CN107844667A - Automatic section searching method based on cut set searching algorithm - Google Patents

Automatic section searching method based on cut set searching algorithm Download PDF

Info

Publication number
CN107844667A
CN107844667A CN201711216776.7A CN201711216776A CN107844667A CN 107844667 A CN107844667 A CN 107844667A CN 201711216776 A CN201711216776 A CN 201711216776A CN 107844667 A CN107844667 A CN 107844667A
Authority
CN
China
Prior art keywords
section
cut
cut set
searching algorithm
searching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711216776.7A
Other languages
Chinese (zh)
Inventor
郝文斌
马菁曼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU POWER SUPPLY Co OF STATE GRID SICHUAN ELECTRIC POWER Corp
Original Assignee
CHENGDU POWER SUPPLY Co OF STATE GRID SICHUAN ELECTRIC POWER Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU POWER SUPPLY Co OF STATE GRID SICHUAN ELECTRIC POWER Corp filed Critical CHENGDU POWER SUPPLY Co OF STATE GRID SICHUAN ELECTRIC POWER Corp
Priority to CN201711216776.7A priority Critical patent/CN107844667A/en
Publication of CN107844667A publication Critical patent/CN107844667A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Evolutionary Computation (AREA)
  • Computer Hardware Design (AREA)
  • Health & Medical Sciences (AREA)
  • Strategic Management (AREA)
  • Primary Health Care (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Water Supply & Treatment (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Computational Mathematics (AREA)
  • Public Health (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses the automatic section searching method based on cut set searching algorithm, it is divided into initial section, transmission cross-section and key sections including transmission cross-section in power network, MATLAB first reads in basic data from PSASP, recycle the basic data read in obtain the topological diagram of power network, that is, obtain adjacency matrix;Then using the cut set searching algorithm judged based on connectedness, the minimal cut set of the whole network is obtained, that is, obtains initial section;Further according to direction of tide and distribution factor constraints is cut-off, transmission cross-section is filtered out from initial section;The margin of safety of transmission cross-section is finally calculated, and judges whether its margin of safety is less than threshold value, key sections are then elected as less than threshold value.All key sections of final output.Automatic section searching method of the invention based on cut set searching algorithm, not only avoids omitting important section, and saved operations staff's time.

