CN107824867B CN201711223302.5A CN201711223302A CN107824867B CN 107824867 B CN107824867 B CN 107824867B CN 201711223302 A CN201711223302 A CN 201711223302A CN 107824867 B CN107824867 B CN 107824867B
Authority
CN
China
Prior art keywords
gear
rack
pipe fitting
mobile
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711223302.5A
Other languages
Chinese (zh)
Other versions
CN107824867A (en
Inventor
邱红光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Jiangbei Sen One Machinery Manufacturing Co Ltd
Original Assignee
Ningbo Jiangbei Sen One Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Jiangbei Sen One Machinery Manufacturing Co Ltd filed Critical Ningbo Jiangbei Sen One Machinery Manufacturing Co Ltd
Priority to CN201711223302.5A priority Critical patent/CN107824867B/en
Publication of CN107824867A publication Critical patent/CN107824867A/en
Application granted granted Critical
Publication of CN107824867B publication Critical patent/CN107824867B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/003Positioning devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/20Storage arrangements; Piling or unpiling
    • B21D43/22Devices for piling sheets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23DPLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR
    • B23D21/00Machines or devices for shearing or cutting tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23DPLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR
    • B23D33/00Accessories for shearing machines or shearing devices
    • B23D33/02Arrangements for holding, guiding, and/or feeding work during the operation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Making Paper Articles (AREA)
  • Sawing (AREA)

Abstract

The present invention relates to pipe fittings to cut field, and in particular to a kind of division techniques such as pipe fitting include the following steps: step 1: preparing a kind of pipe fitting cutting equipment;Step 2: fixed limit;Step 3: cutting swelling;Step 4: withdrawing;Step 5: blanking;Step 6: feeding;Step 7: preparation is cut next time.It when using the technical program, effectively avoids the problem that pipe fitting is easy to happen deformation in fixation procedure, while may insure that pipe fitting Cutting Length is uniform, also solve the problems, such as that the pipe fitting one end that first lands is easily damaged.

Description

A kind of division techniques such as pipe fitting
Technical field
The present invention relates to pipe fittings to cut field, and in particular to a kind of division techniques such as pipe fitting.
Background technique
When repeatedly being cut to a pipe fitting, general operating procedure are as follows: 1, pipe fitting is placed on cutting work station;2, Tube wall is fixedly clamped by clamp system;3, cutting mechanism cuts pipe fitting;4, the pipe fitting after cutting falls automatically to be received Collection;5, clamp system unclamps pipe fitting, and artificial mobile pipe fitting is cut next time.It is cut in the pipe fitting relatively thin to tube wall In the process, there are the following problems: it is relatively thin to be primarily due to tube wall, when clamp system is clamped fixed to tube wall, tube wall meeting Deformation occurs;Followed by pipe fitting one end can first land in dropping process after pipe fitting cutting, be easy to cause pipe fitting to damage after hitting It is bad;It besides needs manually to feed pipe fitting after the completion of cutting every time, the tubular length after not can guarantee cutting is impartial, also Increase additional cost of labor, processing efficiency is caused to reduce.
Summary of the invention
The purpose of the present invention is to provide in a kind of pipe fitting cutting process will not deformation occurs, not will lead to pipe fitting damage and The technique for realizing automatic equidistant cutting.
In order to achieve the above objectives, the technical solution of the present invention is to provide division techniques such as a kind of pipe fittings, include the following steps:
Step 1: prepare a kind of pipe fitting cutting equipment, including rack, supporting table, collecting box, No.1 gear, clamping device, It transfers mechanism, cutting mechanism and pushes against mechanism;The No.1 gear is rotationally connected in rack, and No.1 gear is incomplete tooth Wheel;The clamping device includes No.1 clamping unit and No. two clamping units, and the No.1 clamping unit includes No.1 grip block And the convex block being fixedly connected with No.1 grip block, No.1 grip block are connect with housing slide, No.1 grip block one end is fixed with The No.1 rack gear that can be engaged with No.1 gear;No. two clamping units include No. two grip blocks and air bag, No. two grip blocks with Rack is hinged, and cavity is equipped in No. two grip blocks, the air blower of the interior conveying gas of the oriented air bag of installation in cavity;The shift machine Structure includes adjusting rod, support bar and swingle, and support bar is connect with housing slide, and support bar one end and adjusting rod one end are hinged, The adjusting rod other end and the end face of No.1 gear are hinged;The support bar other end and swingle one end are hinged, the swingle other end with No. two grip blocks are hinged;Wherein swingle is equipped with stroke hole, is fixed with the pin in stroke hole in rack;The cutting Mechanism includes No. two rack gears, No. two gears, No. three rack gears and cutter;No. two rack gears are fixed on support bar, No. two teeth Wheel is rotationally connected in rack, and No. three rack gears are slidably connected in rack, and the cutter are fixed with No. three rack gear one end Connection;Wherein No. two gears are engaged with No. two rack gears, No. three rack gears;The abutting mechanism includes pushing against item, uniformly consolidating It is scheduled on and pushes against the abutting block on item and the cylinder for being limited to abutting block, the cylinder is fixed in rack, described Item is pushed against to be fixedly connected with the No.1 grip block other end;
Step 2: setting starting and the shut-in time interval of cylinder and air blower first, pipe fitting is then placed on support On platform, pipe fitting one end is pushed against with No.1 grip block and makes convex block be inserted into the end pipe fitting is fixed, while cylinder starts, cylinder Output elongate axis is simultaneously limited to block is pushed against;
Step 3: the rotation of No.1 gear drives adjusting rod to swing, thus drive support bar mobile, the mobile process of support bar It is middle to drive No. two rack gears mobile, to drive No. two gears rotation engaged with No. two rack gears, and then drive No. three rack gears mobile, Cutter are moved under the action of No. three rack gears and are cut to pipe fitting;Drive swingle around pin while support bar is mobile Rotation pushes against the end after No. two grip blocks and another end in contact of pipe fitting, while air blower opens to drive No. two grip block rotations It is dynamic, air bag swelling pipe fitting inner wall under the action of air blower;
Step 4: during No.1 gear continues to rotate, support bar opposite direction under the action of adjusting rod is mobile, branch Drive No. two rack gear opposite directions mobile during stay opposite direction is mobile, to drive No. two gears engaged with No. two rack gears Opposite direction rotation, and then drive No. three rack gear opposite directions mobile, cutter opposite direction under the action of No. three rack gears is mobile;Support Swingle is driven to rotate around pin opposite direction while opposite direction is mobile, so that No. two grip block opposite directions rotations are driven, into And drive the pipe fitting rotation cut;
Step 5: when pipe fitting turns to minimum point by cut end, air blower is shut down, and is cut after the gas evolution in air bag Pipe fitting fall in collecting box;
Step 6: No.1 gear rotates a period of time exhaust hood and closes, and cylinder output shaft is shunk, and releases to the limit for pushing against block Position, No.1 gear is engaged with No.1 rack gear at this time, and No.1 rack gear moves under the action of No.1 gear, so that No.1 be driven to clamp Block is mobile, and then drives pipe fitting mobile;
Step 7: when No.1 gear is no longer engaged with No.1 rack gear, No.1 gear is rotated one week, and pipe fitting is next at this time Cut point is located at below cutter, while cylinder starts, and cylinder output elongate axis simultaneously again limits abutting block, then weighs Multiple above-mentioned steps 3-6, completes the multiple cutting to pipe fitting.
This programme has the technical effect that No.1 grip block and convex block can be fixed pipe fitting, while No. two grip blocks It can cooperate No.1 grip block that pipe fitting is fixed, effectively avoid the problem that pipe fitting is easy to happen deformation in fixation procedure; Cooperate simultaneously with No.1 gear, No.1 rack gear, transfer mechanism and cutting mechanism, automatic equidistant movement can be carried out to pipe fitting, really Keeping part Cutting Length is uniform;Cooperate again with swingle, No. two grip blocks, air bag and air blower, pipe fitting can be put down gently, First land one end damage in pipe fitting dropping process after effectivelying prevent cutting, avoids unnecessary expenditures;In addition only pass through one The running of whole equipment, more saving energy consumption are realized in the rotation of number gear, while equipment is simple, easy to operate.
Further, the exhaust fan of gas in extraction air bag is installed in cavity described in step 1.The technology of this programme is imitated Fruit is: after air blower stops air blast, exhaust fan can quickly be extracted the gas in air bag out, it is ensured that pipe fitting cut end is moved to most It is fallen in collecting box rapidly when low spot, to realize that air bag operates the swelling of next section of pipe fitting.
Further, supporting table described in step 1 is equipped with and the matched through slot of pipe fitting.This programme has the technical effect that Pipe fitting is placed in through slot to the stability that can increase pipe fitting, while through slot can be the pipe fitting guiding in moving process.
Further, collecting box bottom surface described in step 1 is equipped with rubber pad.This programme has the technical effect that pipe fitting one End can topple over after landing, and rubber pad can reduce the impact force of pipe fitting and bottom, further ensure that the integrality of pipe fitting.
Further, the hole wall of stroke hole described in step 1 is equipped with graphite linings.This programme has the technical effect that pin It is moved repeatedly in stroke hole, the frictional force of pin and hole wall can be mitigated by the way that graphite linings are arranged on the hole wall in stroke hole, Swingle is prevented to be worn.
When by adopting the above technical scheme, effectively avoid the problem that pipe fitting is easy to happen deformation in fixation procedure, while can To ensure that pipe fitting Cutting Length is uniform, also solve the problems, such as that the pipe fitting one end that first lands is easily damaged.
Detailed description of the invention
Fig. 1 is schematic diagram before pipe fitting cutting equipment used in the present invention is cut;
Fig. 2 is schematic diagram after the cutting of pipe fitting cutting equipment used in the present invention.
Specific embodiment
Below by the further details of explanation of specific embodiment:
Appended drawing reference in Figure of description includes: supporting table 1, collecting box 2, No.1 gear 3, No.1 grip block 4, convex block 5,6, No. two grip blocks 7 of No.1 rack gear, air bag 8, air blower 9, exhaust fan 10, adjusting rod 11, support bar 12, swingle 13, pin 14, No. two gear 16, three of rack gear 15, two rack gears 17, cutter 18 are followed closely, item 19 is pushed against, pushes against block 20.
Specific step is as follows for a kind of division techniques such as pipe fitting:
Step 1: prepare a kind of pipe fitting cutting equipment as shown in Figure 1, 2, including supporting table 1, collecting box 2, servo motor, No.1 gear 3, clamping device, transfer mechanism, cutting mechanism and abutting mechanism.Servo motor is bolted in rack, No.1 gear 3 is fixedly connected on servo motor output shaft, and wherein No.1 gear 3 is partial gear.Wherein opened in supporting table 1 There is through slot, through slot is for placing pipe fitting;In addition 2 bottom surface of collecting box is fixed with rubber pad.
Clamping device includes No.1 clamping unit and No. two clamping units, and No.1 clamping unit includes 4 He of No.1 grip block Convex block 5, convex block 5 and No.1 grip block 4 weld, and through-hole is provided on No.1 grip block 4, and rack passes through through-hole and makes No.1 grip block 4 can horizontally slip relative to rack;Wherein 4 upper end of No.1 grip block is welded with No.1 rack gear 6,6 energy of No.1 rack gear and No.1 Gear 3 engages.No. two clamping units include No. two grip blocks 7 and air bag 8, as shown in Figure 1, No. two 7 upper left corners of grip block and machine Frame is hinged, and cavity is provided in No. two grip blocks 7, and air blower 9 and exhaust fan 10, air blower 9 and exhaust fan 10 are equipped in cavity Pass through hose and conveying gas and the gas bleeding out of air bag 8 into air bag 8.
Transfer mechanism includes adjusting rod 11, support bar 12 and the swingle 13 in fold-line-shaped, the hole being provided in rack, Support bar 12 passes through hole and horizontally slips relative to hole;12 left end of support bar and adjusting rod 11 are hinged by holding, adjusting rod 11 Left end and the end face of No.1 gear 3 are hinged;12 right end of support bar and 13 upper end of swingle are hinged, 13 lower end of swingle and No. two folders It is hinged to hold block 7.It is wherein provided with stroke hole on swingle 13, graphite linings are fixed on the hole wall in stroke hole, are fixed with position in rack In the pin 14 in stroke hole.
Cutting mechanism includes No. two rack gears 17 of gear 16, three of rack gear 15, two and cutter 18;No. two rack gears 15 are fixed In 12 lower surface of support bar, on the rack, No. three 17 vertical sliding of rack gear connections on the rack, are cut for No. two rotation connections of gear 16 Cutter 18 and No. three 17 lower ends of rack gear are welded;Wherein No. two gears 16 are engaged in No. two rack gears 15 and No. three rack gears 17.
It pushes against mechanism to include cylinder, push against item 19 and be uniformly fixed on the abutting block 20 pushed against on item 19, cylinder passes through Bolt is fixed on the rack, and pushes against item 19 and 4 lower end of No.1 grip block is welded, and cylinder, which is located at, pushes against 19 front of item, cylinder output It can be pushed against after elongate axis and push against block 20, No.1 grip block 4 is prevented to be moved to the left.
Step 2: when being cut, starting and the shut-in time interval of cylinder and air blower 9 are set first, it then will pipe Part is placed in supporting table 1, pushes against pipe fitting left end with No.1 grip block 4, and so that convex block 5 is inserted into left end and pipe fitting is fixed, Cylinder starting simultaneously, cylinder output elongate axis are simultaneously limited (11 left end of adjusting rod is located at A point at this time) to block 20 is pushed against;
Step 3: and then starting servo motor, No.1 gear 3 rotate counterclockwise under the action of servo motor, drive and adjust Bar 11 is swung, so that support bar 12 be driven to be moved to the left, support bar 12 drives No. two rack gears 15 to the left during being moved to the left Mobile, so that No. two gears 16 engaged with No. two rack gears 15 be driven to rotate counterclockwise, and then No. three rack gears 17 of drive are to moving down Dynamic, cutter 18 are moved down under the action of No. three rack gear 17 and are cut to pipe fitting;Support bar 12 is moved to the left same When drive swingle 13 rotated clockwise around pin 14, thus drive No. two grip blocks 7 rotated clockwise around hinge joint, No. two folder It holds and pushes against right end after block 7 is contacted with pipe fitting right end, while air blower 9 starts, air bag 8 expands and swollen under the action of air blower 9 Tight pipe fitting inner wall;
Step 4: during No.1 gear 3 continues to rotate, adjusting rod 11 is moved to B point, and support bar 12 is in adjusting rod Move right under the action of 11, support bar 12 move right during drive No. two rack gears 15 move right, thus drive with No. two gears 16 of No. two rack gears 15 engagement rotate clockwise, and then No. three rack gears 17 is driven to move up, and cutter 18 are three It is moved up under the action of number rack gear 17;Swingle 13 is driven to turn counterclockwise while support bar 12 moves right around pin 14 It is dynamic, so that No. two grip blocks 7 be driven to rotate counterclockwise around hinge joint, and then the pipe fitting cut is driven to rotate counterclockwise;
Step 5: when pipe fitting turns to minimum point by cut end, air blower 9 is shut down, exhaust fan 10 starts, in air bag 8 The pipe fitting that gas is cut after being extracted is fallen in collecting box 2;
Step 6: No.1 gear 3 rotates a period of time exhaust hood and closes, and cylinder output shaft is shunk, and releases to abutting block 20 Limit, No.1 gear 3 is engaged with No.1 rack gear 6 at this time;No.1 rack gear 6 moves right under the action of No.1 gear 3, thus band Dynamic No.1 grip block 4 moves right, and then pipe fitting is driven to move right;
Step 7: when No.1 gear 3 is no longer engaged with No.1 rack gear 6, No.1 gear 3 just rotates one week (adjusting rod 11 Left end is again positioned at A point), the next cut point of pipe fitting is located at 18 lower section of cutter at this time, while cylinder starts, cylinder output shaft It extends and is limited to block 20 is pushed against again;Then repeat the above steps 3-6, completes the multiple cutting to pipe fitting.
What has been described above is only a preferred embodiment of the present invention, it is noted that for those skilled in the art, Without departing from the inventive concept of the premise, several modifications and improvements can also be made, these also should be considered as guarantor of the invention Range is protected, these all will not influence the effect and patent practicability that the present invention is implemented.The present invention omits the technology of description, shape Shape, construction portion are well-known technique.

Claims (5)

1. division techniques such as a kind of pipe fittings, which comprises the steps of:
Step 1: preparing a kind of pipe fitting cutting equipment, including rack, supporting table, collecting box, No.1 gear, clamping device, transfer Mechanism, cutting mechanism and abutting mechanism;The No.1 gear is rotationally connected in rack, and No.1 gear is partial gear; The clamping device includes No.1 clamping unit and No. two clamping units, the No.1 clamping unit include No.1 grip block and The convex block being fixedly connected with No.1 grip block, No.1 grip block are connect with housing slide, and No.1 grip block one end is fixed with can be with The No.1 rack gear of No.1 gear engagement;No. two clamping units include No. two grip blocks and air bag, No. two grip blocks and rack Hingedly, cavity is equipped in No. two grip blocks, the air blower of the interior conveying gas of the oriented air bag of installation in cavity;Transfer mechanism packet Adjusting rod, support bar and swingle are included, support bar is connect with housing slide, and support bar one end and adjusting rod one end are hinged, is adjusted The bar other end and the end face of No.1 gear are hinged;The support bar other end and swingle one end are hinged, the swingle other end and No. two Grip block is hinged;Wherein swingle is equipped with stroke hole, is fixed with the pin in stroke hole in rack;The cutting mechanism Including No. two rack gears, No. two gears, No. three rack gears and cutter;No. two rack gears are fixed on support bar, and No. two gears turn Dynamic to be connected in rack, No. three rack gears are slidably connected in rack, and the cutter are fixedly connected with No. three rack gear one end; Wherein No. two gears are engaged with No. two rack gears, No. three rack gears;The abutting mechanism include push against item, uniformly be fixed on to Abutting block on tight item and the cylinder for being limited to abutting block, the cylinder are fixed in rack, the abutting item It is fixedly connected with the No.1 grip block other end;
Step 2: setting starting and the shut-in time interval of cylinder and air blower first, pipe fitting is then placed on supporting table On, pipe fitting one end is pushed against with No.1 grip block and makes convex block be inserted into the end pipe fitting is fixed, while cylinder starts, and cylinder is defeated Out elongate axis and to push against block limit;
Step 3: the rotation of No.1 gear drives adjusting rod to swing, thus drive support bar mobile, band during support bar is mobile Dynamic No. two rack gears are mobile, to drive No. two gears rotation engaged with No. two rack gears, and then drive No. three rack gears mobile, cutting Knife is moved under the action of No. three rack gears and is cut to pipe fitting;Swingle is driven to turn around pin while support bar is mobile It is dynamic, to drive No. two grip block rotations, the end is pushed against after No. two grip blocks and another end in contact of pipe fitting, while air blower opens It is dynamic, air bag swelling pipe fitting inner wall under the action of air blower;
Step 4: during No.1 gear continues to rotate, support bar opposite direction under the action of adjusting rod is mobile, support bar Drive No. two rack gear opposite directions mobile during opposite direction is mobile, to drive No. two gear negative sides engaged with No. two rack gears To rotation, and then drive No. three rack gear opposite directions mobile, cutter opposite direction under the action of No. three rack gears is mobile;Support bar is anti- Swingle is driven to rotate around pin opposite direction while direction is mobile, to drive No. two grip block opposite direction rotations, and then band The dynamic pipe fitting rotation cut;
Step 5: when pipe fitting turns to minimum point by cut end, air blower is shut down, the pipe cut after the gas evolution in air bag Part is fallen in collecting box;
Step 6: No.1 gear rotates a period of time exhaust hood and closes, and cylinder output shaft is shunk, and releases the limit to block is pushed against, this When No.1 gear engaged with No.1 rack gear, No.1 rack gear moves under the action of No.1 gear, thus drive No.1 grip block move It is dynamic, and then drive pipe fitting mobile;
Step 7: when No.1 gear is no longer engaged with No.1 rack gear, No.1 gear is rotated one week, the next cutting of pipe fitting at this time Point be located at cutter below, while cylinder start, cylinder output elongate axis and again to abutting block limit, then repeat Step 3-6 is stated, the multiple cutting to pipe fitting is completed.
2. division techniques such as a kind of pipe fittings according to claim 1, it is characterised in that: be equipped in cavity described in step 1 Extract the exhaust fan of gas in air bag out.
3. division techniques such as a kind of pipe fittings according to claim 2, it is characterised in that: supporting table described in step 1 is equipped with With the matched through slot of pipe fitting.
4. division techniques such as a kind of pipe fittings according to claim 3, it is characterised in that: collecting box bottom surface described in step 1 is set There is rubber pad.
5. division techniques such as a kind of pipe fittings according to claim 4, it is characterised in that: the hole wall of stroke hole described in step 1 It is equipped with graphite linings.
CN201711223302.5A 2017-11-29 2017-11-29 A kind of division techniques such as pipe fitting Active CN107824867B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711223302.5A CN107824867B (en) 2017-11-29 2017-11-29 A kind of division techniques such as pipe fitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711223302.5A CN107824867B (en) 2017-11-29 2017-11-29 A kind of division techniques such as pipe fitting

Publications (2)

Publication Number Publication Date
CN107824867A CN107824867A (en) 2018-03-23
CN107824867B true CN107824867B (en) 2019-02-05

Family

ID=61646497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711223302.5A Active CN107824867B (en) 2017-11-29 2017-11-29 A kind of division techniques such as pipe fitting

Country Status (1)

Country Link
CN (1) CN107824867B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112846394A (en) * 2021-02-26 2021-05-28 深圳天明堂实业有限公司 Auxiliary cutting device for aluminum alloy pipeline

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU719819A1 (en) * 1978-04-07 1980-03-05 Предприятие П/Я В-8406 Pipe cutting device
CN205600027U (en) * 2016-04-15 2016-09-28 上海闽坚铝业有限公司 Aluminum product high efficiency cutting device
CN205704503U (en) * 2016-04-27 2016-11-23 黄根来 A kind of building timber efficient cutting
CN205733214U (en) * 2016-05-19 2016-11-30 南安市智德机械设备有限公司 A kind of metal pipe material fixed-length cutting device
CN206139893U (en) * 2016-10-15 2017-05-03 宁夏百辰工业产品设计有限公司 Device is cuted to high -precision pseudotype fixed length of copper pipe
CN206200229U (en) * 2016-11-16 2017-05-31 广东技术师范学院 A kind of Copper fabrication controllable type copper pipe intercept unit
CN206445274U (en) * 2017-01-03 2017-08-29 天津市佳格交通配件有限公司 A kind of fixed length pipe cutting machine of adjustable withdrawing distance
CN206643424U (en) * 2017-04-25 2017-11-17 叶宝义 A kind of handware efficient cutting

Also Published As

Publication number Publication date
CN107824867A (en) 2018-03-23

Similar Documents

Publication Publication Date Title
CN107813006B (en) A kind of hardware pipe fitting cutting equipment
US3918330A (en) Insulated wire cutting and stripping apparatus
CN107824867B (en) A kind of division techniques such as pipe fitting
CN106475884A (en) A kind of steel pipe cutting device of automatic charging
CN104663848B (en) A kind of prawn opens back of the body head-removed device
CN105945438B (en) A kind of automatic weld cap machine of smoke pipe
CN108353624A (en) Pineapple picker
CN208483977U (en) A kind of Furniture manufacture cutter device
CN212495689U (en) Pipe cutting machine with workpiece clamped firmly
CN114042954A (en) High-efficient drilling equipment of metallurgical part
CN206954636U (en) A kind of automatic slash pocket machine
CN112441538A (en) Three-piece top cover installation equipment for pop-top can
US3469278A (en) Fish beheading and cleaning machine
CN203735358U (en) Shrimp head remover
CN108638264A (en) Timber processing apparatus
CN210922214U (en) Heat accumulating type heating furnace feeding device
CN112775750A (en) Semi-automatic seamless steel pipe chamfering machine
CN111436625A (en) Full-automatic coconut cutting device
CN102039398A (en) Discharge turnover device in casting system of composite copper-aluminum busbar
CN113001039A (en) Laser cutting equipment with function of discharging fume fast
CN219294163U (en) Plastic film processing cutting equipment with conveying structure
CN201950201U (en) Discharging turning device in copper aluminum composite row casting system
CN207664152U (en) A kind of process units pasting insulating trip automatically for battery side
CN111977279A (en) Even conveying equipment of mud that cutter earthing sword was used of burning
CN216065778U (en) Hydraulic engineering pipeline cutting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant