CN107840426A - The detention tank that a kind of sludge bucket can be taken off - Google Patents
The detention tank that a kind of sludge bucket can be taken off Download PDFInfo
- Publication number
- CN107840426A CN107840426A CN201711273231.XA CN201711273231A CN107840426A CN 107840426 A CN107840426 A CN 107840426A CN 201711273231 A CN201711273231 A CN 201711273231A CN 107840426 A CN107840426 A CN 107840426A
- Authority
- CN
- China
- Prior art keywords
- sludge
- sludge bucket
- lifting
- groove
- bucket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/52—Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
- C02F1/5281—Installations for water purification using chemical agents
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D21/00—Separation of suspended solid particles from liquids by sedimentation
- B01D21/02—Settling tanks with single outlets for the separated liquid
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D21/00—Separation of suspended solid particles from liquids by sedimentation
- B01D21/24—Feed or discharge mechanisms for settling tanks
- B01D21/245—Discharge mechanisms for the sediments
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F2001/007—Processes including a sedimentation step
Abstract
The invention discloses the detention tank that a kind of sludge bucket can be taken off, including sedimentation basin body, sludge bucket lowering or hoisting gear, some sludge buckets and sludge bucket unloading dolly;Sludge bucket includes upper sludge bucket and lower sludge bucket;If dewatered sludge via is formed in upper sludge bucket;The inside of lower sludge bucket forms some closing posts coordinated with sludge via;Upper sludge bucket sleeve is in lower sludge bucket and both OQ ts are set;When upper sludge bucket and lower sludge bucket near when, closing post closing sludge via;When upper sludge bucket and lower sludge bucket farthest away from when, closing post departs from sludge via;Upper sludge bucket lifting is arranged on the front-rear side walls and lifting extension group of precipitation chamber;When upper sludge bucket is in the top, upper sludge bucket can depart from lifting extension group from left to right.The present invention is cleared up without manually arriving detention tank bottom, avoids the danger during this, and sludge bucket is convenient to remove, and sludge cleaning is convenient thoroughly, is easy to the collection and transport of follow-up sludge.
Description
Technical field
The present invention relates to sewage treatment area, and in particular to the detention tank that a kind of sludge bucket can be taken off.
Background technology
Sewage disposal is to make the mistake that sewage reaches a certain water body of draining or the water quality requirement that reuses is purified to it
Journey.It is each that sewage disposal is widely used in building, agricultural, traffic, the energy, petrochemical industry, environmental protection, urban landscape, medical treatment, food and drink etc.
Field, the daily life of common people is also come into more and more.
Substantial amounts of sewage is often produced in plant produced, if be directly discharged in river, easily causes larger pollution,
So needing to handle sewage before sewage discharge, generally require to use detention tank in sewage disposal process, it is existing
Detention tank it is complex when removing base sludge, it is necessary to which artificially lower cleaned to sedimentation basin bottom, due to bottom
Various harmful substances are flooded with, this all process have potential dangerous;And the collection and transport of follow-up sludge are very not yet
It is convenient.
The content of the invention
The purpose of the present invention be in view of the shortcomings of the prior art, provide the detention tank that a kind of sludge bucket can be taken off, including
Sedimentation basin body, sludge bucket lowering or hoisting gear, some sludge buckets and sludge bucket unloading dolly;Sedimentation basin body forms for upper surface
The cuboid of the precipitation chamber of rectangle and inlay on the ground;The left side wall top of precipitation chamber forms charging aperture, on left side wall
Portion forms gap;Precipitate and form the rectangular-shaped resettlement groove that some left and right directions are uniformly arranged on the bottom surface of chamber;Placement
The bottom center of groove forms the water-carrying groove of rectangle;The bottom of sedimentation basin body forms the water falling groove of rectangle channel-shaped;Water-carrying groove
Positioned at the top of water falling groove and both connections;The left and right sidewall bottom of water falling groove forms drainpipe;Sedimentation basin body it is upper
The equally distributed lifting extension group in some left and right is formed on end face;Lifting extension group includes symmetrical lifting extension before and after a pair
Plate and a pair of lifting extension boards respectively positioned at sedimentation basin body front-rear side walls upper surface on;Sludge bucket includes upper sludge bucket
With lower sludge bucket;If the dewatered sludge via being vertically arranged is formed in upper sludge bucket;The inside of lower sludge bucket form it is some with
The closing post that sludge via coordinates;Upper sludge bucket sleeve is in lower sludge bucket and both OQ ts are set;Lower sludge bucket with
Resettlement groove coordinates;Some upper taps are formed on the lower surface of lower sludge bucket;When upper sludge bucket and lower sludge bucket near when,
Close post closing sludge via;When upper sludge bucket and lower sludge bucket farthest away from when, closing post departs from sludge via;Upper sludge bucket liter
Drop is arranged on the front-rear side walls and lifting extension group of precipitation chamber;When upper sludge bucket is in the top, upper sludge bucket can be from a left side
Depart from lifting extension group to the right;Sludge bucket unloading dolly fore-and-aft direction is set and across on sedimentation basin body;Sludge bucket unloads
Load dolly or so, which slides, to be arranged on the upper surface of sedimentation basin body.
