CN107834545A - A kind of city 110kV power network cyclization methods based on transfer load method - Google Patents

A kind of city 110kV power network cyclization methods based on transfer load method Download PDF

Info

Publication number
CN107834545A
CN107834545A CN201711114658.5A CN201711114658A CN107834545A CN 107834545 A CN107834545 A CN 107834545A CN 201711114658 A CN201711114658 A CN 201711114658A CN 107834545 A CN107834545 A CN 107834545A
Authority
CN
China
Prior art keywords
cyclization
website
power network
city
result
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711114658.5A
Other languages
Chinese (zh)
Inventor
郝文斌
周维阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU POWER SUPPLY Co OF STATE GRID SICHUAN ELECTRIC POWER Corp
Original Assignee
CHENGDU POWER SUPPLY Co OF STATE GRID SICHUAN ELECTRIC POWER Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU POWER SUPPLY Co OF STATE GRID SICHUAN ELECTRIC POWER Corp filed Critical CHENGDU POWER SUPPLY Co OF STATE GRID SICHUAN ELECTRIC POWER Corp
Priority to CN201711114658.5A priority Critical patent/CN107834545A/en
Publication of CN107834545A publication Critical patent/CN107834545A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of city 110kV power network cyclization methods based on transfer load method, including:Generation includes the initial adjacency matrix of power network topology information;Obtain cyclization both sides 220kV access path;First time cyclization emulation testing is carried out, if storing this cyclization scheme into result of calculation table if;Site information is stored into site information table;Website in result of calculation table is further screened, the website sum after being screened;Iteration of simulations calculating is carried out one by one to the website of transferable load Loop Closing Operation, stored if by verification into checkout result table;Otherwise the simulation calculation of next website, the website after having traveled through all screenings are carried out;If result of calculation table remains as sky, trans-regional two optimal 220kV cyclizations websites are found by searching for shortest path;The partition scheme validity for realizing to obtain is higher, solves the limitation of traditional scheme, ensure that the technique effect of power supply reliability.

