CN107871228A - Workflow editor based on loose-leaf configuration - Google Patents

Workflow editor based on loose-leaf configuration Download PDF

Info

Publication number
CN107871228A
CN107871228A CN201610856102.2A CN201610856102A CN107871228A CN 107871228 A CN107871228 A CN 107871228A CN 201610856102 A CN201610856102 A CN 201610856102A CN 107871228 A CN107871228 A CN 107871228A
Authority
CN
China
Prior art keywords
loose
leaf
flow
activity
preferential
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610856102.2A
Other languages
Chinese (zh)
Inventor
吴康宁
陈丹丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meadow Network Technology (shanghai) Co Ltd
Original Assignee
Meadow Network Technology (shanghai) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meadow Network Technology (shanghai) Co Ltd filed Critical Meadow Network Technology (shanghai) Co Ltd
Priority to CN201610856102.2A priority Critical patent/CN107871228A/en
Publication of CN107871228A publication Critical patent/CN107871228A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of workflow editor based on loose-leaf configuration, loose-leaf can configure mechanism, and in a flow, each node personnel see different loose-leaf contents.Main flow circulation sets more loose-leaves to a loose-leaf, this loose-leaf the inside, and more loose-leaves carry out statistics according to dataform information and obtain result.The complexity and difficulty of application security control on the one hand can be so reduced, on the other hand can make full use of preferential more loose-leaf control flow editing machine workflow circulation processes again.Embodiments of the invention provide a kind of workflow editor based on loose-leaf configuration, automatically initiate several flows, and these flows have what is independently circulated parallel, also have an impact the preferential association flow whether main flow arrives lower link.On the one hand flexible, convenient operation interface is provided for system manager, on the other hand can realizes that the synchronous exchange of data and shared feature are more popular with users, effectively help system can simplify unnecessary flow.

Description

Workflow editor based on loose-leaf configuration
Technical field
The present invention relates to the workflow editor field under computer application environment, more particularly to according to circulation in development process Automatic execution business process, document, information or task are transmitted and performed between more loose-leaves.
Background technology
Workflow management, centered on being a kind of remarkable operation flow of the forming end-to-end by standardization, with lasting raising Systematization method for the purpose of organization business performance.It should be an operational positioning describing, refer to process analysis, stream Cheng Dingyi and redefine, resource allocation, arrangement of time, flow quality and efficiency test and appraisal, process optimization etc..Because workflow management is Designed for customer demand, thus this flow can be needed with the change of internal and external environment it is optimised.
In process supply chain field, three kinds of different levels workflow managements are the optimization operation flows relevant with supplier, Such as predict, replenish, planning, contracting, storage controlling, information communication etc..The performance of supplier is largely by buying side Flow restricts.Such as in pre- flow gauge, minimum inventory, highest stock how are determined, according to what frequency renewal, pass to supply Business, directly affect the capacity planning and delivery just-in-time ability of supplier.For another example replenish, different types of product, according to what frequency Rate replenishes, and it is a little how many to replenish, and it is how many to purchase the preposition phase, not only has influence on the stock control of company, also has influence on supplier Production programming.Management level can be by mobilizing, emphasizing to reach a period of time effect, but does not change flow and its rule of behind, this Kind effect is temporary transient.Workflow management and improved key are to determine target and strategy, writtenization flow, implementing procedure, it is determined that Person liable and periodical evaluation.On this basis, develop a series of index, it is ensured that flow by intended manner operate, and with above The hook such as the delivery just-in-time rate said, up-to-standard rate.So, from flow to performance, then by performance feedback to flow, one is formed The management circle of closing.
System implements benefit caused by the workflow editor mechanism based on loose-leaf configuration:Flow based on loose-leaf configuration is compiled Collect device and on the one hand provide flexible, convenient operation interface for system manager, on the other hand can realize the timed delivery of data The feature changed and shared is more popular with users, effectively help system can simplify unnecessary flow.
The content of the invention
In order to overcome the shortcomings of the existing workflow editor mechanism based on loose-leaf configuration, the present invention provides one kind and is based on living The workflow editor of page configuration, loose-leaf can configure mechanism, and in a flow, each node personnel see different loose-leaf contents. Main flow circulation sets more loose-leaves to a loose-leaf, this loose-leaf the inside, and more loose-leaves are counted according to dataform information Obtain result.Several flows are automatically initiated, these flows have what is independently circulated parallel, also have an impact whether main flow arrives lower link Preferential association flow.Main flow will circulate to lower link, it is necessary to after the completion of waiting preferential flow execution, under this when is clicked on Link button is just effective.The complexity and difficulty of application security control on the one hand can be so reduced, on the other hand again can Make full use of preferential more loose-leaf control flow editing machine workflow circulation processes.
The technical solution adopted for the present invention to solve the technical problems is:Workflow editor based on loose-leaf configuration is usual In the case of be NP-hard problems, heuristic algorithm is extensive due to that can obtain acceptable solution in a rational run time Using.In the activity diagram of Graphics-oriented, action is conceptualized as node, is connected with the side for representing controlling stream;In BPEL, it is Adaptation flow engine, which is explained, to be performed, and its definition is with and to based on bulk.This causes conversion between the two to handle respectively.For Sequential partial, traditional technology is generally used for reference, for example, non-structured flow chart is converted to the technology of structuring, or automatically Machine generates the theory of canonical formula;For concurrent part, handled using restricted patterned features in BPEL.
The invention has the advantages that based on loose-leaf configuration workflow editor, but due to its be concerned only with activity it is required Resource characteristic, it is impossible to obtain preferable performance, hierarchical algorithm will be decomposed into work the off period according to the parallel and synchronous characteristic of activity Dynamic preferential more loose-leaves carry out Optimizing Flow, do not consider the Service Source feature of activity;And activity selects in limiting time window Service execution, it can produce many unavailable discrete " time fragments ".By defining the more loose-leaf intensity TCS descriptions of time priority One movable maximum time preferential more loose-leaf activity numbers;The information is introduced into preferential more loose-leaves, it is more to devise time priority The most suitable rule BFTCS of loose-leaf intensity, for the improvement stage of heuritic approach, step up the performance of initial feasible solution.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the Formal Representation figure of present example flow table activity diagram.
Fig. 2 is present example workflow editor flow transition diagram.
Fig. 3 is that present example workflow editor flow changes SESE segmentation figures.
Fig. 4 is present example workflow editor flow transfer framework basic block diagram
Fig. 5 is that present example workflow editor flow changes EPC meta-model diagrams.
Embodiment
In Fig. 4, present example workflow editor flow transfer framework basic block diagram is illustrated.Source model module is born Duty manages and safeguards source model/model system, and encapsulates some operations on meta-model and model.Target model module Object module/model system is responsible for and safeguarded, also encapsulates some operations on meta-model and model, it is mainly deposited The element in object module is put, ultimately forms the flow file after conversion.Initiation module is changed mainly to be responsible for according to certain plan Slightly and algorithm obtains data from source model system, and transform engine module is sent to after these data are packed.Conversion Engine modules are judged according to the data received, are the elements generated in object module or are needed to receive more information. The information that meta-model/model construction module provides according to transform engine, being extracted in source model module or target model module needs The information wanted, generate the model information in target model module.
In Fig. 1, the Formal Representation figure of present example flow table activity diagram is illustrated.In DAG figures, positioned at same The activity in path is serial to be performed, and its deadline is all movable execution time sums, and is constrained by preferential more loose-leaves.Cause This, if the service execution that one of activity selection rank is relatively low, other activities can select seeervice level because the off period constrains Not higher service, i.e. these movable services selections (being substantially to distribute each movable time) mutually influence, by This provides following (1) and gives G=(V, E), and the more loose-leaves of time priority must be located on same path.For j, forerunner's activity r The referred to as j more loose-leaf activities of forward direction time priority;For r, succeeding activity j is referred to as the r more loose-leaf activities of backward time priority. (2) G=(V, E) is given, the more loose-leaf activity numbers of its maximum forward time priority are referred to as the r more loose-leaf intensity of forward direction time priority; Given G=(V, E), its maximum backward more loose-leaf activity number of time priority are referred to as the r more loose-leaf intensity of backward time priority;It is given G=(V, E), the more loose-leaf intensity of time priority that the more loose-leaf intensity sums of its forward and backward time priority are referred to as i.It can see Go out, the more loose-leaf intensity of movable time priority are a kind of quality metrics, preferentially more living for identifying a movable maximum time The movable number of page, its value can be calculated by the reachability matrix of DAG figures.The summation of the i-th row is that i backward time priority is more living in matrix Page intensity;I-th row summation is the i more loose-leaf intensity of forward direction time priority;I-th row and the i-th row summation are then more for i time priority Loose-leaf intensity.Numerical value represents the more loose-leaf intensity levels of the movable time priority above node (except dummy node).
Analysis time, the more loose-leaf intensity of a movable time priority were bigger preferentially knowable to the definition of more loose-leaf intensity, should The movable number that activity influences in services selection is more.Activity 7 has maximum time preferential more loose-leaf intensity (value is 6), if should The service of active priority selection seeervice level relatively low (run time is longer), then in the case where the off period constrains, the more loose-leaves of its time priority Activity 3,4,5,6 (except dummy node) can not select the longer service of run time because reducing slack time or is not present, Expense will be higher needed for these activities, and the local optimum performance of algorithm will be affected;If conversely, movable 3 (time priorities More loose-leaf intensity are small) the relatively low service of prioritizing selection seeervice level, the services selection of its only influence activity 7, other activities are still organic The relatively low service of seeervice level can be selected further to reduce workflow total cost, i.e. the more loose-leaf intensity of time priority are that priority is more The key factor that loose-leaf is considered as when designing.

Claims (3)

1. based on the workflow editor of loose-leaf configuration, it is characterized in that:Loose-leaf can configure mechanism, in a flow, each node people Member sees different loose-leaf contents;Main flow circulation sets more loose-leaves, more loose-leaf roots to a loose-leaf, this loose-leaf the inside Statistics, which is carried out, according to dataform information obtains result.
2. loose-leaf according to claim 1 can configure mechanism, it is characterized in that:Parallel and synchronous characteristic according to activity will be cut Only the phase be decomposed into activity preferential more loose-leaves carry out Optimizing Flow, do not consider activity Service Source feature;And activity is when limiting Between selection service execution in window, can produce many unavailable discrete " time fragments ";It is more living by defining time priority Page intensity TCS describes a movable maximum time preferential more loose-leaf activity numbers;The information is introduced into the more loose-leaves of BF, devised The most suitable rule BFTCS of the more loose-leaf intensity of time priority, for the improvement stage of heuritic approach, step up the property of initial feasible solution Energy.
3. in a flow according to claim 1, each node personnel see different loose-leaf contents, it is characterized in that: Several flows are automatically initiated, these flows have what is independently circulated parallel, also have an impact the preferential pass whether main flow arrives lower link Join flow;Main flow will circulate to lower link, it is necessary to after the completion of waiting preferential flow execution, click on lower link button this when Just effectively.
CN201610856102.2A 2016-09-27 2016-09-27 Workflow editor based on loose-leaf configuration Pending CN107871228A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610856102.2A CN107871228A (en) 2016-09-27 2016-09-27 Workflow editor based on loose-leaf configuration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610856102.2A CN107871228A (en) 2016-09-27 2016-09-27 Workflow editor based on loose-leaf configuration

Publications (1)

Publication Number Publication Date
CN107871228A true CN107871228A (en) 2018-04-03

Family

ID=61750880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610856102.2A Pending CN107871228A (en) 2016-09-27 2016-09-27 Workflow editor based on loose-leaf configuration

Country Status (1)

Country Link
CN (1) CN107871228A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109214626A (en) * 2017-07-03 2019-01-15 优甸网络科技(上海)有限公司 Process loose-leaf configuration mechanism based on editing machine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101834729A (en) * 2009-03-13 2010-09-15 上海络杰软件有限公司 Business process distributing and processing system
CN105574705A (en) * 2015-11-24 2016-05-11 上海赞越软件服务中心 Priority rule-based workflow transfer mechanism
CN105844421A (en) * 2016-03-30 2016-08-10 上海赞越软件服务中心 Flow editor-based flow scheme and flow chart translation mechanism
CN105894186A (en) * 2016-03-30 2016-08-24 上海赞越软件服务中心 Workflow circulation mechanism using multiple loose leaves

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101834729A (en) * 2009-03-13 2010-09-15 上海络杰软件有限公司 Business process distributing and processing system
CN105574705A (en) * 2015-11-24 2016-05-11 上海赞越软件服务中心 Priority rule-based workflow transfer mechanism
CN105844421A (en) * 2016-03-30 2016-08-10 上海赞越软件服务中心 Flow editor-based flow scheme and flow chart translation mechanism
CN105894186A (en) * 2016-03-30 2016-08-24 上海赞越软件服务中心 Workflow circulation mechanism using multiple loose leaves

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109214626A (en) * 2017-07-03 2019-01-15 优甸网络科技(上海)有限公司 Process loose-leaf configuration mechanism based on editing machine

Similar Documents

Publication Publication Date Title
Youssef et al. Modelling and optimization of multiple-aspect RMS configurations
Kumanan et al. Multi-project scheduling using an heuristic and a genetic algorithm
CN108446895A (en) A kind of engineering construction project intelligent management system
Youssef et al. Availability consideration in the optimal selection of multiple-aspect RMS configurations
CN104679595B (en) A kind of application oriented IaaS layers of dynamic resource allocation method
EP3454210B1 (en) Prescriptive analytics based activation timetable stack for cloud computing resource scheduling
Moura et al. Business-driven IT management-upping the ante of IT: exploring the linkage between it and business to improve both IT and business results
CN105844421A (en) Flow editor-based flow scheme and flow chart translation mechanism
CN110009202A (en) A kind of intelligent scheduled production program system and method for fertilizer factory
He et al. ISA-95 tool for enterprise modeling
Li et al. Robust optimization for integrated construction scheduling and multiscale resource allocation
US6731999B1 (en) Wafer start order release algorithm in a foundry fab
CN115907332A (en) Two-layer optimization method and device for oil-gas well maintenance task scheduling
Fernández-Montes et al. Smart scheduling for saving energy in grid computing
CN105574705A (en) Priority rule-based workflow transfer mechanism
CN104899725B (en) A kind of the intelligent work streaming system and its circulation method of decision support and event feedback
CN107871228A (en) Workflow editor based on loose-leaf configuration
CN105894186A (en) Workflow circulation mechanism using multiple loose leaves
CN109636299A (en) Node time limit mechanism based on workflow band
CN103034930B (en) Automated software life cycle model deployment system
CN109214626A (en) Process loose-leaf configuration mechanism based on editing machine
Dewhurst et al. Towards integrated manufacturing planning with common tool and information sets
Kmiecik Automation of warehouse resource planning process by using a cloud demand forecasting tool
Golovatchev et al. Integrated PLM-process-approach for the development and management of telecommunications products in a multi-lifecycle environment
CN112884455A (en) Task plan processing system, method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180403