As the preferred of above-mentioned technical proposal, upper sludge bucket by top the level board of rectangle and the rectangular funnel shape of bottom
Pars infundibularis;When upper sludge bucket is in bottom, level board or so mutually contradicts;The level board combination of all upper sludge buckets
The size of rectangular slab is equal sized with the bottom surface of precipitation chamber;The upper surface of the level board of upper sludge bucket is formed under cross section is in
The upper groove of the narrow wide isosceles trapezoid shape and rectangle sideline of the upper end open of upper groove overlaps with the sideline of level board;On
The low groove of rectangular funnel shape is formed on the bottom surface of groove;The sludge via upper end of both sides connects with upper groove;The dirt at center
Mud via upper end connects with low groove;The lower surface of level board forms rectangular box-like upper plate;Lower sludge bucket is upper surface
Form rectangular-shaped lower accommodating cavity;The upper surface of lower sludge bucket forms rectangular box-like lifting stopper slot;Upper plate is vertical
Lifting is arranged in lifting stopper slot;Some upper taps run through up and down are formed in the lower wall of lower accommodating cavity;Close post
It is arranged on straight up in the lower wall of lower accommodating cavity.
As the preferred of above-mentioned technical proposal, some guide rods are uniformly formed on the lower surface of upper plate;Guide rod vertically to
Under through lifting stopper slot lower wall and lower end of the guide rod be bolted with stop nut;It is molded at left and right sides of the lower wall of resettlement groove
There is the escape groove with guide rod and stop nut cooperation.
As the preferred of above-mentioned technical proposal, the front-rear side walls for precipitating chamber form the lifting of some rectangle channel-shaped respectively
Groove;Lifting groove is vertically up to lift on extension board;The front/rear end on the top of upper sludge bucket is respectively arranged with cuboid
The lifting supporting plate of shape;Lifting is provided with support frame in lifting groove;A pair of supporting forms a pair respectively on relative end face
The supporting part being distributed up and down;Gap and the width on the above-below direction of lifting supporting plate between the supporting part of about a pair distributions
It is equal;The left and right width for lifting supporting plate is equal with the left and right width of lifting groove;Liter is articulated between the top and bottom sidewall of lifting groove
Drop driving threaded rod;The rear portion of supporting part is screwed onto on lifting driving threaded rod;Lift and be fixed with liter on the upper surface of extension board
Motor drops;The output shaft for lifting motor is fixedly connected with the upper end of lifting driving threaded rod;The top of lifting groove
Left and right sidewall forms the releasing slots for the rectangle that left and right is run through respectively;The width of the above-below direction of releasing slots and lifting supporting plate
The width of above-below direction is equal.
As the preferred of above-mentioned technical proposal, when supporting part is in most significant end, supporting plate face releasing slots are lifted.
As the preferred of above-mentioned technical proposal, sludge bucket unloading dolly includes the vehicle frame of L-type;It is molded on the lower surface of vehicle frame
There is the roller supporting groove of rectangle channel-shaped;The rolling that some left and right are uniformly arranged is separately installed with the front-rear side walls of roller supporting groove
Wheel;The guide-rail plate of the rectangle of left and right directions setting is formed on the upper surface of the front-rear side walls of sedimentation basin body respectively;Lead for a pair
Rail plate is positioned at the inner side of a pair of lifting extension boards;The guide rail of the annulus channel-shaped coordinated with guide-rail plate is formed on the surface of roller
Groove.