Description

A kind of city 110kV power network cyclization methods based on transfer load method
Technical field
The present invention relates to urban distribution network research field, in particular it relates to a kind of city 110kV electricity based on transfer load method Network closed loop method.
Background technology
With the continuous development of China's voltage class, receiving end sub-area division is imperative, as《Power system security is stable Directive/guide》In explicitly point out:" with the construction of high voltage order one power network, partition running, phase should be done step-by-step in subordinate voltage power network Keep standby each other between adjacent subregion, the electromagnetic looped network of the different voltage class for the electricity net safety stable that should avoid and eliminate the effects of the act ".
Due to the method for operation of China's power network " closed loop design, open loop operation ", urban distribution network 110kV and following voltage class Power network is largely run using radial pattern dual power supply form:Each load point is comprising an access power supply and a standby electricity Source, under normal circumstances load powered by single power supply.Once working line breaks down, it is electrically operated to carry out make and break, then will In-put of spare power supply uses, so as to which part ensure that reliability, the continuation of power supply.Two kinds can be used during failure under normal circumstances Mode is repaired, first, the transfer carrying out failure load by way of " cold fall ", that is, disconnect faulty line to failure load Carry out power failure processing, then by extension wire interconnection switch cyclization.The advantage of this maintenance mode is that Loop Closing Operation is guarded, to electricity Network operation influences small, reliability height, and shortcoming is that transient-power failure can be caused, and the normal life production to customer interrupted causes one Fixed loss, but for important load, hospital, government bodies, factory etc., have a power failure the damage that may then cause to estimate Lose.Second, cyclization both sides 220kV websites are carried out into Loop Closing Operation, i.e., first strengthen the electrical link of cyclization both sides, then carry out 110kV Circuit Loop Closing Operation, because 220kV level Grids circuit, design of transformer amount of redundancy are big, while it is with higher level's 500kV voltages etc. Level electromagnetic looped network operation, is that the Loop Closing Operation between 220kV is safer;But then, due to 220kV circuit cyclizations pair Network load trend has a great influence, and inevitably results in the change of whole distract electric network swim after cyclization.
So using traditional cyclization mode, for high-grade voltage security after the trend distribution situation after cyclization and cyclization Verification can expend great resource.Meanwhile China's grid company is responsible for the city-level Utilities Electric Co. of 110kV voltage class operation maintenance There is no the scheduling authority of 220kV voltage class, if superior control centre applies, need substantial amounts of time and administration cost, So as to which border website can not cut operation the very first time in the lookaside wire of trouble time, therefore failure can not be cut the very first time Remove, there is the risk of power failure.
The content of the invention
The invention provides a kind of city 110kV power network cyclization methods based on transfer load method, solve solution tradition The problem of cyclization scheme is no longer applicable under sub-area division operation background, the partition scheme validity for realizing to obtain is higher, solution The certainly limitation of traditional scheme, it ensure that the technique effect of power supply reliability.
For achieving the above object, this application provides a kind of city 110kV power network cyclizations based on transfer load method Method, methods described include:
Step 1:Electric network data is read, power network 220kV substation datas, AC line data is obtained and becomes with power network 500kV There is the 220kV transformer stations node number being directly electrically connected in power station, and generation includes the initial adjacency matrix of power network topology information;
Step 2:Based on initial adjacency matrix, Depth Priority Algorithm acquisition cyclization both sides 220kV link road is used Footpath, if its shortest path passes through 500kV websites, judge it for partition running;Otherwise it is then with region cyclization situation.Depth is excellent First search method is a kind of Topology identification algorithm of high efficient and reliable.Limit in whole figure is divided into two parts, that is, after accessing Limit and do not access limit.Again from specified limit, the principle based on depth-first, all non-accessed nodes are searched Rope accesses, untill the limit under all the same areas is accessed.Its feature is that all nodes can access, and The search result of depth capacity can be obtained.
Step 3:First time cyclization emulation testing is carried out, if storing this cyclization scheme into result of calculation table if; Otherwise step 4 is carried out.
Step 4:It is identified using the transferable load site information of breadth-first search involutive ring both sides 220kV, These site information are stored into site information table.Breadth-first search is a kind of blindness search method, it is therefore an objective to system Ground deploys and checks all nodes in figure, to look for result.In other words, it is it is not intended that the possible position of result, thoroughly Whole figure is searched on ground, and untill finding result, resulting result is most broad path in figure.
Step 5:According to the situation of cyclization both sides 220kV bus phase angles, website in result of calculation table is further screened, phase The big side in angle, which retains, may move into website, the small extensible website of once reservation of phase angle, the website sum after being screened;
Step 6:Iteration of simulations calculating is carried out one by one to the website of transferable load Loop Closing Operation, by it if by verification Storage is into checkout result table;Otherwise the simulation calculation of next website is carried out, until having traveled through in step 5 after all screenings Website.
Step 7:If result of calculation table remains as sky after step 6, traditional cyclization scheme is carried out, i.e., by searching for shortest path Trans-regional two optimal 220kV cyclizations websites are found in footpath, i.e., first cyclization both sides are run into electromagnetic looped network, carried out 110kV Loop Closing Operations.
According to such scheme, in the step 2, carry out recognizing 500kV transformer stations using Depth Priority Algorithm General layout is run, is specially:Obtain the adjacent relation matrix of power network 220kV websites;Obtained using Depth Priority Algorithm current The number of partitions of scheme and its comprising 220kV websites.
According to such scheme, in addition to step 3 and step 6:By the way of PSASP software tool packs are called, to gained Cyclization scheme carries out static security analysis and short circuit current verification, preserves the partition scheme that simultaneously output verification passes through.
One or more technical schemes that the application provides, have at least the following technical effects or advantages:
1) the operation general layout module of 500kV transformer stations is recognized based on Depth Priority Algorithm by adding, this method takes It is higher for the form of artificial formulation partition scheme, obtained partition scheme validity.
2) the city 110kV power network cyclization methods based on transfer load method, can obtain feasible cyclization scheme, solution The certainly limitation of traditional scheme, ensure that power supply reliability.And whole cyclization strategy is set to be grasped in 110kV voltage class Make, so as to greatly improve the operational efficiency of prefecture-level power network O&M company.
3) by the way of PSASP software tool packs are called, static security analysis and short circuit are carried out to gained partition scheme Electric current verifies, and preserves and the scheme that passes through of output verification, enable whole algorithm automatically export it is all meet area principle and The partition scheme verified by index.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, forms one of the application Point, do not form the restriction to the embodiment of the present invention;
Fig. 1 is the schematic flow sheet of the city 110kV power network cyclization methods based on transfer load method;
Fig. 2 is XY110kV stations wiring schematic diagram;
Fig. 3 is schematic diagram before XY110kV-SY110kV cyclizations;
Fig. 4 is schematic diagram after XY110kV-SY110kV cyclizations;
Fig. 5 is that XY110kV-SY110kV changes TF110kV method of operation schematic diagrames;
Fig. 6 is schematic diagram after XY110kV-SY110kV new departure cyclizations.
Embodiment
The invention provides a kind of city 110kV power network cyclization methods based on transfer load method, solve solution tradition The problem of cyclization scheme is no longer applicable under sub-area division operation background, the partition scheme validity for realizing to obtain is higher, solution The certainly limitation of traditional scheme, it ensure that the technique effect of power supply reliability.
It is below in conjunction with the accompanying drawings and specific real in order to be more clearly understood that the above objects, features and advantages of the present invention Mode is applied the present invention is further described in detail.It should be noted that in the case where not conflicting mutually, the application's Feature in embodiment and embodiment can be mutually combined.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still, the present invention may be used also To be implemented using other different from the other modes in the range of being described herein, therefore, protection scope of the present invention is not by under The limitation of specific embodiment disclosed in face.
Fig. 1-Fig. 6 is refer to, this application provides a kind of city 110kV power network cyclization methods based on transfer load method, Methods described includes:
Step 1:Electric network data is read, the data generation based on reading includes the initial adjacency matrix of power network topology information;
Step 2:Based on initial adjacency matrix, acquisition cyclization both sides 220kV access path, if its shortest path passes through 500kV websites, then judge it for partition running;Otherwise it is with region cyclization situation;
Step 3:First time cyclization emulation testing is carried out, if storing this cyclization scheme into result of calculation table if; Otherwise step 4 is carried out;
Step 4:220kV transferable load site information in involutive ring both sides is identified, and site information is stored to website In information table;
Step 5:According to the situation of cyclization both sides 220kV bus phase angles, website in result of calculation table is further screened, phase The big side in angle, which retains, may move into website, the small extensible website of once reservation of phase angle, the website sum after being screened;
Step 6:Iteration of simulations calculating is carried out one by one to the website of transferable load Loop Closing Operation, by it if by verification Storage is into checkout result table;Otherwise the simulation calculation of next website is carried out, until having traveled through in step 5 after all screenings Website;
Step 7:If result of calculation table remains as sky after step 6, trans-regional two are found by searching for shortest path Optimal 220kV cyclizations website.
Somewhere XY110kV website interconnection wiring diagrams are as shown in Figure 2.Under normal circumstances, it is supplied by HTC220kV power stations Electricity, and SY220kV is its extension wire, is connected by interconnection.
The identification of cyclization both sides division results, according to the result of Depth Priority Algorithm, from HTC220kV to SY220kV Shortest path is " HTC220kV ">“WH220kV”>“LX220kV”>“SZ220kV”>“JS220kV”>" SY220kV ", judge to tie Fruit:Run in different subregions.
The operating structure in the region is as shown in Figure 3.
The direct cyclizations of XY110kV and SY110kV are analyzed cyclization data, judge whether to disclosure satisfy that system by us first Parameter limits.
Data before and after cyclization are displayed in Table 1:
Data statistics before and after the XY110kV cyclizations of table 1
Known this area 110kV buses are based on LGJ-120/150 model cables, from result, if will The direct cyclizations of XY110kV-SY110kV, its trend have been over the 110kV capacities of trunk.Due to be before cyclization circuit it Between larger bus phase angle difference (- 6.1 °), therefore closed loop power flow has exceeded circuit maximum bearing value.Therefore the side of direct cyclization Case is undesirable.
2 various types of wire of table limits table
Shown in Fig. 3, XY110kV phase angles are less than SY110kV phase angles, can in XY110kV power supply website HTC220kV There was only TF110kV with the website produced, and SY220kV websites are not present can be transferred to website, so according to cyclization protocol procedures, Its operation is as follows:
1) TF110kV and WH110kV buses are connected
2) TF110kV and HTC110kV buses are disconnected
3) XY110kV and SY110kV buses are connected
4) XY110kV and HTC110kV buses are disconnected
Operating process is as shown in Figure 5 and Figure 6.
Data statistics before and after the XY110kV website cyclizations of table 3
Can be obtained by data in table 3, compared with the scheme of direct cyclization, new departure because TF110kV website loads transfer, XY110kV line bus phase angle and SY110kV bus phase angle differences narrow down to -4.1 ° from -6.1 °, so that closed loop power flow is from 99.8 + j24.2MVa have decreased to 67.8+j18.0MVa.Now closed loop power flow is within capacity of trunk allowed band.
Static security analysis is also through, it was demonstrated that the validity of this programme simultaneously.
Although preferred embodiments of the present invention have been described, but those skilled in the art once know basic creation Property concept, then can make other change and modification to these embodiments.So appended claims be intended to be construed to include it is excellent Select embodiment and fall into having altered and changing for the scope of the invention.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (7)

  1. A kind of 1. city 110kV power network cyclization methods based on transfer load method, it is characterised in that methods described includes:
    Step 1:Electric network data is read, the data generation based on reading includes the initial adjacency matrix of power network topology information;
    Step 2:Based on initial adjacency matrix, acquisition cyclization both sides 220kV access path, if its shortest path passes through 500kV Website, then judge it for partition running;Otherwise it is with region cyclization situation;
    Step 3:First time cyclization emulation testing is carried out, if storing this cyclization scheme into result of calculation table if;Otherwise Carry out step 4;
    Step 4:220kV transferable load site information in involutive ring both sides is identified, and site information is stored to site information In table;
    Step 5:According to the situation of cyclization both sides 220kV bus phase angles, website in result of calculation table is further screened, phase angle is big Side retain and may move into website, the small extensible website of once reservation of phase angle, the website after screen is total;
    Step 6:Iteration of simulations calculating is carried out one by one to the website of transferable load Loop Closing Operation, stored if by verification Into checkout result table;Otherwise the simulation calculation of next website is carried out, until having traveled through the station in step 5 after all screenings Point;
    Step 7:If result of calculation table remains as sky after step 6, by search for shortest path find trans-regional two it is optimal 220kV cyclization websites.
  2. 2. the city 110kV power network cyclization methods according to claim 1 based on transfer load method, it is characterised in that read Power taking network data, obtains power network 220kV substation datas, AC line data and has with power network 500kV transformer stations and directly electrically connect The 220kV transformer stations node number connect.
  3. 3. the city 110kV power network cyclization methods according to claim 1 based on transfer load method, it is characterised in that base In initial adjacency matrix, Depth Priority Algorithm acquisition cyclization both sides 220kV access path is used.
  4. 4. the city 110kV power network cyclization methods according to claim 1 based on transfer load method, it is characterised in that adopt It is identified with the transferable load site information of breadth-first search involutive ring both sides 220kV.
  5. 5. the city 110kV power network cyclization methods according to claim 1 based on transfer load method, it is characterised in that institute Stating step 7 also includes:First cyclization both sides are run into electromagnetic looped network, are carrying out 110kV Loop Closing Operations.
  6. 6. the city 110kV power network cyclization methods according to claim 3 based on transfer load method, it is characterised in that In the step 2, using Depth Priority Algorithm recognize the operation general layout of 500kV transformer stations, be specially:Obtain power network The adjacent relation matrix of 220kV websites;Using Depth Priority Algorithm obtain Current protocols number of partitions and its comprising 220kV websites.
  7. 7. the city 110kV power network cyclization methods according to claim 1 based on transfer load method, it is characterised in that step Rapid 3 and/or step 6 also include:By the way of PSASP software tool packs are called, static security is carried out to gained cyclization scheme Analysis and short circuit current verification, preserve the partition scheme that simultaneously output verification passes through.
CN201711114658.5A 2017-11-13 2017-11-13 A kind of city 110kV power network cyclization methods based on transfer load method Pending CN107834545A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711114658.5A CN107834545A (en) 2017-11-13 2017-11-13 A kind of city 110kV power network cyclization methods based on transfer load method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711114658.5A CN107834545A (en) 2017-11-13 2017-11-13 A kind of city 110kV power network cyclization methods based on transfer load method

Publications (1)

Publication Number Publication Date
CN107834545A true CN107834545A (en) 2018-03-23

Family

ID=61654218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711114658.5A Pending CN107834545A (en) 2017-11-13 2017-11-13 A kind of city 110kV power network cyclization methods based on transfer load method

Country Status (1)

Country Link
CN (1) CN107834545A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109004646A (en) * 2018-08-09 2018-12-14 国网山东省电力公司经济技术研究院 A kind of sub-area division algorithm based on architectural characteristic
CN109687439A (en) * 2018-12-25 2019-04-26 积成电子股份有限公司 A kind of quick calculation method of power transmission network Alloy White Iron
CN117498351A (en) * 2023-12-22 2024-02-02 成都天合一成科技服务有限公司 Full-model simulation system based on real-time data of power grid and used for loop closing control

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102842949A (en) * 2011-06-22 2012-12-26 北京市电力公司 System and method for selected tripping control of loop closing protection
CN105337301A (en) * 2014-08-12 2016-02-17 国家电网公司 Gird connection point selection method and device of microgrid

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102842949A (en) * 2011-06-22 2012-12-26 北京市电力公司 System and method for selected tripping control of loop closing protection
CN105337301A (en) * 2014-08-12 2016-02-17 国家电网公司 Gird connection point selection method and device of microgrid

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周维阳等: "《基于转移负荷法的城市电网合环》", 《电子技术与软件工程》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109004646A (en) * 2018-08-09 2018-12-14 国网山东省电力公司经济技术研究院 A kind of sub-area division algorithm based on architectural characteristic
CN109687439A (en) * 2018-12-25 2019-04-26 积成电子股份有限公司 A kind of quick calculation method of power transmission network Alloy White Iron
CN117498351A (en) * 2023-12-22 2024-02-02 成都天合一成科技服务有限公司 Full-model simulation system based on real-time data of power grid and used for loop closing control
CN117498351B (en) * 2023-12-22 2024-05-14 成都天合一成科技服务有限公司 Full-model simulation system based on real-time data of power grid and used for loop closing control

Similar Documents

Publication Publication Date Title
Guo et al. Allocation of centrally switched fault current limiters enabled by 5G in transmission system
Kashem et al. Network reconfiguration for enhancement of voltage stability in distribution networks
Zhu et al. Comprehensive weight method based on game theory for identify critical transmission lines in power system
CN101917001B (en) Fault sequencing method for on-line static security analysis of power system
CN102623975A (en) Method for generating current differential protection generalized node on basis of electric topology of regional distribution network
CN104466959A (en) Power system key line identification method and system
CN107769191A (en) key transmission cross-section automatic identifying method based on network topology and flow data
CN105184669B (en) A kind of city 220kV looped network partition method based on node collection GN splitting algorithm
CN107834545A (en) A kind of city 110kV power network cyclization methods based on transfer load method
CN106655169A (en) Path description-based N-1 security check method of power distribution network
CN112232382A (en) Method and system for identifying branch and ammeter membership of low-voltage transformer area
CN103529709B (en) Electric power system fault Union Switch Device model implementation method and system thereof
CN107017635A (en) A kind of adaptive islanding control method and system
CN109768544A (en) Area power grid load transfer method
Qi et al. Optimal planning of smart grid communication network for interregional wide-area monitoring protection and control system
CN107844667A (en) Automatic section searching method based on cut set searching algorithm
CN105139081A (en) Highly reliable planning method for contact points in power distribution system
CN105790263B (en) The 220kV cities looped network partition method of GN algorithms is improved based on backtracking thought
Hemmatpour et al. Efficient wind turbine generation planning for decreasing distribution system company payments in real applications
CN104698342B (en) A kind of electrical power distribution network fault location method based on load point state and path logic computing
Dong et al. A two-stage approach on island partitioning of power distribution networks with distributed generation
CN115765005A (en) Power grid partition optimization method considering short-circuit current and terminal
CN110232168A (en) Electrical coordinate system construction method, medium and equipment based on electrical distance
CN109839570A (en) A kind of multiterminal alternating current-direct current mixing power distribution network direct current high resistive fault detection method and device
Moarrefi et al. Reconfiguration and distributed generation (DG) placement considering critical system condition

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180323

RJ01 Rejection of invention patent application after publication