Description

Automatic section searching method based on cut set searching algorithm
Technical field
The present invention relates to a kind of section searching method, and in particular to the automatic section searcher based on cut set searching algorithm Method.
Background technology
Due to most places dispatching of power netwoks planning department using Chinese DianKeYuan software PSASP to local power network progress tide Stream, short circuit etc. calculate, and to find out the weak link of the power network, that is, identify key sections, and do not know automatically on software PSASP The function of other section, therefore most of operational planners are to move open-circuit line, meter in PSASP left-hand seats according to operating experience Trend is calculated, said process is then largely repeated and obtains key sections.As power network scale is increasing, operations staff's not only work Measure further heavy, and easily miss key sections.Therefore the automatic identification of section is very crucial.
At present, the method on section automatic identification mainly has:1) using electric tightness degree by sub-area division, then will Circuit between subregion is as section, but this method can not search out the section inside area;2) it is disconnected based on shortest path identification Face, although the section that this method can be inside identification region, the margin of safety of section is not accounted for, it is possible to which finding out is not The section of real system monitoring.
The content of the invention
The technical problems to be solved by the invention are that the key sections detection in current power system is not accurate, are not examined Consider the margin of safety of section, it is possible to which it is not that the section of real system monitoring is calculated, and it is an object of the present invention to provide being based on cut set search to find out The automatic section searching method of method, is solved the problems, such as above-mentioned.
The present invention is achieved through the following technical solutions:
Automatic section searching method based on cut set searching algorithm, including transmission cross-section is divided into initial section, defeated in power network Electric section and key sections, also comprise the following steps:S1:Actual electric network system is abstracted into figure using graph theory, utilizes adjoining Annexation between matrix storage transformer station, then the cut set searching algorithm by being judged based on connectedness search for the institute of power network There is minimal cut set, so as to obtain initial section;S2:On the basis of initial section, consistent, branch road is flowed to using effective power flow The threshold value that breadth coefficient is more than setting is cut-off, the constraint in terms of the two is screened, and obtains transmission cross-section;S3:Utilize power network Security constraint filters out the small transmission cross-section of margin of safety and meets following formula as key sections, the i.e. margin of safety of key sections:
In formula:The margin of safety of section selected by M expressions;The active power that section selected by P expressions passes through;PlimitSelected by expression The transmission limit of section;MminRepresent key sections margin of safety threshold value;S4:Under given section tidal current constraint, normal fortune Line mode disconnects any circuit in the section, and remaining line current is no more than its electric current limit, section ability to transmit electricity pole The section allows the strength of current passed through when limit is system normal operation, and the Continuation Method after N-1 Component screenings calculates section Transmission limit.When traditional Continuation Method calculates the transmission limit of section, it is assumed that the section has m element, disconnects successively disconnected Bin part i (i=1,2 ..., m), and calculate the peak power P that remaining m-1 element can transmiti, then transmission limit be:
Plimit=min { Pi| i=1,2 ..., m }
Assuming that conventional method calculates a PiTime complexity be O (P), then the time complexity for calculating the section is m×O(P).The algorithm redundancy is high, expends time length, is unfavorable for applying on a large scale, therefore the present invention is proposed based on N-1 members Continuation Method after part screening calculates section transmission limit.In this method, found before the computation using some screening principles The most easily out-of-limit element of trend after failure, that is, the peak power for ensureing to transmit after the element fault are required transmission pole Limit, thus only needs once to be calculated, its time complexity is O (P).
Further, the transmission cross-section in the step S2 is:min{λij| i, j ∈ D } > λmin
In formula:D is selected section;λminIt is to cut-off distribution factor threshold value;Before representing that branch road i disconnects, branch road j's is active Trend;Before representing that branch road i disconnects, the effective power flow of the circuit;After representing that branch road i disconnects, branch road j effective power flow.
Further, the N-1 elements in the step S4 are the section for being made up of 2 elements, select impedance big, first The big element of part limit is as N-1 elements.
Further, N-1 elements are the section for being made up of 3 limit identical elements in the step S4, are selected Impedance value element placed in the middle is as N-1 fault elements.
Further, the graph theory used in the step 1 is only ground in power system not considering the characteristic of network element When studying carefully the topological relation of network, a figure can be abstracted into, wherein load, transformer station, power supply are abstracted into the summit of figure, and Circuit is then abstracted into the side of figure.
Further, in graph theory, chart is shown as G (V, E), and V represents vertex set, and E represents the set on side, the figure G (V, E) has n summit, arbitrarily takes out a vertex v first1It is put into vertex set V1In so that V1={ v1, V2={ v2..., vi..., vn, now V2There is n-1 summit.Define matrix B V2=[b2..., bi..., bn], then have:
Now BV2=[1 ..., 1]n-1, convert thereof into binary number and represented with N, be i.e. N=2n-1, when N often subtracts 1 certainly, top Point set also and then renewal once, untill N is kept to 1, now vertex set V2An only summit, therefore, in the mistake that N subtracts 1 certainly Cheng Zhong, BV2Can corresponds all segmentation results of vertex set.
Further, the vertex set is judged, judges vertex set V1、V2Respectively constitute subgraph G1(V1、E1)、G2 (V2, E2) connectedness, if subgraph G1(V1, E1)、G2(V2, E2) connect, then calculate subgraph G1The incidence set on all summits with Scheme the incidence set on G all summits ring and, that is, obtain minimal cut set, if not connecting, re-start vertex set and select.
In order to more efficiently easily search for section, the invention also provides one kind based on MATLAB and PSASP dynamic friendships Mutual section method for solving, this method are utilized respectively MATLAB and PSASP adjust to it using Temp files as interaction core With and modification, form the efficient circulation of system data, avoid writing for complex interface program, it is preferably in engineering in practice Application, in PSASP7 versions, the basic data and result of calculation of project file are stored in Temp files with txt forms In folder, therefore the present invention is calculated based on the data in Temp files.LF.L0-LF.L6 files are copied into In MATLAB project files folder, to read related data, MATLAB according to the form of each LF file storages data carry out by Position modification, to realize the change to basic data, it should be noted that to keep modification preceding consistent with data type after modification.
, it is necessary to first do corresponding configuration before PSASP Load flow calculations module is called.From PSASP installation text In part, executable file Wmlf.exe and whole dynamic link library files (suffix .dll) needed for copy Load flow calculation, arrive In MATLAB project file folder.After relevant configuration is completed, it is possible to realize calling of the MATLAB to PSASP trend modules.
MATLAB calls the result after PSASP progress Load flow calculations to be stored in LF.LP1-LF.LP6 files, wherein file LF.LP2 stores power flow solutions.As reading PSASP basic datas, it is also that step-by-step is read that MATLAB, which reads power flow solutions,.
MATLAB first reads in basic data from PSASP, recycles the basic data of reading to obtain the topological diagram of power network, i.e., Obtain adjacency matrix;Then using the cut set searching algorithm judged based on connectedness, the minimal cut set of the whole network is obtained, that is, is obtained just Beginning section;Further according to direction of tide and distribution factor constraints is cut-off, transmission cross-section is filtered out from initial section;Finally count The margin of safety of transmission cross-section is calculated, and judges whether its margin of safety is less than threshold value, key sections are then elected as less than threshold value.Finally Export all key sections.
The present invention compared with prior art, has the following advantages and advantages:
1st, the automatic section searching method of the invention based on cut set searching algorithm, not only avoids omitting important section, and Operations staff's time is saved;
2nd, the automatic section searching method of the invention based on cut set searching algorithm, searching method positive effect, is able to verify that The validity of algorithm;
3rd, the automatic section searching method of the invention based on cut set searching algorithm, can realize the number for calling modification PSASP According to, recursive call PSASP correlation computations modules, and read the function of PSASP result of calculation.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, forms one of the application Point, do not form the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the system flow chart of the embodiment of the present invention one.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment and accompanying drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make For limitation of the invention.
Embodiment
As shown in figure 1, in order to more efficiently easily search for section, the invention also provides one kind based on MATLAB and The section method for solving of PSASP dynamic interactions, this method are utilized respectively MATLAB and PSASP using Temp files as interaction core It is called and changed, forms the efficient circulation of system data, avoids writing for complex interface program, it is preferably The application of engineering in practice, in PSASP7 versions, the basic data and result of calculation of project file are preserved with txt forms In Temp files, therefore the present invention is calculated based on the data in Temp files.By LF.L0-LF.L6 File is copied into MATLAB project files folder, and to read related data, MATLAB is according to each LF file storages data Form carries out step-by-step modification, to realize the change to basic data, it should be noted that to keep modification preceding and data after modification Type is consistent.
, it is necessary to first do corresponding configuration before PSASP Load flow calculations module is called.From PSASP installation text In part, executable file Wmlf.exe and whole dynamic link library files (suffix .dll) needed for copy Load flow calculation, arrive In MATLAB project file folder.After relevant configuration is completed, it is possible to realize calling of the MATLAB to PSASP trend modules.
MATLAB calls the result after PSASP progress Load flow calculations to be stored in LF.LP1-LF.LP6 files, wherein file LF.LP2 stores power flow solutions.As reading PSASP basic datas, it is also that step-by-step is read that MATLAB, which reads power flow solutions,.
MATLAB first reads in basic data from PSASP, recycles the basic data of reading to obtain the topological diagram of power network, i.e., Obtain adjacency matrix;Then using the cut set searching algorithm judged based on connectedness, the minimal cut set of the whole network is obtained, that is, is obtained just Beginning section;Further according to direction of tide and distribution factor constraints is cut-off, transmission cross-section is filtered out from initial section;Finally count The margin of safety of transmission cross-section is calculated, and judges whether its margin of safety is less than threshold value, key sections are then elected as less than threshold value.Finally Export all key sections.
The present invention is using data based on certain data of planning power network dry season big mode in PSASP softwares, with the electricity Net voltage class is that more than 220 kilovolts transformer stations are rack, shares 500 kv substation 7,220 kv substations 48, Peak load is up to 10,600,000 kilowatts.
Circuit overload index is the maximum current value that operating temperature is 80 DEG C, environment temperature is 40 DEG C of circuits permissions;220000 It is 1.2 times by the capability value of transformer to lie prostrate transformer overload index;Cut-off distribution factor threshold value and choose 0.2;Key sections Margin of safety threshold value chooses 0.4.
The present invention writes main program on MATLAB, by the above method, all section quantitative comparisons of gained power network such as table 1 It is shown:
Table 1
And the key sections result searched for automatically is indicated by table 2:
Table 2
Table 2 compared for all key sections results of the power network and give section result with operation expert, wherein No. 1, No. 2 sections For automatic search result.Note:Element number is PSASP circuit number, and the unit of section limit value is 100MW.
By the result of Tables 1 and 2, it can be found that:
The section that the inventive method obtains and the section that expert provides are essentially the same, wherein the inventive method new discovery 2, No. 8 sections, and No. 1 section of the inventive method is more complete than No. 1 section that expert provides.
The section limit value that the inventive method obtains is lower than the limit value that expert provides, because what the present invention was carried out to section Most severe N-1 is examined;But both section limit values are more or less the same, it may be said that bright section limit value of the present invention calculates correct Property.
The inventive method do not obtain expert to indivedual sections, this be due to cut-off breadth coefficient threshold value and safety it is abundant Spend the problems of value of threshold value.As the present invention in the result of initial section contains No. 10 sections, but due to each element of the section Between the breadth coefficient that cut-offs be not all higher than threshold value, then just screened out in transmission cross-section;The present invention is in transmission cross-section As a result contain No. 9 sections, due to the threshold value value of the margin of safety of section, cause the section to be screened out in key sections.
Increasing people is concerned about the automatic search of transmission cross-section in recent years, thus the present invention using PSASP and Two platforms of MATLAB to automatic search section study significant.
Above-described embodiment, the purpose of the present invention, technical scheme and beneficial effect are carried out further Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not used to limit this hair Bright protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc. all should Within protection scope of the present invention.

Claims (7)

1. the automatic section searching method based on cut set searching algorithm, including transmission cross-section is divided into initial section, transmission of electricity in power network Section and key sections, it is characterised in that also comprise the following steps:
S1:Actual electric network system is abstracted into figure using graph theory, the annexation between transformer station is stored using adjacency matrix, then All minimal cut sets of power network are searched for by the cut set searching algorithm judged based on connectedness, so as to obtain initial section;
S2:On the basis of initial section, threshold of consistent, the branch breaking breadth coefficient more than setting is flowed to using effective power flow Value, the constraint in terms of the two are screened, and obtain transmission cross-section;
S3:The small transmission cross-section of margin of safety is filtered out as the peace of key sections, i.e. key sections by the use of power system security constraints Full nargin meets following formula:
In formula:The margin of safety of section selected by M expressions;The active power that section selected by P expressions passes through;PlimitSection selected by expression Transmission limit;MminRepresent key sections margin of safety threshold value;
S4:Under given section tidal current constraint, normal operating mode disconnects any circuit, remaining line electricity in the section Stream is no more than its electric current limit, and the section allows the most spring tide passed through when the section ability to transmit electricity limit is system normal operation Flow, the Continuation Method after N-1 Component screenings calculates section transmission limit.
2. the automatic section searching method according to claim 1 based on cut set searching algorithm, it is characterised in that the step Suddenly the transmission cross-section in S2 is:min{λij| i, j ∈ D } > λmin
In formula:D is selected section;λminIt is to cut-off distribution factor threshold value;Before representing that branch road i disconnects, branch road j effective power flow;Before representing that branch road i disconnects, the effective power flow of the circuit;After representing that branch road i disconnects, branch road j effective power flow.
3. the automatic section searching method according to claim 1 based on cut set searching algorithm, it is characterised in that the step N-1 elements in rapid S4 are the section for being made up of 2 elements, select the element that impedance is big, element limit is big as N-1 members Part.
4. the automatic section searching method according to claim 1 based on cut set searching algorithm, it is characterised in that the step N-1 elements are the section for being made up of 3 limit identical elements in rapid S4, select impedance value element placed in the middle as N-1 Fault element.
5. the automatic section searching method according to claim 1 based on cut set searching algorithm, it is characterised in that the step The graph theory used in rapid 1 power system do not consider the characteristic of network element and when only studying the topological relation of network, can will It is abstracted into a figure, and wherein load, transformer station, power supply are abstracted into the summit of figure, and circuit is then abstracted into the side of figure.
6. the automatic section searching method according to claim 5 based on cut set searching algorithm, it is characterised in that in graph theory In, chart is shown as G (V, E), and V represents vertex set, and E represents the set on side, and the figure G (V, E) has n summit, first arbitrarily Take out a vertex v1It is put into vertex set V1In so that V1={ v1, V2={ v2..., vi..., vn, now V2There is n-1 top Point.Define matrix B V2=[b2..., bi..., bn], then have:
Now BV2=[1 ..., 1]n-1, convert thereof into binary number and represented with N, be i.e. N=2n-1, when N often subtracts 1 certainly, vertex set Also and then renewal once, untill N is kept to 1, now vertex set V2An only summit, therefore, during N subtracts 1 certainly, BV2Can corresponds all segmentation results of vertex set.
7. the automatic section searching method according to claim 6 based on cut set searching algorithm, it is characterised in that by described in Vertex set is judged, judges vertex set V1、V2Respectively constitute subgraph G1(V1, E1)、G2(V2, E2) connectedness, if subgraph G1 (V1, E1)、G2(V2, E2) connect, then calculate subgraph G1The ring of the incidence set on all summits and the incidence set on all summits of figure G With obtain minimal cut set, if not connecting, re-start vertex set and select.
CN201711216776.7A 2017-11-28 2017-11-28 Automatic section searching method based on cut set searching algorithm Pending CN107844667A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711216776.7A CN107844667A (en) 2017-11-28 2017-11-28 Automatic section searching method based on cut set searching algorithm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711216776.7A CN107844667A (en) 2017-11-28 2017-11-28 Automatic section searching method based on cut set searching algorithm

Publications (1)

Publication Number Publication Date
CN107844667A true CN107844667A (en) 2018-03-27

Family

ID=61680430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711216776.7A Pending CN107844667A (en) 2017-11-28 2017-11-28 Automatic section searching method based on cut set searching algorithm

Country Status (1)

Country Link
CN (1) CN107844667A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109217339A (en) * 2018-10-25 2019-01-15 国网天津市电力公司 A kind of construction method in the Static Voltage Security domain based on PMU configuration
CN109558518A (en) * 2018-10-30 2019-04-02 深圳先进技术研究院 The method, apparatus and storage medium of community discovery in a kind of determining social networks
CN112186741A (en) * 2020-09-10 2021-01-05 贵州电网有限责任公司 Power grid operation weak point distinguishing method based on BPA (Business Process analysis) simulation calculation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101252280A (en) * 2008-04-08 2008-08-27 昆明理工大学 On-line evaluating method of urban network max power supply capability
CN103326356A (en) * 2013-06-07 2013-09-25 广东电网公司电力调度控制中心 Power grid key transmission section limit transmission capacity calculation method with consideration of artificial scheduling knowledge

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101252280A (en) * 2008-04-08 2008-08-27 昆明理工大学 On-line evaluating method of urban network max power supply capability
CN103326356A (en) * 2013-06-07 2013-09-25 广东电网公司电力调度控制中心 Power grid key transmission section limit transmission capacity calculation method with consideration of artificial scheduling knowledge

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
T.E. DY-LIACCO: "Enhancing power system security control", 《IEEE COMPUTER APPLICATIONS IN POWER》 *
周德才 等: "基于图论的输电断面快速搜索", 《中国电机工程学报》 *
汤涌 等: "《电力系统多尺度仿真与试验技术》", 31 July 2013, 中国电力出版社 *
赵峰 等: "基于电气分区的输电断面及其自动发现", 《电力系统自动化》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109217339A (en) * 2018-10-25 2019-01-15 国网天津市电力公司 A kind of construction method in the Static Voltage Security domain based on PMU configuration
CN109217339B (en) * 2018-10-25 2022-03-11 国网天津市电力公司 Construction method of static voltage security domain based on PMU configuration
CN109558518A (en) * 2018-10-30 2019-04-02 深圳先进技术研究院 The method, apparatus and storage medium of community discovery in a kind of determining social networks
CN112186741A (en) * 2020-09-10 2021-01-05 贵州电网有限责任公司 Power grid operation weak point distinguishing method based on BPA (Business Process analysis) simulation calculation

Similar Documents

Publication Publication Date Title
Aziz et al. Review on optimization methodologies in transmission network reconfiguration of power systems for grid resilience
Chen et al. Resilient distribution system by microgrids formation after natural disasters
Ho et al. Optimal placement of fault indicators using the immune algorithm
CN107844667A (en) Automatic section searching method based on cut set searching algorithm
CN104466959A (en) Power system key line identification method and system
CN111143764B (en) Distribution network reliability assessment method with complex structure based on diffusion theory
Dixit et al. Integration of distributed generation for assessment of distribution system reliability considering power loss, voltage stability and voltage deviation
Anteneh et al. Distribution network reliability enhancement and power loss reduction by optimal network reconfiguration
CN113328437B (en) Intelligent power distribution network CPS topology construction method and fault recovery method
Gholami et al. Service restoration for unbalanced distribution networks using a combination two heuristic methods
CN109949178A (en) One kind is based on the judgement of support vector machines middle voltage distribution networks power-off event and complementing method
Dubey et al. A robust approach to restoring critical loads in a resilient power distribution system
Jain et al. Augmentation of situational awareness by fault passage indicators in distribution network incorporating network reconfiguration
Esmaili et al. Voltage stability-constrained optimal simultaneous placement of PMUs and channels enhancing measurement reliability and redundancy
CN107808200A (en) Short-time maintenance plan optimization method and device for power distribution network
Mohammadi et al. Synthetic benchmarks for power systems
CN109586281B (en) Power distribution network reliability assessment method, device and medium based on node optimization number
Zhang et al. Intentional islanding method based on community detection for distribution networks
Ildarabadi et al. Resilience enhancement of distribution grids based on the construction of Tie-lines using a novel genetic algorithm
Zand et al. Optimal coordination of DOCRs in microgrid via contingency reduction mechanism and clustering algorithms considering various network topologies based on N-2 contingencies
CN117318020A (en) Medium voltage distribution network weakness identification method considering user blackout risk value
CN107834545A (en) A kind of city 110kV power network cyclization methods based on transfer load method
Kim et al. PMU optimal placement algorithm using topological observability analysis
Jiang et al. Research on load transfer strategy optimisation with considering the operation of distributed generations and secondary dispatch
CN104484546A (en) Method for generating automatic power flow check file of power grid planning project

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180327