The beneficial effects of the present invention are:It is cleared up without manually arriving detention tank bottom, avoids this process
In danger, sludge bucket is convenient to remove, sludge cleaning it is convenient thoroughly, be easy to the collection and transport of follow-up sludge.
Brief description of the drawings
Fig. 1 is the structural representation of the section of the present invention;
Fig. 2 is the structural representation of the section of the sludge bucket 30 of the present invention.
In figure, 10, sedimentation basin body;100th, chamber is precipitated;101st, resettlement groove;102nd, water-carrying groove;103rd, escape groove;104th, fall
Tank;105th, drainpipe;106th, charging aperture;107th, gap;108th, lifting groove;109th, releasing slots;11st, extension board is lifted;12、
Guide-rail plate;20th, sludge bucket lowering or hoisting gear;21st, motor is lifted;22nd, lifting driving threaded rod;23rd, supporting part;30th, sludge
Bucket;31st, upper sludge bucket;311st, level board;312nd, pars infundibularis;313rd, upper groove;314th, low groove;315th, sludge via;32nd, under
Sludge bucket;320th, lower accommodating cavity;322nd, stopper slot is lifted;323rd, post is closed;40th, sludge bucket unloading dolly;41st, vehicle frame;410、
Roller supporting groove;411st, roller.
Embodiment
As shown in Figure 1 and Figure 2, the detention tank that a kind of sludge bucket can be taken off, including sedimentation basin body 10, sludge bucket liter
Falling unit 20, some sludge buckets 30 and sludge bucket unloading dolly 40;Sedimentation basin body 10 is the precipitation that upper surface forms rectangle
The cuboid of chamber 100 and inlay on the ground;The left side wall top of precipitation chamber 100 forms charging aperture 106, left side wall top
Form gap 107;Precipitate and form the rectangular-shaped resettlement groove that some left and right directions are uniformly arranged on the bottom surface of chamber 100
101;The bottom center of resettlement groove 101 forms the water-carrying groove 102 of rectangle;The bottom of sedimentation basin body 10 forms rectangle channel-shaped
Water falling groove 104;Water-carrying groove 102 is located at the top of water falling groove 104 and both connections;The left and right sidewall bottom of water falling groove 104
Form drainpipe 105;The equally distributed lifting extension group in some left and right is formed on the upper surface of sedimentation basin body 10;Lifting
Extension group symmetrically lifts extension board 11 before and after including a pair and a pair of lifting extension boards 11 are located at sedimentation basin body 19 respectively
Front-rear side walls upper surface on;Sludge bucket 30 includes upper sludge bucket 31 and lower sludge bucket 32;Formed in upper sludge bucket 31 perpendicular
If the dewatered sludge via 315 directly set;The inside of lower sludge bucket 32 forms some closing posts coordinated with sludge via 315
323;The upper sleeve of sludge bucket 31 is in lower sludge bucket 32 and both OQ ts are set;Lower sludge bucket 32 is matched somebody with somebody with resettlement groove 101
Close;Some upper taps are formed on the lower surface of lower sludge bucket 32;When upper sludge bucket 31 and lower sludge bucket 32 near when, envelope
Close post 323 and close sludge via 315;When upper sludge bucket 31 and lower sludge bucket 32 farthest away from when, closing post 323 departs from sludge via
315;Upper sludge bucket 31 is lifted on the front-rear side walls for being arranged on precipitation chamber 100 and lifting extension group;When upper sludge bucket 31 is in most
During upper end, upper sludge bucket 31 can depart from lifting extension group from left to right;Sludge bucket unloading dolly 40 fore-and-aft direction is set and horizontal stroke
Across on sedimentation basin body 10;Sludge bucket unloading dolly 40 or so, which slides, to be arranged on the upper surface of sedimentation basin body 10.
As shown in Figure 1 and Figure 2, upper sludge bucket 31 by top rectangle level board 311 and bottom rectangular funnel shape leakage
Pan 312;When upper sludge bucket 31 is in bottom, level board 311 or so mutually contradicts;The level board of all upper sludge buckets 31
The size of the rectangular slab of 311 combinations is equal sized with the bottom surface of precipitation chamber 100;The upper end of the level board 311 of upper sludge bucket 31
Face forms the upper groove 313 of narrow wide isosceles trapezoid shape and the rectangle of the upper end open of upper groove 313 under cross section is in
Sideline overlaps with the sideline of level board 311;The low groove 314 of rectangular funnel shape is formed on the bottom surface of upper groove 313;Both sides
The upper end of sludge via 315 connects with upper groove 313;The upper end of sludge via 315 at center connects with low groove 314;Level board 311
Lower surface form rectangular box-like upper plate 316;Lower sludge bucket 32 is that upper surface forms rectangular-shaped lower accommodating cavity
320;The upper surface of lower sludge bucket 32 forms rectangular box-like lifting stopper slot 322;The upper vertical lifting of plate 316 is arranged on liter
Drop in stopper slot 322;Some upper taps run through up and down are formed in the lower wall of lower accommodating cavity 320;It is vertical to close post 323
Set up in the lower wall of lower accommodating cavity 320.
As shown in Figure 1 and Figure 2, some guide rods 317 are uniformly formed on the lower surface of upper plate 316;Guide rod 317 vertically to
Under through lifting stopper slot 322 lower wall and the lower end of guide rod 317 be bolted with stop nut 318;The lower wall of resettlement groove 101
The left and right sides forms the escape groove 103 with guide rod 317 and the cooperation of stop nut 318.
As shown in Figure 1 and Figure 2, the front-rear side walls for precipitating chamber 100 form the lifting groove 108 of some rectangle channel-shaped respectively;Rise
Drop groove 108 is vertically up to lift on extension board 11;The front/rear end on the top of upper sludge bucket 31 is respectively arranged with rectangular
The lifting supporting plate of body shape;Lifting is provided with support frame 23 in lifting groove 108;A pair of supporting 23 relative to end face on respectively into
Type has the supporting part of about a pair distributions;Gap and the above-below direction of lifting supporting plate between the supporting part of about a pair distributions
On width it is equal;The left and right width for lifting supporting plate is equal with the left and right width of lifting groove 108;The upper and lower sides of lifting groove 108
Lifting driving threaded rod 22 is articulated between wall;The rear portion of supporting part 23 is screwed onto on lifting driving threaded rod 22;Lifting extension
Lifting motor 21 is fixed with the upper surface of plate 11;Lift the output shaft and lifting driving threaded rod 22 of motor 21
Upper end is fixedly connected;The left and right sidewall on the top of lifting groove 108 forms the releasing slots 109 for the rectangle that left and right is run through respectively;It is de-
Width from the above-below direction of groove 109 is equal with the width of the above-below direction of lifting supporting plate.
As shown in Figure 1 and Figure 2, when supporting part 23 is in most significant end, lifting supporting plate face releasing slots 109.
As shown in Figure 1 and Figure 2, sludge bucket unloading dolly 40 includes the vehicle frame 41 of L-type;Formed on the lower surface of vehicle frame 41
The roller supporting groove 410 of rectangle channel-shaped;It is separately installed with what some left and right were uniformly arranged on the front-rear side walls of roller supporting groove 410
Roller 411;The guide-rail plate of the rectangle of left and right directions setting is formed on the upper surface of the front-rear side walls of sedimentation basin body 10 respectively
12;A pair of guide rails plate 12 is positioned at the inner side of a pair of lifting extension boards 11;Form on the surface of roller 411 and coordinate with guide-rail plate 12
Annulus channel-shaped guide groove.
The operation principle for the detention tank that sludge bucket can be taken off:
During precipitation, water is full of in sedimentation basin body 10, and enters sewage from the certain speed of water inlet 106, is thrown at regular time and quantity
Precipitating reagent is spread into sewage, the dirt in sewage starts to be deposited in sludge bucket 31;
Timed collection sludge:Upper sludge bucket 31 moves upwardly away from lower sludge bucket 32, so closes post 323 and departs from sludge mistake
Hole 315, such current flow downward, and the sludge so deposited together enters lower accommodating cavity with current by sludge via 315
In 320,31 downward return of sludge bucket is then gone up, so descending the reclaimed water of accommodating cavity 320, sludge retention is in lower accommodating cavity by tap
320, this action timing for collecting sludge is carried out once, the sludge in the effective upper sludge bucket 31 of cleaning;
When clearing up sludge, the collection sludge action of above-mentioned principle is first passed around, is then discharged out in sedimentation basin body 10
Sewage, then sludge bucket 30 rise to most significant end, then sludge bucket unloading dolly 40 slide from left to right, such sludge bucket 30 from
Open a pair of lifting extension boards 11 and as sludge bucket unloading dolly 40 transports subsequent processing, such sludge cleaning is convenient thorough
Bottom, it is easy to the collection and transport of follow-up sludge.
Above content is only the better embodiment of the present invention, for one of ordinary skill in the art, according to the present invention
Thought, there will be changes, this specification content should not be construed as to this hair in specific embodiments and applications
Bright limitation.
Claims (6)
- A kind of 1. detention tank that sludge bucket can be taken off, it is characterised in that:Including sedimentation basin body (10), sludge bucket lifting dress Put (20), some sludge buckets (30) and sludge bucket unloading dolly (40);Sedimentation basin body (10) is that upper surface forms rectangle Precipitate the cuboid of chamber (100) and inlay on the ground;Precipitation chamber (100) left side wall top form charging aperture (106), Left side wall top forms gap (107);The square that some left and right directions are uniformly arranged is formed on the bottom surface of precipitation chamber (100) The resettlement groove (101) of shape;The bottom center of resettlement groove (101) forms the water-carrying groove (102) of rectangle;Sedimentation basin body (10) Bottom form the water falling groove (104) of rectangle channel-shaped;Water-carrying groove (102) is located at the top of water falling groove (104) and both connect It is logical;The left and right sidewall bottom of water falling groove (104) forms drainpipe (105);Formed on the upper surface of sedimentation basin body (10) Some equally distributed lifting extension groups in left and right;Lifting extension group includes symmetrical lifting extension board (11) and one before and after a pair Lifting extension board (11) is located at respectively on the upper surface of the front-rear side walls of sedimentation basin body (19);Sludge bucket (30) includes upper dirt Bucket (31) and lower sludge bucket (32);Upper sludge bucket (31) is if interior form the dewatered sludge via (315) being vertically arranged;Lower sludge The inside of bucket (32) forms some closing posts (323) coordinated with sludge via (315);Upper sludge bucket (31) sleeve is in lower dirt In bucket (32) and both OQ ts are set;Lower sludge bucket (32) coordinates with resettlement groove (101);Under lower sludge bucket (32) Some upper taps are formed on end face;When upper sludge bucket (31) and lower sludge bucket (32) near when, closing post (323) closing Sludge via (315);When upper sludge bucket (31) and lower sludge bucket (32) farthest away from when, closing post (323) departs from sludge via (315);Upper sludge bucket (31) lifting is arranged on the front-rear side walls and lifting extension group of precipitation chamber (100);When upper sludge bucket (31) when being in the top, upper sludge bucket (31) can depart from lifting extension group from left to right;Sludge bucket unloading dolly (40) is front and rear Direction sets and across on sedimentation basin body (10);Sludge bucket unloading dolly (40) left and right, which is slided, is arranged on sedimentation basin body (10) on upper surface.
- 2. the detention tank that a kind of sludge bucket according to claim 1 can be taken off, it is characterised in that:Upper sludge bucket (31) By the rectangle on top level board (311) and bottom rectangular funnel shape pars infundibularis (312);When upper sludge bucket (31) is in most During lower end, level board (311) left and right mutually contradicts;The chi of the rectangular slab of level board (311) combination of all upper sludge buckets (31) It is very little equal sized with the bottom surface of precipitation chamber (100);The upper surface of the level board (311) of upper sludge bucket (31) forms cross section The rectangle sideline of the upper groove (313) of narrow wide isosceles trapezoid shape and the upper end open of upper groove (313) and level under being in The sideline of plate (311) overlaps;The low groove (314) of rectangular funnel shape is formed on the bottom surface of upper groove (313);The sludge of both sides Via (315) upper end connects with upper groove (313);Sludge via (315) upper end at center connects with low groove (314);It is horizontal The lower surface of plate (311) forms rectangular box-like upper plate (316);Lower sludge bucket (32) forms rectangular-shaped for upper surface Lower accommodating cavity (320);The upper surface of lower sludge bucket (32) forms rectangular box-like lifting stopper slot (322);Upper plate (316) Vertical lifting is arranged in lifting stopper slot (322);Formed in the lower wall of lower accommodating cavity (320) and run through upper above and below some Tap;Closing post (323) is arranged in the lower wall of lower accommodating cavity (320) straight up.
- 3. the detention tank that a kind of sludge bucket according to claim 2 can be taken off, it is characterised in that:Upper plate (316) Lower surface on uniformly form some guide rods (317);Guide rod (317) is straight down through the downside of lifting stopper slot (322) Wall and guide rod (317) lower end is bolted with stop nut (318);Form and lead at left and right sides of the lower wall of resettlement groove (101) The escape groove (103) that bar (317) and stop nut (318) coordinate.
- 4. the detention tank that a kind of sludge bucket according to claim 1 can be taken off, it is characterised in that:Precipitate chamber (100) Front-rear side walls form the lifting grooves (108) of some rectangle channel-shaped respectively;Lifting groove (108) is vertically up to lifting and prolonged Stretch on plate (11);The front/rear end on the top of upper sludge bucket (31) is respectively arranged with the lifting supporting plate of rectangular-shape;Lifting groove (108) lifting is provided with support frame (23) in;About a pair distributions are formed on the relative end face of a pair of supporting (23) respectively Supporting part;Width between the supporting part of about a pair distributions on above-below direction of the gap with lifting supporting plate is equal;Rise The left and right width of descending branch fagging is equal with the left and right width of lifting groove (108);It is articulated between the top and bottom sidewall of lifting groove (108) Lifting driving threaded rod (22);The rear portion of supporting part (23) is screwed onto on lifting driving threaded rod (22);Lift extension board (11) Upper surface on be fixed with lifting motor (21);Lift the output shaft and lifting driving threaded rod (22) of motor (21) Upper end be fixedly connected;The left and right sidewall on the top of lifting groove (108) forms the releasing slots for the rectangle that left and right is run through respectively (109);The width of above-below direction of the width of the above-below direction of releasing slots (109) with lifting supporting plate is equal.
- 5. the detention tank that a kind of sludge bucket according to claim 4 can be taken off, it is characterised in that:When supporting part (23) During in most significant end, supporting plate face releasing slots (109) are lifted.
- 6. the detention tank that a kind of sludge bucket according to claim 1 can be taken off, it is characterised in that:Sludge bucket unloading is small Car (40) includes the vehicle frame 41 of L-type;The roller supporting groove (410) of rectangle channel-shaped is formed on the lower surface of vehicle frame 41;Roller branch The roller (411) that some left and right are uniformly arranged is separately installed with the front-rear side walls of support groove (410);Before sedimentation basin body (10) The guide-rail plate (12) of the rectangle of left and right directions setting is formed on the upper surface of rear wall respectively;A pair of guide rails plate (12) is located at one To the inner side of lifting extension board (11);The annulus channel-shaped coordinated with guide-rail plate (12) is formed on the surface of roller (411) to lead Track slot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711273231.XA CN107840426A (en) | 2017-12-06 | 2017-12-06 | The detention tank that a kind of sludge bucket can be taken off |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711273231.XA CN107840426A (en) | 2017-12-06 | 2017-12-06 | The detention tank that a kind of sludge bucket can be taken off |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107840426A true CN107840426A (en) | 2018-03-27 |
Family
ID=61663695
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711273231.XA Pending CN107840426A (en) | 2017-12-06 | 2017-12-06 | The detention tank that a kind of sludge bucket can be taken off |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107840426A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109824224A (en) * | 2019-03-15 | 2019-05-31 | 苏州耀水源环境科技有限公司 | A kind of Treatment of Sludge device convenient for closing fermentation |
CN110898470A (en) * | 2019-12-11 | 2020-03-24 | 重庆尚泽源环保科技有限公司 | Sewage treatment water floating mud scraping device |
CN114291895A (en) * | 2021-12-31 | 2022-04-08 | 中山市高平织染水处理有限公司 | Sludge discharge device and process for hydrolysis acidification tank |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS53107154A (en) * | 1977-03-01 | 1978-09-18 | Sakurada Iron Works | Precipitate scraper |
CN204034337U (en) * | 2014-09-03 | 2014-12-24 | 吴堂军 | A kind of sedimentation basin |
CN204952376U (en) * | 2015-08-18 | 2016-01-13 | 淮沪电力有限公司 | Dirty water sedimentation bottom of pool negative pressure waste fitting discharging of portion |
CN205323300U (en) * | 2016-01-31 | 2016-06-22 | 王斌 | Hydraulic engineering multibuchet advection formula sedimentation tank |
CN205495045U (en) * | 2016-03-07 | 2016-08-24 | 赵伟根 | Novel twin -tub is handled just heavy chi fuzhajing and is promoted device |
-
2017
- 2017-12-06 CN CN201711273231.XA patent/CN107840426A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS53107154A (en) * | 1977-03-01 | 1978-09-18 | Sakurada Iron Works | Precipitate scraper |
CN204034337U (en) * | 2014-09-03 | 2014-12-24 | 吴堂军 | A kind of sedimentation basin |
CN204952376U (en) * | 2015-08-18 | 2016-01-13 | 淮沪电力有限公司 | Dirty water sedimentation bottom of pool negative pressure waste fitting discharging of portion |
CN205323300U (en) * | 2016-01-31 | 2016-06-22 | 王斌 | Hydraulic engineering multibuchet advection formula sedimentation tank |
CN205495045U (en) * | 2016-03-07 | 2016-08-24 | 赵伟根 | Novel twin -tub is handled just heavy chi fuzhajing and is promoted device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109824224A (en) * | 2019-03-15 | 2019-05-31 | 苏州耀水源环境科技有限公司 | A kind of Treatment of Sludge device convenient for closing fermentation |
CN110898470A (en) * | 2019-12-11 | 2020-03-24 | 重庆尚泽源环保科技有限公司 | Sewage treatment water floating mud scraping device |
CN110898470B (en) * | 2019-12-11 | 2021-08-27 | 重庆尚泽源环保科技有限公司 | Sewage treatment water floating mud scraping device |
CN114291895A (en) * | 2021-12-31 | 2022-04-08 | 中山市高平织染水处理有限公司 | Sludge discharge device and process for hydrolysis acidification tank |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107840426A (en) | The detention tank that a kind of sludge bucket can be taken off | |
CN105498313A (en) | Dross removing device | |
CN209361923U (en) | A kind of pool bottom sludge cleaning plant | |
CN204563771U (en) | Tandem sewage sedimentation tank | |
CN208824000U (en) | A kind of overflow settling tank | |
CN205699618U (en) | Sewage disposal subsider | |
CN208648957U (en) | A kind of spraying sewage-treatment plant | |
CN203281084U (en) | Anti-blocking precipitator | |
CN104941279B (en) | A kind of bionic type cyanophyceae enrichment removing equipment and pulling flow type algae-removing method | |
CN206955843U (en) | Oil conte, sewage treatment device | |
CN207632577U (en) | A kind of high-efficient vertical flow settling pond | |
CN215480166U (en) | Sewage treatment device | |
CN2444935Y (en) | Oil water separation device | |
CN107837569A (en) | A kind of detention tank with sludge device for transferring | |
CN107837568A (en) | A kind of detention tank of post rod type drainage | |
CN209188197U (en) | A kind of waste water station alkalinity primary sedimentation tank with water nozzle cleaning plant | |
CN114772696A (en) | Sewage precipitation separation processing apparatus | |
CN207253891U (en) | A kind of multistage filtering cell system that can fully recycle glass powder | |
DE10053730B4 (en) | Clear water withdrawal means | |
CN209685492U (en) | Car-washing sewage circulating treating system | |
CN207575862U (en) | A kind of concrete sewage sedimentation basin convenient for scavenger precipitation object | |
CN207581528U (en) | A kind of environment-protection wastewater recycling and processing device | |
CN208660455U (en) | A kind of removing impurity by means of precipitation pond | |
CN108245940A (en) | A kind of settling tank in sanitary sewage disposal | |
KR101227333B1 (en) | Nonpoint source pollution removal system using buoyancy rising floodgatet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180327 |
|
RJ01 | Rejection of invention patent application after publication |