CN107830509A - A kind of coal powder cleaning combusting boiler of dilatation design - Google Patents

A kind of coal powder cleaning combusting boiler of dilatation design Download PDF

Info

Publication number
CN107830509A
CN107830509A CN201711214433.7A CN201711214433A CN107830509A CN 107830509 A CN107830509 A CN 107830509A CN 201711214433 A CN201711214433 A CN 201711214433A CN 107830509 A CN107830509 A CN 107830509A
Authority
CN
China
Prior art keywords
boiler
boiler furnace
coal powder
furnace
powder cleaning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711214433.7A
Other languages
Chinese (zh)
Inventor
徐进廷
郭春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yili Jieneng Technology Co Ltd
Original Assignee
Yili Jieneng Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yili Jieneng Technology Co Ltd filed Critical Yili Jieneng Technology Co Ltd
Priority to CN201711214433.7A priority Critical patent/CN107830509A/en
Publication of CN107830509A publication Critical patent/CN107830509A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B31/00Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements of dispositions of combustion apparatus
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B31/00Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements of dispositions of combustion apparatus
    • F22B31/08Installation of heat-exchange apparatus or of means in boilers for heating air supplied for combustion
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/06Arrangements of devices for treating smoke or fumes of coolers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23LSUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
    • F23L15/00Heating of air supplied for combustion
    • F23L15/04Arrangements of recuperators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Solid-Fuel Combustion (AREA)

Abstract

The present invention discloses a kind of coal powder cleaning combusting boiler of dilatation design, including steelframe, boiler furnace and burner, boiler furnace is fixed in steelframe, the top of boiler furnace sets drum, the insertion position of burner extends laterally on the bottom of boiler furnace, boiler furnace with the front and rear membrane wall of burner correspondence position.The coal powder cleaning combusting boiler of dilatation design in the present invention, boiler furnace bottom flame central position is subjected to dilatation design, so that furnace flame is evenly arranged, burn more stable, increasing the setting of flame kernel sectional area increasing furnace depth simultaneously can also avoid flame from sweeping wall, avoid the coking of flame kernel region;Increase flame kernel membrane type wall area, that is, increase high-temperature region heating surface area, because high-temperature region heating surface area increases, the increase of heating surface utilization ratio.

Description

A kind of coal powder cleaning combusting boiler of dilatation design
Technical field
The present invention relates to pulverized coal firing boiler technical field, more particularly to a kind of coal powder cleaning combusting pot of dilatation design Stove.
Background technology
In existing pulverized coal firing boiler, because sectional area is identical above and below burner hearth, the flame-shaped of burner hearth shape and coal dust firing Shape adaptability is bad, influences being uniformly distributed for flame, and existing chamber structure is readily designed to section of burner hearth and held with burner hearth The unmatched situation of product, when boiler furnace volume design meet needs and furnace cross-sectional area designs it is smaller when, flame kernel area Domain burner hearth coking is serious, and boiler can not reliability service;When boiler furnace sectional area design satisfaction needs, combustion space design is inclined Hour, easily cause furnace outlet coking serious, boiler can not reliability service;Meet needs when boiler furnace sectional area designs, When combustion space design also meets needs, because furnace heating surface utilization rate is low beyond flame kernel, easily boiler is caused to be heated Face arrangement increases considerably, and increases boiler manufacture cost.
The content of the invention
It is an object of the invention to provide a kind of coal powder cleaning combusting boiler of dilatation design, deposited with solving above-mentioned prior art The problem of, the dilatation design boiler can greatly improve pulverized-coal fired boiler reliability of operation, avoid burner hearth overtemperature, avoid pot Stove burner hearth coking, improves Combustion Efficiency of Coal Powder, boiler thermal output is further improved.
To achieve the above object, the invention provides following scheme:The present invention provides a kind of coal dust cleaning of dilatation design Burning boiler, including steelframe, boiler furnace and burner, the boiler furnace are fixed in the steelframe, the boiler furnace Top drum is set, the insertion position of the burner on the bottom of the boiler furnace, the boiler furnace with it is described The front and rear membrane wall of burner correspondence position extends laterally.
Optionally, it is provided with the steelframe and some holds platform.
Optionally, the combustor level is arranged in the prepattern wall of the boiler furnace.
Optionally, corresponding with the position of the burner bellows and secondary of being provided with the outside of the boiler furnace Bellows.
Optionally, described First air bellows and secondary air bellow are the blower fan being connected with each other.
Optionally, the middle and upper part surrounding of the boiler furnace offers air port, the boiler furnace outside and the air port Corresponding position is installed with tertiary air bellows.
Optionally, the tertiary air bellows use independent blower fan.
Optionally, the exit of the boiler furnace is provided with high temperature superheater, is connected at the boiler furnace outlet Low temperature superheater is provided with horizontal flue.
Optionally, the afterbody of the flue of the boiler furnace is sequentially installed with higher level's economizer and subordinate's economizer.
Optionally, air preheater is installed on the inside of the flue outlet.
The present invention achieves following technique effect relative to prior art:
The coal powder cleaning combusting boiler of dilatation design in the present invention, boiler furnace bottom flame central position is expanded Meter is installed with, upper furnace sectional dimension is constant, and furnace cross-sectional area diminishes suddenly from large to small, by section, rises flue gas resistance and omits Micro- increase, influenceed by resistance increase, the flue gas of burning is even into upper furnace so that furnace flame is evenly arranged, is fired Burn it is more stable, while increase flame kernel sectional area increase furnace depth setting flame can also be avoided to sweep wall, avoid flame Central area coking;Increase flame kernel membrane type wall area, that is, increase high-temperature region heating surface area, due to high-temperature region heating surface face Product increase, the increase of heating surface utilization ratio.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to institute in embodiment The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only some implementations of the present invention Example, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is the overall structure diagram of the coal powder cleaning combusting boiler that dilatation designs in the present invention;
Wherein, 1 steelframe;2 boiler furnaces;3 burners;4 tertiary air bellows;5 drums;6 high temperature superheaters;7 cryogenic overheatings Device;8 higher level's economizers;9 subordinate's economizers;10 air preheaters.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
It is an object of the invention to provide a kind of coal powder cleaning combusting boiler of dilatation design, deposited with solving above-mentioned prior art The problem of, the dilatation design boiler can greatly improve pulverized-coal fired boiler reliability of operation, avoid burner hearth overtemperature, avoid pot Stove burner hearth coking, improves Combustion Efficiency of Coal Powder, boiler thermal output is further improved.
The coal powder cleaning combusting boiler of dilatation design provided by the invention, including steelframe, boiler furnace and burner, boiler Burner hearth is fixed in steelframe, and the top of boiler furnace sets drum, and the insertion position of burner is in the bottom of boiler furnace, boiler Front and rear membrane wall on burner hearth with burner correspondence position extends laterally.
The coal powder cleaning combusting boiler of dilatation design, the flame kernel regional location in coal dust firing carry out dilatation, Upper furnace sectional dimension is constant, and furnace cross-sectional area diminishes suddenly from large to small, by section, rises flue gas resistance and is slightly increased, Influenceed by resistance increase, the flue gas of burning is even into upper furnace so that furnace flame evenly arranges that burning is more steady It is fixed.
Fig. 1 is refer to, wherein, Fig. 1 is the overall structure signal of the coal powder cleaning combusting boiler that dilatation designs in the present invention Figure.
As shown in figure 1, the present invention provides a kind of coal powder cleaning combusting boiler of dilatation design, including steelframe 1, boiler furnace 2 and burner 3, boiler furnace 2 be fixed in steelframe 1, the top of boiler furnace 2 sets drum 5, the insertion position of burner 3 In the bottom of boiler furnace 2, the front and rear membrane wall on boiler furnace 2 with the correspondence position of burner 3 extends laterally.
The bottom left and right sides membrane wall of boiler furnace 2 is constant, and membrane wall respectively forwardly translates backward before and after lower furnace portion, membrane type Wall avoids interfering with boiler steel frame 1 while translation, avoids the increase of the steel consumption of boiler steel frame 1.Some hold is provided with steelframe 1 Platform, it can be used for holding set device.
Burner 3 is arranged horizontally in the prepattern wall of boiler furnace 2, when the position that burner 3 is set is coal dust firing Flame kernel region position, i.e. burner 3 is in the position of the dilatation of boiler furnace 2.Flame kernel in coal dust firing Regional location, section of burner hearth carry out a range of structure dilatation, section of burner hearth is met flame kernel burning, the need of heat exchange Will, while flame impingement membrane wall is avoided, avoid burner hearth coking.Flame from lower furnace portion enter upper furnace when, by become cut The influence of face resistance, flame degree of filling and distribution in burner hearth are more excellent.
The outside of boiler furnace 2 it is corresponding with the position of burner 3 be provided with a bellows and secondary air box, First air wind Case and secondary air bellow are the blower fan being connected with each other;The middle and upper part surrounding of boiler furnace 2 offers air port,;The outside of boiler furnace 2 With;Position corresponding to air port is installed with tertiary air bellows 4, and tertiary air bellows 4 use independent blower fan.Boiler tertiary air bellows 4 are arranged in the surrounding on the top of boiler furnace 2, and boiler First air, Secondary Air are sent into boiler furnace 2 through burner 3, by being classified cloth Wind, the generation of nitrogen oxides is controlled, ensure the abundant burning of coal dust.
The exit of boiler furnace 2 is provided with high temperature superheater 6, is set on the horizontal flue of the exit of boiler furnace 2 connection It is equipped with low temperature superheater 7.Superheater is that the saturated steam under certain pressure is heated into the overheat under relevant pressure in boiler The heating surface of vapor, the effect of superheater are exactly that saturated vapor is heated into superheated steam, reduce flue gas loss, improve boiler The thermal efficiency.
The afterbody of the flue of boiler furnace 2 is sequentially installed with higher level's economizer 8 and subordinate's economizer 9, for recovery waste heat, Economizer is the heating surface for the saturation water being heated into boiler feedwater in boiler back end ductwork under drum pressure, is absorbed due to it It is the flue gas for comparing low temperature, reduces the exhaust gas temperature of flue gas, save the energy, improve efficiency.
Air preheater 10 is installed on the inside of flue outlet, on the one hand improves and is sent into furnace air temperature, make Boiler Furnace The temperature of thorax 2 is improved, and is on the other hand reduced exhaust gas temperature and is improved boiler efficiency, additionally it is possible to is improved flame temperature, is strengthened in stove Radiant heat transfer.
It should be noted that the coal powder cleaning combusting boiler of the dilatation design in the present invention, the specific setting of above-mentioned part Position can carry out appropriate adjustment according to actual needs, as long as in addition, identical with the general principle of the present invention, it is simply single The additions and deletions or change of some pure part, also each fall within protection scope of the present invention.
Specific case is applied in the present invention to be set forth the principle and embodiment of the present invention, above example Illustrate to be only intended to help the method and its core concept for understanding the present invention;Meanwhile for those of ordinary skill in the art, according to According to the thought of the present invention, in specific embodiments and applications there will be changes.In summary, this specification content It should not be construed as limiting the invention.

Claims (10)

  1. A kind of 1. coal powder cleaning combusting boiler of dilatation design, it is characterised in that:Including steelframe, boiler furnace and burner, institute State boiler furnace to be fixed in the steelframe, the top of the boiler furnace sets drum, and the insertion position of the burner exists The bottom of the boiler furnace, the front and rear membrane wall on the boiler furnace with the burner correspondence position expand laterally Exhibition.
  2. 2. the coal powder cleaning combusting boiler of dilatation design according to claim 1, it is characterised in that:Set on the steelframe Have and some hold platform.
  3. 3. the coal powder cleaning combusting boiler of dilatation design according to claim 1, it is characterised in that:The combustor level It is arranged in the prepattern wall of the boiler furnace.
  4. 4. the coal powder cleaning combusting boiler of dilatation design according to claim 1, it is characterised in that:Outside the boiler furnace Side it is corresponding with the position of the burner be provided with a bellows and secondary air box.
  5. 5. the coal powder cleaning combusting boiler of dilatation design according to claim 4, it is characterised in that:Described First air wind Case and secondary air bellow are the blower fan being connected with each other.
  6. 6. the coal powder cleaning combusting boiler of dilatation design according to claim 1, it is characterised in that:The boiler furnace Middle and upper part surrounding offers air port, and position corresponding with the air port is installed with tertiary air wind on the outside of the boiler furnace Case.
  7. 7. the coal powder cleaning combusting boiler of dilatation design according to claim 6, it is characterised in that:The tertiary air bellows Using independent blower fan.
  8. 8. the coal powder cleaning combusting boiler of dilatation design according to claim 1, it is characterised in that:The boiler furnace Exit is provided with high temperature superheater, and low temperature superheater is provided with the horizontal flue connected at the boiler furnace outlet.
  9. 9. the coal powder cleaning combusting boiler of dilatation design according to claim 1, it is characterised in that:The boiler furnace The afterbody of flue is sequentially installed with higher level's economizer and subordinate's economizer.
  10. 10. the coal powder cleaning combusting boiler of dilatation design according to claim 9, it is characterised in that:The flue outlet Inner side air preheater is installed.
CN201711214433.7A 2017-11-28 2017-11-28 A kind of coal powder cleaning combusting boiler of dilatation design Pending CN107830509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711214433.7A CN107830509A (en) 2017-11-28 2017-11-28 A kind of coal powder cleaning combusting boiler of dilatation design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711214433.7A CN107830509A (en) 2017-11-28 2017-11-28 A kind of coal powder cleaning combusting boiler of dilatation design

Publications (1)

Publication Number Publication Date
CN107830509A true CN107830509A (en) 2018-03-23

Family

ID=61646028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711214433.7A Pending CN107830509A (en) 2017-11-28 2017-11-28 A kind of coal powder cleaning combusting boiler of dilatation design

Country Status (1)

Country Link
CN (1) CN107830509A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7409328A (en) * 1973-07-11 1975-01-14 Fascione Pietro BOILER FOR FLUIDUM FUEL.
CN101936525A (en) * 2010-09-27 2011-01-05 上海交通大学 Low NOx rotational flow coal dust combustion device of industrial boiler
CN202546736U (en) * 2012-03-23 2012-11-21 广西西江锅炉制造有限公司 Bagasse pith and pulverized coal fired boiler
CN203203006U (en) * 2012-12-24 2013-09-18 杭州燃油锅炉有限公司 Upright pulverized coal corner tube type boiler
CN205014343U (en) * 2015-10-12 2016-02-03 大唐华银株洲发电有限公司 W flame boiler
CN207179620U (en) * 2017-11-28 2018-04-03 亿利洁能科技有限公司 A kind of coal powder cleaning combusting boiler of dilatation design

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7409328A (en) * 1973-07-11 1975-01-14 Fascione Pietro BOILER FOR FLUIDUM FUEL.
CN101936525A (en) * 2010-09-27 2011-01-05 上海交通大学 Low NOx rotational flow coal dust combustion device of industrial boiler
CN202546736U (en) * 2012-03-23 2012-11-21 广西西江锅炉制造有限公司 Bagasse pith and pulverized coal fired boiler
CN203203006U (en) * 2012-12-24 2013-09-18 杭州燃油锅炉有限公司 Upright pulverized coal corner tube type boiler
CN205014343U (en) * 2015-10-12 2016-02-03 大唐华银株洲发电有限公司 W flame boiler
CN207179620U (en) * 2017-11-28 2018-04-03 亿利洁能科技有限公司 A kind of coal powder cleaning combusting boiler of dilatation design

Similar Documents

Publication Publication Date Title
CN207975627U (en) It is suitable for using the 660MW grade ultra-supercritical boilers of high alkalinity coal
CN203869022U (en) Boiler system and temperature adjusting device thereof
CN103438418B (en) Double-n-shaped boiler
CN110220198A (en) A kind of high temperature and pressure waste incineration horizontal boiler
CN103486563A (en) Supercritical once-through boiler capable of firing eastern Junggar coal
CN207179620U (en) A kind of coal powder cleaning combusting boiler of dilatation design
CN110360569A (en) A kind of high temperature and pressure garbage burning boiler
CN107436031A (en) A kind of double gaseous fuel vacuum boilers
CN105953217B (en) The 1000MW ultra supercritical double reheat boilers of high reheat steam temperature wide regulating ratio
CN202065984U (en) Chain grate boiler with two longitudinally arranged drums
CN111486440A (en) System and method for adjusting reheating steam temperature of W flame boiler by adopting flue gas recirculation
CN107830509A (en) A kind of coal powder cleaning combusting boiler of dilatation design
CN202546736U (en) Bagasse pith and pulverized coal fired boiler
CN104595894A (en) System and method for solving high-sodium coal combustion contamination by low-wall-temperature heat exchange surface
CN204986984U (en) Change wall formula tangential firing boiler combustion ware of horizontal deflection angle
CN207247522U (en) Double gaseous fuel vacuum boilers
CN204254601U (en) A kind of pilot boiler
CN103363657B (en) Flameless combustion compact Layout horizontal internal combustion fire pipe water heating boiler
CN102889585A (en) Environment-friendly energy-saving vertical boiling boiler
CN207035086U (en) The low nitrogen pulverized-coal fired boiler of U-shaped flame
CN105180132A (en) Novel fuel oil and fuel gas steam boiler
CN204372885U (en) Boiler
CN104390202A (en) L-shaped radiation boiler capable of reducing high-alkalinity coal combustion contamination
CN209706026U (en) It is applicable in the pulverized-coal fired boiler of low melting point coal quality
CN203533511U (en) Double-n-shaped boiler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180323