CN107866548A - Aluminum alloy die casting blank precise forming process - Google Patents

Aluminum alloy die casting blank precise forming process Download PDF

Info

Publication number
CN107866548A
CN107866548A CN201710974793.0A CN201710974793A CN107866548A CN 107866548 A CN107866548 A CN 107866548A CN 201710974793 A CN201710974793 A CN 201710974793A CN 107866548 A CN107866548 A CN 107866548A
Authority
CN
China
Prior art keywords
sand mold
temperature
sand
wax
aluminum alloy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710974793.0A
Other languages
Chinese (zh)
Other versions
CN107866548B (en
Inventor
周志明
王刚
孙玉虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xianghe Electronic Science & Technology Co Ltd
Original Assignee
Jiangsu Xianghe Electronic Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xianghe Electronic Science & Technology Co Ltd filed Critical Jiangsu Xianghe Electronic Science & Technology Co Ltd
Priority to CN201710974793.0A priority Critical patent/CN107866548B/en
Publication of CN107866548A publication Critical patent/CN107866548A/en
Application granted granted Critical
Publication of CN107866548B publication Critical patent/CN107866548B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D27/00Treating the metal in the mould while it is molten or ductile ; Pressure or vacuum casting
    • B22D27/09Treating the metal in the mould while it is molten or ductile ; Pressure or vacuum casting by using pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C7/00Patterns; Manufacture thereof so far as not provided for in other classes
    • B22C7/02Lost patterns
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/02Sand moulds or like moulds for shaped castings
    • B22C9/04Use of lost patterns
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D27/00Treating the metal in the mould while it is molten or ductile ; Pressure or vacuum casting
    • B22D27/04Influencing the temperature of the metal, e.g. by heating or cooling the mould
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C21/00Alloys based on aluminium
    • C22C21/02Alloys based on aluminium with silicon as the next major constituent

Abstract

Aluminum alloy die casting blank precise forming process, comprises the following steps:Step 1: the structure fabrication mould according to casting;Step 2: suppressing wax-pattern and sprue cup, cross gate, sprue and ingate using wax injector, and to wax-pattern repairing type, wax module group type is carried out according to constitutional diagram, then to the wax-pattern oil removing after combination;Step 3: the wax-pattern that type has been organized to more than carries out multilayer hanging sand;Step 4: being dewaxed, formwork is no less than 20 hours under ventilation condition from dry after dewaxing, and formwork is calcined in chamber type electric resistance furnace, and formwork is examined after being cooled to room temperature;Step 5: the formwork through washing must carry out drying shell process;Step 6: carrying out moulding using water-glass sand, then sand mold is dried processing;Step 7: smelting aluminium alloy liquation, is poured into a mould using pressure regulation, when crystallization time reaches half, make the temperature of sand mold reduce by 5 10s, the temperature that sand mold reduces is 24 DEG C;Step 8: casting is cleared up;Step 9: casting is heat-treated.

Description

Aluminum alloy die casting blank precise forming process
Technical field
The present invention relates to hot investment casting technical field of aluminum alloy technology, and in particular to aluminum alloy die casting blank precise forming technique Method.
Background technology
Aluminium alloy is most widely used a kind of non-ferrous metal structural material in industry, in Aeronautics and Astronautics, automobile, machinery Widely applied in manufacture, ship aluminium alloy and chemical industry.Cast aluminium alloy gold density is low, but intensity is higher, approaches or super High-quality steel is crossed, plasticity is good, can be processed into various section bars, has excellent electric conductivity, thermal conductivity and corrosion stability, has sizable Market potential, belong to field of new materials, usage amount industrially is only second to steel.With modern industry and the hair of casting technology Exhibition, it is also increasing to cast aluminium alloy gold demand.
At present, China's aluminum alloy die casting manufactures mode and following several forms is mainly presented:Sand casting, gravity casting Make, the casting of low pressure casting, compression casting and precise forming.
Aluminium alloy blank microdiecast is to make liquid or semi-liquid metal high-speed filling casting mold under high pressure effect, and is being pressed The casting method of casting is frozen under power.With scientific and technical and industrial economy rapid development in recent years, the knot of die casting Structure becomes increasingly complex, and the higher requirement proposed to the integrated of all kinds of aluminum alloy die castings, lightweight, reliability, aluminium is closed The dimensional accuracy and surface quality of golden die casting it is also proposed higher requirement.But the country is in whole aluminium processing industry at present In, the foundry engieering and experience of the casting of famine precision aluminium-alloy, during aluminum alloy die casting is produced, the aluminium of melting Alloy molten solution carries a large amount of gas meetings existing in the form of bubbles, so that many holes occur in aluminum alloy die casting surface Hole, hole cause the reduction of aluminum alloy die casting quality, seriously result even in aluminum alloy die casting and scrap.Cast the quantity of hole It is to weigh the leading indicator of Mechanical processing of casting surface quality with size, casting hole is the main of influence aluminum alloy die casting elongation percentage Reason, and fatigue crack source often primarily occur ins hole close quarters, so hole caused by die casting is to influence aluminium alloy The principal element of die casting mechanical performance.Hole property, size and the difference of distribution, result in aluminum alloy die casting mechanical property Difference.
It is unavoidable in the appearance of casting industry Hole, when aperture is smaller and appears in inside aluminum alloy die casting When, workpiece quality will not generally be made a big impact.If but appear in machining surface and will directly affect aluminium alloy compression casting The surface quality and fatigue behaviour of part.
The content of the invention
In order to solve more produced aluminum alloy die casting surface hole defect, quality and mechanical performance is poor and percent defective mistake High technical problem, it is an object of the invention to provide aluminum alloy die casting blank precise forming process, enable aluminum alloy to die casting Most of holes on part are evenly distributed on inside aluminum alloy die casting, effectively reduce hole in final surface exposed probability, Simultaneously reduce generation hole aperture, improve the surface quality of aluminum alloy die casting, enhance the machinery of aluminum alloy die casting Performance, while greatly reduce percent defective.
The technical solution adopted in the present invention is:Aluminum alloy die casting blank precise forming process, including following step Suddenly:
Step 1: according to the structure fabrication mould of casting, Casting shrinkage 0.5%-1.0%, pattern draft is 1 '- 3′;
Step 2: suppress wax-pattern and sprue cup, cross gate, sprue and ingate using wax injector, and to wax-pattern repairing type, Wax module group type is carried out according to constitutional diagram, then to the wax-pattern oil removing after combination;
Step 3: the wax-pattern that type has been organized to more than carries out multilayer hanging sand;
Step 4: carrying out dewaxing process, formwork is no less than 20 hours under ventilation condition from dry after dewaxing, then formwork is put It is calcined in chamber type electric resistance furnace, formwork cools to less than 450 DEG C taking-ups with the furnace after the completion of roasting, and mould is examined after being cooled to room temperature Shell;
Step 5: the formwork through washing must carry out drying shell process;
Step 6: carrying out moulding using water-glass sand, then sand mold is dried processing;
Step 7: smelting aluminium alloy liquation, is poured into a mould using pressure regulation, pouring temperature is 765-775 DEG C, and it is 350- synchronously to build pressure 400KPa, liter hydraulic coupling are 5-10KPa, and it is 250-300mm/s to rise liquid speed degree, and mold filling pressure difference is 60-100KPa, filling velocity For 250-300mm/s, crystallization pressure 2-3KPa, crystallization time 200-250s, when crystallization time reaches half, make sand mold Temperature reduce 5-10s, sand mold reduce temperature be 2-4 DEG C;
Step 8: clear up casting, using the clear shell of waterpower or the clear shell of dry blast, using sawing machine cut-fill system, Blast is carried out using blowing machine;
Step 9: casting is heat-treated.
The baking shell system of baking shell process is in the step 5:380 DEG C, >=3 hours are incubated, with using paper after being furnace-cooled to room temperature Seal cast styling.
Dewaxing parameter is in the dewaxing process:Outer courage steam pressure is 0.25-0.35MPa, and the dewaxing time is 11- 12min, temperature in use are 135-145 DEG C.
The formwork, which is placed in chamber type electric resistance furnace, to be calcined, and roasting parameter is:Furnace temperature formwork when 265-275 DEG C enters stove, with After be warming up to 790-820 DEG C, be incubated 2-3 hours, after the completion of close power supply.
The composition of the molten aluminium alloy is:Silicon 9.5-12.5%, copper 2.5-3.5%, nickel 0.5-0.75%, magnesium 3.5- 4.5%, zinc 7.5-8.5%, manganese 2.5-3.5%, titanium 0.9-1.1%, chromium 1.5-2.5%, europium 0.01-0.015%, holmium 0.002- 0.004%, lutetium 0.01-0.015%, surplus is aluminium.
The specific preparation method of water-glass sand in the step 6 is:Choose Foundry sand and be incorporated as into roughing sand Its weight 6.5%-7.5% waterglass is put into puddle mixer and is well mixed as adhesive afterwards.
The step 6 is to carry out moulding using water-glass sand, and gas hole is then pricked on sand mold, and the gas hole is from sand The blind hole that type outer surface is extended to inside sand mold, then the protective cover sealed in the end face of sand mold, set on the protective cover There is blow vent, being passed through hot blast to its inside from the blow vent of protective cover, mould surface is dried, hot blast temperature 150-180 DEG C, wind speed 5-6m/s, time 15-20min, protective cover is removed afterwards, nitrogen is then passed through in hole to blowing afloat for sand mold, gas Flow velocity degree is 5-6m/s, and gas temperature is 23-27 DEG C, time 5-10s.
Heat treatment comprises the following steps in the step 9:A, first stage homogenization heat treatment:Aluminium alloy castings is put Enter in heat-treatment heater, by room temperature to 235-245 DEG C of progress isothermal holding, soaking time 37-40h;B, second Stage homogenization heat treatment:It is continuously heating to 355-385 DEG C of progress isothermal holding, soaking time 15-20h;C, the phase III Homogenization heat treatment:It is continuously heating to 480-500 DEG C of progress isothermal holding, soaking time 10-15h;D, fourth stage is uniform Change heat treatment:It is continuously heating to 555-565 DEG C of progress isothermal holding, soaking time 0.5-1h;Casting is finally cooled to room Temperature.
Preferably, in the step 7 when crystallization time reaches half, by dropping sand mold temperature to sand mold spray drying ice Low 2-4 DEG C.
Preferably, in the step 7 when crystallization time reaches half, dried using blower fan to sand mold, so that sand mold Temperature reduces 2-4 DEG C.
Compared with prior art, the invention has the advantages that:
Aluminum alloy die casting blank precise forming process of the present invention, step is simple, easy to implement, so that Under conditions of resource and energy resource consumption are relatively low, semifinished product precision is met the requirements, enabled aluminum alloy to by the process in the present invention The integrated of die casting, lightweight, reliability greatly improve;
Because the molten aluminium alloy of melting carries a large amount of gas meetings existing in the form of bubbles, so that aluminium alloy compression casting Many holes occur in part surface, and the present invention is made using pressure regulation cast molten aluminium alloy, and when reaching half in crystallization time The temperature of sand mold reduces 5-10s, so that the molten aluminium alloy temperature at die casting surface close to sand mold reduces, is in The molten aluminium alloy temperature of inside die-casting part is more than the molten aluminium alloy temperature at die casting surface, forms temperature difference, temperature The higher molten aluminium alloy of degree moves to the relatively low molten aluminium alloy direction of temperature, and its reaction force driving bubble is higher to temperature Place's movement, so that the bubble in molten aluminium alloy is disturbed and shifted to inside die-casting part, hole is effectively reduced most Surface exposed probability eventually, improves the surface quality of aluminum alloy die casting, improves aluminum alloy die casting elongation percentage, while greatly Reduce percent defective greatly;Most of holes that process of the present invention is enabled aluminum alloy on die casting are evenly distributed on aluminium conjunction Golden inside die-casting part, hole is effectively reduced in final surface exposed probability, while reduce generation hole aperture, improve product Mechanical performance and mechanical property, so as to solve in actual production because hole is exposed and percent defective mistake when causing the die casting to process The problem of high, improve product quality;
By making the reduction of sand mold temperature to sand mold spray drying ice, so that aluminum alloy die casting entirety uniform decrease in temperature, Bu Huiyin Local temperature differential is too high to make bubble coalescence, so that bubble distribution is more uniform, effectively reduces bubble to aluminum alloy die casting The influence of mechanical performance and mechanical property;
Molten aluminium alloy of the present invention, not only good fluidity are adapted to the hot investment casting of heavy castings, and as cast condition Casting has very high tensile strength and good ductility, is improved by the mechanical property of product after heat treatment, tool There are higher tensile strength, higher yield strength and elongation percentage, greatly improve product quality;
It is shorter that the present invention sand mold is dried used drying means cycle during processing, to using hot blast outside sand mold Dry, being passed through nitrogen in air-vent is dried, and compared with traditional gas hardening, drying means of the present invention can Contained humidity in sand mold uniformly is sloughed, nitrogen is passed through in air-vent, accelerates setting rate, and makes sand hardness higher, sand mold It is unlikely to deform, improves die casting efficiency.
Embodiment
With reference to specific embodiment, the present invention is further elaborated, and protection scope of the present invention is not limited to following Embodiment.Implement process, condition, reagent of the present invention etc., be the universal of this area in addition to the following content specially referred to Content is not particularly limited in knowledge and common knowledge, the present invention.
Embodiment 1
Aluminum alloy die casting blank precise forming process, comprises the following steps:
Step 1: it is 1 ' according to the structure fabrication mould of casting, Casting shrinkage 0.5%, pattern draft;
Step 2: suppress wax-pattern and sprue cup, cross gate, sprue and ingate using wax injector, and to wax-pattern repairing type, Wax module group type is carried out according to constitutional diagram, then to the wax-pattern oil removing after combination;
Step 3: the wax-pattern that type has been organized to more than carries out multilayer hanging sand;
Step 4: being dewaxed, dewaxing parameter is:Outer courage steam pressure is 0.25MPa, and the dewaxing time is 11min, is used Temperature is 135 DEG C, and formwork is no less than 20 hours under ventilation condition from dry after dewaxing, and formwork is calcined in chamber type electric resistance furnace, stove Temperature formwork when 265 DEG C enters stove, then raises temperature to 790 DEG C, is incubated 2 hours, after the completion of close power supply, formwork cools to the furnace Less than 450 DEG C taking-ups, formwork is examined after being cooled to room temperature;
Step 5: the formwork through washing must carry out drying shell process, shell system is dried:380 DEG C, >=3 hours are incubated, with being furnace-cooled to After room temperature cast styling is sealed with paper;
Step 6: carrying out moulding using water-glass sand, then sand mold is dried processing;
Step 7: smelting aluminium alloy liquation, is poured into a mould using pressure regulation, pouring temperature is 765 DEG C, and it is 350KPa synchronously to build pressure, It is 5KPa to rise hydraulic coupling, and liter liquid speed degree is 250mm/s, and mold filling pressure difference is 60KPa, filling velocity 250mm/s, crystallization pressure For 2KPa, crystallization time 200s, when crystallization time reaches half, make the temperature of sand mold reduce 5s, the temperature that sand mold reduces For 2 DEG C;
Step 8: clear up casting, using the clear shell of waterpower or the clear shell of dry blast, using sawing machine cut-fill system, Blast is carried out using blowing machine;
Step 9: casting is heat-treated.
The composition of the molten aluminium alloy is:Silicon 9.5%, copper 2.5%, nickel 0.5%, magnesium 3.5%, zinc 7.5%, manganese 2.5%, titanium 0.9%, chromium 1.5%, europium 0.01%, holmium 0.002%, lutetium 0.01%, surplus is aluminium.
The specific preparation method of water-glass sand in the step 6 is:Choose Foundry sand and be incorporated as into roughing sand The waterglass of its weight 6.5% is put into puddle mixer and is well mixed as adhesive afterwards.
The step 6 is to carry out moulding using water-glass sand, and gas hole is then pricked on sand mold, and the gas hole is from sand The blind hole that type outer surface is extended to inside sand mold, then the protective cover sealed in the end face of sand mold, set on the protective cover There is blow vent, being passed through hot blast to its inside from the blow vent of protective cover, mould surface is dried, and hot blast temperature is 150 DEG C, Wind speed is 5m/s, time 15min, removes protective cover afterwards, nitrogen is then passed through in hole to blowing afloat for sand mold, air velocity is 5m/s, gas temperature are 23 DEG C, time 5s.
Heat treatment comprises the following steps in the step 9:A, first stage homogenization heat treatment:Aluminium alloy castings is put Enter in heat-treatment heater, by room temperature to 235 DEG C of progress isothermal holdings, soaking time 37h;B, second stage is uniform Change heat treatment:It is continuously heating to 355 DEG C of progress isothermal holdings, soaking time 15h;C, phase III homogenization heat treatment:After It is continuous to be warming up to 480 DEG C of progress isothermal holdings, soaking time 10h;D, fourth stage homogenization heat treatment:It is continuously heating to 555 DEG C carry out isothermal holding, soaking time 0.5h;Casting is finally cooled to room temperature.
Preferably, in the step 7 when crystallization time reaches half, by dropping sand mold temperature to sand mold spray drying ice Low 2 DEG C.
In the step 7 when crystallization time reaches half, blower fan can also be used to be dried to sand mold, so that sand mold Temperature reduces by 2 DEG C.
Embodiment 2
Aluminum alloy die casting blank precise forming process, comprises the following steps:
Step 1: it is 2 ' according to the structure fabrication mould of casting, Casting shrinkage 0.7%, pattern draft;
Step 2: suppress wax-pattern and sprue cup, cross gate, sprue and ingate using wax injector, and to wax-pattern repairing type, Wax module group type is carried out according to constitutional diagram, then to the wax-pattern oil removing after combination;
Step 3: the wax-pattern that type has been organized to more than carries out multilayer hanging sand;
Step 4: being dewaxed, dewaxing parameter is:Outer courage steam pressure is 0.3MPa, and the dewaxing time is 11.5min, is made It is 138 DEG C with temperature, formwork is no less than 20 hours under ventilation condition from dry after dewaxing, and formwork is calcined in chamber type electric resistance furnace, Furnace temperature formwork when 270 DEG C enters stove, then raises temperature to 810 DEG C, is incubated 2.5 hours, after the completion of close power supply, formwork furnace cooling To less than 450 DEG C taking-ups, formwork is examined after being cooled to room temperature;
Step 5: the formwork through washing must carry out drying shell process, shell system is dried:380 DEG C, >=3 hours are incubated, with being furnace-cooled to After room temperature cast styling is sealed with paper;
Step 6: carrying out moulding using water-glass sand, then sand mold is dried processing;
Step 7: smelting aluminium alloy liquation, is poured into a mould using pressure regulation, pouring temperature is 770 DEG C, and it is 380KPa synchronously to build pressure, It is 7KPa to rise hydraulic coupling, and liter liquid speed degree is 280mm/s, and mold filling pressure difference is 75KPa, filling velocity 270mm/s, crystallization pressure For 2KPa, crystallization time 235s, when crystallization time reaches half, make the temperature of sand mold reduce 7s, the temperature that sand mold reduces For 3 DEG C;
Step 8: clear up casting, using the clear shell of waterpower or the clear shell of dry blast, using sawing machine cut-fill system, Blast is carried out using blowing machine;
Step 9: casting is heat-treated.
The composition of the molten aluminium alloy is:Silicon 10%, copper 3%, nickel 0.55%, magnesium 3.8%, zinc 7.8%, manganese 3%, titanium 1%, chromium 2%, europium 0.012%, holmium 0.003%, lutetium 0.013%, surplus is aluminium.
The specific preparation method of water-glass sand in the step 6 is:Choose Foundry sand and be incorporated as into roughing sand The waterglass of its weight 7% is put into puddle mixer and is well mixed as adhesive afterwards.
The step 6 is to carry out moulding using water-glass sand, and gas hole is then pricked on sand mold, and the gas hole is from sand The blind hole that type outer surface is extended to inside sand mold, then the protective cover sealed in the end face of sand mold, set on the protective cover There is blow vent, being passed through hot blast to its inside from the blow vent of protective cover, mould surface is dried, and hot blast temperature is 175 DEG C, Wind speed is 5.5m/s, time 17min, removes protective cover afterwards, nitrogen is then passed through in hole to blowing afloat for sand mold, air velocity For 5.5m/s, gas temperature is 25 DEG C, time 8s.
Heat treatment comprises the following steps in the step 9:A, first stage homogenization heat treatment:Aluminium alloy castings is put Enter in heat-treatment heater, by room temperature to 240 DEG C of progress isothermal holdings, soaking time 38h;B, second stage is uniform Change heat treatment:It is continuously heating to 375 DEG C of progress isothermal holdings, soaking time 18h;C, phase III homogenization heat treatment:After It is continuous to be warming up to 490 DEG C of progress isothermal holdings, soaking time 13h;D, fourth stage homogenization heat treatment:It is continuously heating to 560 DEG C carry out isothermal holding, soaking time 0.8h;Casting is finally cooled to room temperature.
Preferably, in the step 7 when crystallization time reaches half, by dropping sand mold temperature to sand mold spray drying ice Low 3 DEG C.
In the step 7 when crystallization time reaches half, blower fan can also be used to be dried to sand mold, so that sand mold Temperature reduces by 3 DEG C.
Embodiment 3
Aluminum alloy die casting blank precise forming process, comprises the following steps:
Step 1: it is 3 ' according to the structure fabrication mould of casting, Casting shrinkage 1.0%, pattern draft;
Step 2: suppress wax-pattern and sprue cup, cross gate, sprue and ingate using wax injector, and to wax-pattern repairing type, Wax module group type is carried out according to constitutional diagram, then to the wax-pattern oil removing after combination;
Step 3: the wax-pattern that type has been organized to more than carries out multilayer hanging sand;
Step 4: being dewaxed, dewaxing parameter is:Outer courage steam pressure is 0.35MPa, and the dewaxing time is 12min, is used Temperature is 145 DEG C, and formwork is no less than 20 hours under ventilation condition from dry after dewaxing, and formwork is calcined in chamber type electric resistance furnace, stove Temperature formwork when 275 DEG C enters stove, then raises temperature to 820 DEG C, is incubated 3 hours, after the completion of close power supply, formwork cools to the furnace Less than 450 DEG C taking-ups, formwork is examined after being cooled to room temperature;
Step 5: the formwork through washing must carry out drying shell process, shell system is dried:380 DEG C, >=3 hours are incubated, with being furnace-cooled to After room temperature cast styling is sealed with paper;
Step 6: carrying out moulding using water-glass sand, then sand mold is dried processing;
Step 7: smelting aluminium alloy liquation, is poured into a mould using pressure regulation, pouring temperature is 775 DEG C, and it is 400KPa synchronously to build pressure, It is 10KPa to rise hydraulic coupling, and it is 300mm/s to rise liquid speed degree, and mold filling pressure difference is 100KPa, filling velocity 300mm/s, and crystallization is pressed Power is 3KPa, crystallization time 250s, when crystallization time reaches half, makes the temperature of sand mold reduce 10s, the temperature that sand mold reduces Spend for 4 DEG C;
Step 8: clear up casting, using the clear shell of waterpower or the clear shell of dry blast, using sawing machine cut-fill system, Blast is carried out using blowing machine;
Step 9: casting is heat-treated.
The composition of the molten aluminium alloy is:Silicon 12.5%, copper 3.5%, nickel 0.75%, magnesium 4.5%, zinc 8.5%, manganese 3.5%, titanium 1.1%, chromium 2.5%, europium 0.015%, holmium 0.004%, lutetium 0.015%, surplus is aluminium.
The specific preparation method of water-glass sand in the step 6 is:Choose Foundry sand and be incorporated as into roughing sand The waterglass of its weight 7.5% is put into puddle mixer and is well mixed as adhesive afterwards.
The step 6 is to carry out moulding using water-glass sand, and gas hole is then pricked on sand mold, and the gas hole is from sand The blind hole that type outer surface is extended to inside sand mold, then the protective cover sealed in the end face of sand mold, set on the protective cover There is blow vent, being passed through hot blast to its inside from the blow vent of protective cover, mould surface is dried, and hot blast temperature is 180 DEG C, Wind speed is 6m/s, time 20min, removes protective cover afterwards, nitrogen is then passed through in hole to blowing afloat for sand mold, air velocity is 6m/s, gas temperature are 27 DEG C, time 10s.
Heat treatment comprises the following steps in the step 9:A, first stage homogenization heat treatment:Aluminium alloy castings is put Enter in heat-treatment heater, by room temperature to 245 DEG C of progress isothermal holdings, soaking time 40h;B, second stage is uniform Change heat treatment:It is continuously heating to 385 DEG C of progress isothermal holdings, soaking time 20h;C, phase III homogenization heat treatment:After It is continuous to be warming up to 500 DEG C of progress isothermal holdings, soaking time 15h;D, fourth stage homogenization heat treatment:It is continuously heating to 565 DEG C carry out isothermal holding, soaking time 1h;Casting is finally cooled to room temperature.
Preferably, in the step 7 when crystallization time reaches half, by dropping sand mold temperature to sand mold spray drying ice Low 4 DEG C.
In the step 7 when crystallization time reaches half, blower fan can also be used to be dried to sand mold, so that sand mold Temperature reduces by 4 DEG C.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair The equivalent structure or equivalent flow conversion that bright description is made, or directly or indirectly it is used in other related technology necks Domain, it is included within the scope of the present invention.

Claims (10)

1. aluminum alloy die casting blank precise forming process, it is characterised in that comprise the following steps:
Step 1: according to the structure fabrication mould of casting, Casting shrinkage 0.5%-1.0%, pattern draft is 1 ' -3 ';
Step 2: suppress wax-pattern and sprue cup, cross gate, sprue and ingate using wax injector, and to wax-pattern repairing type, according to Constitutional diagram carries out wax module group type, then to the wax-pattern oil removing after combination;
Step 3: the wax-pattern that type has been organized to more than carries out multilayer hanging sand;
Step 4: carrying out dewaxing process, formwork is no less than 20 hours under ventilation condition from dry after dewaxing, then formwork is placed on into case Formula resistance kiln roasting, formwork cools to less than 450 DEG C taking-ups with the furnace after the completion of roasting, and formwork is examined after being cooled to room temperature;
Step 5: the formwork through washing must carry out drying shell process;
Step 6: carrying out moulding using water-glass sand, then sand mold is dried processing;
Step 7: smelting aluminium alloy liquation, is poured into a mould using pressure regulation, pouring temperature is 765-775 DEG C, and it is 350- synchronously to build pressure 400KPa, liter hydraulic coupling are 5-10KPa, and it is 250-300mm/s to rise liquid speed degree, and mold filling pressure difference is 60-100KPa, filling velocity For 250-300mm/s, crystallization pressure 2-3KPa, crystallization time 200-250s, when crystallization time reaches half, make sand mold Temperature reduce 5-10s, sand mold reduce temperature be 2-4 DEG C;
Step 8: clearing up casting, using the clear shell of waterpower or the clear shell of dry blast, using sawing machine cut-fill system, use Blowing machine carries out blast;
Step 9: casting is heat-treated.
2. aluminum alloy die casting blank precise forming process as claimed in claim 1, it is characterised in that the step 5 It is middle dry shell process baking shell system be:380 DEG C, >=3 hours are incubated, cast styling is sealed with paper with being furnace-cooled to after room temperature.
3. aluminum alloy die casting blank precise forming process as claimed in claim 1, it is characterised in that the dewaxing work Dewaxing parameter is in sequence:Outer courage steam pressure is 0.25-0.35MPa, and the dewaxing time is 11-12min, temperature in use 135- 145℃。
4. aluminum alloy die casting blank precise forming process as claimed in claim 1, it is characterised in that the formwork is put It is calcined in chamber type electric resistance furnace, roasting parameter is:Furnace temperature formwork when 265-275 DEG C enters stove, then raises temperature to 790-820 DEG C, Be incubated 2-3 hours, after the completion of close power supply.
5. aluminum alloy die casting blank precise forming process as claimed in claim 1, it is characterised in that the aluminium alloy The composition of liquation is:Silicon 9.5-12.5%, copper 2.5-3.5%, nickel 0.5-0.75%, magnesium 3.5-4.5%, zinc 7.5-8.5%, manganese 2.5-3.5%, titanium 0.9-1.1%, chromium 1.5-2.5%, europium 0.01-0.015%, holmium 0.002-0.004%, lutetium 0.01- 0.015%, surplus is aluminium.
6. aluminum alloy die casting blank precise forming process as claimed in claim 1, it is characterised in that the step 6 In the specific preparation method of water-glass sand be:Choose Foundry sand and its weight 6.5%-7.5% is incorporated as into roughing sand Waterglass as adhesive, be put into puddle mixer and be well mixed afterwards.
7. aluminum alloy die casting blank precise forming process as claimed in claim 1, it is characterised in that the step 6 To carry out moulding using water-glass sand, gas hole is then pricked on sand mold, the gas hole is to extend to sand mold from sand mold outer surface Internal blind hole, then the protective cover sealed in the end face of sand mold, blow vent are provided with the protective cover, from protective cover Blow vent is passed through hot blast to its inside and mould surface is dried, and hot blast temperature is 150-180 DEG C, wind speed 5-6m/s, when Between be 15-20min, remove protective cover afterwards, nitrogen be then passed through in hole to blowing afloat for sand mold, air velocity 5-6m/s, gas Temperature is 23-27 DEG C, time 5-10s.
8. aluminum alloy die casting blank precise forming process as claimed in claim 1, it is characterised in that the step 9 Middle heat treatment comprises the following steps:A, first stage homogenization heat treatment:Aluminium alloy castings is put into heat-treatment heater, By room temperature to 235-245 DEG C of progress isothermal holding, soaking time 37-40h;B, second stage homogenization heat treatment:After It is continuous to be warming up to 355-385 DEG C of progress isothermal holding, soaking time 15-20h;C, phase III homogenization heat treatment:Continue to rise Warm to 480-500 DEG C progress isothermal holding, soaking time 10-15h;D, fourth stage homogenization heat treatment:It is continuously heating to 555-565 DEG C of progress isothermal holding, soaking time 0.5-1h;Casting is finally cooled to room temperature.
9. aluminum alloy die casting blank precise forming process as claimed in claim 1, it is characterised in that the step 7 In crystallization time reach half when, by sand mold spray drying ice make sand mold temperature reduce 2-4 DEG C.
10. aluminum alloy die casting blank precise forming process as claimed in claim 1, it is characterised in that the step In seven when crystallization time reaches half, dried using blower fan to sand mold, so that sand mold temperature reduces 2-4 DEG C.
CN201710974793.0A 2017-10-19 2017-10-19 Aluminum alloy die casting blank precise forming process Active CN107866548B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710974793.0A CN107866548B (en) 2017-10-19 2017-10-19 Aluminum alloy die casting blank precise forming process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710974793.0A CN107866548B (en) 2017-10-19 2017-10-19 Aluminum alloy die casting blank precise forming process

Publications (2)

Publication Number Publication Date
CN107866548A true CN107866548A (en) 2018-04-03
CN107866548B CN107866548B (en) 2018-09-11

Family

ID=61753120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710974793.0A Active CN107866548B (en) 2017-10-19 2017-10-19 Aluminum alloy die casting blank precise forming process

Country Status (1)

Country Link
CN (1) CN107866548B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109277528A (en) * 2018-11-23 2019-01-29 安徽应流集团霍山铸造有限公司 A kind of composite casting technology method using sand casting and model casting

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003253368A (en) * 2002-02-28 2003-09-10 Ube Machinery Corporation Ltd Aluminum alloy for semisolid casting
CN102554125A (en) * 2011-12-28 2012-07-11 西安西工大超晶科技发展有限责任公司 Precision casting method of aluminum gearbox
CN102717030A (en) * 2012-06-14 2012-10-10 西安西工大超晶科技发展有限责任公司 Precision casting method for thick-wall base aluminium alloy casting
CN103469017A (en) * 2013-09-22 2013-12-25 苏州华宇精密铸造有限公司 Aluminum alloy for precision casting and casting method thereof
CN103509978A (en) * 2013-09-22 2014-01-15 苏州华宇精密铸造有限公司 Heat treatment method for precision casting aluminum alloy
CN103506577A (en) * 2013-09-22 2014-01-15 苏州华宇精密铸造有限公司 Precision casting method of aluminum alloy cast

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003253368A (en) * 2002-02-28 2003-09-10 Ube Machinery Corporation Ltd Aluminum alloy for semisolid casting
CN102554125A (en) * 2011-12-28 2012-07-11 西安西工大超晶科技发展有限责任公司 Precision casting method of aluminum gearbox
CN102717030A (en) * 2012-06-14 2012-10-10 西安西工大超晶科技发展有限责任公司 Precision casting method for thick-wall base aluminium alloy casting
CN103469017A (en) * 2013-09-22 2013-12-25 苏州华宇精密铸造有限公司 Aluminum alloy for precision casting and casting method thereof
CN103509978A (en) * 2013-09-22 2014-01-15 苏州华宇精密铸造有限公司 Heat treatment method for precision casting aluminum alloy
CN103506577A (en) * 2013-09-22 2014-01-15 苏州华宇精密铸造有限公司 Precision casting method of aluminum alloy cast

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109277528A (en) * 2018-11-23 2019-01-29 安徽应流集团霍山铸造有限公司 A kind of composite casting technology method using sand casting and model casting

Also Published As

Publication number Publication date
CN107866548B (en) 2018-09-11

Similar Documents

Publication Publication Date Title
CN105200272B (en) A kind of extrusion casting method of wrought aluminium alloy lampshade
CN102978488B (en) Production technology of aluminum alloy sectional bar for automobile bumper
CN106191572B (en) A kind of pressure casting method of auto parts machinery aluminium alloy and auto parts machinery
CN102717030B (en) Precision casting method for thick-wall base aluminium alloy casting
CN102943193B (en) Grain refinement machining process of hard aluminium alloy cast ingot
CN104439219B (en) A kind of casting technique of steel loop base based on casting and rolling composite forming
CN102019353A (en) Precision casting molding method for complex thin-walled member
CN101758194B (en) Indirect extruding and casting method of wrought aluminum alloy casting
CN102962425B (en) Preparation method of oblique oil cylinder body
CN105312540B (en) The composite roll manufacturing process and equipment of a kind of reusable edible roller core
CN101844218A (en) Low pressure casting process for aluminum alloy cylinder part
CN102554125A (en) Precision casting method of aluminum gearbox
CN105057593B (en) A kind of copper-alloy casting full form casting process
CN102828073B (en) Method for producing powder-coated aluminum alloy section
CN102899540A (en) Super large specification aluminum alloy slab ingot and casting method
CN105215314A (en) A kind of auto parts machinery pressure casting method
CN106676345A (en) Super-strength aluminum alloy section
CN106694853A (en) Method for casting motorcycle parts by use of low-pressure casting process
CN103170600A (en) Aluminum-silicon alloy brake-separating piece semisolid rheological diecasting forming process
CN104131202A (en) Short-process preparation method for 6061aluminum alloy die forging
CN107447134A (en) A kind of high intensity can anodic oxidation pack alloy and preparation method thereof
CN103469017B (en) Aluminum alloy for precision casting and casting method thereof
CN103509978B (en) Heat treatment method for precision casting aluminum alloy
CN103506577B (en) Precision casting method of aluminum alloy cast
CN111203514A (en) Precision casting method for high-temperature alloy complex thin-wall casting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant