CN107858596A - A kind of refrigerated ice bin instrument and its production technology - Google Patents

A kind of refrigerated ice bin instrument and its production technology Download PDF

Info

Publication number
CN107858596A
CN107858596A CN201711295378.9A CN201711295378A CN107858596A CN 107858596 A CN107858596 A CN 107858596A CN 201711295378 A CN201711295378 A CN 201711295378A CN 107858596 A CN107858596 A CN 107858596A
Authority
CN
China
Prior art keywords
dial plate
temperature
ice bin
finished product
zinc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711295378.9A
Other languages
Chinese (zh)
Inventor
唐荣
唐建明
陆荣晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bovin Refrigeration Technology (suzhou) Co Ltd
Original Assignee
Bovin Refrigeration Technology (suzhou) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bovin Refrigeration Technology (suzhou) Co Ltd filed Critical Bovin Refrigeration Technology (suzhou) Co Ltd
Priority to CN201711295378.9A priority Critical patent/CN107858596A/en
Publication of CN107858596A publication Critical patent/CN107858596A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/002Ferrous alloys, e.g. steel alloys containing In, Mg, or other elements not provided for in one single group C22C38/001 - C22C38/60
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/02Cleaning by the force of jets or sprays
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/04Cleaning involving contact with liquid
    • B08B3/10Cleaning involving contact with liquid with additional treatment of the liquid or of the object being cleaned, e.g. by heat, by electricity or by vibration
    • B08B3/12Cleaning involving contact with liquid with additional treatment of the liquid or of the object being cleaned, e.g. by heat, by electricity or by vibration by sonic or ultrasonic vibrations
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/005Ferrous alloys, e.g. steel alloys containing rare earths, i.e. Sc, Y, Lanthanides
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/06Ferrous alloys, e.g. steel alloys containing aluminium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/12Ferrous alloys, e.g. steel alloys containing tungsten, tantalum, molybdenum, vanadium, or niobium

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Coating With Molten Metal (AREA)

Abstract

The invention discloses a kind of refrigerated ice bin instrument, including meter body, meter body weight percent composition is:Re:2.98 3.15%, Bi:0.56 0.89%, C:1.25 1.89%, Si:3.25 3.69%, Mn:3.56 3.98%, Mo:5.6 6.7%, Al:1.56 1.65%, Ru:2.25 2.63%, Zn:2.56 3.12%, rare earth:23 29%, remaining is Fe and trace impurity;In rare earth, by weight percentage comprising following components:Sc:3.25 4.56%, Ce:9.6 9.9%, Sr:6.8 7.2%, Nd:12.36 13.25%, Eu:7.8 8.3%, Sm:3.4 7.6%, surplus Zr.

Description

A kind of refrigerated ice bin instrument and its production technology
Technical field
The present invention relates to instrument processing technique field, particularly relates to a kind of refrigerated ice bin instrument and its production work Skill.
Background technology
Refrigerator-freezer instrument abrasion resistance properties of the prior art are relatively low, and using effect is poor, and spoilage is larger, the damage of instrument The overall damage of product is often created, significantly increases scrappage, environmental pollution also result in great threat, to carry The utilization rate of high refrigerator-freezer instrument, reduce scrappage, time saving and energy saving, the present invention proposes a kind of refrigerated ice bin instrument and its production Technique.
The content of the invention
The shortcomings that technical problems to be solved by the invention are, existed for above prior art proposes a kind of refrigerated ice bin With instrument and its production technology, operating efficiency is not only increased, and reduces scrappage, has saved production cost, step letter It is single, convenient operation.
The present invention solve above technical problem technical scheme be:
A kind of refrigerated ice bin instrument, including meter body, meter body weight percent composition are:Re:2.98-3.15%, Bi:0.56-0.89%, C:1.25-1.89%, Si:3.25-3.69%, Mn:3.56-3.98%, Mo:5.6-6.7%, Al:1.56- 1.65%, Ru:2.25-2.63%, Zn:2.56-3.12%, rare earth:23-29%, remaining is Fe and trace impurity;
In rare earth, by weight percentage comprising following components:Sc:3.25-4.56%, Ce:9.6-9.9%, Sr:6.8-7.2%, Nd: 12.36-13.25%, Eu:7.8-8.3%, Sm:3.4-7.6%, surplus Zr.
The technical scheme that further limits of the present invention is:
Foregoing refrigerated ice bin instrument, meter body weight percent composition are:Re:2.98%, Bi:0.56%, C:1.25%, Si:3.25%, Mn:3.56%, Mo:5.6%, Al:1.56%, Ru:2.25%, Zn:2.56%, rare earth:23%, remaining is Fe and micro Impurity;
In rare earth, by weight percentage comprising following components:Sc:3.25%, Ce:9.6%, Sr:6.8%, Nd:12.36%, Eu: 7.8%, Sm:3.4%, surplus Zr.
Foregoing refrigerated ice bin instrument, including meter body, meter body weight percent composition are:Re:3.15%, Bi:0.89%, C:1.89%, Si:3.69%, Mn:3.98%, Mo:6.7%, Al:1.65%, Ru:2.63%, Zn:3.12%, rare earth: 29%, remaining is Fe and trace impurity;
In the rare earth, by weight percentage comprising following components:Sc:4.56%, Ce:9.9%, Sr:7.2%, Nd:13.25%, Eu:8.3%, Sm:7.6%, surplus Zr.
A kind of production technology of refrigerated ice bin instrument, including following steps:
(One)Dial plate shape is made in steel billet, concrete technology is:
Heating steel billet, heating-up temperature are 1550-1750 DEG C;
High-pressure water descaling, de-scaling pressure are set as 18-22MPa, and red steel temperature is 950-1100 DEG C after de-scaling;
Rolling, roughing mill inlet temperature are 1150-1160 DEG C, and mill inlet temperature is at 950-1100 DEG C;
Subtract fixed diameter rolling, 890-910 DEG C of control reducing sizing mill inlet temperature, 700-750 DEG C of reducing sizing mill outlet temperature;
Spinning, control dial plate temperature is at 800-820 DEG C;
It is air-cooled, control into cover lid temperature and go out cover lid temperature, enter cover lid temperature for 750-760 DEG C, it is 450-500 to go out cover lid temperature ℃;
Finishing, dial plate defect part is sheared, bundling, weigh, pack after be put in storage;
(Two)Dial plate is first removed into hot rolling oxide skin through mechanical dephosphorizing equipment, then sequentially enters rinse bath cleaning, descaling bath acid Wash, high pressure water washing, enter and phosphorating treatment is carried out in phosphating equipment, then enter clear water reserviors washing, then saponification, finally enter drying and set Standby drying, obtains surface treated dial plate, wherein:
(Three)Surface treated dial plate in step 2 is placed on drawbench and carries out thinning shaping, obtains seven thickness identicals half Finished product dial plate;
(Four)Semi-finished product dial plate in step 3 is used into ultrasonic degreasing, i.e., semi-finished product dial plate is put into degreasing bath, to de- Launch ultrasonic wave in fat groove and carry out degreasing, ultrasonic wave is high-frequency sound wave of the frequency in more than 16kHz;
(Five)By the semi-finished product dial plate repeat step after degreasing(Two)In process, obtain the semi-finished product table after secondary surface treatment Disk;
(Six)Semi-finished product dial plate through secondary surface treatment in step 5 is carried out helping plating;
Fluxing agent and reduces ammonium chloride solution amount in fluxing agent using the mixed liquor of ammonium chloride and zinc chloride as far as possible, ammonium chloride and The weight ratio of zinc chloride is 1.2:1.6, fluxing agent heating and temperature control is at 45-55 DEG C when helping plating;
(Seven)Will be helped in step 6 plating after semi-finished product dial plate be immersed in immediately in galvanizing bath carry out surface it is zinc-plated, filled in galvanizing bath There is the zinc ingot metal of heating melting in advance, galvanizing time 5-8s, leaching zinc temperature control is at 420-450 DEG C;
(Eight)Instrument board after will be zinc-plated is cleared up i.e. assembly and can obtain refrigerated ice bin instrument.
The production technology of foregoing refrigerated ice bin instrument, step(Two)Acid is salt of the concentration in 12-15% in middle descaling bath Acid, to wire acid cleaning 10-15min under normal temperature;The temperature control of phosphatization is at 55-65 DEG C in phosphating equipment, phosphatization 8-11min.
The production technology of foregoing refrigerated ice bin instrument, step(Two)In high pressure water washing using air strengthen stirring Water mode.
The production technology of foregoing high intensity wear-resistant sheet metal component, step(Seven)In the zinc ingot metal of melting use GB/T470 In No. 2 or No. 4 zinc ingot metals, galvanizing bath is that the heat preservation tank of lid is connected with open topped.
It is using technical scheme beneficial effect:The production craft step of the present invention(Two)In high pressure water washing Stirring water mode is strengthened using air, directly discharged relative to flushing water, water consumption is larger, and instrument board remained on surface part alkali For liquid, acid solution, the direct current spray irrigation mode of molysite, have and more strengthen rinse capacity, reduce the residual alkali of instrument panel surface Liquid, while energy consumption is saved in using water wisely, reduces discharge of wastewater;In the production technology of the present invention:Step(Three)Using ultrasonic wave Degreasing, cleaning speed is fast, quality is high, easy to automate, and cleannes are high and whole instrument board cleannes are consistent, are not necessary to people Hand contacts cleaning fluid, and securely and reliably, instrument board surface nondestructive is hindered, and saves solvent, heat energy, work-yard and artificial etc.;This Invention production technology is surface-treated twice, and the impurity such as thorough descaling ensure that instrument board surface cleaning, finally Ensure the quality of finished product.
Embodiment
Embodiment 1
The present embodiment provides a kind of refrigerated ice bin instrument, including meter body, meter body weight percent composition are:Re: 2.98%, Bi:0.56%, C:1.25%, Si:3.25%, Mn:3.56%, Mo:5.6%, Al:1.56%, Ru:2.25%, Zn:2.56%, Rare earth:23%, remaining is Fe and trace impurity;
In rare earth, by weight percentage comprising following components:Sc:3.25%, Ce:9.6%, Sr:6.8%, Nd:12.36%, Eu: 7.8%, Sm:3.4%, surplus Zr;
A kind of production technology of refrigerated ice bin instrument, including following steps:
(One)Dial plate shape is made in steel billet, concrete technology is:
Heating steel billet, heating-up temperature are 1550 DEG C;
High-pressure water descaling, de-scaling pressure are set as 18MPa, and red steel temperature is 950 DEG C after de-scaling;
Rolling, roughing mill inlet temperature are 1150 DEG C, and mill inlet temperature is at 950 DEG C;
Subtract fixed diameter rolling, 890 DEG C of control reducing sizing mill inlet temperature, 700 DEG C of reducing sizing mill outlet temperature;
Spinning, control dial plate temperature is at 800 DEG C;
It is air-cooled, control into cover lid temperature and go out cover lid temperature, enter cover lid temperature for 750 DEG C, go out cover lid temperature for 450 DEG C;
Finishing, dial plate defect part is sheared, bundling, weigh, pack after be put in storage;
(Two)Dial plate is first removed into hot rolling oxide skin through mechanical dephosphorizing equipment, then sequentially enters rinse bath cleaning, descaling bath acid Wash, high pressure water washing, enter and phosphorating treatment is carried out in phosphating equipment, then enter clear water reserviors washing, then saponification, finally enter drying and set Standby drying, obtains surface treated dial plate, wherein:
(Three)Surface treated dial plate in step 2 is placed on drawbench and carries out thinning shaping, obtains seven thickness identicals half Finished product dial plate;
(Four)Semi-finished product dial plate in step 3 is used into ultrasonic degreasing, i.e., semi-finished product dial plate is put into degreasing bath, to de- Launch ultrasonic wave in fat groove and carry out degreasing, ultrasonic wave is high-frequency sound wave of the frequency in more than 16kHz;
(Five)By the semi-finished product dial plate repeat step after degreasing(Two)In process, obtain the semi-finished product table after secondary surface treatment Disk;
(Six)Semi-finished product dial plate through secondary surface treatment in step 5 is carried out helping plating;
Fluxing agent and reduces ammonium chloride solution amount in fluxing agent using the mixed liquor of ammonium chloride and zinc chloride as far as possible, ammonium chloride and The weight ratio of zinc chloride is 1.2:1.6, fluxing agent heating and temperature control is at 45 DEG C when helping plating;
(Seven)Will be helped in step 6 plating after semi-finished product dial plate be immersed in immediately in galvanizing bath carry out surface it is zinc-plated, filled in galvanizing bath There is the zinc ingot metal of heating melting in advance, galvanizing time 5s, leaching zinc temperature control is at 420 DEG C;
(Eight)Instrument board after will be zinc-plated is cleared up i.e. assembly and can obtain refrigerated ice bin instrument;
Step(Two)Acid is hydrochloric acid of the concentration 12% in middle descaling bath, to wire acid cleaning 10min under normal temperature;Phosphorus in phosphating equipment The temperature control of change is at 55 DEG C, phosphatization 8min;Step(Two)In high pressure water washing using air strengthen stirring water mode;Step (Seven)In melting zinc ingot metal use GB/T470 in No. 2 or No. 4 zinc ingot metals, galvanizing bath be open topped at be connected with lid The heat preservation tank of son.
Embodiment 2
The present embodiment provides a kind of refrigerated ice bin instrument, including meter body, meter body weight percent composition are:Re: 3.15%, Bi:0.89%, C:1.89%, Si:3.69%, Mn:3.98%, Mo:6.7%, Al:1.65%, Ru:2.63%, Zn:3.12%, Rare earth:29%, remaining is Fe and trace impurity;
In the rare earth, by weight percentage comprising following components:Sc:4.56%, Ce:9.9%, Sr:7.2%, Nd:13.25%, Eu:8.3%, Sm:7.6%, surplus Zr.
A kind of production technology of refrigerated ice bin instrument, including following steps:
(One)Dial plate shape is made in steel billet, concrete technology is:
Heating steel billet, heating-up temperature are 1750 DEG C;
High-pressure water descaling, de-scaling pressure are set as 22MPa, and red steel temperature is 1100 DEG C after de-scaling;
Rolling, roughing mill inlet temperature are 1160 DEG C, and mill inlet temperature is at 1100 DEG C;
Subtract fixed diameter rolling, 910 DEG C of control reducing sizing mill inlet temperature, 750 DEG C of reducing sizing mill outlet temperature;
Spinning, control dial plate temperature is at 820 DEG C;
It is air-cooled, control into cover lid temperature and go out cover lid temperature, enter cover lid temperature for 760 DEG C, go out cover lid temperature for 500 DEG C;
Finishing, dial plate defect part is sheared, bundling, weigh, pack after be put in storage;
(Two)Dial plate is first removed into hot rolling oxide skin through mechanical dephosphorizing equipment, then sequentially enters rinse bath cleaning, descaling bath acid Wash, high pressure water washing, enter and phosphorating treatment is carried out in phosphating equipment, then enter clear water reserviors washing, then saponification, finally enter drying and set Standby drying, obtains surface treated dial plate, wherein:
(Three)Surface treated dial plate in step 2 is placed on drawbench and carries out thinning shaping, obtains seven thickness identicals half Finished product dial plate;
(Four)Semi-finished product dial plate in step 3 is used into ultrasonic degreasing, i.e., semi-finished product dial plate is put into degreasing bath, to de- Launch ultrasonic wave in fat groove and carry out degreasing, ultrasonic wave is high-frequency sound wave of the frequency in more than 16kHz;
(Five)By the semi-finished product dial plate repeat step after degreasing(Two)In process, obtain the semi-finished product table after secondary surface treatment Disk;
(Six)Semi-finished product dial plate through secondary surface treatment in step 5 is carried out helping plating;
Fluxing agent and reduces ammonium chloride solution amount in fluxing agent using the mixed liquor of ammonium chloride and zinc chloride as far as possible, ammonium chloride and The weight ratio of zinc chloride is 1.2:1.6, fluxing agent heating and temperature control is at 55 DEG C when helping plating;
(Seven)Will be helped in step 6 plating after semi-finished product dial plate be immersed in immediately in galvanizing bath carry out surface it is zinc-plated, filled in galvanizing bath There is the zinc ingot metal of heating melting in advance, galvanizing time 8s, leaching zinc temperature control is at 450 DEG C;
(Eight)Instrument board after will be zinc-plated is cleared up i.e. assembly and can obtain refrigerated ice bin instrument;
Step(Two)Acid is hydrochloric acid of the concentration 15% in middle descaling bath, to wire acid cleaning 15min under normal temperature;Phosphorus in phosphating equipment The temperature control of change is at 65 DEG C, phosphatization 11min;Step(Two)In high pressure water washing using air strengthen stirring water mode;Step Suddenly(Seven)In melting zinc ingot metal use GB/T470 in No. 2 or No. 4 zinc ingot metals, galvanizing bath be open topped at be connected with The heat preservation tank of lid.
Embodiment 3
The present embodiment provides a kind of refrigerated ice bin instrument, including meter body, meter body weight percent composition are:Re: 3.11%, Bi:0.78%, C:1.56%, Si:3.78%, Mn:3.77%, Mo:6.2%, Al:1.58%, Ru:2.55%, Zn:3.08%, Rare earth:25%, remaining is Fe and trace impurity;
In rare earth, by weight percentage comprising following components:Sc:3.78%, Ce:9.8%, Sr:6.9%, Nd:12.45%, Eu: 8.1%, Sm:5.6%, surplus Zr;
A kind of production technology of refrigerated ice bin instrument, including following steps:
(One)Dial plate shape is made in steel billet, concrete technology is:
Heating steel billet, heating-up temperature are 1650 DEG C;
High-pressure water descaling, de-scaling pressure are set as 20MPa, and red steel temperature is 1000 DEG C after de-scaling;
Rolling, roughing mill inlet temperature are 1155 DEG C, and mill inlet temperature is at 1000 DEG C;
Subtract fixed diameter rolling, 900 DEG C of control reducing sizing mill inlet temperature, 720 DEG C of reducing sizing mill outlet temperature;
Spinning, control dial plate temperature is at 810 DEG C;
It is air-cooled, control into cover lid temperature and go out cover lid temperature, enter cover lid temperature for 755 DEG C, go out cover lid temperature for 480 DEG C;
Finishing, dial plate defect part is sheared, bundling, weigh, pack after be put in storage;
(Two)Dial plate is first removed into hot rolling oxide skin through mechanical dephosphorizing equipment, then sequentially enters rinse bath cleaning, descaling bath acid Wash, high pressure water washing, enter and phosphorating treatment is carried out in phosphating equipment, then enter clear water reserviors washing, then saponification, finally enter drying and set Standby drying, obtains surface treated dial plate, wherein:
(Three)Surface treated dial plate in step 2 is placed on drawbench and carries out thinning shaping, obtains seven thickness identicals half Finished product dial plate;
(Four)Semi-finished product dial plate in step 3 is used into ultrasonic degreasing, i.e., semi-finished product dial plate is put into degreasing bath, to de- Launch ultrasonic wave in fat groove and carry out degreasing, ultrasonic wave is high-frequency sound wave of the frequency in more than 16kHz;
(Five)By the semi-finished product dial plate repeat step after degreasing(Two)In process, obtain the semi-finished product table after secondary surface treatment Disk;
(Six)Semi-finished product dial plate through secondary surface treatment in step 5 is carried out helping plating;
Fluxing agent and reduces ammonium chloride solution amount in fluxing agent using the mixed liquor of ammonium chloride and zinc chloride as far as possible, ammonium chloride and The weight ratio of zinc chloride is 1.2:1.6, fluxing agent heating and temperature control is at 50 DEG C when helping plating;
(Seven)Will be helped in step 6 plating after semi-finished product dial plate be immersed in immediately in galvanizing bath carry out surface it is zinc-plated, filled in galvanizing bath There is the zinc ingot metal of heating melting in advance, galvanizing time 7s, leaching zinc temperature control is at 430 DEG C;
(Eight)Instrument board after will be zinc-plated is cleared up i.e. assembly and can obtain refrigerated ice bin instrument;
Step(Two)Acid is hydrochloric acid of the concentration 13% in middle descaling bath, to wire acid cleaning 12min under normal temperature;Phosphorus in phosphating equipment The temperature control of change is at 60 DEG C, phosphatization 10min;Step(Two)In high pressure water washing using air strengthen stirring water mode;Step Suddenly(Seven)In melting zinc ingot metal use GB/T470 in No. 2 or No. 4 zinc ingot metals, galvanizing bath be open topped at be connected with The heat preservation tank of lid.
In addition to the implementation, the present invention can also have other embodiment.It is all to use equivalent substitution or equivalent transformation shape Into technical scheme, all fall within the protection domains of application claims.

Claims (7)

1. a kind of refrigerated ice bin instrument, including meter body, it is characterised in that:The meter body weight percent composition For:Re:2.98-3.15%, Bi:0.56-0.89%, C:1.25-1.89%, Si:3.25-3.69%, Mn:3.56-3.98%, Mo: 5.6-6.7%, Al:1.56-1.65%, Ru:2.25-2.63%, Zn:2.56-3.12%, rare earth:23-29%, remaining is Fe and micro Impurity;
In the rare earth, by weight percentage comprising following components:Sc:3.25-4.56%, Ce:9.6-9.9%, Sr:6.8- 7.2%, Nd:12.36-13.25%, Eu:7.8-8.3%, Sm:3.4-7.6%, surplus Zr.
2. refrigerated ice bin instrument according to claim 1, it is characterised in that:The meter body weight percent composition For:Re:2.98%, Bi:0.56%, C:1.25%, Si:3.25%, Mn:3.56%, Mo:5.6%, Al:1.56%, Ru:2.25%, Zn: 2.56%, rare earth:23%, remaining is Fe and trace impurity;
In the rare earth, by weight percentage comprising following components:Sc:3.25%, Ce:9.6%, Sr:6.8%, Nd:12.36%, Eu:7.8%, Sm:3.4%, surplus Zr.
3. refrigerated ice bin instrument according to claim 1, including meter body, it is characterised in that:The meter body Weight percent composition is:Re:3.15%, Bi:0.89%, C:1.89%, Si:3.69%, Mn:3.98%, Mo:6.7%, Al: 1.65%, Ru:2.63%, Zn:3.12%, rare earth:29%, remaining is Fe and trace impurity;
In the rare earth, by weight percentage comprising following components:Sc:4.56%, Ce:9.9%, Sr:7.2%, Nd:13.25%, Eu:8.3%, Sm:7.6%, surplus Zr.
4. a kind of production technology of refrigerated ice bin instrument, the technique is provided with claim 1-3 described in any claim Refrigerated ice bin instrument, it is characterised in that the technique includes following steps:
(One)Dial plate shape is made in steel billet, concrete technology is:
Heating steel billet, heating-up temperature are 1550-1750 DEG C;
High-pressure water descaling, de-scaling pressure are set as 18-22MPa, and red steel temperature is 950-1100 DEG C after de-scaling;
Rolling, roughing mill inlet temperature are 1150-1160 DEG C, and mill inlet temperature is at 950-1100 DEG C;
Subtract fixed diameter rolling, 890-910 DEG C of control reducing sizing mill inlet temperature, 700-750 DEG C of reducing sizing mill outlet temperature;
Spinning, control dial plate temperature is at 800-820 DEG C;
It is air-cooled, control into cover lid temperature and go out cover lid temperature, enter cover lid temperature for 750-760 DEG C, it is 450-500 to go out cover lid temperature ℃;
Finishing, dial plate defect part is sheared, bundling, weigh, pack after be put in storage;
(Two)Dial plate is first removed into hot rolling oxide skin through mechanical dephosphorizing equipment, then sequentially enters rinse bath cleaning, descaling bath acid Wash, high pressure water washing, enter and phosphorating treatment is carried out in phosphating equipment, then enter clear water reserviors washing, then saponification, finally enter drying and set Standby drying, obtains surface treated dial plate, wherein:
(Three)Surface treated dial plate in step 2 is placed on drawbench and carries out thinning shaping, obtains seven thickness identicals half Finished product dial plate;
(Four)Semi-finished product dial plate in step 3 is used into ultrasonic degreasing, i.e., semi-finished product dial plate is put into degreasing bath, to de- Launch ultrasonic wave in fat groove and carry out degreasing, ultrasonic wave is high-frequency sound wave of the frequency in more than 16kHz;
(Five)By the semi-finished product dial plate repeat step after degreasing(Two)In process, obtain the semi-finished product table after secondary surface treatment Disk;
(Six)Semi-finished product dial plate through secondary surface treatment in step 5 is carried out helping plating;
Fluxing agent and reduces ammonium chloride solution amount in fluxing agent using the mixed liquor of ammonium chloride and zinc chloride as far as possible, ammonium chloride and The weight ratio of zinc chloride is 1.2:1.6, fluxing agent heating and temperature control is at 45-55 DEG C when helping plating;
(Seven)Will be helped in step 6 plating after semi-finished product dial plate be immersed in immediately in galvanizing bath carry out surface it is zinc-plated, filled in galvanizing bath There is the zinc ingot metal of heating melting in advance, galvanizing time 5-8s, leaching zinc temperature control is at 420-450 DEG C;
(Eight)Instrument board after will be zinc-plated is cleared up i.e. assembly and can obtain refrigerated ice bin instrument.
5. the production technology of refrigerated ice bin instrument according to claim 4, it is characterised in that:Described step(Two)In In descaling bath acid for concentration 12-15% hydrochloric acid, to wire acid cleaning 10-15min under normal temperature;Phosphatization in the phosphating equipment Temperature control is at 55-65 DEG C, phosphatization 8-11min.
6. the production technology of refrigerated ice bin instrument according to claim 4, it is characterised in that:Described step(Two)In High pressure water washing using air strengthen stirring water mode.
7. the production technology of high intensity wear-resistant sheet metal component according to claim 4, it is characterised in that:Described step (Seven)In melting zinc ingot metal use GB/T470 in No. 2 or No. 4 zinc ingot metals, galvanizing bath be open topped at be connected with lid The heat preservation tank of son.
CN201711295378.9A 2017-12-08 2017-12-08 A kind of refrigerated ice bin instrument and its production technology Pending CN107858596A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711295378.9A CN107858596A (en) 2017-12-08 2017-12-08 A kind of refrigerated ice bin instrument and its production technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711295378.9A CN107858596A (en) 2017-12-08 2017-12-08 A kind of refrigerated ice bin instrument and its production technology

Publications (1)

Publication Number Publication Date
CN107858596A true CN107858596A (en) 2018-03-30

Family

ID=61705593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711295378.9A Pending CN107858596A (en) 2017-12-08 2017-12-08 A kind of refrigerated ice bin instrument and its production technology

Country Status (1)

Country Link
CN (1) CN107858596A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109023085A (en) * 2018-09-07 2018-12-18 江苏天泽教育咨询有限公司 It is a kind of precision high rigidity measuring tool and its heat treatment modified technique
CN109097688A (en) * 2018-09-10 2018-12-28 江苏天泽教育咨询有限公司 A kind of environment protection type high-strength metal material and its production technology

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643121A (en) * 2013-11-21 2014-03-19 江苏天舜金属材料集团有限公司 Zinc-plating steel strand for overhead guying, and production process thereof
US20170149036A1 (en) * 2014-06-25 2017-05-25 Salzgitter Flachstahl Gmbh Steel product for protecting electrical components from mechanical damage

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643121A (en) * 2013-11-21 2014-03-19 江苏天舜金属材料集团有限公司 Zinc-plating steel strand for overhead guying, and production process thereof
US20170149036A1 (en) * 2014-06-25 2017-05-25 Salzgitter Flachstahl Gmbh Steel product for protecting electrical components from mechanical damage

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵宝荣: "《实用金属材料选用手册》", 30 November 2012 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109023085A (en) * 2018-09-07 2018-12-18 江苏天泽教育咨询有限公司 It is a kind of precision high rigidity measuring tool and its heat treatment modified technique
CN109097688A (en) * 2018-09-10 2018-12-28 江苏天泽教育咨询有限公司 A kind of environment protection type high-strength metal material and its production technology

Similar Documents

Publication Publication Date Title
CN101775635B (en) Treatment process of stainless steel cold-rolled sheet
CN107299340B (en) A kind of surface treatment method of steel
CN104213017B (en) A kind of galvanized steel plain sheet and production technology thereof
CN105386030B (en) A kind of method for treating stainless steel surfaces
CN110423995B (en) Stainless steel product barrel plating method and activating solution
CN106676538A (en) Environment-friendly technology for copper and copper alloy surface treatment
CN103046036A (en) Metal derusting and antirusting agent and preparation method of metal derusting and antirusting agent
CN107829035A (en) A kind of accurate high intensity sheet metal component and its corrosion-resistant vacuum heat treatment process
CN104975280A (en) Cold-rolled steel sheet passivating treatment method
CN107858596A (en) A kind of refrigerated ice bin instrument and its production technology
CN106637025A (en) Modified zinc plating treatment process for steel
CN106967968B (en) High-efficiency environment friendly steel derusting conjunctiva agent and preparation method thereof
CN108103413A (en) A kind of precision is wear-resistant stamping parts and its production technology
CN105018949A (en) Rust remover suitable for steel precision part and rust removing process of rust remover
CN102828174A (en) Method and system for surface phosphating treatment of steel
CN108034292A (en) A kind of high intensity wear-resistant sheet metal component and its production technology
CN102337545A (en) Rust remover for ultrasonically cleaning metal mould and preparation method thereof
CN102888613A (en) Pickling solution for removing oxide skins of surfaces of nickel and nickel alloy and pickling method
CN110055576B (en) Preparation method of high-strength corrosion-resistant steel material
CN102993870B (en) Modified silanized metal surface pre-treating agent containing polyoxyethylene oleate and preparation method thereof
CN111850575A (en) Rust removing liquid capable of avoiding damage to steel surface caused by excessive acid corrosion
CN109943777A (en) A kind of phosphatization cold-strip steel and manufacturing method
CN108411198A (en) A kind of high-performance stainless steel and seamless steel pipe and its manufacturing method
CN101353811A (en) Method for reducing tin plate sheet surface hexavalent chromium amount
CN110230065B (en) Neutral remover for high-temperature oxide skin and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180330

RJ01 Rejection of invention patent application after publication