CN107859357A - A kind of integrative construction device and method - Google Patents

A kind of integrative construction device and method Download PDF

Info

Publication number
CN107859357A
CN107859357A CN201711328839.8A CN201711328839A CN107859357A CN 107859357 A CN107859357 A CN 107859357A CN 201711328839 A CN201711328839 A CN 201711328839A CN 107859357 A CN107859357 A CN 107859357A
Authority
CN
China
Prior art keywords
negative pressure
cover plate
bed course
concrete surface
surface layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711328839.8A
Other languages
Chinese (zh)
Other versions
CN107859357B (en
Inventor
李曙光
陈改新
孟川
田军涛
纪国晋
赵波
计涛
关遇时
李敬玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Institute of Water Resources and Hydropower Research
Beijing IWHR KHL Co Ltd
Original Assignee
China Institute of Water Resources and Hydropower Research
Beijing IWHR KHL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Institute of Water Resources and Hydropower Research, Beijing IWHR KHL Co Ltd filed Critical China Institute of Water Resources and Hydropower Research
Priority to CN201711328839.8A priority Critical patent/CN107859357B/en
Publication of CN107859357A publication Critical patent/CN107859357A/en
Application granted granted Critical
Publication of CN107859357B publication Critical patent/CN107859357B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B41/00After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone
    • C04B41/45Coating or impregnating, e.g. injection in masonry, partial coating of green or fired ceramics, organic coating compositions for adhering together two concrete elements
    • C04B41/46Coating or impregnating, e.g. injection in masonry, partial coating of green or fired ceramics, organic coating compositions for adhering together two concrete elements with organic materials
    • C04B41/48Macromolecular compounds
    • C04B41/4853Epoxides
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B41/00After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone
    • C04B41/45Coating or impregnating, e.g. injection in masonry, partial coating of green or fired ceramics, organic coating compositions for adhering together two concrete elements
    • C04B41/50Coating or impregnating, e.g. injection in masonry, partial coating of green or fired ceramics, organic coating compositions for adhering together two concrete elements with inorganic materials
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B41/00After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone
    • C04B41/60After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone of only artificial stone
    • C04B41/61Coating or impregnation
    • C04B41/62Coating or impregnation with organic materials
    • C04B41/63Macromolecular compounds
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B41/00After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone
    • C04B41/60After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone of only artificial stone
    • C04B41/61Coating or impregnation
    • C04B41/65Coating or impregnation with inorganic materials
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09DCOATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
    • C09D163/00Coating compositions based on epoxy resins; Coating compositions based on derivatives of epoxy resins
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09DCOATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
    • C09D4/00Coating compositions, e.g. paints, varnishes or lacquers, based on organic non-macromolecular compounds having at least one polymerisable carbon-to-carbon unsaturated bond ; Coating compositions, based on monomers of macromolecular compounds of groups C09D183/00 - C09D183/16
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Wood Science & Technology (AREA)
  • Inorganic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Electrochemistry (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention relates to a kind of integrative construction device and integral construction method, the integrative construction device is used to concrete surface layer that is impaired or deteriorating is repaired and protected, including impregnation chamber (11), negative pressure equipment (9) and fluid reservoir (8), impregnation chamber (11) includes cover plate (6) and bed course (4), and cover plate (6) and bed course (4) are used for and concrete surface layer (10) surrounds the seal cavity for being used for filling maceration extract (110) together;Negative pressure equipment (9) is connected with impregnation chamber (11), and negative pressure equipment (9) is used to provide negative pressure for seal cavity;Fluid reservoir (8) is connected with impregnation chamber (11), and fluid reservoir (8) is used to store maceration extract (110).The present invention forms overcoat while being repaired to concrete surface layer, in concrete surface, so as to the repairing and protection by once constructing while realizing concrete surface layer.

Description

A kind of integrative construction device and method
Technical field
The present invention relates to a kind of integrative construction device and integral construction method, more particularly to it is a kind of by impaired or Deterioration concrete structure top layer carries out vacuum polymerization thing dipping and then realizes the one of concrete surface layer repairing and protection simultaneously Change constructing device and correlation method.
Background technology
Western China weather conditions are very harsh severe:Summer is hot, and winter is dry and cold, and the temperature difference is big, and wind speed is high, relatively Humidity is low etc., and the durability to local concrete structure brings great threat.According to relevant scholar to western China concrete The finding on the spot of building, cracking, surface deterioration and steel bar corrosion are in concrete canal, bridge, road built etc. It is seen everywhere, has had a strong impact on the safety and service life of works, huge economic loss is brought to China.The Ministry of Construction of China The investigation of the last century 80's shows that most domestic industrial building needs overhaul after using 25~30 years, locates Building service life under harsh and unforgiving environments only 15~20 years.
The mechanical property and durability of polymer impregnated concrete are better than normal concrete, therefore domestic and foreign scholars are attempted Damage concrete structure top layer is repaired using the method for dipping.Some scholars store liquid infusion process (cofferdam storage using normal pressure Liquid method) impregnated.But the shortcomings that normal pressure storage liquid method is that technique is cumbersome, efficiency is low, repairing slurries can not reclaim, and easily pollutes ring Border, vertical plane or slope bearing layer can not be applied to.In the prior art, concrete structure is impregnated using flexible negative pressure cavity Repairing, although relatively storing liquid method has certain improvement, it is used to still suffer from following deficiency during the repairing protection of aging concrete plate building:
1. flexible negative pressure impregnation intracavitary maceration extract noresidue, without residual monomer, therefore realize the protection of concrete surface layer not It is preferable.Flexible negative pressure impregnation technique only plays certain repairing effect to the cosmetic bug of concrete structure, and breakage is degraded More serious, rugged surface is unable to reach preferable " repairing sth. old and make it as good as new " effect;Also need to carry out subsequently after the completion of dipping It is floating, multiple smearing etc. process with improve outward appearance, realize protect;
2. construction technology is cumbersome.Laying pad, fixed-bearing are needed before dipping, also needs to take pad off after maceration extract solidification, Technique is cumbersome, vertical plane or the gradient it is larger slope bearing layer it is especially inconvenient;
3. pickling efficiency is low, the area in impregnation chamber can not 100% realize dipping repairing.For large-area construction, dipping When repairing face is close to due to film, the flow path of the maceration extract of importing in vacuum chamber is difficult to control, it is easy on periphery Region forms dipping blind area, and impregnation area only accounts for 90% or so of impregnation chamber area coverage, and remaining 10% region can only follow-up people Work smears repairing, influences construction speed and repair efficiency;
4. vacuum is low, limited to the repair efficiency of concrete in impregnation chamber.For negative pressure impregnation technique, maceration extract is imported Initial vacuum intracavitary vacuum is more high more is advantageous to repair the discharge of air and the importing of slurries and infiltration in facial cleft seam, repair efficiency It is preferably also.The impregnating depth that vacuum in impregnation chamber is low to cause maceration extract in concrete is low, therefore to the repairing of concrete Reinforce limited;Vacuum is low simultaneously causes almost maceration extract can not be sucked into crack during elevation construction.
The content of the invention
To solve the above problems, the present invention proposes one kind by carrying out vacuum to impaired or deterioration concrete structure top layer Integrative construction device and construction method polymer impregnated and then that realize concrete surface layer repairing and protection simultaneously.
In order to complete above-mentioned purpose, the invention provides a kind of integrative construction device, for being mixed to impaired or deterioration Coagulate native top layer to be repaired and protected, it includes:Impregnation chamber, impregnation chamber include cover plate and bed course, and cover plate and bed course are used for and mixed Solidifying native top layer surrounds the seal cavity for filling maceration extract together;Negative pressure equipment, negative pressure equipment are connected with impregnation chamber, and negative pressure is set It is ready for use on and provides negative pressure for seal cavity;Fluid reservoir, fluid reservoir are connected with impregnation chamber, and fluid reservoir is used to store maceration extract.
Preferably, cover plate is high polymer elastic sheet material, and bed course is the adjustable flexible rubber dam bed course of thickness, bed course and mixed Solidifying native top layer is tightly connected, and cover plate and bed course are tightly connected.
Preferably, at least one negative port that can be tightly connected with one end of negative pressure catheter and extremely is provided with cover plate The few one drain interface that can be tightly connected with one end of liquid guide ducts, the other end of negative pressure catheter are connected with negative pressure equipment, The other end of liquid guide ducts is connected with fluid reservoir, and at least one spare interface is additionally provided with cover plate.
It is further preferred that negative port, drain interface and spare interface are external interface.
It is further preferred that being provided with negative pressure choke valve on negative pressure catheter, drain choke valve is provided with liquid guide ducts.
Preferably, cushion block is provided with seal cavity, cushion block is high polymer material cushion block.
Preferably, the position that cover plate connects with bed course is connected by sealing structure, and sealing structure includes layers of two-sided and soft Property sealing material layer.
Meanwhile present invention also offers a kind of integral construction method, for entering to concrete surface layer that is impaired or deteriorating Row repairing and protection, it includes following step:
First, concrete surface layer to be repaired is covered with impregnation chamber, and impregnation chamber includes cover plate and bed course, cover plate, bed course and Concrete surface layer surrounds seal cavity together;Then, start negative pressure equipment, opened after the vacuum of requirement is reached in cavity to be sealed Drain choke valve is opened, simultaneously closes off negative pressure choke valve, the maceration extract in fluid reservoir is imported by liquid guide ducts in seal cavity, Concrete surface layer is repaired and protected;Finally, repair layer is formed after maceration extract solidification, removes cover plate and bed course.
Preferably, maceration extract is methyl methacrylate base modified system and epoxy-resin systems:
Methyl methacrylate base modified system includes:Methyl methacrylate 100ml, butyl methacrylate 20~ 30ml, 10~25ml of methacrylic acid, to 1~3g of toluenesulfinic acid, 0.5~2g of dibenzoyl peroxide, N, N- dimethyl benzenes 1~3g of amine, inorganic filler 5-10g, 1~5g of modifying agent;
Epoxy-resin systems include:The parts by weight of epoxy resin body 100, the parts by weight of curing agent 33~38, diluent 25~ 30 parts by weight.
Preferably, cushion block (3) is provided with seal cavity, repair layer is formed after maceration extract solidification, remove cover plate (6) and After bed course (4), in the repair layer of cushion block (3) indwelling after solidification, vacuum is 30~750mmHg.
Beneficial effects of the present invention:
1. realizing concrete surface layer repairing and protection integratedization construction, that is, realize and concrete surface layer, superficial defects are repaiied While benefit, the overcoat that a layer thickness is controllable, smooth is formed in former concrete surface, prevent erosion environment condition and its Further destruction of its unfavorable factor to concrete, play repairing effect while take into account protection and it is attractive in appearance.
2. construction technology simple and fast:Nearly rigidity dipping is formed using elastic polymer sheet material and simple edge sealing process Chamber;Pad need not be laid before dipping, only need to lay cushion blocks in several positions in impregnation chamber, cushion block need not after having impregnated hardening Take out, save laying pad and the process for taking pad off, while integrated construction technique also eliminates sequent surface and manually smeared Process that is flat, repeatedly smearing, single-steeping can complete whole processes.
3. pickling efficiency is high, vacuum chamber inner region covers up to 100% dipping.Because present apparatus technique ensure that liquid flow Space needed for dynamic and savings, it can be ensured that maceration extract quickly introduces in operable time during large-area construction, and can realize intracavitary Thorough impregnation, no construction dead angle.
4. vacuum is high in vacuum chamber.Using easy reliable edge banding technique and large-scale vacuum negative pressure work station, vacuum chamber Interior final vacuum 750mmHg, and it is adjustable as needed.
5. impregnate work progress safety, economic, environmental protection., can using external " hot plug " joint style of fast and flexible Realize pumping on demand, feed liquor impregnates on demand;Maceration extract under vacuum condition " zero loss " is realized simultaneously, that is, without dipping liquid stream in constructing Go out, maceration extract need not be reclaimed after construction, avoids environmental pollution, secondary leaching can be carried out at any time when work progress occurs unexpected Stain or repeatedly dipping.
Brief description of the drawings
Fig. 1 is the integrative construction device schematic diagram of the present invention.
Fig. 2 is the schematic diagram of another angle of the integrative construction device of the present invention.
Description of reference numerals
1- drain interfaces;20- drain choke valves;21- negative pressure choke valves;3- cushion blocks;4- bed courses;
5- negative ports;6- cover plates;7- spare interfaces;8- fluid reservoirs;9- negative pressure equipments;
10- concrete surface layers;11- impregnation chambers;110- maceration extracts;120- negative pressure catheters;
121- liquid guide ducts;13- concrete crackses.
Embodiment
With reference to the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Ground describes.Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still the present invention can be with It is different from other manner described here using other to implement, those skilled in the art can be without prejudice to intension of the present invention In the case of do similar popularization, therefore the present invention is not limited by following public specific embodiment.
As depicted in figs. 1 and 2, impregnation chamber 11 includes cover plate 6 and bed course 4, and cover plate 6, bed course 4 and concrete surface layer 10 are together Surround seal cavity.Cover plate 6 is high polymer elastic sheet material, such as common high polymer elastic sheet material has PVC board, made with rubber Plate class, plastic plate etc., bed course 4 is the adjustable flexible rubber dam bed course of thickness.Bed course 4 and the sealing of concrete surface layer 10 connect Connect.Cover plate 6 and bed course 4 are tightly connected.The thickness of cover plate 6 is 1 millimeter to 2 millimeters.Cover plate 6 is provided with drain interface 1, negative port 5 and spare interface 7.Above-mentioned interface can use the external interface of unified specification, and this interface mode make it that interface position is clever Work is changeable, can arrange the position of interface according to actual conditions, at the same using unified specification to operate it is extremely convenient, no Need specifically to go to distinguish drain interface 1 and negative port 5.Preferably, cushion block 3 is provided with impregnation chamber 11, cushion block 3 is high score Subpad block, the material of common making macromolecule cushion block have rubber, resin, plastics etc., cushion block 3 be placed on cover plate 6 due to taking out Vacuum causes the place collapsed.Negative pressure equipment 9 is tightly connected by negative pressure catheter 120 and the negative port 5 on cover plate 6, negative Negative pressure choke valve 21 is provided with pressure conduit 120, and negative pressure choke valve 21 is controlling the negative pressure in elastic impregnation chamber 11.Fluid reservoir 8 are tightly connected by liquid guide ducts 121 and the phase of drain interface 1 on cover plate 6, and drain throttling is provided with liquid guide ducts 121 Valve 20, drain choke valve 20 input the flow of maceration extract 110 to control into elastic impregnation chamber 11.Used in above-mentioned sealed connection Encapsulant include layers of two-sided and layer of flexible sealing material, such as common encapsulant has aramid fiber, carbon fiber, stone The line of ink marker, high water base fiber and other material.
The specific works step of the present embodiment is as follows:
1st, construction surface pre-processes:Construction surface is handled, the surface blot of concrete layer 10, mud are removed using angle grinder The attachments such as soil, liver moss, outmoded repair layer, and remain in the floating ash in surface and crack after absorbing polishing with negative pressure equipment 9.It is right Moist surface needs to carry out drying and processing, it should be ensured that inside concrete carries out next procedure again after doing solid work.For breakage, degrade Serious surface should remove the fragment of loosening.
2nd, sealed set impregnation chamber:Concrete surface layer 10 to be repaired is covered with impregnation chamber 11, and impregnation chamber 11 includes cover plate 6 With bed course 4, cover plate 6, bed course 4 and concrete surface layer 10 form seal cavity.Concrete operations mode is:Use epoxy repair material Crack to the sealing station of impregnation chamber 11, it is empty the defects of carry out repairing and ensure smooth at edge sealing, no gas permeation.Using machinery Or the mode such as gluing fixes bed course 4 and cover plate 6 successively, the seal cavity of closing is formed.It is few in the inner homogeneous of impregnation chamber 11 arrangement Amount cushion block 3 prevents sheet material from too deforming.Drain interface 1, negative port 5 and spare interface 7 are set on cover plate 6.
3rd, vacuum monitor:External negative pressure equipment 9 is accessed into impregnation chamber 11 to be tested, starts negative pressure equipment 9, it is ensured that chamber Interior vacuum is not less than 0.09Mpa, and can independently keep vacuum 5 minutes after negative pressure choke valve 21 cuts off negative pressure catheter 120 More than.
4th, maceration extract is configured:The selection of maceration extract 110 need to meet at following 4 points:(1) polymer monomer and mixed system glue Spend that low, boiling point is high, should meet that high fluidity and high osmosis are not acutely seethed with excitement and steamed under the vacuum of construction requirement again Hair;(2) maceration extract mixed system can realize normal temperature, the solidification of vacuum condition lower short time;(3) have after maceration extract solidification and be suitable as For the characteristic of surface preventing material, such as impermeability, frost resistance, high-weatherability, high-impact mill property;(4) if concrete construction Than more serious, macrocrack is more for thing surface damage/deterioration, then can select the slightly larger polymer monomer of viscosity, such as asphalt mixtures modified by epoxy resin Resin system (parts by weight of epoxy resin body 100, the parts by weight of curing agent 33~38, the parts by weight of diluent 25~30;Such as it is preferably Epoxy resin body 140g, curing agent 50g, diluent 40g);If surface damage is slight, the methyl-prop of low viscosity may be selected E pioic acid methyl ester system.Maceration extract 110 need to i.e. with i.e. use, and in the range of operable time import impregnation chamber 11, if necessary can will Fluid reservoir 8, which is put into water, to cool to extend operable time.By taking methyl methacrylate base modified system as an example, it includes:First Base methyl acrylate 100ml, 20~30ml of butyl methacrylate, 10~25ml of methacrylic acid, to toluenesulfinic acid 1~ 3g, 0.5~2g of dibenzoyl peroxide, N, 1~3g of accelerine, inorganic filler 5-10g, 1~5g of modifying agent etc..
5th, maceration extract is imported:Start negative pressure equipment 9, drain throttling is opened after the vacuum of requirement is reached in cavity to be sealed Valve 20, negative pressure choke valve 21 is simultaneously closed off, the maceration extract 110 in fluid reservoir 8 is imported seal cavity by liquid guide ducts 121 In, concrete surface layer 10 is repaired and protected.After maceration extract 110 is full of impregnation chamber 11, the cut-out of drain choke valve 20 is led After fluid catheter 121, the inferior initial set of liquid 110 to be impregnated of vacuum condition is being kept.
6th, removal is handled:Maceration extract 110 forms repair layer after solidifying, remove cover plate 6 and bed course 4.Specifically, maceration extract It is removable negative pressure equipment dismountable cover plate 6 and bed course 4 after 9,24 hours after 110 initial sets, is reused after remaining;Cushion block 3 It is not required to take out, in the repair layer of indwelling after solidification.Cushion block 3 plays Stability Analysis of Structures effect to seal cavity, avoids vacuum from spending When big, there is the problem of structure collapses in impregnation chamber 11.In addition, after repair layer solidifies to be formed, cushion block 3 does not take out and turns into and repair A part for layer is mended, cushion block 3 can play Stability Analysis of Structures effect to repair layer.In addition, in order to increase cushion block 3 to the steady of repair layer It is set for using, multiple elongated flexible and extendable bodies can be arranged on cushion block 3, these elongated flexible and extendable cognition are distributed in repair layer Within, strengthen the Stability Analysis of Structures effect to repair layer.
The lifting of building Surface layer's concrete properties is notable after the completion of construction, and surface protecting layer is elegant in appearance and protective Can be excellent.It is as shown in the table that comparative test result is carried out to concrete test block before and after dipping, it can be seen that mixed for impaired/deterioration Native test block is coagulated, mechanical property is greatly improved after the repairing of vacuum impregnation construction technology, and compression strength recovery rate is more than 70%, cleavage strength recovery rate is more than 90%, structural strengthening is acted on obvious;Pass through anti-carbonization, chloride-penetration resistance, resistant abrasion The contrast of the test results such as experiment is as can be seen that the technique is also very prominent to the protection effect of concrete surface, in erosion environment It can prevent to cause the composition of concrete deterioration to continue to penetrate into substantially in the case of can not changing;Have in itself along with maceration extract High durable, high-impact mill etc. are suitable as the characteristic of top layer protective materials, ensure that the realization of repairing protection integrated function.
Following form is that methyl methacrylate base is modified performance comparison table before and after maceration extract repairing, passes through these data It is known that after dipping reinforcement, parameter compression strength (Mpa) and cleavage strength (Mpa) significantly improve.
The methyl methacrylate base of table 1 is modified performance comparison table before and after maceration extract repairing
The scope of operation of the present invention is not limited by shape, the common concrete construction surface such as plane, inclined-plane, facade, cylinder Construction, has a wide range of application, strong adaptability.
This technique uses elastic impregnation chamber, and maceration extract can be achieved using simple construction technology and quickly introduce and Dilvar zone Domain all standing;There is pulp high osmosis can go deep into concrete structure inner repair defect, crack, while be formed on surface The controllable protective layer of thickness, it is achieved thereby that repairing and the protection integrated on concrete structure top layer.This technology is in concrete Dam overfull dam surface crack repairing, the top layer repairing protection of road/bridge and repairing for harsh and unforgiving environments area concrete thin-wall construction The fields such as protection are mended to have a extensive future.
In addition, the selection of maceration extract used in the present invention is depending on building surface degree of injury/ageing state, it is different Surface appearance selects different maceration extracts;The color of maceration extract can be adjusted as needed, such as may be selected and structure trunk color Close color, so as to which color is coordinated with building primary colors after repairing, realize effect attractive in appearance.Also, the scope of operation is not by shape Shape limits, and the common concrete construction surface such as plane, inclined-plane, facade, cylinder can apply.
Obviously, described embodiment is only the part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.

Claims (10)

1. a kind of integrative construction device, for concrete surface layer that is impaired or deteriorating to be repaired and protected, its feature exists In the integrative construction device includes:
Impregnation chamber (11), the impregnation chamber (11) include cover plate (6) and bed course (4), and the cover plate (6) and the bed course (4) are used In being surrounded together with concrete surface layer (10) for filling the seal cavities of maceration extract (110);
Negative pressure equipment (9), the negative pressure equipment (9) are connected with the impregnation chamber (11), and it is described that the negative pressure equipment (9), which is used for, Seal cavity provides negative pressure;
Fluid reservoir (8), the fluid reservoir (8) are connected with the impregnation chamber (11), and the fluid reservoir (9) is used to store maceration extract (110)。
2. integrative construction device according to claim 1, it is characterised in that the cover plate (6) is high polymer elastic plate Material, the bed course (4) are the adjustable flexible rubber dam bed course of thickness, and the bed course (4) and concrete surface layer (10) sealing connect Connect, the cover plate (6) and bed course (4) are tightly connected.
3. integrative construction device according to claim 1, it is characterised in that be provided with least one on the cover plate (6) The individual negative port (5) that can be tightly connected with one end of negative pressure catheter (120) and it is at least one can be with liquid guide ducts (121) The drain interface (1) that is tightly connected of one end, the other end of the negative pressure catheter (120) is connected with the negative pressure equipment (9), institute The other end for stating liquid guide ducts (121) is connected with the fluid reservoir (8), is additionally provided with the cover plate (6) at least one standby Interface (7).
4. integrative construction device according to claim 3, it is characterised in that the negative port (5), the drain connect Mouth (1) and the spare interface (7) are external interface.
5. integrative construction device according to claim 3, it is characterised in that be provided with the negative pressure catheter (120) Negative pressure choke valve (21), drain choke valve (20) is provided with the liquid guide ducts (121).
6. integrative construction device according to claim 1, it is characterised in that be provided with cushion block in the seal cavity (3), the cushion block (3) is high polymer material cushion block.
7. according to the integrative construction device any one of claim 1-6, it is characterised in that the cover plate (6) and institute The position for stating bed course (4) connection is connected by sealing structure, and the sealing structure includes layers of two-sided and layer of flexible sealing material.
8. a kind of integral construction method, for concrete surface layer that is impaired or deteriorating to be repaired and protected, its feature exists In, including following step:
First, concrete surface layer to be repaired (10) is covered with impregnation chamber (11), and the impregnation chamber (11) includes cover plate (6) and pad Layer (4), the cover plate (6), the bed course (4) and concrete surface layer (10) surround seal cavity together;
Then, start negative pressure equipment (9), drain choke valve is opened after the vacuum for reaching requirement in the seal cavity (20) negative pressure choke valve (21), is simultaneously closed off, the maceration extract (110) in fluid reservoir (8) is imported institute by liquid guide ducts (121) State in seal cavity, concrete surface layer (10) is repaired and protected;
Finally, repair layer is formed after maceration extract (110) solidification, removes the cover plate (6) and the bed course (4).
9. integral construction method according to claim 8, it is characterised in that the maceration extract (11) is methacrylic acid Carbomethoxy modified system or epoxy-resin systems:
The methyl methacrylate base modified system includes:Methyl methacrylate 100ml, butyl methacrylate 20~ 30ml, 10~25ml of methacrylic acid, to 1~3g of toluenesulfinic acid, 0.5~2g of dibenzoyl peroxide, N, N- dimethyl benzenes 1~3g of amine, inorganic filler 5-10g, 1~5g of modifying agent;
The epoxy-resin systems include:The parts by weight of epoxy resin body 100, the parts by weight of curing agent 33~38, diluent 25~ 30 parts by weight.
10. integral construction method according to claim 8, it is characterised in that
Cushion block (3) is provided with the seal cavity, repair layer is formed after maceration extract solidification, removes the cover plate (6) and institute After stating bed course (4), in the repair layer of cushion block (3) indwelling after solidification;
The vacuum is 30~750mmHg.
CN201711328839.8A 2017-12-13 2017-12-13 Integrated construction device and method Active CN107859357B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711328839.8A CN107859357B (en) 2017-12-13 2017-12-13 Integrated construction device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711328839.8A CN107859357B (en) 2017-12-13 2017-12-13 Integrated construction device and method

Publications (2)

Publication Number Publication Date
CN107859357A true CN107859357A (en) 2018-03-30
CN107859357B CN107859357B (en) 2023-09-08

Family

ID=61706464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711328839.8A Active CN107859357B (en) 2017-12-13 2017-12-13 Integrated construction device and method

Country Status (1)

Country Link
CN (1) CN107859357B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235384A (en) * 2018-10-31 2019-01-18 蓝色海洋(天津)工程技术有限公司 A kind of power plant's flood discharging tunnel repair apparatus and its repair layer

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86100856A (en) * 1986-02-01 1987-08-19 国家建筑材料工业局苏州混凝土水泥制品研究院 Negative pressure polymerized at normal temperature thing impregnation technology
TW555926B (en) * 2001-08-07 2003-10-01 Tekken Constr Co Repair and reinforcement method for concrete structure
KR100822891B1 (en) * 2006-12-28 2008-04-16 최낙영 Reinforcement - plate for structure flaw mend and method for structure flaw mend thereby
JP2010065488A (en) * 2008-09-12 2010-03-25 Tobishima Corp Repair method for structure having crack, and repair device therefor
CN104088254A (en) * 2014-07-11 2014-10-08 泛华建设集团有限公司 Leakage repairing device for pressure-bearing reinforced concrete structure and construction method thereof
CN105693913A (en) * 2016-03-02 2016-06-22 李金平 High-permeation chemical grouting material and preparation method thereof
CN207749852U (en) * 2017-12-13 2018-08-21 北京中水科海利工程技术有限公司 A kind of integrative construction device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86100856A (en) * 1986-02-01 1987-08-19 国家建筑材料工业局苏州混凝土水泥制品研究院 Negative pressure polymerized at normal temperature thing impregnation technology
TW555926B (en) * 2001-08-07 2003-10-01 Tekken Constr Co Repair and reinforcement method for concrete structure
KR100822891B1 (en) * 2006-12-28 2008-04-16 최낙영 Reinforcement - plate for structure flaw mend and method for structure flaw mend thereby
JP2010065488A (en) * 2008-09-12 2010-03-25 Tobishima Corp Repair method for structure having crack, and repair device therefor
CN104088254A (en) * 2014-07-11 2014-10-08 泛华建设集团有限公司 Leakage repairing device for pressure-bearing reinforced concrete structure and construction method thereof
CN105693913A (en) * 2016-03-02 2016-06-22 李金平 High-permeation chemical grouting material and preparation method thereof
CN207749852U (en) * 2017-12-13 2018-08-21 北京中水科海利工程技术有限公司 A kind of integrative construction device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235384A (en) * 2018-10-31 2019-01-18 蓝色海洋(天津)工程技术有限公司 A kind of power plant's flood discharging tunnel repair apparatus and its repair layer
CN109235384B (en) * 2018-10-31 2024-04-19 蓝色海洋(天津)工程技术有限公司 Flood discharge hole repair equipment for power plant and repair layer thereof

Also Published As

Publication number Publication date
CN107859357B (en) 2023-09-08

Similar Documents

Publication Publication Date Title
CN104018526B (en) EPR deformation joint repairs water-stopping structure and construction method thereof
CN108149945A (en) A kind of quick crack repairing structure of easy construction and its construction method
CN108166517A (en) For the shut-in well method and well-sealing device of superelevation floor height hydraulic pressure dewatering well of deep well
CN104100102B (en) Flat-top waterproof integrated conduct method
CN206143827U (en) Underground works crack repairing structure
CN208072375U (en) A kind of vacuum method pinniform horizontal drainage structure
CN207749852U (en) A kind of integrative construction device
CN107859357A (en) A kind of integrative construction device and method
CN111042997B (en) Method for repairing major structural damage reinforcement of main beam of wind turbine blade
CN110374352A (en) Concrete wall glue injection method and non-return streamer rubber head
CN108894531A (en) Repairing building cracks method
CN102001185B (en) Secondary injection molding process of megawatt level wind turbine blades
CN206201630U (en) Concrete structure protection and reparation polymer compound film with self-repair function
CN103452081A (en) Construction method for flexible composite impermeable layer of upstream face of high arch dam
CN105090677B (en) Leakage stoppage method for root leakage of storage tank
CN216339298U (en) Rockfill concrete dam with GH-III anti-seepage structure
CN206002422U (en) A kind of bituminous paving permeability performance test device
CN212273415U (en) Trenchless pipeline is restoreed and is used interior bushing pipe
CN203924150U (en) EPR deformation joint is repaired water-stopping structure
CN205637360U (en) Waterproof roof is planted to underground garage
CN103225260A (en) Method for pouring elastic waterproof bridge expansion joint material
CN209099797U (en) A kind of lossless reparation structure of building basement foig
CN106337449A (en) Crack repairing structure for underground engineering and construction method of crack repairing structure
CN111809669A (en) Basement post-cast strip leaking stoppage grouting and reinforcing construction method
CN206090551U (en) Underground pile head watertight fittings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant