CN107829526A - Bridges in highway engineering pile foundation steel concrete supporting component and attaching method thereof - Google Patents
Bridges in highway engineering pile foundation steel concrete supporting component and attaching method thereof Download PDFInfo
- Publication number
- CN107829526A CN107829526A CN201711092121.3A CN201711092121A CN107829526A CN 107829526 A CN107829526 A CN 107829526A CN 201711092121 A CN201711092121 A CN 201711092121A CN 107829526 A CN107829526 A CN 107829526A
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- sleeve
- guiding
- screw thread
- styletable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 42
- 239000010959 steel Substances 0.000 title claims abstract description 42
- 238000000034 method Methods 0.000 title claims abstract description 24
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 139
- 239000000853 adhesive Substances 0.000 claims description 8
- 230000001070 adhesive effect Effects 0.000 claims description 8
- 210000003205 muscle Anatomy 0.000 claims description 5
- 238000003825 pressing Methods 0.000 claims description 3
- 238000003754 machining Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 4
- 239000000463 material Substances 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000004382 potting Methods 0.000 description 1
- 239000006188 syrup Substances 0.000 description 1
- 235000020357 syrup Nutrition 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (7)
- A kind of 1. bridges in highway engineering pile foundation steel concrete supporting component, it is characterised in that including:Sleeve, it is the hollow circular cylinder structure connected up and down, and one end of the sleeve is arranged to threaded ends, with the spiral shell The relative other end in line connection end is arranged to be oriented to connection end;The first internal thread is provided with the inwall of the threaded ends, Described be oriented on the inwall of connection end is provided with guide groove, and the guide groove is the groove radially extended along the sleeve, described Guide groove extends radially to the meet with first internal thread along the sleeve, and described be oriented on the outer wall of connection end also sets It is equipped with the first external screw thread;Reinforcing bar, it is with the sleeve with suitable;Described reinforcing bar one end is arranged to the end of thread, and the end of thread is provided with and the sleeve Threaded ends the second external screw thread for being engaged of the first internal thread, the other end of the reinforcing bar is arranged to be oriented to styletable, institute State guiding styletable and be provided with the lead being engaged with the guide groove of the guiding connection end of the sleeve, the steel-bar arrangement is oriented to The external diameter of one end of post is more than the external diameter of the reinforcing bar body;Fixed cover, it is circular ring structure, and the fixed cover includes sleeve fixing end and reinforcing bar fixing end, the sleeve fixing end The second internal thread to be matched with the first external screw thread on the sleeve outer wall is provided with circle ring inner wall;The reinforcing bar fixing end Internal radius be engaged with the reinforcing bar body external diameter, be provided with the inwall of the reinforcing bar fixing end and to be led with the reinforcing bar The groove to be matched to post.
- 2. bridges in highway engineering pile foundation steel concrete supporting component as claimed in claim 1, it is characterised in that the guiding The 3rd external screw thread is provided with reinforcing bar body on the inside of post, the inwall of the reinforcing bar fixing end of the fixed cover is provided with and the steel The 3rd internal thread that the 3rd external screw thread on muscle body outer wall is engaged.
- 3. bridges in highway engineering pile foundation steel concrete supporting component as claimed in claim 1, it is characterised in that described first External screw thread and the second internal thread are disposed as taper thread.
- A kind of 4. connection side of the bridges in highway engineering pile foundation steel concrete supporting component described in claim 1-3 any one Method, it is characterised in that comprise the following steps:Step 1: jumping-up is carried out respectively to two terminations of reinforcing bar to be connected;Step 2: the processing end of thread and guiding styletable, a jumping-up end machining with machine for threading to reinforcing bar described in step 1 Second external screw thread, the first internal thread of second external screw thread and the threaded ends of the sleeve match;To the reinforcing bar Another jumping-up termination carry out cold pressing deformation, gone out by being cold-pressed deformation processing and led with the guiding connection end inwall of the sleeve The lead being engaged to groove;The 3rd external screw thread is processed on reinforcing bar body on the inside of lead;Step 3: the threaded ends of the end of thread of the first reinforcing bar and the sleeve are attached, to treat and the second reinforcing bar Styletable is oriented to be attached by the guiding connection end of the sleeve;Fixed cover is enclosed in the guiding styletable of the second reinforcing bar in advance Side;Step 4: the guide groove of the lead of the second reinforcing bar and the sleeve for being connected to the first screw thread steel end is corresponded, and The guiding styletable of second reinforcing bar is stretched into the guiding connection end of the sleeve;Step 5: fixed cover is attached with the sleeve by first external screw thread and the second internal thread, i.e., by One reinforcing bar finishes with the second bar connecting.
- 5. the connection method of bridges in highway engineering pile foundation steel concrete supporting component as claimed in claim 4, its feature exist In, the 3rd external screw thread of processing on the reinforcing bar body in step 2 on the inside of the lead, the 3rd externally threaded processing length Spend at least 2 times of the 3rd internal thread.
- 6. the connection method of bridges in highway engineering pile foundation steel concrete supporting component as claimed in claim 4, its feature exist In before the fixed cover is enclosed on the inside of the guiding styletable of the second reinforcing bar in advance in step 3, being processed on the fixed cover inwall Groove, the lead that the groove is oriented to styletable with the reinforcing bar match.
- 7. the connection method of bridges in highway engineering pile foundation steel concrete supporting component as claimed in claim 4, its feature exist In in the guiding styletable brush a layer of adhesive of second reinforcing bar in step 4, then the guiding styletable of the second reinforcing bar being stretched into institute State in the guiding connection end of sleeve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711092121.3A CN107829526B (en) | 2017-11-08 | 2017-11-08 | Bridges in highway engineering pile foundation steel concrete supporting component and attaching method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711092121.3A CN107829526B (en) | 2017-11-08 | 2017-11-08 | Bridges in highway engineering pile foundation steel concrete supporting component and attaching method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107829526A true CN107829526A (en) | 2018-03-23 |
CN107829526B CN107829526B (en) | 2018-12-21 |
Family
ID=61653940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711092121.3A Active CN107829526B (en) | 2017-11-08 | 2017-11-08 | Bridges in highway engineering pile foundation steel concrete supporting component and attaching method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107829526B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111910838A (en) * | 2020-08-18 | 2020-11-10 | 南通路桥工程有限公司 | High-stability mechanical connecting assembly and connecting method for highway bridge pile foundation steel bars |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2110043U (en) * | 1991-12-28 | 1992-07-15 | 北京市建筑工程研究所 | Taper thread reinforcing join piece for extrusion sleeve |
CN2375692Y (en) * | 1999-07-02 | 2000-04-26 | 河北省电焊机股份有限公司 | Upsetting steel bar connector |
CN2538893Y (en) * | 2002-06-06 | 2003-03-05 | 王秀和 | Reinforcing bar jointed special shaped sleeve |
CN1407191A (en) * | 2001-08-09 | 2003-04-02 | 胡锦标 | Steel reinforce bar connecting device and use thereof |
KR20070025844A (en) * | 2005-09-05 | 2007-03-08 | 김용근 | Reinforcing bar coupling with threaded sleeve |
-
2017
- 2017-11-08 CN CN201711092121.3A patent/CN107829526B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2110043U (en) * | 1991-12-28 | 1992-07-15 | 北京市建筑工程研究所 | Taper thread reinforcing join piece for extrusion sleeve |
CN2375692Y (en) * | 1999-07-02 | 2000-04-26 | 河北省电焊机股份有限公司 | Upsetting steel bar connector |
CN1407191A (en) * | 2001-08-09 | 2003-04-02 | 胡锦标 | Steel reinforce bar connecting device and use thereof |
CN2538893Y (en) * | 2002-06-06 | 2003-03-05 | 王秀和 | Reinforcing bar jointed special shaped sleeve |
KR20070025844A (en) * | 2005-09-05 | 2007-03-08 | 김용근 | Reinforcing bar coupling with threaded sleeve |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111910838A (en) * | 2020-08-18 | 2020-11-10 | 南通路桥工程有限公司 | High-stability mechanical connecting assembly and connecting method for highway bridge pile foundation steel bars |
CN111910838B (en) * | 2020-08-18 | 2021-12-28 | 南通路桥工程有限公司 | High stability highway bridge stake foundation steel bar mechanical connection subassembly |
Also Published As
Publication number | Publication date |
---|---|
CN107829526B (en) | 2018-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1109794C (en) | Fastener construction with internal support for spaced portions of structural member | |
CN105874120B (en) | The end fixing means of rope and the rope of end of tape fixture, for rope end fixing means end fitting | |
CN105714986B (en) | Shear wall steel bar limiting erecting device and application method | |
CN107829526A (en) | Bridges in highway engineering pile foundation steel concrete supporting component and attaching method thereof | |
CN107447757B (en) | A kind of Extruded anchoring tool and anchoring process of FRP tendons | |
CN206495423U (en) | Line bar connector | |
CN107542272A (en) | Novel portable prestressed draw-bar tensioning equipment | |
TW202104762A (en) | Wood screw | |
CN103362311B (en) | A kind of traction apparatus of finished steel strand bundle band anchorage | |
CN206070885U (en) | Screw-thread steel plug-in type branch sleeve for building | |
CN205577123U (en) | Combined material truss connection node | |
CN214884400U (en) | Connecting device for stiff concrete section steel column and reinforced concrete beam steel bars | |
CA2946325A1 (en) | Coupler for stranded rope | |
CN113565269B (en) | Clamping piece thread composite steel bar connecting joint | |
CN208650401U (en) | A kind of Building class connection member | |
CN105756200A (en) | Connecting node for trusses made of composite materials | |
CN108844814A (en) | A kind of braid material Hopkinson tension test clamp method | |
CN106320609B (en) | Steel strand inhaul cable and manufacturing method thereof | |
CN101799095A (en) | Method for connecting resin-based composite material tube and metal material | |
CN210031793U (en) | Recoverable anchoring mechanism | |
CN209025325U (en) | Bridge construction reinforced bar connection structure | |
CN204492012U (en) | A kind of bar connecting device | |
CN104831921B (en) | The circumferential band to pull bar is not required to for the square column template of fixing concrete | |
JP4068982B2 (en) | Fixing structure and fixing forming method of fiber composite wire end, and fixing structure of fixed fiber composite wire | |
CN207727847U (en) | Screw-threaded coupling Split type steel bar branch sleeve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Qing Zhigang Inventor after: Li Jun Inventor after: Li Sheng Inventor after: Huang Xianbin Inventor after: Li Xiuwang Inventor after: Lu Bingxiu Inventor before: Meng Xianshan Inventor before: Wang Hongying Inventor before: Zhao Zhi Inventor before: Yao Yan Inventor before: Zhu Hongyu Inventor before: Dong Junfeng Inventor before: Zhao Xuzhao Inventor before: Zhu Tuo Inventor before: Yang Weidong Inventor before: Zhang Rongjian |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20181102 Address after: 530308 15, West Guangxi building, 4 Kok Road, Nanning, the Guangxi Zhuang Autonomous Region Applicant after: GUANGXI CHANGCHANG ROAD & BRIDGE CONSTRUCTION Co.,Ltd. Address before: 067499 Hebei province Chengde County Chengde County lower plate Town Board city street traffic bureau engineering team family courtyard No. 261 Applicant before: Meng Xianshan Applicant before: Wang Hongying Applicant before: Zhao Zhi Applicant before: Yao Yan Applicant before: Zhu Hongyu Applicant before: Dong Junfeng Applicant before: Zhao Xuzhao Applicant before: Zhu Tuo Applicant before: Yang Weidong Applicant before: Zhang Rongjian |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: Building F3, Group F, Nanning ASEAN Enterprise Headquarters, No. 10 Xinji Road, High tech Zone, Nanning City, Guangxi Zhuang Autonomous Region, 530308 Patentee after: Guangxi Jiaojian Engineering Construction Group Co.,Ltd. Address before: 530308 15, West Guangxi building, 4 Kok Road, Nanning, the Guangxi Zhuang Autonomous Region Patentee before: GUANGXI CHANGCHANG ROAD & BRIDGE CONSTRUCTION Co.,Ltd. |