, so as to be stirred to the sewage in river course, increases river course
The mobile performance of interior sewage, the growth and breeding of microorganism in river course is more beneficial for, improves the self-purification capacity in river course, cause sterilization again
Stirring is sufficiently mixed between medicament 14 and sewage, accelerates the processing speed of sewage;
(3) while treatment box 1 is handled the sewage in river course, support the microorganism band 31 on the bottom surface of clamp 29 right
Sewage carries out microbiological treatment, by the new into metabolism of microorganism, degrades and utilize the harmful substance in sewage so that sewage obtains
To purified treatment;
(4) device drives driving wheel 33 to rotate, driving wheel 33 is again after same position handles a period of time by driver
Driven pulley 34 is driven to rotate by balata belt 36 so that device moves along steel wire rope, changes position of the device in river course,
So as to carry out processing in all directions to the sewage in river course, more automated using operation;
3) cleaning is repaired with checking:
The inside of regular device is repaired and cleared up, so that it is guaranteed that device uses the longevity to sewage disposal, extension fixture
Life.
The specific embodiment of the present invention is these are only, but the technical characteristic of the present invention is not limited thereto.It is any with this hair
Based on bright, to realize essentially identical technique effect, made ground simple change, equivalent substitution or modification etc., all cover
Among protection scope of the present invention.
Claims (9)
- A kind of 1. river sewage integrated treatment unit, it is characterised in that:It is described including treatment box, adjusting bracket and running gear Water inlet pipe and drainpipe are provided with the left and right sides for the treatment of box, the drainpipe is located at the top of the water inlet pipe, institute State and injector head is provided with drainpipe, the treatment box is internally provided with the first cavity, the second cavity and the 3rd cavity, described Filter layer, adsorption layer and purification pipe, second cavity are provided with first cavity and the 3rd cavity and passes through sealing plate Medicament chamber and stir chamber are partitioned into, delivery pump, one end of the delivery pump and the medicine are provided with the top surface of the medicament chamber Agent chamber is connected, and the other end of the delivery pump is provided with medicine spraying tube group, and the medicament intracavitary is provided with disinfectant, described to stir Mix intracavitary and be provided with stirring motor, the agitating shaft of the stirring motor extends to the bottom surface of the treatment box, the agitating shaft Bottom is provided with agitator arm, and the adjusting bracket includes fixed mount and travelling carriage, and the travelling carriage is set on the fixed mount, Moved up and down along the fixed mount, the top of the travelling carriage is connected by pull rope with the fixed mount, the treatment box It is connected with the travelling carriage, the running gear includes support baseboard and mobile devices, and the fixed mount is located at the support On bottom plate, the mobile devices are symmetricly set at left and right sides of the bottom surface of the support baseboard.
- A kind of 2. river sewage integrated treatment unit according to claim 1, it is characterised in that:The purification pipe spiral Set, microbe stuffing be provided with the purification pipe, the upper end of the purification pipe by upper mounted plate and first cavity, The madial wall of 3rd cavity is connected, and the lower end of the purification pipe passes through bottom plate and first cavity, described the The madial wall of three cavitys is connected, and permeable hole is evenly arranged with the bottom plate.
- A kind of 3. river sewage integrated treatment unit according to claim 1, it is characterised in that:The filter layer is ripple Line shape.
- A kind of 4. river sewage integrated treatment unit according to claim 1, it is characterised in that:The fixed mount includes Telescopic fixing rod and limiting plate, the limiting plate include upper limit plate and lower limiting board, and the telescopic fixing rod is located on described Between limiting plate and the lower limiting board.
- A kind of 5. river sewage integrated treatment unit according to claim 1, it is characterised in that:The bottom of the travelling carriage Support clamp is provided with face, the treatment box is connected in the support clamp, and passes through the spacing fixation of screw, the support Microorganism band is evenly arranged with the bottom surface of clamp.
- A kind of 6. river sewage integrated treatment unit according to claim 1, it is characterised in that:A left side for the travelling carriage Right both ends are provided with fixed hanger.
- A kind of 7. river sewage integrated treatment unit according to claim 1, it is characterised in that:The mobile devices bag Driving wheel and driven pulley are included, the driving wheel is connected by connecting shaft with the driven pulley, and the driving wheel passes through rubber peel With the rotation for driving the driven pulley.
- A kind of 8. river sewage integrated treatment unit according to claim 1, it is characterised in that:On the support baseboard Drive cylinder is provided with, the piston rod of the drive cylinder is connected with the lower limiting board, is provided with the support baseboard Chute, the lower limiting board are connected in the chute, are moved along the chute.
- 9. using a kind of processing method of river sewage integrated treatment unit as claimed in claim 1, it is characterised in that:Bag Include following steps:1) the installation positioning of device:(1) water inlet pipe and drainpipe are installed in the left and right sides for the treatment of box according to the size for the treatment of box, it is ensured that drainpipe position In the top of water inlet pipe, injector head is then installed according to the length of drainpipe, then the inside for the treatment of box installed, according to entering The actual installation position of water pipe and drainpipe is installed to the internal part of the first cavity and the second cavity, successively will filtering Layer, adsorption layer and purification pipe be installed in the first cavity and the second cavity, it is ensured that sewage from water inlet pipe enter the first cavity and Sprayed again from the injector head on drainpipe after the processing of filter layer, adsorption layer and purification pipe is had to pass through after in second cavity, then The internal part of 3rd cavity is installed, according to the size of stirring motor, by sealing plate by the 3rd cavity interval patent medicine Agent chamber and stir chamber, stirring motor is installed in stir chamber, then agitator arm is installed on agitating shaft, then by disinfectant Agent is added to medicament intracavitary, it is ensured that and the disinfectant of medicament intracavitary is full of, consequently facilitating subsequently water quality is disinfected, then Delivery pump is installed on the top surface of 3rd cavity,;(2) treatment box is fixed on adjusting bracket, and microorganism band is installed on the bottom surface of support clamp, then according to river course Actual water level regulation telescopic fixing rod length so that the length of telescopic fixing rod then passes through tune higher than river water level height The length of pull rope is saved, changes height of the travelling carriage on fixed mount, it is ensured that the lower submerged for the treatment of box is in river course, drainpipe It is fixed on support baseboard, then drive cylinder is connected with lower limiting board, then pass through above water level, then by adjusting bracket Drive cylinder adjusts position of the adjusting bracket on support baseboard so that the structure of whole device is more stable, avoids treatment box Positioned at the side of adjusting bracket, and cause whole device crank,(3) after device installs, river course is carried out by equitable subsection according to river course physical length, installed in each processing river course section The good device of one assembly, spud pile is set at the both ends of processing river course section first, then by steel wire rope by the fixation at both ends Connected between stake, and ensure the fixation hanger on steel wire penetrating travelling carriage so that direction of the device along steel wire rope is carried out It is mobile, so that it is guaranteed that in river course sewage processing quality;2) sewage disposal:(1) after device is put into river course, the sewage in river course is entered in the first cavity and the second cavity from water inlet pipe, is passed through Handled while first cavity and the second cavity, effectively accelerate the processing speed of sewage, sewage enters the first cavity and second In cavity, first pass around filter layer and remove the impurity in sewage, then by the peculiar smell in adsorption layer absorption effluent, improve river course Water quality after sewage disposal, then sewage, which enters, purifies pipe, by purifying the microbe stuffing in pipe to entering to advance to sewage The processing of one step so that the water quality after sewage disposal is more preferable, and the sewage after then handling sprays from the injector head on drainpipe, increases The contact area of big sewage and air, improves the oxygen content in sewage, simultaneously because having necessarily between drainpipe and water level Distance so that the drop effect of sewage is more preferable, processing quality of further increasing water quality;(2) while medicament intracavitary disinfectant is transported in medicine spraying tube group by delivery pump, then is sprayed onto from medicine spraying tube group in river course, Carried out disinfection processing to the sewage in river course, and the stirring motor in stir chamber is opened, and stirring motor is driven by agitating shaft The rotation of agitator arm, so as to be stirred to the sewage in river course, increase the mobile performance of sewage in river course, be more beneficial for river The growth and breeding of microorganism in road, the self-purification capacity in river course is improved, causes to be sufficiently mixed stirring between disinfectant and sewage again, Accelerate the processing speed of sewage;(3) while treatment box is handled the sewage in river course, the microorganism band on clamp bottom surface is supported to carry out sewage Microbiological treatment, by the new into metabolism of microorganism, degrade and utilize the harmful substance in sewage so that sewage is purified place Reason;(4) device drives driving wheel to rotate, driving wheel passes through rubber again after same position handles a period of time by driver Belt drive driven pulley rotates so that device moves along steel wire rope, changes position of the device in river course, so as to in river course Sewage carry out processing in all directions, more automated using operation;3) cleaning is repaired with checking:The inside of regular device is repaired and cleared up, so that it is guaranteed that device is to sewage disposal, the service life of extension fixture.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711035336.1A CN107879549B (en) | 2017-10-30 | 2017-10-30 | River sewage integrated treatment device and method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711035336.1A CN107879549B (en) | 2017-10-30 | 2017-10-30 | River sewage integrated treatment device and method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107879549A true CN107879549A (en) | 2018-04-06 |
CN107879549B CN107879549B (en) | 2020-06-30 |
Family
ID=61782842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711035336.1A Active CN107879549B (en) | 2017-10-30 | 2017-10-30 | River sewage integrated treatment device and method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107879549B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108751312A (en) * | 2018-05-30 | 2018-11-06 | 嘉兴星创科技有限公司 | The cleaning plant of floccule in a kind of textile fabric printing and dyeing waste water |
CN111960551A (en) * | 2020-07-22 | 2020-11-20 | 哈尔滨工程大学 | Marine oil stain degradation microbial inoculum throwing device and throwing method thereof |
CN113060857A (en) * | 2021-03-19 | 2021-07-02 | 鄂尔多斯应用技术学院 | A mining area river course sewage continuous type processing apparatus for mining area ecological remediation |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103144743A (en) * | 2013-03-22 | 2013-06-12 | 武汉恒威重机有限公司 | Integral sludge solidification ship |
CN204737853U (en) * | 2015-05-16 | 2015-11-04 | 深圳市万山红环保实业有限公司 | Riverway sewage centralized processing system |
CN106007123A (en) * | 2016-06-27 | 2016-10-12 | 浙江水利水电学院 | Water quality purification treatment device and method for landscape fishpond |
CN106430623A (en) * | 2016-10-13 | 2017-02-22 | 宁波池泓环保设备工程有限公司 | River channel wastewater original-ecological treatment apparatus |
CN106630384A (en) * | 2016-11-11 | 2017-05-10 | 浙江同济科技职业学院 | Water treatment system and treatment method applied to urban lake |
CN206521366U (en) * | 2017-01-18 | 2017-09-26 | 广东城基生态科技股份有限公司 | A kind of river corridor restoration system |
CN206538317U (en) * | 2017-03-16 | 2017-10-03 | 浙江水利水电学院 | A kind of small-scale sewage integrated apparatus for city river sewage disposal |
CN206562325U (en) * | 2017-02-23 | 2017-10-17 | 中煤鄂尔多斯能源化工有限公司 | A kind of petrochemical wastewater processing unit of uniform coagulation |
-
2017
- 2017-10-30 CN CN201711035336.1A patent/CN107879549B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103144743A (en) * | 2013-03-22 | 2013-06-12 | 武汉恒威重机有限公司 | Integral sludge solidification ship |
CN204737853U (en) * | 2015-05-16 | 2015-11-04 | 深圳市万山红环保实业有限公司 | Riverway sewage centralized processing system |
CN106007123A (en) * | 2016-06-27 | 2016-10-12 | 浙江水利水电学院 | Water quality purification treatment device and method for landscape fishpond |
CN106430623A (en) * | 2016-10-13 | 2017-02-22 | 宁波池泓环保设备工程有限公司 | River channel wastewater original-ecological treatment apparatus |
CN106630384A (en) * | 2016-11-11 | 2017-05-10 | 浙江同济科技职业学院 | Water treatment system and treatment method applied to urban lake |
CN206521366U (en) * | 2017-01-18 | 2017-09-26 | 广东城基生态科技股份有限公司 | A kind of river corridor restoration system |
CN206562325U (en) * | 2017-02-23 | 2017-10-17 | 中煤鄂尔多斯能源化工有限公司 | A kind of petrochemical wastewater processing unit of uniform coagulation |
CN206538317U (en) * | 2017-03-16 | 2017-10-03 | 浙江水利水电学院 | A kind of small-scale sewage integrated apparatus for city river sewage disposal |
Non-Patent Citations (1)
Title |
---|
胡孟春等: "《荒漠与生态环境研究》", 31 December 2011, 北京:中国环境科学出版社 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108751312A (en) * | 2018-05-30 | 2018-11-06 | 嘉兴星创科技有限公司 | The cleaning plant of floccule in a kind of textile fabric printing and dyeing waste water |
CN111960551A (en) * | 2020-07-22 | 2020-11-20 | 哈尔滨工程大学 | Marine oil stain degradation microbial inoculum throwing device and throwing method thereof |
CN113060857A (en) * | 2021-03-19 | 2021-07-02 | 鄂尔多斯应用技术学院 | A mining area river course sewage continuous type processing apparatus for mining area ecological remediation |
Also Published As
Publication number | Publication date |
---|---|
CN107879549B (en) | 2020-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108218084A (en) | A kind of urban sewage treatment system and its processing method | |
CN100484903C (en) | Fermentation treater of zero-discharge fowl and animal excrement | |
CN107879549A (en) | A kind of river sewage integrated treatment unit and its processing method | |
CN207330639U (en) | A kind of effluent treatment plant | |
CN105198177B (en) | Integrated sewage treating apparatus | |
CN110642465A (en) | Intelligent recycling zero-emission sewage treatment system | |
CN116332353A (en) | Sewage treatment process for high-efficiency denitrification and dephosphorization | |
CN206033417U (en) | Sewage treatment equipment | |
CN1180991C (en) | Combined sewage treating process and apparatus | |
CN116789275A (en) | Comprehensive treatment equipment and method for river water environment | |
CN1309664C (en) | Reinforced biological contacting oxidation water correction apparatus | |
CN115490403A (en) | Integrated sewage treatment equipment and sewage treatment method | |
CN211546280U (en) | Sewage treatment device | |
CN208500605U (en) | A kind of environment-friendly sewage processing equipment with rotation function | |
CN209128264U (en) | A kind of biomembrane treatment tank | |
CN215161984U (en) | Sewage treatment system with multistage filter structure for river regulation | |
CN219409470U (en) | Sewage treatment device for water environment treatment | |
CN219194690U (en) | Landscape pond purifier | |
CN220034081U (en) | Landscape water environment treatment device | |
CN220678168U (en) | Permanent magnet separator | |
CN210001739U (en) | Water quality microorganism purification device | |
CN219681888U (en) | Algae removal equipment | |
CN208104024U (en) | A kind of MBR film swing type sewage processing unit | |
CN214990403U (en) | Sewage solid-liquid separation treatment device | |
CN202080985U (en) | Mini-type sewage-disposal device driven by wind power energy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20191115 Address after: 315000 room M103, building 1, Lane 60, siyanqi street, Yinzhou District, Ningbo City, Zhejiang Province Applicant after: NINGBO SHUNXING GARDEN CONSTRUCTION CO., LTD. Address before: 323800 Songyuan New Road, Qingyuan County, Lishui City, Zhejiang Province, 17 Applicant before: Zhejiang Xin Xin Construction Co., Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |