CN107872024A - A kind of low tension switch hotline maintenance instrument - Google Patents
A kind of low tension switch hotline maintenance instrument Download PDFInfo
- Publication number
- CN107872024A CN107872024A CN201711381254.2A CN201711381254A CN107872024A CN 107872024 A CN107872024 A CN 107872024A CN 201711381254 A CN201711381254 A CN 201711381254A CN 107872024 A CN107872024 A CN 107872024A
- Authority
- CN
- China
- Prior art keywords
- plate
- phases
- phase
- low tension
- tension switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 31
- 238000009413 insulation Methods 0.000 claims abstract description 87
- 230000004888 barrier function Effects 0.000 claims abstract description 61
- 239000011810 insulating material Substances 0.000 claims description 3
- 238000012360 testing method Methods 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract description 2
- 238000002474 experimental method Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 230000004224 protection Effects 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 229920005479 Lucite® Polymers 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004926 polymethyl methacrylate Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B3/00—Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Power Engineering (AREA)
- Distribution Board (AREA)
Abstract
The invention discloses a kind of low tension switch hotline maintenance instrument, including the first three phase isolated baffle plate, the second three phase isolated baffle plate, BC phases insulation barrier, C phases insulation barrier, single-phase insulation barrier and insulation operation spanner;The first left plate and the first right plate of first three phase isolated baffle plate are arranged with three bus slots, and the second left plate and the second right plate of the second three phase isolated baffle plate are arranged with three bus slots;The 3rd left plate and the 3rd right plate of BC phase insulation barriers are arranged with two bus slots;The 4th left plate and the 4th right plate of C phase insulation barriers are arranged with a bus slot;Single-phase insulation barrier is one flat plate, provided with a horizontal slot.It has the technical effect that:The security of operation is can ensure that, ensures the personal safety of operating personnel;The power failure range that power failure area becomes from original whole case is reduced to the power failure range in the low tension switch loop for needing to overhaul, test or change.
Description
Technical field
The present invention relates to a kind of low tension switch hotline maintenance instrument in electrician tool field.
Background technology
Case becomes in the process of running because of a variety of causes, and low tension switch occurs that failure needs to overhaul, test or change.It is and traditional
Maintenance, experiment or to change the method for low tension switch be that the high pressure inlet wire for becoming case has a power failure, case becomes overall and had a power failure, then maintenance,
Low tension switch is changed in experiment, recovers power transmission again after maintenance, experiment or replacing low tension switch.The drawbacks of this method, is aobvious and easy
See:Increase maintenance, experiment and early stage and the later stage work amount of changing low tension switch, are related to 10kV line outages, power off time
Length, power failure area are big, influence user power utilization quality.
The content of the invention
The invention aims to overcome the deficiencies in the prior art, there is provided a kind of low tension switch hotline maintenance instrument, its
The security of operation is can ensure that, ensures the personal safety of operating personnel;The power failure range that power failure area becomes from original whole case subtracts
Few power failure range to the low tension switch loop for needing to overhaul, test or change.
Realizing a kind of technical scheme of above-mentioned purpose is:A kind of low tension switch hotline maintenance instrument, including the first three-phase are exhausted
Edge baffle plate, the second three phase isolated baffle plate, BC phases insulation barrier, C phases insulation barrier, single-phase insulation barrier and insulation operation spanner;
The first three phase isolated baffle plate is made up of the first left plate, the first right plate, the first top plate and the first front side board,
First left plate and first right plate are arranged with three bus slots;
The second three phase isolated baffle plate is made up of the second left plate, the second right plate, the second top plate and the second front side board,
Second left plate and second right plate are arranged with three bus slots;
The BC phases insulation barrier is made up of the 3rd left plate, the 3rd right plate, the 3rd top plate and the 3rd front side board, described
3rd left plate and the 3rd right plate are arranged with two bus slots;
The C phases insulation barrier is made up of the 4th left plate, the 4th right plate, the 4th top plate and the 4th front side board, described
4th left plate and the 4th right plate are arranged with a bus slot;
The single-phase insulation barrier is one flat plate, provided with a horizontal slot.
Further, the first top plate of the first three phase isolated baffle plate be provided with can be with the zero line lead-in line row of low tension switch
The zero line lead-in line row neck of clamping;
3rd top plate of the BC phases insulation barrier is provided with can be with the A phase inlet wires of the A phase lead-in line row clampings of low tension switch
Arrange neck;
4th top plate of the C phases insulation barrier is provided with can be with the B phase lead-in line rows of the B phase lead-in line row clampings of low tension switch
Neck.
Further, the first three phase isolated baffle plate and the second three phase isolated baffle plate are contour, and the BC phases insulate
The height of baffle plate is less than the height of the first three phase isolated baffle plate, and the height of the C phases insulation barrier is exhausted less than the BC phases
The height of edge baffle plate.
Further, the first three phase isolated baffle plate, the second three phase isolated baffle plate, the BC phases insulation barrier,
The C phases insulation barrier and the single-phase insulation barrier are made by transparent insulating materials.
Further, the insulation operation spanner is the first insulation operation spanner or the second insulation operation spanner;
The first insulation operation spanner includes being used for the sleeve part for operating low tension switch, for rotating the sleeve part
Rotating part, pass through the connection axis connection coaxial with the sleeve part between the rotating part and the sleeve part;
The second insulation operation spanner includes being used for the wrench body for operating low tension switch, and is connected to the spanner
The Handheld Division of body tail end.
Employ a kind of technical scheme of low tension switch hotline maintenance instrument of the present invention, including the first three phase isolated gear
Plate, the second three phase isolated baffle plate, BC phases insulation barrier, C phases insulation barrier, single-phase insulation barrier and insulation operation spanner;It is described
First three phase isolated baffle plate is made up of the first left plate, the first right plate, the first top plate and the first front side board, first left side
Plate and first right plate are arranged with three bus slots;The second three phase isolated baffle plate is by the second left plate, second
Right plate, the second top plate and the second front side board composition, second left plate and second right plate are arranged with three mothers
Line slot;The BC phases insulation barrier is made up of the 3rd left plate, the 3rd right plate, the 3rd top plate and the 3rd front side board, described
3rd left plate and the 3rd right plate are arranged with two bus slots;The C phases insulation barrier is by the 4th left plate,
Four right plates, the 4th top plate and the 4th front side board composition, the 4th left plate and the 4th right plate are arranged with one
Bus slot;The single-phase insulation barrier is one flat plate, provided with a horizontal slot.It has the technical effect that:It can ensure that operation
Security, ensure the personal safety of operating personnel;The power failure range that power failure area becomes from original whole case be reduced to need maintenance,
Experiment or the power failure range in the low tension switch loop changed.
Brief description of the drawings
Fig. 1 is a kind of the first three phase isolated baffle arrangement schematic diagram of low tension switch hotline maintenance instrument of the present invention.
Fig. 2 is a kind of the second three phase isolated baffle arrangement schematic diagram of low tension switch hotline maintenance instrument of the present invention.
Fig. 3 is a kind of BC phase insulation barrier structural representations of low tension switch hotline maintenance instrument of the present invention.
Fig. 4 is a kind of C phase insulation barrier structural representations of low tension switch hotline maintenance instrument of the present invention.
Fig. 5 is a kind of single-phase insulation barrier structural representation of low tension switch hotline maintenance instrument of the present invention.
Fig. 6 is a kind of the first insulation operation spanner structural representation of low tension switch hotline maintenance instrument of the present invention.
Fig. 7 is a kind of the second insulation operation spanner structural representation of low tension switch hotline maintenance instrument of the present invention.
Fig. 8 is that a kind of low tension switch hotline maintenance instrument of the present invention uses schematic diagram before A phase lead-in line rows are dismantled.
Fig. 9 is that a kind of low tension switch hotline maintenance instrument of the present invention uses schematic diagram after B phase lead-in line rows are dismantled.
Embodiment
Refer to Fig. 1 to Fig. 9, the present inventor in order to preferably understand technical scheme,
It is described in detail below by specifically embodiment, and with reference to accompanying drawing:
Low tension switch 9 includes horizontal A phases bus 91, B phases bus 92 and C phases bus 93.A phases bus 91, B phases bus 92
The first A phases lead-in line row 911, the first B phase lead-in line rows being vertically arranged in groups are sequentially provided between C phases bus 93 and input terminal
921 and the first C phases lead-in line row 931, the 2nd A phases lead-in line row 912, the 2nd B phases lead-in line row 922 and the 2nd C being vertically arranged in groups
Phase lead-in line row 932, the 3rd A phases lead-in line row 913, the 3rd B phases lead-in line row 923 and the 3rd C phase lead-in line rows being vertically arranged in groups
933, and one perpendicular with the first A phases lead-in line row 911, the first B phases lead-in line row 921 and the position correspondence of the first C phases lead-in line row 931
Straight zero line lead-in line row 94.
A kind of low tension switch hotline maintenance instrument of the present invention, including the first three phase isolated baffle plate 1, the second three phase isolated gear
Plate 2, BC phases insulation barrier 3, C phases insulation barrier 4, single-phase insulation barrier 5, and the first insulation operation spanner 6 and second insulate
Operation spanner 7.
First three phase isolated baffle plate 1 is by the first left plate 11, the first right plate 12, the first top plate 13 and the first front side board 14
Form, three first bus slots 15 are arranged with the first left plate 11 and on the first right plate 12, corresponding to low tension switch 9
A phases bus 91, B phases bus 92 and C phases bus 93.Three first buses on first left plate 11 and on the first right plate 12
Slot 15 be arranged in parallel.First top plate 13 of the first three phase isolated baffle plate 1 is provided with corresponding with zero line lead-in line row 94
Zero line lead-in line row neck 16.
Second three phase isolated baffle plate 2 is by the second left plate 21, the second right plate 22, the second top plate 23 and the second front side board 24
Form, three second bus slots 25 are arranged with the second left plate 21 and on the second right plate 22, corresponding to low tension switch 9
A phases bus 91, B phases bus 92 and C phases bus 93.Three second buses on second left plate 21 and on the second right plate 22
Slot 25 be arranged in parallel.
BC phases insulation barrier 3 is by the 3rd left plate 31, the 3rd right plate 32,34 groups of the 3rd top plate 33 and the 3rd front side board
Into symmetrically having two triple bus-bar slots 35 on the 3rd left plate 31 and the 3rd right plate 32, corresponding to the B phases of low tension switch 9
Bus 92 and C phases bus 93.With two triple bus-bar slots 35 on the 3rd right plate 32 it is parallel on 3rd left plate 31
Set.3rd top plate 33 is provided with the A phase lead-in line rows neck 36 corresponding to the 2nd A phases lead-in line row 912.
C phases insulation barrier 4 is included by the 4th left plate 41, the 4th right plate 42, the 4th top plate 43 and the 4th front side board 44
Form, a 4th bus slot 45 is arranged with the 4th left plate 41 and on the 4th right plate 42, corresponding to low tension switch 9
C phases bus 93.4th top plate 43 of C phases insulation barrier 4 is provided with the B phase lead-in line row cards corresponding to the 2nd B phases lead-in line row 922
Groove 46.
Single-phase insulation barrier 5 is one flat plate, provided with can with the A phases bus 91 of low tension switch 9, B phases bus 92 is horizontal inserts
The horizontal slot 51 connect.
First three phase isolated baffle plate 1, the second three phase isolated baffle plate 2, BC phases insulation barrier 3, C phases insulation barrier 4 and single-phase
Insulation barrier 5 is made by transparent insulating materials, such as lucite.The height h1 of first three phase isolated baffle plate 1 is equal to the
The height h3 of height h2, the BC phase insulation barrier 3 of two three phase isolated baffle plates 92 is less than the height h1, C of the first three phase isolated baffle plate 1
The height h4 of phase insulation barrier 4 is less than the height h3 of BC phases insulation barrier 3, adapts to the needs of installation in low tension switch 9.
First insulation operation spanner 6 includes being used for the sleeve part 61 for operating low tension switch 9, the rotation for turnbarrel portion 61
Transfer part 62, it is connected between rotating part 62 and sleeve part 61 by the connecting shaft 63 coaxial with sleeve part 61.
Second insulation operation spanner 7 includes being used for the wrench body 71 for operating low tension switch 9, and is connected to wrench body
The Handheld Division 72 of 71 tail ends.
During use:
As shown in figure 8, three first bus slots 15 on the first left plate 11 of the first three phase isolated baffle plate 1, and
Three first bus slots 15 on first right plate 12 are corresponding with A phases bus 91, B phases bus 92 and C phases bus 93 horizontal slotting
Connect, including the first A phases lead-in line row 911, the first B phases lead-in line row 921 and the insulation protection of the first C phases lead-in line row 931, the first A phases
Lead-in line row 911, the first B phases lead-in line row 921 and the first C phases lead-in line row 931 are close to the first front side board 13.Zero line lead-in line row 94 is caught in
In zero line lead-in line row neck 16, and it is close to the bottom land of zero line lead-in line row neck 16.
Three second bus slots 25 on second left plate 21 of the second three phase isolated baffle plate 2, and the second right plate
Three second bus slots 25 and the 93 corresponding horizontal grafting of A phases bus 91, B phases bus 92 and C phases bus on 22, by the 3rd A
Including phase lead-in line row 913, the 3rd B phases lead-in line row 923 and the insulation protection of the 3rd C phases lead-in line row 933, the 3rd A phases lead-in line row 913,
3rd B phases lead-in line row 923 and the 3rd C phases lead-in line row 933 are close to the second front side board 23.
It has been achieved in that the both ends of A phases bus 91, B phases bus 92 and C phases bus 93 and isolating for charging member.
Two triple bus-bar slots 35 on 3rd left plate 31 of BC phases insulation barrier 3, and on the 3rd right plate 32
Two triple bus-bar slot 35 and B phases buses 92 and C phases bus 93 horizontal grafting, by the 2nd B phases lead-in line row 922 and second
Including the insulation protection of C phases lead-in line row 932, the 2nd B phases lead-in line row 922 and the 2nd C phases lead-in line row 932 are close to the 3rd front side board 33.
2nd A phases lead-in line row 912 is caught in A phase lead-in line rows neck 36, is close to the bottom land of A phase lead-in line rows neck 36.Thus achieve A phases
Bus 91 and B phases bus 92, C phases bus 93 are isolated.Then the first insulation insulation operation spanner of operation spanner 6 or second is utilized
7 remove the 2nd A phases lead-in line row 912.
As shown in figure 9, after the 2nd A phases lead-in line row 912 is removed, the 4th on the 4th left plate 41 of C phases insulation barrier 3 is female
The horizontal grafting of triple bus-bar slot 45 and C phases bus 93 on line slot 45, and the 4th right plate 44, the 2nd C phases are entered
Including line arranges 932 insulation protections, the 2nd C phases lead-in line row 932 is close to the 4th front side board 43.2nd B phases lead-in line row 922 is caught in B phases
In lead-in line row neck 46, and it is close to the bottom land of B phase lead-in line rows neck 46.Meanwhile the horizontal slot 51 of single-phase insulation barrier 5 is
The top of two B phases lead-in line rows 922 and the 91 horizontal grafting of A phases bus, are achieved in A phase buses, female with B phases bus 92 and C phases
Line 93 is isolated with live part, and the 2nd B phases lead-in line row 922 of low tension switch is removed.Then in the 2nd C phases lead-in line row 932
Top, the grafting of horizontal slot 51 and B phases bus 92 of single-phase insulation barrier 5, by the 2nd C phases lead-in line row 932 of low tension switch
Remove.
Then overhaul, test or change low tension switch, after the completion of low tension switch and corresponding phase are installed in the opposite order
Lead-in line row.
A kind of low tension switch hotline maintenance instrument of the present invention, the high of dielectric strength can reach more than 20kV/min, meet band
The safety requirements of electric operation, European-type box change is widely used in, it is in light weight, carry, be easy for installation, using simple.
The present invention a kind of low tension switch hotline maintenance instrument, the first three phase isolated baffle plate 1, the second three phase isolated baffle plate 2,
BC phases insulation barrier 3, C phases insulation barrier 4, single-phase insulation barrier 5, installation is simple, can guarantee that effective safe distance, security
It is stronger, simultaneously because it belongs to rigid insulation shading tool, service life length, usually 8-10, it is not required to during to low tension switch 9
Application, which has a power failure, to be planned, and power failure area and power off time are greatly decreased.
A kind of low tension switch hotline maintenance instrument of the present invention, it can be ensured that the security of operation, ensure the people of operating personnel
Body safety;The power failure range that power failure area becomes from original whole case is reduced to the low tension switch for needing to overhaul, test or change and returned
Road power failure range, maintenance, the early stage of experiment and later stage work are reduced, without applying for 10 kilovolts of power failure plans.
Those of ordinary skill in the art it should be appreciated that the embodiment of the above be intended merely to explanation the present invention,
And be not used as limitation of the invention, as long as in the spirit of the present invention, the change to embodiment described above
Change, modification will all fall in the range of claims of the present invention.
Claims (5)
- A kind of 1. low tension switch hotline maintenance instrument, it is characterised in that:Kept off including the first three phase isolated baffle plate, the second three phase isolated Plate, BC phases insulation barrier, C phases insulation barrier, single-phase insulation barrier and insulation operation spanner;The first three phase isolated baffle plate is made up of the first left plate, the first right plate, the first top plate and the first front side board, described First left plate and first right plate are arranged with three bus slots;The second three phase isolated baffle plate is made up of the second left plate, the second right plate, the second top plate and the second front side board, described Second left plate and second right plate are arranged with three bus slots;The BC phases insulation barrier is made up of the 3rd left plate, the 3rd right plate, the 3rd top plate and the 3rd front side board, and the described 3rd Left plate and the 3rd right plate are arranged with two bus slots;The C phases insulation barrier is made up of the 4th left plate, the 4th right plate, the 4th top plate and the 4th front side board, and the described 4th Left plate and the 4th right plate are arranged with a bus slot;The single-phase insulation barrier is one flat plate, provided with a horizontal slot.
- A kind of 2. low tension switch hotline maintenance instrument according to claim 1, it is characterised in that:First three phase isolated First top plate of baffle plate is provided with can be with the zero line lead-in line row neck of the zero line lead-in line row clamping of low tension switch;3rd top plate of the BC phases insulation barrier is provided with can be with the A phase lead-in line row cards of the A phase lead-in line row clampings of low tension switch Groove;4th top plate of the C phases insulation barrier is provided with can be with the B phase lead-in line row cards of the B phase lead-in line row clampings of low tension switch Groove.
- A kind of 3. low tension switch hotline maintenance instrument according to claim 1, it is characterised in that:First three phase isolated Baffle plate and the second three phase isolated baffle plate are contour, and the height of the BC phases insulation barrier is less than the first three phase isolated baffle plate Height, the height of the C phases insulation barrier is less than the height of the BC phases insulation barrier.
- A kind of 4. low tension switch hotline maintenance instrument according to claim 1, it is characterised in that:First three phase isolated Baffle plate, the second three phase isolated baffle plate, the BC phases insulation barrier, the C phases insulation barrier and the single-phase insulation barrier It is made by transparent insulating materials.
- A kind of 5. low tension switch hotline maintenance instrument according to claim 1, it is characterised in that:The insulation operation spanner For the first insulation operation spanner or the second insulation operation spanner;The first insulation operation spanner includes being used for the sleeve part for operating low tension switch, for rotating the rotation of the sleeve part Portion, pass through the connection axis connection coaxial with the sleeve part between the rotating part and the sleeve part;The second insulation operation spanner includes being used for the wrench body for operating low tension switch, and is connected to the wrench body The Handheld Division of tail end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711381254.2A CN107872024A (en) | 2017-12-20 | 2017-12-20 | A kind of low tension switch hotline maintenance instrument |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711381254.2A CN107872024A (en) | 2017-12-20 | 2017-12-20 | A kind of low tension switch hotline maintenance instrument |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107872024A true CN107872024A (en) | 2018-04-03 |
Family
ID=61755979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711381254.2A Pending CN107872024A (en) | 2017-12-20 | 2017-12-20 | A kind of low tension switch hotline maintenance instrument |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107872024A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111668053A (en) * | 2020-05-22 | 2020-09-15 | 国网浙江东阳市供电有限公司 | Insulating shielding cover for low-voltage knife switch and low-voltage knife switch |
Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2350907Y (en) * | 1998-12-31 | 1999-11-24 | 厦门Abb低压电器设备有限公司 | Multifunctional partition board for distribution switchgear cabinet |
CN201509051U (en) * | 2009-09-24 | 2010-06-16 | 临海市耀明电力设备有限公司 | bus insulating plate |
CN202004364U (en) * | 2010-12-10 | 2011-10-05 | 汝阳县电业局 | Adjustable insulation sleeve |
CN102832551A (en) * | 2011-06-17 | 2012-12-19 | 上海市电力公司 | Low voltage switch protection tool |
CN202840314U (en) * | 2012-10-15 | 2013-03-27 | 沧州供电公司 | T-head insulating operation rod |
CN203218735U (en) * | 2013-05-08 | 2013-09-25 | 梅勒电气(武汉)有限公司 | Electrical cabinet convenient for bus lapping |
CN203976942U (en) * | 2014-06-30 | 2014-12-03 | 郑州发祥铝业有限公司 | A kind of aluminum electrolytic cell riser bus bar short circuit port insulation protective guard |
CN204144745U (en) * | 2014-09-11 | 2015-02-04 | 国家电网公司 | Change the insulated isolated device of 10 KV distribution line disconnecting switches |
CN204517174U (en) * | 2015-03-09 | 2015-07-29 | 周东 | Essential supplies bus box |
CN204651742U (en) * | 2015-06-05 | 2015-09-16 | 国网山东费县供电公司 | A kind of insulating barrier for keeping in repair moving contact of disconnecting link |
CN105337227A (en) * | 2015-10-30 | 2016-02-17 | 国网山东省电力公司东营供电公司 | Copper bar insulating cover in power transmission bus duct |
CN205085887U (en) * | 2015-11-06 | 2016-03-16 | 国家电网公司 | A multi -purpose spanner for electric power construction |
CN105680372A (en) * | 2016-04-15 | 2016-06-15 | 国网上海市电力公司 | Insulating shielding cover for 10kV cable lead wire live-line lapping |
CN205753291U (en) * | 2016-05-12 | 2016-11-30 | 镇江加勒智慧电力科技股份有限公司(中外合资) | Master row insulating protective plate |
CN106229884A (en) * | 2016-08-31 | 2016-12-14 | 国网山东省电力公司曹县供电公司 | A kind of Combined insulating baffle plate preventing phase short-circuit between conductors |
CN206076808U (en) * | 2016-06-08 | 2017-04-05 | 国网山东省电力公司青岛供电公司 | A kind of disconnecting link hard combined shielding cover |
CN206099238U (en) * | 2016-09-26 | 2017-04-12 | 贵州长通电气有限公司 | Protection device that perpendicular generating line of switch board was arranged |
CN106684741A (en) * | 2017-03-07 | 2017-05-17 | 国网浙江省电力公司检修分公司 | Demounting auxiliary tool for substation screen-top miniature bus and application method of demounting auxiliary tool |
CN206558940U (en) * | 2017-02-28 | 2017-10-13 | 广西电网有限责任公司桂林供电局 | A kind of anti-misoperation protective cover of relay protection outlet pressing plate |
CN206575081U (en) * | 2017-02-16 | 2017-10-20 | 国网宁夏电力公司银川供电公司 | Overhead transmission line insulated isolated device |
CN207625172U (en) * | 2017-12-20 | 2018-07-17 | 国网上海市电力公司 | A kind of low tension switch hotline maintenance tool |
-
2017
- 2017-12-20 CN CN201711381254.2A patent/CN107872024A/en active Pending
Patent Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2350907Y (en) * | 1998-12-31 | 1999-11-24 | 厦门Abb低压电器设备有限公司 | Multifunctional partition board for distribution switchgear cabinet |
CN201509051U (en) * | 2009-09-24 | 2010-06-16 | 临海市耀明电力设备有限公司 | bus insulating plate |
CN202004364U (en) * | 2010-12-10 | 2011-10-05 | 汝阳县电业局 | Adjustable insulation sleeve |
CN102832551A (en) * | 2011-06-17 | 2012-12-19 | 上海市电力公司 | Low voltage switch protection tool |
CN202840314U (en) * | 2012-10-15 | 2013-03-27 | 沧州供电公司 | T-head insulating operation rod |
CN203218735U (en) * | 2013-05-08 | 2013-09-25 | 梅勒电气(武汉)有限公司 | Electrical cabinet convenient for bus lapping |
CN203976942U (en) * | 2014-06-30 | 2014-12-03 | 郑州发祥铝业有限公司 | A kind of aluminum electrolytic cell riser bus bar short circuit port insulation protective guard |
CN204144745U (en) * | 2014-09-11 | 2015-02-04 | 国家电网公司 | Change the insulated isolated device of 10 KV distribution line disconnecting switches |
CN204517174U (en) * | 2015-03-09 | 2015-07-29 | 周东 | Essential supplies bus box |
CN204651742U (en) * | 2015-06-05 | 2015-09-16 | 国网山东费县供电公司 | A kind of insulating barrier for keeping in repair moving contact of disconnecting link |
CN105337227A (en) * | 2015-10-30 | 2016-02-17 | 国网山东省电力公司东营供电公司 | Copper bar insulating cover in power transmission bus duct |
CN205085887U (en) * | 2015-11-06 | 2016-03-16 | 国家电网公司 | A multi -purpose spanner for electric power construction |
CN105680372A (en) * | 2016-04-15 | 2016-06-15 | 国网上海市电力公司 | Insulating shielding cover for 10kV cable lead wire live-line lapping |
CN205753291U (en) * | 2016-05-12 | 2016-11-30 | 镇江加勒智慧电力科技股份有限公司(中外合资) | Master row insulating protective plate |
CN206076808U (en) * | 2016-06-08 | 2017-04-05 | 国网山东省电力公司青岛供电公司 | A kind of disconnecting link hard combined shielding cover |
CN106229884A (en) * | 2016-08-31 | 2016-12-14 | 国网山东省电力公司曹县供电公司 | A kind of Combined insulating baffle plate preventing phase short-circuit between conductors |
CN206099238U (en) * | 2016-09-26 | 2017-04-12 | 贵州长通电气有限公司 | Protection device that perpendicular generating line of switch board was arranged |
CN206575081U (en) * | 2017-02-16 | 2017-10-20 | 国网宁夏电力公司银川供电公司 | Overhead transmission line insulated isolated device |
CN206558940U (en) * | 2017-02-28 | 2017-10-13 | 广西电网有限责任公司桂林供电局 | A kind of anti-misoperation protective cover of relay protection outlet pressing plate |
CN106684741A (en) * | 2017-03-07 | 2017-05-17 | 国网浙江省电力公司检修分公司 | Demounting auxiliary tool for substation screen-top miniature bus and application method of demounting auxiliary tool |
CN207625172U (en) * | 2017-12-20 | 2018-07-17 | 国网上海市电力公司 | A kind of low tension switch hotline maintenance tool |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111668053A (en) * | 2020-05-22 | 2020-09-15 | 国网浙江东阳市供电有限公司 | Insulating shielding cover for low-voltage knife switch and low-voltage knife switch |
CN111668053B (en) * | 2020-05-22 | 2024-03-12 | 国网浙江东阳市供电有限公司 | Insulating shielding cover for low-voltage knife switch and low-voltage knife switch |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109286046A (en) | A kind of battery energy storage system | |
CN103552488A (en) | Bilateral power supply system for electrified railway | |
CN107872024A (en) | A kind of low tension switch hotline maintenance instrument | |
CN108092182A (en) | Ultra-high-tension power transmission line is segmented de-icing method and system | |
CN207625172U (en) | A kind of low tension switch hotline maintenance tool | |
CN103701060A (en) | Steel-clad movable-type alternating current metal closed switch cabinet | |
CN207426654U (en) | A kind of mechanical bifurcation connector for lv power cable | |
CN203611784U (en) | Two-side power supply system of electrified railway | |
CN203690788U (en) | Steel-clad movable-type AC metal enclosed switch cabinet | |
CN102222553A (en) | Trough-type connecting hardware fitting of sectional-type composite isolator | |
CN102436918B (en) | Traction transformer for Scott wiring | |
CN205863854U (en) | A kind of use safe efficient dustproof bus duct | |
CN107482523A (en) | Double bus scheme GIS device and its repair method, pressure test method | |
CN205282406U (en) | Circuit breaker adaptation seat | |
CN204497637U (en) | A kind of photovoltaic generation integral type transformer station | |
CN107749601A (en) | A kind of resin-cast terminal bus | |
CN210200619U (en) | Hard isolation baffle for replacing isolation switch insulation combination in electrified manner | |
CN203859420U (en) | Busbar grounding wire used for 10-35kV centrally-arranged type switch cabinet | |
CN205051174U (en) | Structure is arranged to high tension switchgear generating line | |
CN109301705A (en) | Power distribution cabinet | |
CN211743679U (en) | Copper bar connection structure is become to microgrid case | |
CN209388779U (en) | A kind of condenser type isolated bus taken up little area | |
CN207896028U (en) | A kind of 4 phase inlet wires conversion phase outlet system and device | |
CN207052899U (en) | A kind of Combined busbar | |
CN204030288U (en) | A kind of 40.5kV switch cubicle three shielding small size contact boxs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |