CN107852622A - Clearance G ap systems of selection and device - Google Patents

Clearance G ap systems of selection and device Download PDF

Info

Publication number
CN107852622A
CN107852622A CN201580081949.1A CN201580081949A CN107852622A CN 107852622 A CN107852622 A CN 107852622A CN 201580081949 A CN201580081949 A CN 201580081949A CN 107852622 A CN107852622 A CN 107852622A
Authority
CN
China
Prior art keywords
gap
measurement
measurement gap
data packet
threshold value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201580081949.1A
Other languages
Chinese (zh)
Other versions
CN107852622B (en
Inventor
张涛
曹振臻
蔺波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of CN107852622A publication Critical patent/CN107852622A/en
Application granted granted Critical
Publication of CN107852622B publication Critical patent/CN107852622B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/04Arrangements for maintaining operational condition

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a kind of clearance G ap systems of selection and device, is related to the communications field, and methods described is used in user equipment (UE), including:The configuration information that base station is sent is received, the configuration information is used for the time for indicating that measurement gap Gap occurs;The time occurred according to the measurement Gap times occurred and SL Gap, judge to measure whether Gap conflicts with SL Gap, the time that SL Gap occur is configured according to predetermined policy;When measurement Gap conflicts with SL Gap, one is selected from measurement Gap and SL Gap;When selection be measurement Gap when, carry out nearby region measurement in Gap is measured;Or when selection be SL Gap when, the transmission packet in SL Gap.The present invention solves measurement Gap and the SL Gap that base station is staggered completely each other for each UE configurations, causes the problem of difficulty for configuring Gap is big, and allocative efficiency is low, has reached the effect for the efficiency for improving configuration Gap.

Description

Clearance G ap selection method and device Technical field
The present invention relates to the communications field, in particular to a kind of Gap selection method and device.
Background technique
In a wireless communication system, user equipment (English: user equipment;Referred to as: UE) while the base station that serving cell (Cell) neutralizes control serving cell is communicated, also need to measure the signal of the adjacent cell adjacent with serving cell, to carry out cell switching on suitable opportunity, adjacent cell is also switched to the serving cell of UE.Due to the limitation of transceiver, UE not only cannot keep communication with base station in synchronization but also carry out nearby region measurement, and base station needs to configure measurement Gap to UE at this time, and measurement Gap is the period (period) that UE executes measurement.UE is interrupted in measurement Gap and the communication of base station, carries out nearby region measurement;It is measuring in the time except Gap, UE is kept and the communication of base station.Specifically, base station can configure a measurement Gap mode to UE, and measurement Gap mode defines the time that measurement Gap occurs.For example, in a kind of measurement Gap mode, there is a measurement Gap in every 40ms.
Device-to-device (English: Device to Device;Referred to as: D2D) refer between UE through sidelink (English: Sidelink;Referred to as: the SL) mode for finding and communicating mutually, in such a mode, a UE directly transmits information to another UE, without passing through base station transfer.UE used D2D resource on SL is a part of serving cell or adjacent cell resource.Due to the limitation of transceiver, UE cannot not only be communicated in SL transmitting data packet but also with base station holding in synchronization, and base station needs to configure SL Gap to UE at this time, and SL Gap is the period (period) that UE executes that sidelink sends or receives.UE is interrupted in SL Gap and the communication of base station, in SL transmitting data packet;In the time except SL Gap, UE is kept and the communication of base station.
As needed, base station may be same UE configuration measurement Gap and SL Gap, when the UE cannot while carrying out nearby region measurement also SL transmit data packet when, base station needs to configure the SL Gap being staggered completely each other and measurement Gap for the UE, so that SL Gap and measurement Gap will not conflict each other, UE in this way can be in SL Gap in SL transmitting data packet, without nearby region measurement;Nearby region measurement is carried out in measurement Gap, not in SL transmitting data packet;It is measuring except Gap and is keeping communication with base station except SL Gap.Above-mentioned configuration requirement makes base station be that UE configuration measurement Gap and SL Gap becomes non- It is often complicated, affect the efficiency of Gap configuration.
Summary of the invention
It is that each UE configures measurement Gap and the SL Gap being staggered completely each other to solve base station, causes the difficulty for configuring Gap big, the low problem of allocative efficiency, the embodiment of the invention provides a kind of Gap selection method and devices.The technical solution is as follows:
In a first aspect, a kind of Gap selection method is provided, in user equipment (UE), which comprises
The configuration information that base station is sent is received, the configuration information is used to indicate the time that measurement Gap occurs;
According to the time that the measurement Gap time occurred and sidelink SL Gap occur, judge whether the measurement Gap conflicts with the SL Gap, the time that the SL Gap occurs is configured according to predetermined policy;
When the measurement Gap conflicts with the SL Gap, one is selected from the measurement Gap and the SL Gap;
When selection be the measurement Gap when, carry out nearby region measurement in the measurement Gap;Alternatively,
When selection be the SL Gap when, transmit data packet in the SL Gap.
In the first possible implementation of the first aspect, the time that the time occurred according to the measurement Gap and SL Gap occur, judge whether the measurement Gap conflicts with the SL Gap, comprising:
Period corresponding to the next measurement Gap determined after current time according to the measurement Gap time occurred, and the period of next SL Gap after the current time is determined according to the time that the SL Gap occurs, judge whether period corresponding to the measurement Gap and the period of the SL Gap are be overlapped, the minimum value of period corresponding to the measurement Gap is the period of the measurement Gap, period that the maximum value of period corresponding to the measurement Gap is the measurement Gap and the UE from the measurement Gap be switched to the SL Gap needed for the sum of period;Alternatively,
Period corresponding to the next SL Gap determined after the current time according to the SL Gap time occurred, and the period of next measurement Gap after current time is determined according to the time that the measurement Gap occurs, judge whether period corresponding to the SL Gap and the period of the measurement Gap are be overlapped, the minimum value of period corresponding to the SL Gap is the period of the SL Gap, period that the maximum value of period corresponding to the SL Gap is the SL Gap and the UE from the SL Gap be switched to the measurement Gap needed for the sum of period.
With reference to first aspect or the first possible implementation of first aspect, at second of first aspect It is described that one is selected from the measurement Gap and the SL Gap in possible implementation, comprising:
The relative priority between the measurement Gap and SL Gap is obtained, the relative priority between the measurement Gap and SL Gap is that the base station issues, alternatively, the relative priority between the measurement Gap and SL Gap is that the UE is determined;
When the measurement Gap is high priority compared to the SL Gap, the measurement Gap is selected;Alternatively,
When the measurement Gap is low priority compared to the SL Gap, the SL Gap is selected.
It is with reference to first aspect or the first possible implementation of first aspect, in a third possible implementation of the first aspect, described that one is selected from the measurement Gap and the SL Gap, comprising:
The signal parameter of the serving cell of the UE is obtained, the signal parameter is signal strength or signal quality;
Compare the signal parameter and signal threshold value, the signal threshold value is that the base station issues, alternatively, the signal threshold value is that the UE is determined;
When the signal parameter is less than the signal threshold value, the measurement Gap is selected;Alternatively,
When the signal parameter is greater than the signal threshold value, the SL Gap is selected.
It is with reference to first aspect or the first possible implementation of first aspect, in a fourth possible implementation of the first aspect, described that one is selected from the measurement Gap and the SL Gap, comprising:
Obtain the priority of the data packet;
Compare the priority and packet priority threshold value of the data packet, the packet priority threshold value is that base station issues, alternatively, the packet priority threshold value is that the UE is determined;
When the priority of the data packet is lower than the packet priority threshold value, the measurement Gap is selected;Alternatively,
When the priority of the data packet is higher than the packet priority threshold value, the SL Gap is selected.
It is with reference to first aspect or the first possible implementation of first aspect, in the fifth possible implementation of the first aspect, described that one is selected from the measurement Gap and the SL Gap, comprising:
Determine whether the data packet belongs to public safety PS business;
When the data packet is not belonging to the PS business, the measurement Gap is selected;Alternatively,
When the data packet belongs to the PS business, the SL Gap is selected.
It is with reference to first aspect or the first possible implementation of first aspect, in the sixth possible implementation of the first aspect, described that one is selected from the measurement Gap and the SL Gap, comprising:
Whether the frequency where determining the adjacent area belongs to relief performance group, and the relief performance group is the frequency grouping that delay performance is worst in each frequency grouping, and the frequency grouping is grouped to the frequency of measurement needed for the UE;
When the frequency is not belonging to the relief performance group, the measurement Gap is selected;
When the frequency belongs to the relief performance group, the SL Gap is selected.
It is with reference to first aspect or the first possible implementation of first aspect, in a seventh possible implementation of the first aspect, described that one is selected from the measurement Gap and the SL Gap, comprising:
Determine that the SL Gap is for received data packet or to be used to send data packet, the SL Gap is for received data packet or being used to send data packet is that the base station indicates, alternatively, the SL Gap is for received data packet or being used to send data packet is that the UE is determined;
When the SL Gap is used to received data packet, the measurement Gap is selected;Alternatively,
When the SL Gap is used to send data packet, the SL Gap is selected.
Second aspect provides a kind of Gap selection method, in base station, which comprises
It is determined as the measurement Gap of user equipment (UE) configuration;
Configuration information is generated, the configuration information is used to indicate the time that the measurement Gap occurs;
The configuration information is sent to the UE, the configuration information is used to trigger the time that the UE occurs according to the measurement Gap time occurred and sidelink SL Gap, judge whether the measurement Gap conflicts with the SL Gap, the period that the SL Gap occurs is configured according to predetermined policy;When the measurement Gap conflicts with the SL Gap, one is selected from the measurement Gap and the SL Gap;When selection be the measurement Gap when, carry out nearby region measurement in the measurement Gap;Alternatively, when selection be the SL Gap when, transmit data packet in the SL Gap.
In the first possible implementation of the second aspect, the method, further includes:
The relative priority between measurement Gap and SL Gap is sent to the UE, the relative priority between the measurement Gap and SL Gap is used to indicate the UE and selects the measurement Gap or SL Gap.
In a second possible implementation of the second aspect, the method, further includes:
Signal threshold value is sent to the UE, the signal threshold value is used to indicate the UE and selects the measurement Gap or SL Gap.
In the third possible implementation of the second aspect, the method, further includes:
Packet priority threshold value is sent to the UE, the packet priority threshold value is used to indicate the UE and selects the measurement Gap or SL Gap.
In the fourth possible implementation of the second aspect, the method, further includes:
Indicate that the SL Gap is for received data packet or to be used to send data packet to the UE, the SL Gap is for received data packet or being used to send data packet is used to indicate the UE selection measurement Gap or SL Gap.
The third aspect provides a kind of Gap selection device, in user equipment (UE), described device to include:
Receiving unit, for receiving the configuration information of base station transmission, the configuration information is used to indicate the time that measurement Gap occurs;
Processing unit, judges whether the measurement Gap conflicts with the SL Gap, the time that the SL Gap occurs is configured according to predetermined policy at the time that time and sidelink SL Gap for occurring according to the measurement Gap occur;When the measurement Gap conflicts with the SL Gap, one is selected from the measurement Gap and the SL Gap;When selection be the measurement Gap when, carry out nearby region measurement in the measurement Gap;Alternatively, when selection be the SL Gap when, transmit data packet in the SL Gap.
In the first possible implementation of the third aspect, the processing unit, is specifically used for:
Period corresponding to the next measurement Gap determined after current time according to the measurement Gap time occurred, and the period of next SL Gap after the current time is determined according to the time that the SL Gap occurs, judge whether period corresponding to the measurement Gap and the period of the SL Gap are be overlapped, the minimum value of period corresponding to the measurement Gap is the period of the measurement Gap, period that the maximum value of period corresponding to the measurement Gap is the measurement Gap and the UE from the measurement Gap be switched to the SL Gap needed for the sum of period;Alternatively,
Period corresponding to the next SL Gap determined after the current time according to the SL Gap time occurred, and the period of next measurement Gap after current time is determined according to the time that the measurement Gap occurs, judge whether period corresponding to the SL Gap and the period of the measurement Gap are be overlapped, the minimum value of period corresponding to the SL Gap is the period of the SL Gap, period that the maximum value of period corresponding to the SL Gap is the SL Gap and the UE from the SL Gap be switched to the measurement Gap needed for the sum of period.
In conjunction with the possible implementation of the first of the third aspect or the third aspect, in the second possible implementation of the third aspect,
The receiving unit is also used to obtain the relative priority between the measurement Gap and SL Gap, and the relative priority between the measurement Gap and SL Gap is that the base station issues, alternatively, Relative priority between the measurement Gap and SL Gap is that the UE is determined;
The processing unit is specifically used for selecting the measurement Gap when the measurement Gap is high priority compared to the SL Gap;Alternatively, selecting the SL Gap when the measurement Gap is low priority compared to the SL Gap.
In conjunction with the possible implementation of the first of the third aspect or the third aspect, in the third possible implementation of the third aspect,
The receiving unit, is also used to obtain the signal parameter of the serving cell of the UE, and the signal parameter is signal strength or signal quality;
The processing unit, the signal parameter obtained specifically for the receiving unit and signal threshold value, the signal threshold value is that the base station issues, alternatively, the signal threshold value is that the UE is determined;When the signal parameter is less than the signal threshold value, the measurement Gap is selected;Alternatively, selecting the SL Gap when the signal parameter is greater than the signal threshold value.
In conjunction with the possible implementation of the first of the third aspect or the third aspect, in the fourth possible implementation of the third aspect,
The receiving unit is also used to obtain the priority of the data packet;
The processing unit, specifically for the priority and packet priority threshold value of the data packet that the receiving unit obtains, the packet priority threshold value is that base station issues, alternatively, the packet priority threshold value is that the UE is determined;When the priority of the data packet is lower than the packet priority threshold value, the measurement Gap is selected;Alternatively, selecting the SL Gap when the priority of the data packet is higher than the packet priority threshold value.
In conjunction with the possible implementation of the first of the third aspect or the third aspect, in the 5th kind of possible implementation of the third aspect, the processing unit is specifically used for:
Determine whether the data packet belongs to public safety PS business;
When the data packet is not belonging to the PS business, the measurement Gap is selected;Alternatively,
When the data packet belongs to the PS business, the SL Gap is selected.
In conjunction with the possible implementation of the first of the third aspect or the third aspect, in the 6th kind of possible implementation of the third aspect, the processing unit is specifically used for:
Whether the frequency where determining the adjacent area belongs to relief performance group, and the relief performance group is the frequency grouping that delay performance is worst in each frequency grouping, and the frequency grouping is grouped to the frequency of measurement needed for the UE;
When the frequency is not belonging to the relief performance group, the measurement Gap is selected;Alternatively,
When the frequency belongs to the relief performance group, the SL Gap is selected.
In conjunction with the possible implementation of the first of the third aspect or the third aspect, in the 7th kind of possible implementation of the third aspect, the processing unit is specifically used for:
Determine that the SL Gap is for received data packet or to be used to send data packet, the SL Gap is for received data packet or being used to send data packet is that the base station indicates, alternatively, the SL Gap is for received data packet or being used to send data packet is that the UE is determined;
When the SL Gap is used to received data packet, the measurement Gap is selected;Alternatively,
When the SL Gap is used to send data packet, the SL Gap is selected.
Fourth aspect provides a kind of Gap selection device, in base station, described device to include:
Processing module, for being determined as the measurement Gap of user equipment (UE) configuration;Configuration information is generated, the configuration information is used to indicate the time that the measurement Gap occurs;
Transmission unit, the configuration information for generating the processing unit is sent to the UE, the configuration information is used to trigger the time that the UE occurs according to the measurement Gap time occurred and sidelink SL Gap, judge whether the measurement Gap conflicts with the SL Gap, the time that the SL Gap occurs is configured according to predetermined policy;When the measurement Gap conflicts with the SL Gap, one is selected from the measurement Gap and the SL Gap;When selection be the measurement Gap when, carry out nearby region measurement in the measurement Gap;Alternatively, when selection be the SL Gap when, transmit data packet in the SL Gap.
In the first possible implementation of the fourth aspect, the transmission unit, it is also used to send the relative priority between measurement Gap and SL Gap to the UE, the relative priority between the measurement Gap and SL Gap is used to indicate the UE and selects the measurement Gap or SL Gap.
In the second possible implementation of the fourth aspect, the transmission unit is also used to send signal threshold value to the UE, and the signal threshold value is used to indicate the UE and selects the measurement Gap or SL Gap.
In the third possible implementation of the fourth aspect, the transmission unit is also used to send packet priority threshold value to the UE, and the packet priority threshold value is used to indicate the UE and selects the measurement Gap or SL Gap.
In the fourth possible implementation of the fourth aspect, the transmission unit, it is also used to indicate that the SL Gap is for received data packet or to be used to send data packet to the UE, the SL Gap is for received data packet or being used to send data packet is used to indicate the UE selection measurement Gap or SL Gap.
5th aspect, provides a kind of Gap selection device, in user equipment (UE), described device to include: bus, and is connected to processor, memory, transmitter and the receiver of the bus.Wherein, for storing several instructions, described instruction is configured to be executed by the processor memory;
The receiver, for receiving the configuration information of base station transmission, the configuration information is used to indicate the time that measurement Gap occurs;
The processor, judges whether the measurement Gap conflicts with the SL Gap, the time that the SL Gap occurs is configured according to predetermined policy at the time that time and sidelink SL Gap for occurring according to the measurement Gap occur;When the measurement Gap conflicts with the SL Gap, one is selected from the measurement Gap and the SL Gap;When selection be the measurement Gap when, carry out nearby region measurement in the measurement Gap;Alternatively, when selection be the SL Gap when, transmit data packet in the SL Gap.
In the first possible implementation of the 5th aspect, the processor is specifically used for:
Period corresponding to the next measurement Gap determined after current time according to the measurement Gap time occurred, and the period of next SL Gap after the current time is determined according to the time that the SL Gap occurs, judge whether period corresponding to the measurement Gap and the period of the SL Gap are be overlapped, the minimum value of period corresponding to the measurement Gap is the period of the measurement Gap, period that the maximum value of period corresponding to the measurement Gap is the measurement Gap and the UE from the measurement Gap be switched to the SL Gap needed for the sum of period;Alternatively,
Period corresponding to the next SL Gap determined after the current time according to the SL Gap time occurred, and the period of next measurement Gap after current time is determined according to the time that the measurement Gap occurs, judge whether period corresponding to the SL Gap and the period of the measurement Gap are be overlapped, the minimum value of period corresponding to the SL Gap is the period of the SL Gap, period that the maximum value of period corresponding to the SL Gap is the SL Gap and the UE from the SL Gap be switched to the measurement Gap needed for the sum of period.
In conjunction with the first possible implementation of the 5th aspect or the 5th aspect, in second of possible implementation of the 5th aspect, the receiver, it is also used to obtain the relative priority between the measurement Gap and SL Gap, relative priority between the measurement Gap and SL Gap is that the base station issues, alternatively, the relative priority between the measurement Gap and SL Gap is that the UE is determined;
The processor is specifically used for selecting the measurement Gap when the measurement Gap is high priority compared to the SL Gap;Alternatively, when the measurement Gap is low priority compared to the SL Gap, Select the SL Gap.
In conjunction with the first possible implementation of the 5th aspect or the 5th aspect, in the third possible implementation of the 5th aspect, the receiver, is also used to obtain the signal parameter of the serving cell of the UE, and the signal parameter is signal strength or signal quality;
The processor is specifically used for the signal parameter and signal threshold value, and the signal threshold value is that the base station issues, alternatively, the signal threshold value is that the UE is determined;When the signal parameter is less than the signal threshold value, the measurement Gap is selected;Alternatively, selecting the SL Gap when the signal parameter is greater than the signal threshold value.
In conjunction with the first possible implementation of the 5th aspect or the 5th aspect, in the 4th kind of possible implementation of the 5th aspect, the receiver is also used to obtain the priority of the data packet;
The processor, priority and packet priority threshold value specifically for the data packet, the packet priority threshold value is that base station issues, alternatively, the packet priority threshold value is that the UE is determined;When the priority of the data packet is lower than the packet priority threshold value, the measurement Gap is selected;Alternatively, selecting the SL Gap when the priority of the data packet is higher than the packet priority threshold value.
In conjunction with the first possible implementation of the 5th aspect or the 5th aspect, in the 5th kind of possible implementation of the 5th aspect, the processor is specifically used for:
Determine whether the data packet belongs to public safety PS business;
When the data packet is not belonging to the PS business, the measurement Gap is selected;Alternatively,
When the data packet belongs to the PS business, the SL Gap is selected.
In conjunction with the first possible implementation of the 5th aspect or the 5th aspect, in the 6th kind of possible implementation of the 5th aspect, the processor is specifically used for:
Whether the frequency where determining the adjacent area belongs to relief performance group, and the relief performance group is the frequency grouping that delay performance is worst in each frequency grouping, and the frequency grouping is grouped to the frequency of measurement needed for the UE;
When the frequency is not belonging to the relief performance group, the measurement Gap is selected;Alternatively,
When the frequency belongs to the relief performance group, the SL Gap is selected.
In conjunction with the first possible implementation of the 5th aspect or the 5th aspect, in the 7th kind of possible implementation of the 5th aspect, the processor is specifically used for, comprising:
Determine that the SL Gap is for received data packet or to be used to send data packet, the SL Gap is for received data packet or being used to send data packet is that the base station indicates, alternatively, the SL Gap Be for received data packet or be used to send data packet be that the UE is determined;
When the SL Gap is used to received data packet, the measurement Gap is selected;Alternatively,
When the SL Gap is used to send data packet, the SL Gap is selected.
6th aspect, provides a kind of Gap selection device, in base station, described device to include: bus, and is connected to processor, memory, transmitter and the receiver of the bus.Wherein, for storing several instructions, described instruction is configured to be executed by the processor memory;
The processor, for being determined as the measurement Gap of user equipment (UE) configuration;Configuration information is generated, the configuration information is used to indicate the time that the measurement Gap occurs;
The transmitter, the configuration information for generating the processor is sent to the UE, the configuration information is used to trigger the time that the UE occurs according to the measurement Gap time occurred and sidelink SL Gap, judge whether the measurement Gap conflicts with the SL Gap, the time that the SL Gap occurs is configured according to predetermined policy;When the measurement Gap conflicts with the SL Gap, one is selected from the measurement Gap and the SL Gap;When selection be the measurement Gap when, carry out nearby region measurement in the measurement Gap;Alternatively, when selection be the SL Gap when, transmit data packet in the SL Gap.
In the first possible implementation of the 6th aspect, the transmitter, it is also used to send the relative priority between measurement Gap and SL Gap to the UE, the relative priority between the measurement Gap and SL Gap is used to indicate the UE and selects the measurement Gap or SL Gap.
In second of possible implementation of the 6th aspect, the transmitter is also used to send signal threshold value to the UE, and the signal threshold value is used to indicate the UE and selects the measurement Gap or SL Gap.
In the third possible implementation of the 6th aspect, the transmitter is also used to send packet priority threshold value to the UE, and the packet priority threshold value is used to indicate the UE and selects the measurement Gap or SL Gap.
In the 4th kind of possible implementation of the 6th aspect, the transmitter, it is also used to indicate that the SL Gap is for received data packet or to be used to send data packet to the UE, the SL Gap is for received data packet or being used to send data packet is used to indicate the UE selection measurement Gap or SL Gap.
The beneficial effect of technical solution provided in an embodiment of the present invention is:
By selecting one from measurement Gap and SL Gap when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Alternatively, that work as selection is SL Gap When, data packet is transmitted in SL Gap, so that when measurement Gap and SL Gap conflict, UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, measurement Gap and the SL Gap being staggered completely each other need not be configured, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, causes the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, the accompanying drawings required for describing the embodiments of the present invention are briefly described below, apparently, drawings in the following description are only some embodiments of the invention, for those of ordinary skill in the art, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of method flow diagram of Gap selection method provided in an embodiment of the present invention;
Fig. 2 is a kind of method flow diagram of Gap selection method provided in an embodiment of the present invention;
Fig. 3 A is the method flow diagram of another Gap selection method provided in an embodiment of the present invention;
Fig. 3 B is the schematic diagram of measurement Gap and SL Gap provided in an embodiment of the present invention;
Fig. 4 is the method flow diagram of another Gap selection method provided in an embodiment of the present invention;
Fig. 5 is the method flow diagram of another Gap selection method provided in an embodiment of the present invention;
Fig. 6 is the method flow diagram of another Gap selection method provided in an embodiment of the present invention;
Fig. 7 is the method flow diagram of another Gap selection method provided in an embodiment of the present invention;
Fig. 8 is the method flow diagram of another Gap selection method provided in an embodiment of the present invention;
Fig. 9 is a kind of structural schematic diagram of Gap selection device provided in an embodiment of the present invention;
Figure 10 is a kind of structural schematic diagram of Gap selection device provided in an embodiment of the present invention;
Figure 11 is a kind of structural schematic diagram of Gap selection device provided in an embodiment of the present invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing, embodiment of the present invention is described further in detail.
Referring to Figure 1, it illustrates a kind of method flow diagrams of Gap selection method provided in an embodiment of the present invention.The Gap selection method may include:
Step 101, UE receives the configuration information that base station is sent, which is used to indicate measurement Gap The time of appearance.
Step 102, the time that UE occurs according to the measurement Gap time occurred and SL Gap, judge to measure whether Gap conflicts with SL Gap, the time which occurs is configured according to predetermined policy.
Step 103, when measurement Gap conflicts with SL Gap, UE selects one from measurement Gap and SL Gap.
Step 104, when selection be measurement Gap when, UE measurement Gap in carry out nearby region measurement.
Step 105, when selection be SL Gap when, UE transmits data packet in SL Gap.
In conclusion Gap selection method provided in an embodiment of the present invention, by selecting one from measurement Gap and SL Gap when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, it is not necessary to measurement Gap and the SL Gap that configuration is staggered completely each other when measurement Gap and SL Gap conflict, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, cause the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
Fig. 2 is referred to, it illustrates a kind of method flow diagrams of Gap selection method provided in an embodiment of the present invention.The Gap selection method may include:
Step 201, base station is determined as the measurement Gap of UE configuration.
Step 202, base station generates configuration information, which is used to indicate the time that measurement Gap occurs.
Step 203, base station sends configuration information to UE, which is used to trigger the time that UE occurs according to the measurement Gap time occurred and SL Gap, judges to measure whether Gap conflicts with SL Gap, and the time which occurs is configured according to predetermined policy;When measurement Gap conflicts with SL Gap, one is selected from measurement Gap and SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Alternatively, when selection be SL Gap when, transmit data packet in SL Gap.
In conclusion Gap selection method provided in an embodiment of the present invention, by the measurement Gap for being determined as UE configuration;Configuration information is generated, which is used to indicate the time that measurement Gap occurs;UE is sent configuration information to, which selects one from measurement Gap and SL Gap for triggering UE when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that when measurement Gap and SL Gap conflict, UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, measurement Gap and the SL Gap being staggered completely each other need not be configured, configures that solve This measurement Gap and SL Gap being staggered completely causes the difficulty for configuring Gap big, and the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
Fig. 3 A is referred to, it illustrates the method flow diagram of another Gap selection method provided in an embodiment of the present invention, UE measures Gap SL Gap according to the relative priority selection measurement between measurement Gap and SL Gap in the present embodiment.The Gap selection method may include:
Step 301, base station is determined as the measurement Gap of UE configuration.
When this method is applied to long term evolution (English: long term evolution;Abbreviation LTE) in system when, base station is specifically eNB (eNodeB);When this method is applied to Universal Mobile Communication System (English: (universal mobile telecommunications system;When referred to as: UMTS), base station is specifically NB (NodeB);When this method is applied to Wireless Fidelity (English: Wireless Fidelity;English: WiFi) in when, base station be specifically access point (English: access point;Referred to as: AP).
A usual UE includes a transceiver, and a transceiver synchronization can only on a frequency point receiving and transmitting signal, therefore, when the adjacent cell of the serving cell of UE and serving cell alien frequencies, base station needs to configure measurement Gap for UE, so that UE is interrupted in measurement Gap and the communication of base station, nearby region measurement is carried out;It is measuring in the time except Gap, UE is kept and the communication of base station, without nearby region measurement.
In the present embodiment, base station can be the time that UE configuration measurement Gap occurs according to factors, wherein the time that measurement Gap occurs by start time, measure the appearances period of Gap and measure the lasting duration of Gap and determine.Wherein, start time can be what base station directly issued, be also possible to after base station issues offset, UE is calculated according to offset, and this embodiment is not limited.
The present embodiment is illustrated so that the quantity for the alien frequencies that base station measures as needed is the appearance period of UE configuration measurement Gap as an example.Specifically, the appearance period assignment of Gap will be measured smaller when alien frequencies quantity is more;It is the appearance period assignment of Gap will be measured larger when alien frequencies negligible amounts.
When the lasting duration of each measurement Gap of configuration, in one possible implementation, the lasting duration of each measurement Gap is configured when configuration measures Gap by base station;In alternatively possible implementation, the lasting duration of each measurement Gap is determined by UE.
Wherein, when determining the lasting duration of each measurement Gap by UE, UE can read the duration that each measurement Gap is lasting specified in communication protocol;Alternatively, UE can determine the lasting duration of each measurement Gap with itself.When UE itself determines the lasting duration of each measurement Gap, the lasting duration of each measurement Gap can be notified base station by UE, can not also notify base station, this embodiment is not limited.
Step 302, base station generates configuration information, which is used to indicate the time that measurement Gap occurs.
Step 303, base station sends configuration information to UE.
Step 304, UE receives the configuration information that base station is sent.
Step 305, the time that UE occurs according to the measurement Gap time occurred and SL Gap, judge to measure whether Gap conflicts with SL Gap, the time which occurs is configured according to predetermined policy.
Wherein, the time that SL Gap occurs is determined by start time, the appearance period of SL Gap and the lasting duration of SL Gap.
In the present embodiment, the configuration for the time that SL Gap occurs can be what base station issued, is also possible to UE decision, both implementations are introduced separately below:
When the configuration in the appearance period of SL Gap is issued by base station, base station can be the appearance period that UE configures SL Gap according to factors, for example, the appearance period that base station is UE configuration SL Gap according to available resources, so that guaranteeing that there are available resources transmits data packet in SL Gap for UE.Wherein, UE transmits data packet in SL Gap and can specifically include: UE is by SL Gap received data packet on SL, alternatively, UE sends data packet by SL Gap on SL.
It should be noted that in a kind of possible mode, base station is that each SL Gap configuration the period occurs when configuring the appearance period of SL Gap, for example, the appearance period of each SL Gap is 40ms, there is a SL Gap every 40ms at this time;In alternatively possible implementation, base station is grouped using the SL Gap of predetermined number as one, the appearance period of configuration SL Gap grouping, such as, it is grouped 3 SL Gap as one, and the appearance period of each SL Gap grouping is 40ms, a SL Gap grouping occurs every 40ms at this time.
When the lasting duration of configuration SL Gap, in one possible implementation, by base station in duration configuration SL Gap lasting when there is the period for configuring SL Gap;In alternatively possible implementation, the lasting duration of SL Gap is determined by UE.Wherein, when determining the lasting duration of SL Gap by UE, UE can read the duration that SL Gap is lasting specified in communication protocol;Alternatively, UE can determine the lasting duration of SL Gap with itself.When UE itself determines the lasting duration of SL Gap, SL Gap lasting duration can be notified base station by UE, can not also notify base station, this embodiment is not limited.
It should be noted that in a kind of possible mode, base station is that each SL Gap configures duration, for example, each SL Gap lasting duration is 10ms in the lasting duration of configuration SL Gap;In alternatively possible implementation, base station is grouped using the SL Gap of predetermined number as one, it configures SL Gap and is grouped lasting duration, such as, it is grouped 3 SL Gap as one, and each SL Gap a length of 100ms when being grouped lasting, configuring 3 durations in the duration of 100ms at this time is 10ms SL Gap.For example, configuration SL Gap occurs in 10ms, 30ms and 50ms, alternatively, configuration SL Gap occurs in 20ms, 60ms and 80ms, this embodiment is not limited.
The information for being used to indicate the time of SL Gap appearance can also be added to together in the configuration information in step 302 by base station, send the signaling that both information are wasted to save base station by additional configuration information.
When the configuration in the appearance period of SL Gap is determined by UE, UE can read the appearance period of SL Gap specified in communication protocol;Alternatively, UE can determine the appearance period of SL Gap with itself.When UE itself determines the appearance period of SL Gap, the appearance periodic notification base station of SL Gap can not also be notified base station, this embodiment is not limited by UE.Wherein, UE itself determines that the process in the appearance period of SL Gap is identical as the base station configuration appearance process in period of SL Gap, does not repeat herein.
UE is also it needs to be determined that SL Gap lasting duration configures the lasting duration of SL Gap by base station in one possible implementation;In alternatively possible implementation, by UE at the appearance period for determining SL Gap, the lasting duration of SL Gap is determined.Wherein, when determining the lasting duration of SL Gap by UE, UE can read the duration that SL Gap is lasting specified in communication protocol;Alternatively, UE can determine the lasting duration of SL Gap with itself.When UE itself determines the lasting duration of SL Gap, SL Gap lasting duration can be notified base station by UE, can not also notify base station, this embodiment is not limited.
Whether no matter the configuration of SL Gap is determined by base station configuration or UE, can all clash without the concern for measurement Gap and SL Gap, to reduce the requirement of configuration measurement Gap and SL Gap, improve the efficiency of configuration Gap.Wherein, measurement Gap and SL Gap, which is clashed, refers to the time that measurement Gap occurs and the time conflict that SL Gap occurs.Please refer to the schematic diagram that Gap and SL Gap is measured shown in Fig. 3 B, wherein third SL Gap conflicts with second measurement Gap, and the 4th SL Gap conflicts with third measurement Gap.
After measurement Gap and SL Gap has been determined, UE carries out timing, nearby region measurement is carried out within the time that measurement Gap occurs, in SL transmitting data packet within the time that SL Gap occurs.Since measurement Gap and SL Gap may conflict, and UE can only select one from measurement Gap and SL Gap in synchronization, therefore, UE carries out nearby region measurement or by SL Gap before SL transmitting data packet in measurement Gap, it is also necessary to judge to measure whether Gap conflicts with SL Gap.
Specifically, according to the time that the measurement Gap time occurred and SL Gap occur, judge to measure whether Gap conflicts with SL Gap, comprising:
1) corresponding to the next measurement Gap determined after current time according to the measurement Gap time occurred Period, and the period of next SL Gap after current time is determined according to the time that SL Gap occurs, judge whether the period corresponding to measurement Gap is be overlapped with the period of SL Gap, the minimum value of period corresponding to measurement Gap be to measure the period of Gap, and period that the maximum value for measuring the period corresponding to Gap be measurement Gap and UE are from measuring the sum of period needed for Gap is switched to SL Gap;Alternatively,
2) period corresponding to the next SL Gap determined after current time according to the SL Gap time occurred, and the period of next measurement Gap after current time is determined according to the time that measurement Gap occurs, judge whether period corresponding to SL Gap and the period for measuring Gap are be overlapped, the minimum value of period corresponding to SL Gap is the period of SL Gap, period that the maximum value of period corresponding to SL Gap is SL Gap and UE from SL Gap be switched to measurement Gap needed for the sum of period.
When occurring that a measurement Gap after current time, the first duration is positioned backward at the beginning of based on measurement Gap obtained for the first moment, whether will appear a SL Gap in period determined by detection start time and the first moment, when will appear a SL Gap in the period, measurement Gap and SL Gap conflict is determined;When in the period being not in a SL Gap, determine that measurement Gap and SL Gap will not conflict, the minimum value of first duration is to measure the lasting duration of Gap, maximum value is to measure the lasting duration of Gap plus the obtained duration of the first scheduled duration, the first scheduled duration be UE from measurement Gap be switched to SL Gap needed for duration.In actual implementation, the first scheduled duration can be set to 0.5ms, may be set to be other numerical value, this embodiment is not limited.Alternatively,
When occurring that a SL Gap after current time, the second duration is positioned at the beginning of based on SL Gap backward and obtained for the second moment, whether will appear a measurement Gap in period determined by detection start time and the second moment, when will appear a measurement Gap in the period, the SL Gap and measurement Gap conflict is determined;When in the period being not in a measurement Gap, determine that the SL Gap and measurement Gap will not conflict, the minimum value of second duration is the lasting duration of SL Gap, maximum value is the lasting duration of SL Gap plus the obtained duration of the second scheduled duration, the second scheduled duration be UE from SL Gap be switched to measurement Gap needed for duration.In actual implementation, the second scheduled duration can be set to 0.5ms, may be set to be other numerical value, and the second scheduled duration and the first scheduled duration are identical or different, this embodiment is not limited.
Step 306, when measurement Gap conflicts with SL Gap, UE obtains the relative priority between measurement Gap and SL Gap, and the relative priority between measurement Gap and SL Gap is that base station issues, alternatively, the relative priority between measurement Gap and SL Gap is that UE is determined.
In one possible implementation, by the relative priority between sending measuring Gap and the SL Gap of base station;In alternatively possible implementation, the phase between measurement Gap and SL Gap is determined by UE To priority.Wherein, when determining the relative priority between measurement Gap and SL Gap by UE, UE can read the relative priority between measurement Gap and SL Gap specified in communication protocol;Alternatively, UE can determine the relative priority between measurement Gap and SL Gap with itself.When UE itself determines to measure the relative priority between Gap and SL Gap, UE can will measure the relative priority between Gap and SL Gap and notify base station, can not also notify base station, this embodiment is not limited.
When by relative priority between sending measuring Gap and the SL Gap of base station, method provided in this embodiment, further include: base station sends the relative priority between measurement Gap and SL Gap to UE, and the relative priority between measurement Gap and SL Gap is used to indicate UE selection measurement Gap SL Gap.
Specifically, that base station and UE appoint that base station issues is the Gap of the high priority or Gap of low priority, and hereafter, base station only needs clearly measure the relative priority between Gap and SL Gap to UE sending measuring Gap or SL Gap, UE.For example, base station and UE appoint that base station issues is the Gap of high priority, then as base station sending measuring Gap, UE determines that measurement Gap relative to SL Gap is high priority;When base station issues SL Gap, UE determine SL Gap relative to measurement Gap be high priority.Alternatively, base station is respectively the numerical value for measuring Gap and SL Gap configuration preference level, UE compares the two numerical value to determine the relative priority between measurement Gap and SL Gap.The present embodiment is illustrated so that the smaller priority of numerical value is higher, it is assumed that base station is that measure the numerical value of priority of Gap configuration be 2, be the numerical value of the priority of SL Gap configuration is 3, then UE can determine that measurement Gap relative to SL Gap is high priority.Certainly, the relative priority that base station can also by other means between sending measuring Gap and SL Gap, this embodiment is not limited.
Optionally, relative priority between measurement Gap and SL Gap can be added in the configuration information in step 302 by base station is sent to UE, sends the signaling that the relative priority between measurement Gap and SL Gap is wasted to save base station by additional configuration information.
Step 307, when measuring Gap compared to SL Gap is high priority, UE selection measurement Gap executes step 308.
When measuring Gap compared to SL Gap is high priority, show that the importance for carrying out nearby region measurement is higher than the importance in SL transmitting data packet, the measurement of UE selection at this time Gap.
Step 308, UE carries out nearby region measurement in measurement Gap, terminates process.
Step 309, when measuring Gap compared to SL Gap is low priority, UE selects SL Gap.
When measuring Gap compared to SL Gap is low priority, show that the importance for carrying out nearby region measurement is lower than the importance in SL transmitting data packet, UE selects SL Gap at this time.
Step 310, UE transmits data packet in SL Gap.
In conclusion Gap selection method provided in an embodiment of the present invention, by selecting one from measurement Gap and SL Gap when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, it is not necessary to measurement Gap and the SL Gap that configuration is staggered completely each other when measurement Gap and SL Gap conflict, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, cause the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
In addition, by according to the relative priority selection measurement Gap or SL Gap between measurement Gap and SL Gap, it can be when measuring Gap relative to SL Gap be high priority, selection measurement Gap;When measuring Gap relative to SL Gap is low priority, SL Gap is selected, so that the Gap of UE selection meets actual demand, improves the accuracy of Gap selection.
Fig. 4 is referred to, it illustrates the method flow diagram of another Gap selection method provided in an embodiment of the present invention, UE selects measurement Gap SL Gap according to the signal parameter of the serving cell of UE in the present embodiment.The Gap selection method may include:
Step 401, base station is determined as the measurement Gap of UE configuration.
Step 402, base station generates configuration information, which is used to indicate the time that measurement Gap occurs.
Step 403, base station sends configuration information to UE.
Step 404, UE receives the configuration information that base station is sent.
Step 405, the time that UE occurs according to the measurement Gap time occurred and SL Gap, judge to measure whether Gap conflicts with SL Gap, the time which occurs is configured according to predetermined policy.
Wherein, the realization process of step 401-405 is detailed in the description in step 301-305, does not repeat herein.
Step 406, when measurement Gap conflicts with SL Gap, UE obtains the signal parameter of the serving cell of UE, which is signal strength or signal quality.
In the present embodiment, signal parameter is that signal strength or signal quality can be made an appointment by base station and UE.Wherein, signal strength and signal quality are used to indicate the quality of the signal of serving cell.UE obtains signal strength or the technology of signal quality is highly developed, and the present embodiment does not repeat.
Step 407, UE comparison signal parameter and signal threshold value, which is that base station issues, alternatively, the signal threshold value is that UE is determined.
Wherein, signal threshold value is related to the signal parameter that UE is obtained.For example, signal threshold value is signal strength threshold value when the UE signal parameter obtained is signal strength;When the signal parameter that UE is obtained is When signal quality, signal threshold value is signal quality threshold value.
In one possible implementation, signal threshold value is issued by base station;In alternatively possible implementation, signal threshold value is determined by UE.Wherein, when determining signal threshold value by UE, UE can read signal threshold value specified in communication protocol;Alternatively, UE can determine signal threshold value with itself.When UE itself determines signal threshold value, signal threshold value can be notified base station by UE, can not also notify base station, this embodiment is not limited.
When issuing signal threshold value by base station, method provided in this embodiment, further includes: base station sends signal threshold value to UE, which is used to indicate UE selection measurement Gap SL Gap.
Optionally, signal threshold value can be added in the configuration information in step 402 by base station is sent to UE, sends the signaling that signal threshold value is wasted to save base station by additional configuration information.
It should be added that, UE can also obtain the signal strength and signal quality of serving cell simultaneously, signal threshold value at this time includes signal strength threshold value and signal quality threshold value, UE is needed by signal strength compared with signal strength threshold value, and by signal quality compared with signal quality threshold value.In one possible implementation, when signal strength is greater than signal strength threshold value or signal quality is greater than signal quality threshold value, determine that signal parameter is greater than signal threshold value;When signal strength is less than signal strength threshold value and signal quality is less than signal quality threshold value, determine that signal parameter is less than signal threshold value.In alternatively possible implementation, when signal strength is greater than signal strength threshold value and signal quality is greater than signal quality threshold value, determine that signal parameter is greater than signal threshold value;When signal strength is less than signal strength threshold value or signal quality is less than signal quality threshold value, determine that signal parameter is less than signal threshold value.
Step 408, when signal parameter is less than signal threshold value, UE selection measurement Gap executes step 409.
When signal parameter is less than signal threshold value, show that serving cell signal at this time is poor, UE preferentially carries out nearby region measurement, so that adjacent cell be switched to the serving cell of UE when the signal of adjacent cell is preferable, in time to guarantee the normal communication of UE.
Step 409, UE carries out nearby region measurement in measurement Gap, terminates process.
Step 410, when signal parameter is greater than signal threshold value, UE selects SL Gap.
When signal parameter is greater than signal threshold value, show that serving cell signal at this time is preferable, UE need not preferentially carry out nearby region measurement.
Step 411, UE transmits data packet in SL Gap.
In conclusion Gap selection method provided in an embodiment of the present invention, by selecting one from measurement Gap and SL Gap when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measuring Nearby region measurement is carried out in Gap;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, it is not necessary to measurement Gap and the SL Gap that configuration is staggered completely each other when measurement Gap and SL Gap conflict, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, cause the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
In addition, Gap SL Gap is measured by the signal parameter selection of the serving cell according to UE, it can be in the dtr signal of serving cell, selection measurement Gap, preferentially to carry out nearby region measurement, and when the signal of adjacent cell is preferable, adjacent cell is switched to the serving cell of UE, in time to guarantee the normal communication of UE.
Fig. 5 is referred to, it illustrates the method flow diagram of another Gap selection method provided in an embodiment of the present invention, UE selects measurement measurement Gap SL Gap according to the priority of data packet in the present embodiment.The Gap selection method may include:
Step 501, base station is determined as the measurement Gap of UE configuration.
Step 502, base station generates configuration information, which is used to indicate the time that measurement Gap occurs.
Step 503, base station sends configuration information to UE.
Step 504, UE receives the configuration information that base station is sent.
Step 505, the time that UE occurs according to the measurement Gap time occurred and SL Gap, judge to measure whether Gap conflicts with SL Gap, the time which occurs is configured according to predetermined policy.
Wherein, the realization process of step 501-505 is detailed in the description in step 301-305, does not repeat herein.
Step 506, when measurement Gap conflicts with SL Gap, UE obtains the priority of data packet.
Data packet refers to the data packet that will be transmitted on SL by SL Gap.The priority of data packet can be embodied by numerical value, for example, the numerical value of the priority of data packet is 1, or, the numerical value of the priority of data packet is 4 etc., this embodiment is not limited.Wherein, the technology of the priority of UE acquisition data packet is highly developed, and the present embodiment does not repeat.
Step 507, UE compares the priority and packet priority threshold value of data packet, and packet priority threshold value is that base station issues, alternatively, packet priority threshold value is that UE is determined.
In one possible implementation, packet priority threshold value is issued by base station;In alternatively possible implementation, by UE determination data packet priority threshold value.Wherein, when by UE determination data packet priority threshold value, UE can read packet priority threshold value specified in communication protocol;Alternatively, UE can be with itself determination data packet priority threshold value.When UE itself determination data packet priority door When limit value, packet priority threshold value can be notified base station by UE, can not also notify base station, this embodiment is not limited.
When issuing packet priority threshold value by base station, method provided in this embodiment, further includes: base station sends packet priority threshold value to UE, which is used to indicate UE selection measurement Gap SL Gap.
Optionally, packet priority threshold value can be added in the configuration information in step 502 by base station is sent to UE, sends the signaling that packet priority threshold value is wasted to save base station by additional configuration information.
Assuming that the smaller priority of numerical value is higher, and the numerical value of the priority of data packet is 2, and packet priority threshold value is 3, then the priority of data packet is higher than packet priority threshold value;Assuming that packet priority threshold value is 1, then the priority of data packet is lower than packet priority threshold value.
Step 508, when the priority of data packet is lower than packet priority threshold value, UE selection measurement Gap executes step 509.
When the priority of data packet is lower than packet priority threshold value, demonstrating the need for the data packet transmitted on SL not is that very promptly, UE preferentially selects measurement Gap.
Step 509, UE carries out nearby region measurement in measurement Gap, terminates process.
Step 510, when the priority of data packet is higher than packet priority threshold value, UE selects SL Gap.
When the priority of data packet is higher than packet priority threshold value, the data packet for demonstrating the need for transmitting on SL is very urgent, and UE preferentially selects SL Gap.
Step 511, UE transmits data packet in SL Gap.
In conclusion Gap selection method provided in an embodiment of the present invention, by selecting one from measurement Gap and SL Gap when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, it is not necessary to measurement Gap and the SL Gap that configuration is staggered completely each other when measurement Gap and SL Gap conflict, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, cause the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
In addition, by selecting measurement measurement Gap SL Gap according to the priority of data packet, it can be when the priority of data packet be higher than packet priority threshold value, the data packet that determination will be transmitted on SL by SL Gap is very urgent, SL Gap is selected, preferentially at this time to guarantee being normally carried out for business.
Fig. 6 is referred to, it illustrates the method flow diagram of another Gap selection method provided in an embodiment of the present invention, whether UE belongs to public safety (English: Public Safety according to data packet in the present embodiment;Referred to as: PS) service selection measurement measurement Gap SL Gap.The Gap selection method may include:
Step 601, base station is determined as the measurement Gap of UE configuration.
Step 602, base station generates configuration information, which is used to indicate the time that measurement Gap occurs.
Step 603, base station sends configuration information to UE.
Step 604, UE receives the configuration information that base station is sent.
Step 605, the time that UE occurs according to the measurement Gap time occurred and SL Gap, judge to measure whether Gap conflicts with SL Gap, the time which occurs is configured according to predetermined policy.
Wherein, the realization process of step 601-605 is detailed in the description in step 301-305, does not repeat herein.
Step 606, when measurement Gap conflicts with SL Gap, UE determines whether data packet belongs to PS business.
Wherein, PS business refers to the business of public safety.For example, PS business includes military communication service;Non- PS business includes civilian or commercial communication service.
When determining whether data packet belongs to PS business, in one possible implementation, UE determines whether data packet belongs to PS business according to the attribute of itself, for example, all data packets of UE transmission belong to PS business when UE is military intercom.In alternatively possible implementation, UE determines whether data packet belongs to PS business according to the attribute of data packet, for example, UE reads the purpose IP address (English: Internet Protocol of the data packet;Referred to as: IP) and destination port, detect whether the purpose IP address and destination port are destination IP used in PS business and destination port, when destination IP used in the purpose IP address and destination port are PS business and destination port, determine that the data packet belongs to PS business;When destination IP used in the purpose IP address and destination port are not PS business and destination port, determine that the data packet is not belonging to PS business.Certainly, UE can also determine whether data packet belongs to PS business by other means, and this embodiment is not limited.
Step 607, when data packet is not belonging to PS business, UE selection measurement Gap executes step 608.
When data packet is not belonging to PS business, demonstrating the need for the data packet transmitted on SL not is that very promptly, UE preferentially selects measurement Gap.
Step 608, UE carries out nearby region measurement in measurement Gap, terminates process.
Step 609, when data packet belongs to PS business, UE selects SL Gap.
When data packet belongs to PS business, the data packet for demonstrating the need for transmitting on SL is very urgent, and UE preferentially selects SL Gap.
Step 610, UE transmits data packet in SL Gap.
In conclusion Gap selection method provided in an embodiment of the present invention, by selecting one from measurement Gap and SL Gap when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, it is not necessary to measurement Gap and the SL Gap being staggered completely each other for configuration when measurement Gap and SL Gap conflict, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, cause the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
In addition, by whether belonging to PS service selection measurement measurement Gap SL Gap according to the data packet that will be transmitted in SL Gap, it can be when data packet belongs to PS business, the data packet that determination will be transmitted on SL by SL Gap is very urgent, SL Gap is selected, preferentially at this time to guarantee being normally carried out for business.
Refer to Fig. 7, it illustrates the method flow diagram of another Gap selection method provided in an embodiment of the present invention, whether UE belongs to relief performance group (reduced performance group) selection measurement Gap SL Gap according to the frequency where adjacent area in the present embodiment.The Gap selection method may include:
Step 701, base station is determined as the measurement Gap of UE configuration.
Step 702, base station generates configuration information, which is used to indicate the time that measurement Gap occurs.
Step 703, base station sends configuration information to UE.
Step 704, UE receives the configuration information that base station is sent.
Step 705, the time that UE occurs according to the measurement Gap time occurred and SL Gap, judge to measure whether Gap conflicts with SL Gap, the time which occurs is configured according to predetermined policy.
Wherein, the realization process of step 701-705 is detailed in the description in step 301-305, does not repeat herein.
Step 706, when measurement Gap conflicts with SL Gap, whether the frequency where UE determines adjacent area belongs to relief performance group, and relief performance group is the frequency grouping that delay performance is worst in each frequency grouping, and frequency grouping is grouped to the frequency of measurement needed for UE.
It is generally not the measurement for mobility service to the measurement that the frequency in relief performance group carries out.For example, measuring the cell for seeking unloading to the frequency in relief performance group or finding accessible AP etc..It is not used to find changeable adjacent cell due to measuring the frequency in relief performance group, therefore, it is generally not very urgent for measuring to the frequency in relief performance group, and whether UE can belong to relief performance group according to the frequency where adjacent area to select measurement Gap SL Gap.
In general, base station includes at least one survey to UE sending measuring configuration information, in the measurement configuration information Frequency is measured, and each measurement frequency belongs to one of them in two frequency groupings, one in the grouping of the two frequencies is relief performance group, another is normal performance group.In specific implementation, UE can first determination will frequency in measurement Gap where the adjacent area that measure, then determine that frequency belonging to the frequency is grouped, whether the frequency that the frequency according to belonging to it is grouped where determining the adjacent area belongs to relief performance group.
Step 707, when frequency is not belonging to relief performance group, UE selection measurement Gap executes step 708.
When the frequency where adjacent area is not belonging to relief performance group, show that UE may find changeable adjacent cell by nearby region measurement, the signal quality of serving cell may be poor at this time, UE preferentially selects measurement Gap to carry out nearby region measurement, to when the signal of adjacent cell is preferable, adjacent cell is switched to the serving cell of UE in time, to guarantee the normal communication of UE.
Step 708, UE carries out nearby region measurement in measurement Gap, terminates process.
Step 709, when the frequency where adjacent area belongs to relief performance group, UE selects SL Gap.
When the frequency where adjacent area belongs to relief performance group, show that the nearby region measurement is not very urgent, the SL Gap of UE selection at this time.
Step 710, UE transmits data packet in SL Gap.
In conclusion Gap selection method provided in an embodiment of the present invention, by selecting one from measurement Gap and SL Gap when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, it is not necessary to measurement Gap and the SL Gap that configuration is staggered completely each other when measurement Gap and SL Gap conflict, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, cause the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
In addition, by selecting measurement Gap SL Gap according to whether the frequency where adjacent area belongs to relief performance group, it can be when the frequency where adjacent area be not belonging to relief performance group, determine that UE may find changeable adjacent cell by nearby region measurement, the signal quality of serving cell may be poor at this time, and UE preferentially selects measurement Gap to carry out nearby region measurement, thus when the signal of adjacent cell is preferable, adjacent cell is switched to the serving cell of UE in time, to guarantee the normal communication of UE.
Fig. 8 is referred to, it illustrates the method flow diagram of another Gap selection method provided in an embodiment of the present invention, UE is for received data packet or to be used to send data packet selection measurement Gap SL Gap according to SL Gap in the present embodiment.The Gap selection method may include:
Step 801, base station is determined as the measurement Gap of UE configuration.
Step 802, base station generates configuration information, which is used to indicate the time that measurement Gap occurs.
Step 803, base station sends configuration information to UE.
Step 804, UE receives the configuration information that base station is sent.
Step 805, the time that UE occurs according to the measurement Gap time occurred and SL Gap, judge to measure whether Gap conflicts with SL Gap, the time which occurs is configured according to predetermined policy.
Wherein, the realization process of step 801-805 is detailed in the description in step 301-305, does not repeat herein.
Step 806, when measurement Gap conflicts with SL Gap, UE determines that SL Gap is for received data packet or to be used to send data packet, SL Gap is for received data packet or being used to send data packet is that base station indicates, alternatively, SL Gap is for received data packet or being used to send data packet is that UE is determined.
It in one possible implementation, is for received data packet or to be used to send data packet by base station instruction SL Gap;In alternatively possible implementation, determine that SL Gap is for received data packet or to be used to send data packet by UE.Wherein, when determining that SL Gap is for received data packet or when being used to send data packet by UE, it is for received data packet or to be used to send data packet that UE, which can read SL Gap specified in communication protocol,;Alternatively, UE can determine that SL Gap is for received data packet or to be used to send data packet with itself.When UE itself determines that SL Gap is for received data packet or when being used to send data packet, SL Gap can be for received data packet or to be used to send data packet notice base station by UE, can not also notify base station, this embodiment is not limited.
When being for received data packet or when being used to send data packet by base station instruction SL Gap, method provided in this embodiment, further include: base station is for received data packet or to be used to send data packet to UE instruction SL Gap, and SL Gap is for received data packet or being used to send data packet is used to indicate UE selection measurement Gap SL Gap.
Optionally, base station can indicate that SL Gap is for received data packet or to be used to send data packet by the configuration information in step 802, indicate that SL Gap is for received data packet or to be used to send data the wasted signaling of packet to save base station by additional configuration information.
In the present embodiment, UE selection can measure Gap when SL Gap is used to received data packet, and SL Gap is selected when SL Gap is used to send data packet;It is selection measurement Gap that UE, which can also be used to send data packet in SL Gap, and SL Gap is selected when SL Gap is used to received data packet.In one possible implementation, above-mentioned selection rule is issued by base station;In alternatively possible implementation, above-mentioned selection rule is determined by UE.Wherein, when determining above-mentioned selection rule by UE, UE can read above-mentioned selection rule specified in communication protocol;Alternatively, UE can determine above-mentioned selection rule with itself.When UE itself determines above-mentioned selection rule, above-mentioned selection rule can be notified base station by UE, can not also notify base station, this Embodiment is not construed as limiting.
When multiple UE are communicated on SL simultaneously each other, due to that a UE can only be supported to send data packet in synchronization, other UE received data packets, the duration that each UE sends data packet is far smaller than the duration of received data packet, and therefore, the importance for sending data packet is higher than the importance of received data packet, preferably, UE selection measurement Gap when SL Gap is used to received data packet, selects SL Gap, when SL Gap is used to send data packet to guarantee the normal transmission of data packet.
Wherein, the duration of data packet and the duration of received data packet are sent in order to facilitate understanding, the present embodiment is illustrated so that the SL carried out between 5 UE 10 minutes is communicated as an example, then each UE transmission data packet when it is 2 minutes a length of, received data packet when it is 8 minutes a length of.
Step 807, when SL Gap is used to received data packet, UE selection measurement Gap executes step 808.
Step 808, UE carries out nearby region measurement in measurement Gap, terminates process.
Step 809, when SL Gap is used to send data packet, UE selects SL Gap.
Step 810, UE transmits data packet in SL Gap.
In conclusion Gap selection method provided in an embodiment of the present invention, by selecting one from measurement Gap and SL Gap when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, it is not necessary to measurement Gap and the SL Gap that configuration is staggered completely each other when measurement Gap and SL Gap conflict, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, cause the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
In addition, by being for received data packet or to be used to send data packet selection measurement Gap SL Gap according to SL Gap, SL Gap can be selected when SL Gap is used to send data packet, importance due to sending data packet is higher than the importance of received data packet, therefore, UE preferentially selects SL Gap to send data packet, to guarantee the normal transmission of data packet.
Referring to FIG. 9, it illustrates a kind of structural schematic diagrams of Gap selection device provided in an embodiment of the present invention.The Gap selection device is for may include: in UE
Receiving unit 910, for receiving the configuration information of base station transmission, which is used to indicate the time that measurement Gap occurs;
Processing unit 920, judges whether measurement clearance G ap conflicts with SL Gap at the time that time and SL Gap for occurring according to measurement Gap occur, and the time that SL Gap occurs is configured according to predetermined policy 's;When measurement Gap conflicts with SL Gap, one is selected from measurement Gap and SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Alternatively, when selection be SL Gap when, transmit data packet in SL Gap.
In conclusion Gap selection device provided in an embodiment of the present invention, by selecting one from measurement Gap and SL Gap when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, it is not necessary to measurement Gap and the SL Gap that configuration is staggered completely each other when measurement Gap and SL Gap conflict, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, cause the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
Referring to FIG. 9, it illustrates the structural schematic diagrams of another Gap selection device provided in an embodiment of the present invention.The Gap selection device is for may include: in UE
Processing unit 910, for receiving the configuration information of base station transmission, which is used to indicate the time that measurement Gap occurs;
Processing unit 920, judges whether measurement Gap conflicts with SL Gap at the time that time and SL Gap for occurring according to measurement Gap occur, and the time that SL Gap occurs is configured according to predetermined policy;When judging that measure Gap conflicts with SL Gap, one is selected from measurement Gap and SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Alternatively, when selection be SL Gap when, transmit data packet in SL Gap.
In the first possible implementation, processing unit 920 are specifically used for:
Period corresponding to the next measurement Gap determined after current time according to the measurement Gap time occurred, and the period of next SL Gap after current time is determined according to the time that SL Gap occurs, judge whether the period corresponding to measurement Gap is be overlapped with the period of SL Gap, the minimum value of period corresponding to measurement Gap be to measure the period of Gap, and period that the maximum value for measuring the period corresponding to Gap be measurement Gap and UE are from measuring the sum of period needed for Gap is switched to SL Gap;Alternatively,
Period corresponding to the next SL Gap determined after current time according to the SL Gap time occurred, and the period of next measurement Gap after current time is determined according to the time that measurement Gap occurs, judge whether period corresponding to SL Gap and the period for measuring Gap are be overlapped, the minimum value of period corresponding to SL Gap is the period of SL Gap, period that the maximum value of period corresponding to SL Gap is SL Gap and UE from SL Gap be switched to measurement Gap needed for the sum of period.
In the second possible implementation,
Receiving unit 910 is also used to obtain the relative priority between measurement Gap and SL Gap, and measuring the relative priority between Gap and SL Gap is that base station issues, alternatively, the relative priority between measurement Gap and SL Gap is that UE is determined;
Processing unit 920 is specifically used for when measuring Gap compared to SL Gap is high priority, selection measurement Gap;Alternatively, selecting SL Gap when measuring Gap compared to SL Gap is low priority.
In the third possible implementation,
Receiving unit 910, is also used to obtain the signal parameter of the serving cell of UE, and signal parameter is signal strength or signal quality;
Processing unit 920, specifically for comparing the signal parameter and signal threshold value of the acquisition of receiving unit 910, signal threshold value is that base station issues, alternatively, signal threshold value is that UE is determined;When signal parameter is less than signal threshold value, selection measurement Gap;Alternatively, selecting SL Gap when signal parameter is greater than signal threshold value.
In the fourth possible implementation,
Receiving unit 910 is also used to obtain the priority of data packet;
Processing unit 920, the priority and packet priority threshold value of the data packet for comparing the acquisition of receiving unit 910, packet priority threshold value is that base station issues, alternatively, packet priority threshold value is that UE is determined;When the priority of data packet is lower than packet priority threshold value, selection measurement Gap;Alternatively, selecting SL Gap when the priority of data packet is higher than packet priority threshold value.
In a fifth possible implementation, processing unit 920 are specifically used for:
Determine whether data packet belongs to PS business;
When data packet is not belonging to PS business, selection measurement Gap;Alternatively,
When data packet belongs to PS business, SL Gap is selected.
In a sixth possible implementation, processing unit 920 are specifically used for:
Whether the frequency where determining adjacent area belongs to relief performance group, and relief performance group is the frequency grouping that delay performance is worst in each frequency grouping, and frequency grouping is grouped to the frequency of measurement needed for UE;
When frequency is not belonging to relief performance group, selection measurement Gap;Alternatively,
When frequency belongs to relief performance group, SL Gap is selected.
In the 7th kind of possible implementation, processing unit 920 is specifically used for:
Determine that SL Gap is for received data packet or to be used to send data packet, SL Gap is for receiving It is that base station indicates that data packet, which is still used to send data packet, alternatively, SL Gap is for received data packet or being used to send data packet is that UE is determined;
When SL Gap is used to received data packet, selection measurement Gap;Alternatively,
When SL Gap is used to send data packet, SL Gap is selected.
In conclusion Gap selection device provided in an embodiment of the present invention, by selecting one from measurement Gap and SL Gap when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, it is not necessary to measurement Gap and the SL Gap that configuration is staggered completely each other when measurement Gap and SL Gap conflict, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, cause the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
Referring to FIG. 10, it illustrates a kind of structural schematic diagrams of Gap selection device provided in an embodiment of the present invention.The Gap selection device is for may include: in base station
Processing unit 1010, for being determined as the measurement Gap of UE configuration;Configuration information is generated, which is used to indicate the time that measurement Gap occurs;
Transmission unit 1020, configuration information for generating processing unit 1010 is sent to UE, the configuration information is used to trigger the time that UE occurs according to the measurement Gap time occurred and SL Gap, judges to measure whether Gap conflicts with SL Gap, and the time that SL Gap occurs is configured according to predetermined policy;When measurement Gap conflicts with SL Gap, one is selected from measurement Gap and SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Alternatively, when selection be SL Gap when, transmit data packet in SL Gap.
In conclusion Gap selection device provided in an embodiment of the present invention, by the measurement Gap for being determined as UE configuration;Configuration information is generated, which is used to indicate the time that measurement Gap occurs;UE is sent configuration information to, which selects one from measurement Gap and SL Gap for triggering UE when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, it is not necessary to measurement Gap and the SL Gap that configuration is staggered completely each other when measurement Gap and SL Gap conflict, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, cause the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
Referring to FIG. 10, it illustrates the structural schematic diagrams of another Gap selection device provided in an embodiment of the present invention.The Gap selection device is for may include: in base station
Processing unit 1010, the measurement Gap for being determined as UE configuration generate configuration information, which is used to indicate the time that measurement Gap occurs;
Transmission unit 1020, configuration information for generating processing unit 1010 is sent to UE, the configuration information is used to trigger the time that UE occurs according to the measurement Gap time occurred and SL Gap, judges to measure whether Gap conflicts with SL Gap, and the time that SL Gap occurs is configured according to predetermined policy;When measurement Gap conflicts with SL Gap, one is selected from measurement Gap and SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Alternatively, when selection be SL Gap when, transmit data packet in SL Gap.
In the first possible implementation, transmission unit 1020 are also used to send the relative priority between measurement Gap and SL Gap to UE, measure the relative priority between Gap and SL Gap and are used to indicate UE selection measurement Gap SL Gap.
In the second possible implementation, transmission unit 1020, are also used to send signal threshold value to UE, and signal threshold value is used to indicate UE selection measurement Gap SL Gap.
In the third possible implementation, transmission unit 1020, are also used to send packet priority threshold value to UE, and packet priority threshold value is used to indicate UE selection measurement Gap SL Gap.
In the fourth possible implementation, transmission unit 1020, it is also used to indicate that SL Gap is for received data packet or to be used to send data packet to UE, SL Gap is for received data packet or being used to send data packet is used to indicate UE selection measurement Gap SL Gap.
In conclusion Gap selection device provided in an embodiment of the present invention, by the measurement Gap for being determined as UE configuration;Configuration information is generated, which is used to indicate the time that measurement Gap occurs;UE is sent configuration information to, which selects one from measurement Gap and SL Gap for triggering UE when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, it is not necessary to measurement Gap and the SL Gap that configuration is staggered completely each other when measurement Gap and SL Gap conflict, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, cause the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
Figure 11 is please referred to, it illustrates a kind of structural schematic diagrams of Gap selection device provided in an embodiment of the present invention.The Gap selection device may include: bus 1101, and be connected to processor 1102, memory 1103, transmitter 1104 and the receiver 1105 of bus.Wherein, memory 1103 is configured to be executed by processor 1102 for storing several instructions, instruction.
When the Gap selection device is in UE:
Receiver 1105, for receiving the configuration information of base station transmission, which is used to indicate the time that measurement Gap occurs;
Processor 1102, judges whether measurement Gap conflicts with SL Gap at the time that time and SL Gap for occurring according to measurement Gap occur, and the time that SL Gap occurs is configured according to predetermined policy;When measurement Gap conflicts with SL Gap, one is selected from measurement Gap and SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Alternatively, when selection be SL Gap when, transmit data packet in SL Gap.
In the first possible implementation, processor 1102 are specifically used for:
Period corresponding to the next measurement Gap determined after current time according to the measurement Gap time occurred, and the period of next SL Gap after current time is determined according to the time that SL Gap occurs, judge whether the period corresponding to measurement Gap is be overlapped with the period of SL Gap, the minimum value of period corresponding to measurement Gap be to measure the period of Gap, and period that the maximum value for measuring the period corresponding to Gap be measurement Gap and UE are from measuring the sum of period needed for Gap is switched to SL Gap;Alternatively,
Period corresponding to the next SL Gap determined after current time according to the SL Gap time occurred, and the period of next measurement Gap after current time is determined according to the time that measurement Gap occurs, judge whether period corresponding to SL Gap and the period for measuring Gap are be overlapped, the minimum value of period corresponding to SL Gap is the period of SL Gap, period that the maximum value of period corresponding to SL Gap is SL Gap and UE from SL Gap be switched to measurement Gap needed for the sum of period.
In the second possible implementation, receiver 1105 is also used to obtain the relative priority between measurement Gap and SL Gap, and the relative priority measured between Gap and SL Gap is that base station issues, alternatively, the relative priority between measurement Gap and SL Gap is that UE is determined;
Processor 1102 is specifically used for when measuring Gap compared to SL Gap is high priority, selection measurement Gap;Alternatively, selecting SL Gap when measuring Gap compared to SL Gap is low priority.
In the third possible implementation, receiver 1105, are also used to obtain the signal parameter of the serving cell of UE, and signal parameter is signal strength or signal quality;
Processor 1102 is specifically used for comparison signal parameter and signal threshold value, and signal threshold value is under base station Hair, alternatively, signal threshold value is that UE is determined;When signal parameter is less than signal threshold value, selection measurement Gap;Alternatively, selecting SL Gap when signal parameter is greater than signal threshold value.
In the fourth possible implementation, receiver 1105 are also used to obtain the priority of data packet;
Processor 1102, specifically for comparing the priority and packet priority threshold value of data packet, packet priority threshold value is that base station issues, alternatively, packet priority threshold value is that UE is determined;When the priority of data packet is lower than packet priority threshold value, selection measurement Gap;Alternatively, selecting SL Gap when the priority of data packet is higher than packet priority threshold value.
In a fifth possible implementation, processor 1102 are specifically used for:
Determine whether data packet belongs to PS business;
When data packet is not belonging to PS business, selection measurement Gap;Alternatively,
When data packet belongs to PS business, SL Gap is selected.
In a sixth possible implementation, processor 1102 are specifically used for:
Whether the frequency where determining adjacent area belongs to relief performance group, and relief performance group is the frequency grouping that delay performance is worst in each frequency grouping, and frequency grouping is grouped to the frequency of measurement needed for UE;
When frequency is not belonging to relief performance group, selection measurement Gap;Alternatively,
When frequency belongs to relief performance group, SL Gap is selected.
In the 7th kind of possible implementation, processor 1102 is specifically used for, comprising:
Determine that SL Gap is for received data packet or to be used to send data packet, SL Gap is for received data packet or being used to send data packet is that base station indicates, alternatively, SL Gap is for received data packet or being used to send data packet is that UE is determined;
When SL Gap is used to received data packet, selection measurement Gap;Alternatively,
When SL Gap is used to send data packet, SL Gap is selected.
When the Gap selection device is in base station:
Processor 1102, for being determined as the measurement Gap of UE configuration;Configuration information is generated, which is used to indicate the time that measurement Gap occurs;
Transmitter 1104, configuration information for generating processor 1102 is sent to UE, the configuration information is used to trigger the time that UE occurs according to the measurement Gap time occurred and SL Gap, judges to measure whether Gap conflicts with SL Gap, and the time that SL Gap occurs is configured according to predetermined policy;When measurement Gap conflicts with SL Gap, one is selected from measurement Gap and SL Gap;Alternatively, work as selection is measurement When Gap, nearby region measurement is carried out in measurement Gap;When selection be SL Gap when, transmit data packet in SL Gap.
In the first possible implementation, transmitter 1104 are also used to send the relative priority between measurement Gap and SL Gap to UE, measure the relative priority between Gap and SL Gap and are used to indicate UE selection measurement Gap SL Gap.
In the second possible implementation, transmitter 1104, are also used to send signal threshold value to UE, and signal threshold value is used to indicate UE selection measurement Gap SL Gap.
In the third possible implementation, transmitter 1104, are also used to send packet priority threshold value to UE, and packet priority threshold value is used to indicate UE selection measurement Gap SL Gap.
In the fourth possible implementation, transmitter 1104, it is also used to indicate that SL Gap is for received data packet or to be used to send data packet to UE, SL Gap is for received data packet or being used to send data packet is used to indicate UE selection measurement Gap SL Gap.
In conclusion Gap selection device provided in an embodiment of the present invention, by selecting one from measurement Gap and SL Gap when measurement Gap conflicts with SL Gap;When selection be measurement Gap when, measurement Gap in carry out nearby region measurement;Or, when selection be SL Gap when, data packet is transmitted in SL Gap, so that UE still can carry out nearby region measurement in measurement Gap or transmit data packet in SL Gap, it is not necessary to measurement Gap and the SL Gap that configuration is staggered completely each other when measurement Gap and SL Gap conflict, to solve measurement Gap and the SL Gap that configuration is staggered completely each other, cause the difficulty for configuring Gap big, the low problem of allocative efficiency has achieved the effect that the efficiency for improving configuration Gap.
It should be understood that Gap selection device provided by the above embodiment is when carrying out Gap selection, only the example of the division of the above functional modules, in practical application, it can according to need and be completed by different functional modules above-mentioned function distribution, the internal structure of Gap selection device is divided into different functional modules, to complete all or part of the functions described above.In addition, Gap selection device provided by the above embodiment and Gap selection method embodiment belong to same design, specific implementation process is detailed in embodiment of the method, and which is not described herein again.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
Those of ordinary skill in the art may be aware that unit described in conjunction with the examples disclosed in the embodiments of the present disclosure and algorithm steps, can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Professional technician can realize each specific application using distinct methods Described function, but such implementation should not be considered as beyond the scope of the present invention.
It is apparent to those skilled in the art that for convenience and simplicity of description, system, the specific work process of device and unit of foregoing description can refer to corresponding processes in the foregoing method embodiment, details are not described herein.
In several embodiments provided herein, it should be understood that disclosed systems, devices and methods may be implemented in other ways.Such as, the apparatus embodiments described above are merely exemplary, such as, the division of the unit, it can be only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed mutual coupling, direct-coupling or communication connection can be through some interfaces, the indirect coupling or communication connection of device or unit, can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, and component shown as a unit may or may not be physical unit, it can and it is in one place, or may be distributed over multiple network units.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
In addition, the functional units in various embodiments of the present invention may be integrated into one processing unit, it is also possible to each unit and physically exists alone, can also be integrated in one unit with two or more units.
If the function is realized in the form of SFU software functional unit and when sold or used as an independent product, can store in a computer readable storage medium.Based on this understanding, substantially the part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products technical solution of the present invention in other words, the computer software product is stored in a storage medium, it uses including some instructions so that a computer equipment (can be personal computer, server or the network equipment etc.) it performs all or part of the steps of the method described in the various embodiments of the present invention.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), the various media that can store program code such as random access memory (Random Access Memory, RAM), magnetic or disk.
It is described above; only a specific embodiment of the invention, but scope of protection of the present invention is not limited thereto, and anyone skilled in the art is in the technical scope disclosed by the present invention; it can easily think of the change or the replacement, should be covered by the protection scope of the present invention.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (39)

  1. A kind of clearance G ap selection method, in user equipment (UE), which is characterized in that the described method includes:
    The configuration information that base station is sent is received, the configuration information is used to indicate the time that measurement Gap occurs;
    According to the time that the measurement Gap time occurred and sidelink SL Gap occur, judge whether the measurement Gap conflicts with the SL Gap, the time that the SL Gap occurs is configured according to predetermined policy;
    When the measurement Gap conflicts with the SL Gap, one is selected from the measurement Gap and the SL Gap;
    When selection be the measurement Gap when, carry out nearby region measurement in the measurement Gap;Alternatively,
    When selection be the SL Gap when, transmit data packet in the SL Gap.
  2. The method according to claim 1, wherein the time that the time occurred according to the measurement Gap and SL Gap occur, judges whether the measurement Gap conflicts with the SL Gap, comprising:
    Period corresponding to the next measurement Gap determined after current time according to the measurement Gap time occurred, and the period of next SL Gap after the current time is determined according to the time that the SL Gap occurs, judge whether period corresponding to the measurement Gap and the period of the SL Gap are be overlapped, the minimum value of period corresponding to the measurement Gap is the period of the measurement Gap, period that the maximum value of period corresponding to the measurement Gap is the measurement Gap and the UE from the measurement Gap be switched to the SL Gap needed for the sum of period;Alternatively,
    Period corresponding to the next SL Gap determined after the current time according to the SL Gap time occurred, and the period of next measurement Gap after current time is determined according to the time that the measurement Gap occurs, judge whether period corresponding to the SL Gap and the period of the measurement Gap are be overlapped, the minimum value of period corresponding to the SL Gap is the period of the SL Gap, period that the maximum value of period corresponding to the SL Gap is the SL Gap and the UE from the SL Gap be switched to the measurement Gap needed for the sum of period.
  3. Method according to claim 1 or 2, which is characterized in that described that one is selected from the measurement Gap and the SL Gap, comprising:
    The relative priority between the measurement Gap and SL Gap is obtained, the relative priority between the measurement Gap and SL Gap is that the base station issues, alternatively, the relative priority between the measurement Gap and SL Gap is that the UE is determined;
    When the measurement Gap is high priority compared to the SL Gap, the measurement Gap is selected;Alternatively,
    When the measurement Gap is low priority compared to the SL Gap, the SL Gap is selected.
  4. Method according to claim 1 or 2, which is characterized in that described that one is selected from the measurement Gap and the SL Gap, comprising:
    The signal parameter of the serving cell of the UE is obtained, the signal parameter is signal strength or signal quality;
    Compare the signal parameter and signal threshold value, the signal threshold value is that the base station issues, alternatively, the signal threshold value is that the UE is determined;
    When the signal parameter is less than the signal threshold value, the measurement Gap is selected;Alternatively,
    When the signal parameter is greater than the signal threshold value, the SL Gap is selected.
  5. Method according to claim 1 or 2, which is characterized in that described that one is selected from the measurement Gap and the SL Gap, comprising:
    Obtain the priority of the data packet;
    Compare the priority and packet priority threshold value of the data packet, the packet priority threshold value is that base station issues, alternatively, the packet priority threshold value is that the UE is determined;
    When the priority of the data packet is lower than the packet priority threshold value, the measurement Gap is selected;Alternatively,
    When the priority of the data packet is higher than the packet priority threshold value, the SL Gap is selected.
  6. Method according to claim 1 or 2, which is characterized in that described that one is selected from the measurement Gap and the SL Gap, comprising:
    Determine whether the data packet belongs to public safety PS business;
    When the data packet is not belonging to the PS business, the measurement Gap is selected;Alternatively,
    When the data packet belongs to the PS business, the SL Gap is selected.
  7. Method according to claim 1 or 2, which is characterized in that described that one is selected from the measurement Gap and the SL Gap, comprising:
    Whether the frequency where determining the adjacent area belongs to relief performance group, and the relief performance group is the frequency grouping that delay performance is worst in each frequency grouping, and the frequency grouping is grouped to the frequency of measurement needed for the UE;
    When the frequency is not belonging to the relief performance group, the measurement Gap is selected;Alternatively,
    When the frequency belongs to the relief performance group, the SL Gap is selected.
  8. Method according to claim 1 or 2, which is characterized in that described that one is selected from the measurement Gap and the SL Gap, comprising:
    Determine that the SL Gap is for received data packet or to be used to send data packet, the SL Gap is for received data packet or being used to send data packet is that the base station indicates, alternatively, the SL Gap is for received data packet or being used to send data packet is that the UE is determined;
    When the SL Gap is used to received data packet, the measurement Gap is selected;Alternatively,
    When the SL Gap is used to send data packet, the SL Gap is selected.
  9. A kind of clearance G ap selection method, in base station, which is characterized in that the described method includes:
    It is determined as the measurement Gap of user equipment (UE) configuration;
    Configuration information is generated, the configuration information is used to indicate the time that the measurement Gap occurs;
    The configuration information is sent to the UE, the configuration information is used to trigger the time that the UE occurs according to the measurement Gap time occurred and sidelink SL Gap, judge whether the measurement Gap conflicts with the SL Gap, the time that the SL Gap occurs is configured according to predetermined policy;When the measurement Gap conflicts with the SL Gap, one is selected from the measurement Gap and the SL Gap;When selection be the measurement Gap when, carry out nearby region measurement in the measurement Gap;Alternatively, when selection be the SL Gap when, transmit data packet in the SL Gap.
  10. According to the method described in claim 9, it is characterized in that, the method, further includes:
    The relative priority between measurement Gap and SL Gap is sent to the UE, the relative priority between the measurement Gap and SL Gap is used to indicate the UE and selects the measurement Gap or SL Gap.
  11. According to the method described in claim 9, it is characterized in that, the method, further includes:
    Signal threshold value is sent to the UE, the signal threshold value is used to indicate the UE and selects the measurement Gap or SL Gap.
  12. According to the method described in claim 9, it is characterized in that, the method, further includes:
    Packet priority threshold value is sent to the UE, the packet priority threshold value is used to indicate the UE and selects the measurement Gap or SL Gap.
  13. According to the method described in claim 9, it is characterized in that, the method, further includes:
    Indicate that the SL Gap is for received data packet or to be used to send data packet to the UE, the SL Gap is for received data packet or being used to send data packet is used to indicate the UE selection measurement Gap or SL Gap.
  14. A kind of clearance G ap selection device, in user equipment (UE), which is characterized in that described device includes:
    Receiving unit, for receiving the configuration information of base station transmission, the configuration information is used to indicate the time that measurement Gap occurs;
    Processing unit, judges whether the measurement Gap conflicts with the SL Gap, the time that the SL Gap occurs is configured according to predetermined policy at the time that time and sidelink SL Gap for occurring according to the measurement Gap occur;When the measurement Gap conflicts with the SL Gap, one is selected from the measurement Gap and the SL Gap;When selection be the measurement Gap when, carry out nearby region measurement in the measurement Gap;Alternatively, when selection be the SL Gap when, transmit data packet in the SL Gap.
  15. Device according to claim 14, which is characterized in that the processing unit is specifically used for:
    Period corresponding to the next measurement Gap determined after current time according to the measurement Gap time occurred, and the period of next SL Gap after the current time is determined according to the time that the SL Gap occurs, judge whether period corresponding to the measurement Gap and the period of the SL Gap are be overlapped, the minimum value of period corresponding to the measurement Gap is the period of the measurement Gap, period that the maximum value of period corresponding to the measurement Gap is the measurement Gap and the UE from the measurement Gap be switched to the SL Gap needed for the sum of period;Alternatively,
    Period corresponding to the next SL Gap determined after the current time according to the SL Gap time occurred, and determine according to the time that the measurement Gap occurs next measurement Gap after current time Period, judge whether period corresponding to the SL Gap and the period of the measurement Gap are be overlapped, the minimum value of period corresponding to the SL Gap is the period of the SL Gap, period that the maximum value of period corresponding to the SL Gap is the SL Gap and the UE from the SL Gap be switched to the measurement Gap needed for the sum of period.
  16. Device according to claim 14 or 15, which is characterized in that
    The receiving unit, it is also used to obtain the relative priority between the measurement Gap and SL Gap, relative priority between the measurement Gap and SL Gap is that the base station issues, alternatively, the relative priority between the measurement Gap and SL Gap is that the UE is determined;
    The processing unit is specifically used for selecting the measurement Gap when the measurement Gap is high priority compared to the SL Gap;Alternatively, selecting the SL Gap when the measurement Gap is low priority compared to the SL Gap.
  17. Device according to claim 14 or 15, which is characterized in that
    The receiving unit, is also used to obtain the signal parameter of the serving cell of the UE, and the signal parameter is signal strength or signal quality;
    The processing unit, the signal parameter obtained specifically for the receiving unit and signal threshold value, the signal threshold value is that the base station issues, alternatively, the signal threshold value is that the UE is determined;When the signal parameter is less than the signal threshold value, the measurement Gap is selected;Alternatively, selecting the SL Gap when the signal parameter is greater than the signal threshold value.
  18. Device according to claim 14 or 15, which is characterized in that
    The receiving unit is also used to obtain the priority of the data packet;
    The processing unit, for the priority and packet priority threshold value of the data packet that the receiving unit obtains, the packet priority threshold value is that base station issues, alternatively, the packet priority threshold value is that the UE is determined;When the priority of the data packet is lower than the packet priority threshold value, the measurement Gap is selected;Alternatively, selecting the SL Gap when the priority of the data packet is higher than the packet priority threshold value.
  19. Device according to claim 14 or 15, which is characterized in that the processing unit is specifically used for:
    Determine whether the data packet belongs to public safety PS business;
    When the data packet is not belonging to the PS business, the measurement Gap is selected;Alternatively,
    When the data packet belongs to the PS business, the SL Gap is selected.
  20. Device according to claim 14 or 15, which is characterized in that the processing unit is specifically used for:
    Whether the frequency where determining the adjacent area belongs to relief performance group, and the relief performance group is the frequency grouping that delay performance is worst in each frequency grouping, and the frequency grouping is grouped to the frequency of measurement needed for the UE;
    When the frequency is not belonging to the relief performance group, the measurement Gap is selected;Alternatively,
    When the frequency belongs to the relief performance group, the SL Gap is selected.
  21. Device according to claim 14 or 15, which is characterized in that the processing unit is specifically used for:
    Determine that the SL Gap is for received data packet or to be used to send data packet, the SL Gap is for received data packet or being used to send data packet is that the base station indicates, alternatively, the SL Gap is for received data packet or being used to send data packet is that the UE is determined;
    When the SL Gap is used to received data packet, the measurement Gap is selected;Alternatively,
    When the SL Gap is used to send data packet, the SL Gap is selected.
  22. A kind of clearance G ap selection device, in base station, which is characterized in that described device includes:
    Processing unit, for being determined as the measurement Gap of user equipment (UE) configuration;Configuration information is generated, the configuration information is used to indicate the time that the measurement Gap occurs;
    Transmission unit, the configuration information for generating the processing unit is sent to the UE, the configuration information is used to trigger the time that the UE occurs according to the measurement Gap time occurred and sidelink SL Gap, judge whether the measurement Gap conflicts with the SL Gap, the time that the SL Gap occurs is configured according to predetermined policy;When the measurement Gap conflicts with the SL Gap, one is selected from the measurement Gap and the SL Gap;When selection be the measurement Gap when, carry out nearby region measurement in the measurement Gap;Alternatively, when selection be the SL Gap when, transmit data packet in the SL Gap.
  23. Device according to claim 22, it is characterized in that, the transmission unit, is also used to send the relative priority between measurement Gap and SL Gap to the UE, and the relative priority between the measurement Gap and SL Gap is used to indicate the UE and selects the measurement Gap or SL Gap.
  24. Device according to claim 22, which is characterized in that the transmission unit is also used to send signal threshold value to the UE, and the signal threshold value is used to indicate the UE and selects the measurement Gap or SL Gap.
  25. Device according to claim 22, which is characterized in that the transmission unit is also used to send packet priority threshold value to the UE, and the packet priority threshold value is used to indicate the UE and selects the measurement Gap or SL Gap.
  26. Device according to claim 22, it is characterized in that, the transmission unit, it is also used to indicate that the SL Gap is for received data packet or to be used to send data packet to the UE, the SL Gap is for received data packet or being used to send data packet is used to indicate the UE selection measurement Gap or SL Gap.
  27. A kind of clearance G ap selection device, in user equipment (UE), which is characterized in that described device includes: bus, and is connected to processor, memory, transmitter and the receiver of the bus.Wherein, for storing several instructions, described instruction is configured to be executed by the processor memory;
    The receiver, for receiving the configuration information of base station transmission, the configuration information is used to indicate the time that measurement Gap occurs;
    The processor, judges whether the measurement Gap conflicts with the SL Gap, the time that the SL Gap occurs is configured according to predetermined policy at the time that time and sidelink SL Gap for occurring according to the measurement Gap occur;When the measurement Gap conflicts with the SL Gap, one is selected from the measurement Gap and the SL Gap;When selection be the measurement Gap when, carry out nearby region measurement in the measurement Gap;Alternatively, when selection be the SL Gap when, transmit data packet in the SL Gap.
  28. Device according to claim 27, which is characterized in that the processor is specifically used for:
    Period corresponding to the next measurement Gap determined after current time according to the measurement Gap time occurred, and determine according to the time that the SL Gap occurs next SL Gap after the current time Period, judge whether period corresponding to the measurement Gap and the period of the SL Gap are be overlapped, the minimum value of period corresponding to the measurement Gap is the period of the measurement Gap, period that the maximum value of period corresponding to the measurement Gap is the measurement Gap and the UE from the measurement Gap be switched to the SL Gap needed for the sum of period;Alternatively,
    Period corresponding to the next SL Gap determined after the current time according to the SL Gap time occurred, and the period of next measurement Gap after current time is determined according to the time that the measurement Gap occurs, judge whether period corresponding to the SL Gap and the period of the measurement Gap are be overlapped, the minimum value of period corresponding to the SL Gap is the period of the SL Gap, period that the maximum value of period corresponding to the SL Gap is the SL Gap and the UE from the SL Gap be switched to the measurement Gap needed for the sum of period.
  29. The device according to claim 27 or 28, which is characterized in that
    The receiver, it is also used to obtain the relative priority between the measurement Gap and SL Gap, relative priority between the measurement Gap and SL Gap is that the base station issues, alternatively, the relative priority between the measurement Gap and SL Gap is that the UE is determined;
    The processor is specifically used for selecting the measurement Gap when the measurement Gap is high priority compared to the SL Gap;Alternatively, selecting the SL Gap when the measurement Gap is low priority compared to the SL Gap.
  30. The device according to claim 27 or 28, which is characterized in that
    The receiver, is also used to obtain the signal parameter of the serving cell of the UE, and the signal parameter is signal strength or signal quality;
    The processor is specifically used for the signal parameter and signal threshold value, and the signal threshold value is that the base station issues, alternatively, the signal threshold value is that the UE is determined;When the signal parameter is less than the signal threshold value, the measurement Gap is selected;Alternatively, selecting the SL Gap when the signal parameter is greater than the signal threshold value.
  31. The device according to claim 27 or 28, which is characterized in that
    The receiver is also used to obtain the priority of the data packet;
    The processor, priority and packet priority threshold value specifically for the data packet, the packet priority threshold value is that base station issues, alternatively, the packet priority threshold value is institute State what UE was determined;When the priority of the data packet is lower than the packet priority threshold value, the measurement Gap is selected;Alternatively, selecting the SL Gap when the priority of the data packet is higher than the packet priority threshold value.
  32. The device according to claim 27 or 28, which is characterized in that the processor is specifically used for:
    Determine whether the data packet belongs to public safety PS business;
    When the data packet is not belonging to the PS business, the measurement Gap is selected;Alternatively,
    When the data packet belongs to the PS business, the SL Gap is selected.
  33. The device according to claim 27 or 28, which is characterized in that the processor is specifically used for:
    Whether the frequency where determining the adjacent area belongs to relief performance group, and the relief performance group is the frequency grouping that delay performance is worst in each frequency grouping, and the frequency grouping is grouped to the frequency of measurement needed for the UE;
    When the frequency is not belonging to the relief performance group, the measurement Gap is selected;Alternatively,
    When the frequency belongs to the relief performance group, the SL Gap is selected.
  34. The device according to claim 27 or 28, which is characterized in that the processor is specifically used for, comprising:
    Determine that the SL Gap is for received data packet or to be used to send data packet, the SL Gap is for received data packet or being used to send data packet is that the base station indicates, alternatively, the SL Gap is for received data packet or being used to send data packet is that the UE is determined;
    When the SL Gap is used to received data packet, the measurement Gap is selected;Alternatively,
    When the SL Gap is used to send data packet, the SL Gap is selected.
  35. A kind of clearance G ap selection device, in base station, which is characterized in that described device includes: bus, and is connected to processor, memory, transmitter and the receiver of the bus.Wherein, for storing several instructions, described instruction is configured to be executed by the processor memory;
    The processor, for being determined as the measurement Gap of user equipment (UE) configuration;Configuration information is generated, the configuration information is used to indicate the time that the measurement Gap occurs;
    The transmitter, the configuration information for generating the processor is sent to the UE, the configuration information is used to trigger the time that the UE occurs according to the measurement Gap time occurred and sidelink SL Gap, judge whether the measurement Gap conflicts with the SL Gap, the time that the SL Gap occurs is configured according to predetermined policy;When the measurement Gap conflicts with the SL Gap, one is selected from the measurement Gap and the SL Gap;When selection be the measurement Gap when, carry out nearby region measurement in the measurement Gap;Alternatively, when selection be the SL Gap when, transmit data packet in the SL Gap.
  36. Device according to claim 35, which is characterized in that
    The transmitter, is also used to send the relative priority between measurement Gap and SL Gap to the UE, and the relative priority between the measurement Gap and SL Gap is used to indicate the UE and selects the measurement Gap or SL Gap.
  37. Device according to claim 35, which is characterized in that
    The transmitter is also used to send signal threshold value to the UE, and the signal threshold value is used to indicate the UE and selects the measurement Gap or SL Gap.
  38. Device according to claim 35, which is characterized in that
    The transmitter is also used to send packet priority threshold value to the UE, and the packet priority threshold value is used to indicate the UE and selects the measurement Gap or SL Gap.
  39. Device according to claim 35, which is characterized in that
    The transmitter, it is also used to indicate that the SL Gap is for received data packet or to be used to send data packet to the UE, the SL Gap is for received data packet or being used to send data packet is used to indicate the UE selection measurement Gap or SL Gap.
CN201580081949.1A 2015-08-14 2015-08-14 Gap selection method and device Active CN107852622B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2015/087071 WO2017028046A1 (en) 2015-08-14 2015-08-14 Method and apparatus for selecting gap

Publications (2)

Publication Number Publication Date
CN107852622A true CN107852622A (en) 2018-03-27
CN107852622B CN107852622B (en) 2020-04-14

Family

ID=58050488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201580081949.1A Active CN107852622B (en) 2015-08-14 2015-08-14 Gap selection method and device

Country Status (2)

Country Link
CN (1) CN107852622B (en)
WO (1) WO2017028046A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021258347A1 (en) * 2020-06-24 2021-12-30 Lenovo (Beijing) Limited Method and apparatus for handling time-sensitive transmission
CN114698412A (en) * 2020-10-30 2022-07-01 北京小米移动软件有限公司 Measurement interval determination method, measurement method, related device, and storage medium
WO2022242556A1 (en) * 2021-05-18 2022-11-24 维沃移动通信有限公司 Method for determining measurement gap, and terminal and network-side device
WO2023208046A1 (en) * 2022-04-29 2023-11-02 大唐移动通信设备有限公司 Resource selection method, device and apparatus, and storage medium
WO2023205930A1 (en) * 2022-04-24 2023-11-02 Apple Inc. Prioritization handling for uplink gap

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111385836B (en) * 2018-12-29 2022-05-27 大唐移动通信设备有限公司 Method and equipment for information configuration and data transmission
CN112637959B (en) * 2020-12-31 2023-07-25 京信网络系统股份有限公司 Uplink resource allocation method, device, equipment and storage medium
WO2022261839A1 (en) * 2021-06-15 2022-12-22 Oppo广东移动通信有限公司 Measurement method, terminal device, and network device
CN116471670A (en) * 2022-01-07 2023-07-21 维沃移动通信有限公司 Gap conflict processing method and device, terminal and network side equipment
CN117641426A (en) * 2022-08-15 2024-03-01 维沃移动通信有限公司 gap configuration method and device, terminal and network side equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101588636A (en) * 2008-05-22 2009-11-25 大唐移动通信设备有限公司 Method and device for scheduling downlink data
CN101686114A (en) * 2008-09-23 2010-03-31 华为技术有限公司 Terminal semi-static marshaling data processing method and system
CN101772184A (en) * 2009-01-04 2010-07-07 大唐移动通信设备有限公司 Random access feedback method, system and user terminal based on competition
US20110092201A1 (en) * 2008-07-03 2011-04-21 Telefonaktiebolaget L M Ericsson (Publ) Method and Arrangement in a Telecommunication System
CN102938903A (en) * 2012-10-29 2013-02-20 中兴通讯股份有限公司 Method and device for avoiding confliction between measuring opportunity and data transmission opportunity
CN103249058A (en) * 2012-02-01 2013-08-14 中兴通讯股份有限公司 Adjustment method and device for configuration information of dedicated measurement scene

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102917455B (en) * 2011-08-01 2018-04-06 中兴通讯股份有限公司 A kind of uplink semi-persistent scheduling resource allocation methods and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101588636A (en) * 2008-05-22 2009-11-25 大唐移动通信设备有限公司 Method and device for scheduling downlink data
US20110092201A1 (en) * 2008-07-03 2011-04-21 Telefonaktiebolaget L M Ericsson (Publ) Method and Arrangement in a Telecommunication System
CN101686114A (en) * 2008-09-23 2010-03-31 华为技术有限公司 Terminal semi-static marshaling data processing method and system
CN101772184A (en) * 2009-01-04 2010-07-07 大唐移动通信设备有限公司 Random access feedback method, system and user terminal based on competition
CN103249058A (en) * 2012-02-01 2013-08-14 中兴通讯股份有限公司 Adjustment method and device for configuration information of dedicated measurement scene
CN102938903A (en) * 2012-10-29 2013-02-20 中兴通讯股份有限公司 Method and device for avoiding confliction between measuring opportunity and data transmission opportunity

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021258347A1 (en) * 2020-06-24 2021-12-30 Lenovo (Beijing) Limited Method and apparatus for handling time-sensitive transmission
CN114698412A (en) * 2020-10-30 2022-07-01 北京小米移动软件有限公司 Measurement interval determination method, measurement method, related device, and storage medium
CN114698412B (en) * 2020-10-30 2024-04-16 北京小米移动软件有限公司 Measurement interval determining method, measurement method, related device, and storage medium
WO2022242556A1 (en) * 2021-05-18 2022-11-24 维沃移动通信有限公司 Method for determining measurement gap, and terminal and network-side device
WO2023205930A1 (en) * 2022-04-24 2023-11-02 Apple Inc. Prioritization handling for uplink gap
WO2023208046A1 (en) * 2022-04-29 2023-11-02 大唐移动通信设备有限公司 Resource selection method, device and apparatus, and storage medium

Also Published As

Publication number Publication date
CN107852622B (en) 2020-04-14
WO2017028046A1 (en) 2017-02-23

Similar Documents

Publication Publication Date Title
CN107852622A (en) Clearance G ap systems of selection and device
US10484983B2 (en) Robust control channel transmission scheme
US11071168B2 (en) Multi-station access method, apparatus, and system
WO2019084816A1 (en) Method and device for terminal to select resource, and computer storage medium
EP2410775B1 (en) Method, device and terminal for determining transmission mode
CN107005984B (en) Method for reducing resource conflict and UE
US10555311B2 (en) Data transmission method and apparatus based on networks of multiple communications standards
WO2017156856A1 (en) Method, d2d device, and base station used for d2d communications
US20190387420A1 (en) Communication method, communication device and terminal
CN109923890A (en) Measurement method, terminal device and the network equipment
US20150382173A1 (en) Method and Apparatus for Detecting D2D Discovery Sequences, Method and Apparatus for Receiving D2D Data
US11252621B2 (en) Uplink carrier handover method, network device, and terminal device
WO2017166212A1 (en) Signal transmission method, terminal device, access network device and signal transmission system
CN109804691B (en) Data transmission method and device and computer storage medium
US20170238319A1 (en) System, user equipment and base station for carrier selection in a wireless telecommunication system
KR101933067B1 (en) Method for detecting device-to-device signal, user equipment, and base station
WO2017071552A1 (en) Time slot scheduling method and apparatus
WO2018208536A1 (en) Autonomous mesh topology
JP2024517904A (en) Method and system for extending communication coverage in a wireless network - Patents.com
WO2016119219A1 (en) Communication method, base station, and user equipment
WO2018053766A1 (en) Communications method, terminal device and network device
US11212050B2 (en) Method and device for determining resource of logical channel, and computer storage medium
WO2022027665A1 (en) Quality-of-service and quality-of-experience monitoring
US20230254796A1 (en) Resource configuration using the burst spread parameter for wireless communication systems
CN105207752A (en) Signal transmitting and detecting method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant