CN107834548A - 一种含新能源的电网的n‑1校验方法 - Google Patents

一种含新能源的电网的n‑1校验方法 Download PDF

Info

Publication number
CN107834548A
CN107834548A CN201711130620.7A CN201711130620A CN107834548A CN 107834548 A CN107834548 A CN 107834548A CN 201711130620 A CN201711130620 A CN 201711130620A CN 107834548 A CN107834548 A CN 107834548A
Authority
CN
China
Prior art keywords
line
power grid
new energy
load shedding
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711130620.7A
Other languages
English (en)
Other versions
CN107834548B (zh
Inventor
卢斯煜
周保荣
姚文峰
王彤
李琳玮
赵文猛
王滔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China South Power Grid International Co ltd
Original Assignee
China South Power Grid International Co ltd
Power Grid Technology Research Center of China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China South Power Grid International Co ltd, Power Grid Technology Research Center of China Southern Power Grid Co Ltd filed Critical China South Power Grid International Co ltd
Priority to CN201711130620.7A priority Critical patent/CN107834548B/zh
Publication of CN107834548A publication Critical patent/CN107834548A/zh
Application granted granted Critical
Publication of CN107834548B publication Critical patent/CN107834548B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/382
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明提供了一种含新能源的电网的N‑1校验方法,涉及电力电网技术领域,能够减小含新能源的电网的N‑1校验的计算工作量,提高计算速度。其中所述方法包括:建立新能源发电场景;对每一个新能源发电场景,建立电网线路安全敏感性标量函数PI;计算每条线路的PI值,并按照PI值由大到小的顺序对线路进行排序;依序断开单一线路,进行断开后的切负荷量计算,直至某条线路断开不会引起切负荷为止,或者直至连续M条线路断开均不会引起切负荷为止。上述方法应用于对电网线路的N‑1校验中。

Description

一种含新能源的电网的N-1校验方法
技术领域
本发明涉及电力电网技术领域,尤其涉及一种含新能源的电网的N-1校验方法。
背景技术
电力工业是我国化石能源消耗的重要行业,其CO2排放量已经占全国总排放量的38.76%,电力工业的发展将面临着清洁化、高效化、低碳化的巨大压力。在新的发展模式下,风电、光伏等清洁低碳的新电源将得到更广阔的发展空间,而如何最大限度的实现对新能源的利用,将是实现电力工业低碳化的关键技术。
目前,风电、光伏等新能源的大规模并网,其发电出力的随机性、间歇性和波动性,给电网的运行和规划工作带来巨大的挑战。在电网规划中,需要对全部线路进行N-1校验,以检验线路是否符合N-1原则。所谓N-1原则是指判定电网系统安全性的一种准则,按照这一准则,电网系统的N条输电线路发生故障而被切除后,应不造成因其他线路过负荷跳闸而导致用户停电,且不破坏系统的稳定性,不出现电压崩溃等事故。
进行N-1校验需要对电网网络进行N次断线分析,对实际电网系统而言,计算工作量很大,尤其是考虑新能源之后,发电场景将不断增加,进一步增加计算工作量,降低计算速度。
发明内容
针对上述现有技术中的问题,本发明提供一种含新能源的电网的N-1校验方法,以减小含新能源的电网的N-1校验的计算工作量,提高计算速度。
为达到上述目的,本发明采用如下技术方案:
本发明提供了含新能源的电网的N-1校验方法,所述N-1校验方法包括以下步骤:
S1:建立新能源发电场景;
S2:对每一个新能源发电场景,建立电网线路安全敏感性标量函数PI:
其中,pk为电网网络无故障情况下线路k的潮流;为电网网络N-1情况下线路的潮流;pkmax为线路k的容量上限;NL为线路总数;
S3:计算每条线路的PI值,并按照PI值由大到小的顺序对线路进行排序;
S4:依序断开单一线路,进行断开后的切负荷量计算,直至某条线路断开不会引起切负荷为止,或者直至连续M条线路断开均不会引起切负荷为止;其中,1<M<NL。
在本发明所提供的含新能源的电网的N-1校验方法中,在对电网作断线分析时,依线路PI值由大到小的顺序断开线路进行切负荷量计算,直至某条线路或者连续M条线路断开不会引起切负荷,停止计算。由于排在该线路以后的线路的PI值小于该线路的PI值,而电网线路安全敏感性标量函数PI反映的是不同新能源场景下各线路故障对系统安全性的影响程度,因此排在该线路以后的线路断开也不会引起切负荷,即符合N-1原则,可以不必进行N-1校验的计算,从而减小了含新能源的电网的N-1校验的计算工作量,提高了计算速度。
并且,当连续M条线路断开不会引起切负荷时才停止切负荷量的计算,能够减小个别线路断开后会引起切负荷,但由于其PI值很小,但却没有计算到所引起误差,从而在保证了校验准确度的基础上,减小了校验的计算量。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它的附图。
图1为本发明实施例所提供的N-1校验方法的第一种流程图;
图2为本发明实施例所提供的N-1校验方法的第二种流程图。
具体实施方式
为使本发明的上述目的、特征和优点能够更加明显易懂,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述。显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动的前提下所获得的所有其它实施例,均属于本发明保护的范围。
请参见图1和图2,本发明的实施例提供一种含新能源的电网的N-1校验方法,该N-1校验方法包括以下步骤:
S1:建立新能源发电场景。
在步骤S1中,可根据新能源历史发电数据,选取典型发电场景N。
S2:对每一个新能源发电场景,建立电网线路安全敏感性标量函数PI:
其中,pk为电网网络无故障情况下线路k的潮流;
为电网网络N-1情况下线路的潮流;
pkmax为线路k的容量上限;
NL为线路总数。
在步骤S2中,所建立的电网线路安全敏感性标量函数PI能够反映不同新能源场景下各线路故障对系统安全性的影响程度。
为了方便线路PI值的计算,优选的,可在建立电网线路安全敏感性标量函数PI后,利用电网网络无故障情况下潮流计算结果,对公式1进行推导,得到如下公式:
其中,Bk为线路k电抗的倒数;
φk为线路k首末节点角度差;
γk=θTωXek,θT为节点电压角度矩阵的转置,ω为由线路电抗和线路容量的乘积平方后的倒数形成的对角矩阵,X为仅含电抗的阻抗矩阵,ek为线路k首末电压差矩阵;
为线路k首末电压差矩阵的转置;
ωk为由线路k电抗和线路k容量的乘积平方后的倒数形成的对角矩阵;
χk为仅含电抗的阻抗矩阵中的元素。
由公式1推导得到公式2的过程为:
公式1中第一部分,
公式1中第二部分,
从而第一部分与第二部分相加得到公式2。
S3:计算每条线路的PI值,并按照PI值由大到小的顺序对线路进行排序。
在步骤S3中,可依序(即按照PI值由大到小的顺序)对排序后的线路进行编号:L1、L2、…、LNL。所得到的排序也可视为各线路故障对系统安全性的影响程度的排序。
S4:对电网作断线分析。依序断开单一线路,进行断开后的切负荷量计算,直至某条线路断开不会引起切负荷为止,或者直至连续M条线路断开均不会引起切负荷为止。其中,1<M<NL。
上述步骤S4包括两种方案:
方案一:请参见图1,按照L1、L2、…、LNL的顺序依次断开单一线路,进行断开后的切负荷量计算,根据计算结果判断对应线路的断开是否会引起切负荷。如果对应线路的断开是会引起切负荷,则继续下一线路断开后的切负荷量计算。如果对应线路的断开不会引起切负荷,说明该线路故障对系统安全性的影响程度较小,不会造成其他线路过负荷,不会破坏系统的稳定性,那么由于排在该线路之后的线路其PI值更小,即线路若发生故障对系统安全性的影响程度更小,因此排在该线路之后的线路的断开也是不会引起切负荷的,也就是说,排在该线路之后的线路符合N-1原则,因此可以不必再对排在该线路之后的线路进行断开后的切负荷量计算,从而减小了含新能源的电网的N-1校验的计算工作量,提高了计算速度。
方案二:请参见图2,按照L1、L2、…、LNL的顺序依次断开单一线路,进行断开后的切负荷量计算,根据计算结果判断对应线路的断开是否会引起切负荷。如果对应线路的断开是会引起切负荷,则继续下一线路断开后的切负荷量计算。如果对应线路的断开不会引起切负荷,说明该线路故障对系统安全性的影响程度较小,不会造成其他线路过负荷,不会破坏系统的稳定性,此时继续下一线路断开后的切负荷量计算,如果连续M(1<M<NL)条线路的断开均不会引起切负荷,那么由于排在该连续M条线路之后的线路其PI值更小,即线路若发生故障对系统安全性的影响程度更小,因此排在该连续M条线路之后的线路的断开也是不会引起切负荷的,也就是说,排在该连续M条线路之后的线路符合N-1原则,因此可以不必再对排在该连续M条线路之后的线路进行断开后的切负荷量计算,从而减小了含新能源的电网的N-1校验的计算工作量,提高了计算速度。
需要指出的是,在本实施例所提供的N-1校验方法中,主要是利用PI值的大小来判断是否进行线路断开后的切负荷量计算,但是这样可能会存在一定的“遮蔽”现象。例如可能存在个别线路断开后会导致切负荷,但由于其PI值很小,却没有计算。为了减小本实施例所提供的方法的误差,上述方案二中在连续M条线路断开后均未引起系统切负荷时,才终止N-1情况下切负荷量的计算,这样就能够在一定程度上减小误差,同时也能减小校验的计算工作量。
以上所述仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应以所述权利要求的保护范围为准。

Claims (2)

1.一种含新能源的电网的N-1校验方法,其特征在于,所述N-1校验方法包括以下步骤:
S1:建立新能源发电场景;
S2:对每一个新能源发电场景,建立电网线路安全敏感性标量函数PI:
<mrow> <mi>P</mi> <mi>I</mi> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>k</mi> <mo>=</mo> <mn>1</mn> </mrow> <mrow> <mi>N</mi> <mi>L</mi> </mrow> </munderover> <msup> <mrow> <mo>(</mo> <mfrac> <msub> <mi>p</mi> <mi>k</mi> </msub> <msub> <mi>p</mi> <mrow> <mi>k</mi> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> </mfrac> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>-</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>l</mi> <mo>=</mo> <mn>1</mn> </mrow> <mrow> <mi>N</mi> <mi>L</mi> <mo>-</mo> <mn>1</mn> </mrow> </munderover> <msup> <mrow> <mo>(</mo> <mfrac> <msubsup> <mi>p</mi> <mi>k</mi> <mo>^</mo> </msubsup> <msub> <mi>p</mi> <mrow> <mi>k</mi> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> </mfrac> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
其中,pk为电网网络无故障情况下线路k的潮流;为电网网络N-1情况下线路的潮流;pkmax为线路k的容量上限;NL为线路总数;
S3:计算每条线路的PI值,并按照PI值由大到小的顺序对线路进行排序;
S4:依序断开单一线路,进行断开后的切负荷量计算,直至某条线路断开不会引起切负荷为止,或者直至连续M条线路断开均不会引起切负荷为止;其中,1<M<NL。
2.根据权利要求1所述的含新能源的电网的N-1校验方法,其特征在于,步骤S2还包括:在建立电网线路安全敏感性标量函数PI后,利用电网网络无故障情况下潮流计算结果,对公式1进行推导,得到如下公式:
<mrow> <mi>P</mi> <mi>I</mi> <mo>=</mo> <mfrac> <mrow> <mn>2</mn> <msub> <mi>B</mi> <mi>k</mi> </msub> <msub> <mi>&amp;phi;</mi> <mi>k</mi> </msub> <msub> <mi>&amp;gamma;</mi> <mi>k</mi> </msub> </mrow> <mrow> <mn>1</mn> <mo>-</mo> <msub> <mi>B</mi> <mi>k</mi> </msub> <msub> <mi>&amp;chi;</mi> <mi>k</mi> </msub> </mrow> </mfrac> <mo>+</mo> <mfrac> <mrow> <mn>2</mn> <msubsup> <mi>B</mi> <mi>k</mi> <mn>2</mn> </msubsup> <msubsup> <mi>&amp;phi;</mi> <mi>k</mi> <mn>2</mn> </msubsup> <msub> <mi>&amp;tau;</mi> <mi>k</mi> </msub> </mrow> <msup> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <msub> <mi>B</mi> <mi>k</mi> </msub> <msub> <mi>&amp;chi;</mi> <mi>k</mi> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> <mo>-</mo> <mfrac> <mrow> <mn>2</mn> <msubsup> <mi>B</mi> <mi>k</mi> <mn>2</mn> </msubsup> <msubsup> <mi>&amp;phi;</mi> <mi>k</mi> <mn>2</mn> </msubsup> <msub> <mi>&amp;omega;</mi> <mi>k</mi> </msub> </mrow> <mrow> <msup> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <msub> <mi>B</mi> <mi>k</mi> </msub> <msub> <mi>&amp;chi;</mi> <mi>k</mi> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> <msubsup> <mi>P</mi> <mrow> <mi>k</mi> <mi>max</mi> </mrow> <mn>2</mn> </msubsup> </mrow> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>2</mn> <mo>)</mo> </mrow> </mrow>
其中,Bk为线路k电抗的倒数;φk为线路k首末节点角度差;γk=θTωXek,θT为节点电压角度矩阵的转置,ω为由线路电抗和线路容量的乘积平方后的倒数形成的对角矩阵,X为仅含电抗的阻抗矩阵,ek为线路k首末电压差矩阵; 为线路k首末电压差矩阵的转置;ωk为由线路k电抗和线路k容量的乘积平方后的倒数形成的对角矩阵;χk为仅含电抗的阻抗矩阵中的元素。
CN201711130620.7A 2017-11-15 2017-11-15 一种含新能源的电网的n-1校验方法 Active CN107834548B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711130620.7A CN107834548B (zh) 2017-11-15 2017-11-15 一种含新能源的电网的n-1校验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711130620.7A CN107834548B (zh) 2017-11-15 2017-11-15 一种含新能源的电网的n-1校验方法

Publications (2)

Publication Number Publication Date
CN107834548A true CN107834548A (zh) 2018-03-23
CN107834548B CN107834548B (zh) 2019-11-01

Family

ID=61654490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711130620.7A Active CN107834548B (zh) 2017-11-15 2017-11-15 一种含新能源的电网的n-1校验方法

Country Status (1)

Country Link
CN (1) CN107834548B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6108802A (en) * 1998-03-25 2000-08-22 Lucent Technologies Inc. Testing method and apparatus for first-in first-out memories
CN103441493A (zh) * 2013-07-23 2013-12-11 广东电网公司电力调度控制中心 电网电气分区负荷侧关键断面的自动选择方法
CN105656038A (zh) * 2016-03-15 2016-06-08 国电南瑞科技股份有限公司 一种计及电网接纳能力的概率潮流计算方法
CN106385055A (zh) * 2016-12-01 2017-02-08 国网天津市电力公司 一种含分布式电源的配电网安全校核方法
CN106384162A (zh) * 2016-09-06 2017-02-08 西安交通大学 考虑分区备用和n‑1校验的电力系统电能‑备用联合优化调度方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6108802A (en) * 1998-03-25 2000-08-22 Lucent Technologies Inc. Testing method and apparatus for first-in first-out memories
CN103441493A (zh) * 2013-07-23 2013-12-11 广东电网公司电力调度控制中心 电网电气分区负荷侧关键断面的自动选择方法
CN105656038A (zh) * 2016-03-15 2016-06-08 国电南瑞科技股份有限公司 一种计及电网接纳能力的概率潮流计算方法
CN106384162A (zh) * 2016-09-06 2017-02-08 西安交通大学 考虑分区备用和n‑1校验的电力系统电能‑备用联合优化调度方法
CN106385055A (zh) * 2016-12-01 2017-02-08 国网天津市电力公司 一种含分布式电源的配电网安全校核方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
HUANG WEI, FENGLI, HE ZIJUN: "Transmission Network Planning With N-1 Security Criterion Based On Improved Multi-objective Genetic Algorithm", 《2011 4TH INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES (DRPT)》 *
卢斯煜,王彤,金小明,周保荣: "南方电网"西电东送"特性对送受端电网新能源消纳能力影响分析", 《电力建设》 *
张粒子,李丰,叶红豆,舒隽: "考虑风电和负荷波动及N - 1 故障的发电备用优化方法研究", 《太阳能学报》 *
马维旺,冯欢: "利用安全自动装置解决光伏电站接入系统N-1问题的方案分析", 《内蒙古电力技术》 *

Also Published As

Publication number Publication date
CN107834548B (zh) 2019-11-01

Similar Documents

Publication Publication Date Title
US11163280B2 (en) Method and system for dynamic power delivery to a flexible datacenter using unutilized energy sources
CN108183512B (zh) 一种接入新能源的电力系统的可靠性评估方法
Faza A probabilistic model for estimating the effects of photovoltaic sources on the power systems reliability
CN107658895B (zh) 一种直流换相失败预测环节门槛值整定方法
CN111444593B (zh) 一种电-气综合能源系统元件脆弱性改善方法
CN106410789B (zh) 一种针对孤网的电力系统黑启动分区方法
CN107453383B (zh) 一种用于供电分区互联的柔性直流配置方法及装置
CN105260952A (zh) 基于马尔科夫链蒙特卡洛方法的光伏电站可靠性评估方法
CN113055358B (zh) 基于协同攻击基因的电力cps风险传播范围预测方法及系统
CN106155985A (zh) 一种基于相邻数据特征的数据缺失填充方法
Rajaram et al. Optimal placement of distributed generation for voltage stability improvement and loss reduction in distribution network
CN111900720B (zh) 一种基于双层网页排序算法的输电网脆弱线路辨识方法
CN105356508A (zh) 基于psd-bpa的电网风电接入评价系统及其方法
CN107834548A (zh) 一种含新能源的电网的n‑1校验方法
CN110350524A (zh) 一种基于节点重要度的直流潮流优化方法
CN203504197U (zh) 家庭光伏并网发电系统
Li et al. Parallel power flow calculation based on multi-port inversed matrix method
CN109857590B (zh) 一种电力调度中心的数据备份系统
Liu et al. Robust Transmission Expansion Planning Considering Massive N-1 Contingencies with High Proportion of Renewable Energy
CN107818414B (zh) 一种大规模交直流混联电网n-2预想事故集的生成方法
CN108695818B (zh) 一种通过三相重合闸时序减少电压暂降深度的方法
CN111082402A (zh) 一种关于输电网连锁故障序列的预测方法
Wei et al. Resilience Assessment Using Simulation System of Distribution Network under Extreme Weather
Teng et al. Power system vulnerability assessment considering energy storage systems
CN110212537A (zh) 一种电网潮流风险感知方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210602

Address after: 510700 3rd, 4th and 5th floors of building J1 and 3rd floor of building J3, No.11 Kexiang Road, Science City, Luogang District, Guangzhou City, Guangdong Province

Patentee after: China South Power Grid International Co.,Ltd.

Address before: 510663 3 building, 3, 4, 5 and J1 building, 11 building, No. 11, Ke Xiang Road, Luogang District Science City, Guangzhou, Guangdong.

Patentee before: China South Power Grid International Co.,Ltd.

Patentee before: POWER GRID TECHNOLOGY RESEARCH CENTER. CHINA SOUTHERN POWER GRID