CN107816215A CN201711077689.8A CN201711077689A CN107816215A CN 107816215 A CN107816215 A CN 107816215A CN 201711077689 A CN201711077689 A CN 201711077689A CN 107816215 A CN107816215 A CN 107816215A
Authority
CN
China
Prior art keywords
contiguous block
escape way
plate
fixedly connected
steel construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711077689.8A
Other languages
Chinese (zh)
Inventor
金嘉彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711077689.8A priority Critical patent/CN107816215A/en
Publication of CN107816215A publication Critical patent/CN107816215A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3209Temporary tunnels specially adapted against falling objects

Abstract

The invention discloses a kind of good steel construction escape way of stability, including the first supporting steel plate and the second supporting steel plate, the top of first supporting steel plate and the second supporting steel plate is fixedly connected with fixed block by the first reinforcing plate, and it is installed with the first V shaped slab and the second V shaped slab successively from top to bottom between two fixed blocks, the first contiguous block and the second contiguous block have been fixedly connected between first V shaped slab and the second V shaped slab, leak-off chute is offered at the top of first contiguous block.The present invention is by setting the first V shaped slab, the second V shaped slab, the first contiguous block and the second contiguous block, the first contiguous block and the second contiguous block that right angle is set, steel construction escape way can be made safer, it is more stable, and two V shaped slabs can make when emergency case is run into, stability is stronger, is not easy to make escape way crack occur or collapse, the effect for making the steel construction escape way that there is practicality to strengthen.

Description

A kind of good steel construction escape way of stability
Technical field
The present invention relates to long strands field, the good steel construction escape way of specially a kind of stability.
Background technology
The structure that steel construction is made up of steel material, it is one of main building construction types.Structure is mainly by shaped steel With steel plate etc. made of the component composition such as girder steel, steel column and steel truss, generally use weld seam between each component or part, bolt or Rivet interlacement.Because its deadweight is lighter, and easy construction, it is widely used in the fields such as large-sized workshop, venue and Super High.It is so existing Safety management it is more important, but the stability of present steel construction escape way is not good enough, if there is crisis situations, Escape way may be made crack occur or even collapse, the personal safety of personnel can be unfavorable for.
The content of the invention
(1) technical problem solved
In view of the shortcomings of the prior art, the invention provides a kind of good steel construction escape way of stability, solves steel The problem of structure escape way stability is bad.
(2) technical scheme
To achieve the above object, the present invention provides following technical scheme:A kind of good steel construction escape way of stability, bag The first supporting steel plate and the second supporting steel plate are included, the top of first supporting steel plate and the second supporting steel plate is strengthened by first Plate is fixedly connected with fixed block, and is installed with the first V shaped slab and the second V-arrangement successively from top to bottom between two fixed blocks Plate, the first contiguous block and the second contiguous block are fixedly connected between first V shaped slab and the second V shaped slab, described first connects Connect and leak-off chute is offered at the top of block, curved pipe is fixedly connected with the surface of leak-off chute described in the quantity of the leak-off chute, institute To state and angle steel has been fixedly connected with the inside of the first supporting steel plate and the second supporting steel plate, the quantity of the angle steel is eight, and Each two angle steel is one group, and fixed plate is fixedly connected between the angle steel of both sides, is threaded with the angle steel surface First bolt, and U-board is fixedly connected between two fixed plates, the quantity of the U-board is four, and each two U Shape plate is one group, and two U-boards therein are arranged in above first support bar in fixed plate, remaining two U-shapeds Plate is arranged in the fixed plate below first support bar, and rotating shaft is connected with the inner surface of the U-board, and often Bull stick is fixedly connected between two relative rotating shafts, the bottom of first supporting steel plate and the second supporting steel plate is fixedly connected There is a connecting plate, the bottom of the connecting plate opens up fluted, and slide rail, the slide rail are fixedly connected with the left of the groove inner wall Right side be connected with pulley, be provided with mounting blocks on the right side of the pulley, the tops of the mounting blocks and groove inner wall it Between be fixedly connected with the first adjustable spring, the bottom of the mounting blocks is fixedly connected with base.
Preferably, the junction between first contiguous block and the second contiguous block is 90 degree of settings.
Preferably, the point of intersection of the bull stick is connected by the second bolt thread.
Preferably, the bottom of the base is fixedly connected with block rubber, and the bottom of block rubber is coarse setting.
Preferably, the quantity equal at least two of first contiguous block and the second contiguous block, and the first contiguous block and The interlaced setting of second contiguous block.
Preferably, first reinforcing plate is shaped as L-shaped.
(3) beneficial effect
The invention provides a kind of good steel construction escape way of stability.Possesses following beneficial effect:
(1), by setting the first V shaped slab, the second V shaped slab, the first contiguous block and the second contiguous block, right angle is set the present invention The first contiguous block and the second contiguous block, steel construction escape way can be made safer, it is more stable, and two V shaped slabs can make When emergency case is run into, stability is stronger, is not easy to make escape way crack occur or collapse, and makes the steel construction safe Passage has the effect that practicality strengthens.
(2), the present invention bull stick being staggered, makes the first supporting steel plate by setting U-board, bull stick and the second bolt And second is more stable between supporting steel plate, make the stability of the steel construction escape way stronger.
(3), the present invention when making to run into weight, makes pulley in cunning by setting slide rail, pulley, mounting blocks and base Moved on rail, connecting plate is slightly moved down, make the steel construction escape way that there is stability, and make the steel construction safe Passage has the effect that practicality strengthens.Enough prevent from producing torsional deformation during upset, improve equipment uses the longevity Life;It can effectively prevent stuck, be uniformly applied to after accident weight that motor overload burns is scattered on base, it is therefore prevented that should Power is concentrated, and improves the security performance of equipment.It is effective to limit in the displacement for moving up and down and moving along a straight line, solve excessively The problem of displacement.The real-time switching of lengthwise movement is realized, solves the problems, such as the immovable fixing device of existing apparatus.Will rotation Transhipment turn turns to linear motion, effectively raises horizontal positioning precision, solves device lateral positioning and does not ask accurately Topic.
(4), the present invention is by setting the first adjustable spring, using the elastic reaction of the first adjustable spring in normal condition Under, make connection sheet reset, the effect for making the steel construction escape way that there is practicality to strengthen.
(5), the present invention makes rainwater flow to curved pipe at leak-off chute, and flow to by setting leak-off chute and curved pipe Ground, it is not easy to corrode steel construction body, the effect for making the steel construction escape way that there is practicality to strengthen, and makes the steel construction The stability of escape way is more preferable.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the first V shaped slab top structure schematic diagram of the invention;
Fig. 3 is the enlarged drawing at A in Fig. 1.
In figure:1 first supporting steel plate, 2 second supporting steel plates, 3 rotating shafts, 4 first reinforcing plates, 5 fixed blocks, 6 first V-arrangements Plate, 7 second V shaped slabs, 8 first contiguous blocks, 9 second contiguous blocks, 10 leak-off chutes, 11 curved pipes, 12 angle steel, 13 first bolts, 14 Fixed plate, 15U shapes plate, 16 bull sticks, 17 connecting plates, 18 grooves, 19 slide rails, 20 pulleys, 21 mounting blocks, 22 first adjustable springs, 23 bases, 24 second bolts.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
As Figure 1-3, the present invention provides a kind of technical scheme:A kind of good steel construction escape way of stability, including The top of first supporting steel plate (1) and the second supporting steel plate (2), the first supporting steel plate (1) and the second supporting steel plate (2) passes through One reinforcing plate (4) is fixedly connected with fixed block (5), and the first reinforcing plate (4) is shaped as L-shaped, and between two fixed blocks (5) Be installed with the first V shaped slab (6) and the second V shaped slab (7) successively from top to bottom, the first V shaped slab (6) and the second V shaped slab (7) it Between be fixedly connected with the first contiguous block (8) and the second contiguous block (9), between the first contiguous block (8) and the second contiguous block (9) Junction is 90 degree and set, the quantity equal at least two of the first contiguous block (8) and the second contiguous block (9), and first Contiguous block (8) and the second contiguous block (9) interlaced setting, by setting the first V shaped slab (6), the second V shaped slab (7), first to connect Block (8) and the second contiguous block (9) are connect, the first contiguous block (8) and the second contiguous block (9) that right angle is set, steel construction can be made safe Passage is safer, more stable, and two V shaped slabs can make when emergency case is run into, and stability is stronger, is not easy to make peace There is crack or collapsed in full tunnel, the effect for making the steel construction escape way that there is practicality to strengthen, the first contiguous block (8) Top offers leak-off chute (10), and curved pipe (11) is fixedly connected with the surface of the quantity leak-off chute (10) of leak-off chute (10), By setting leak-off chute (10) and curved pipe (11), rainwater is set to flow to curved pipe (11) from leak-off chute (10), and flow to ground Face, it is not easy to corrode steel construction body, the effect for making the steel construction escape way that there is practicality to strengthen, and pacifies the steel construction The stability of full tunnel is more preferable, and angle steel has been fixedly connected with the inside of the first supporting steel plate (1) and the second supporting steel plate (2) (12), the quantity of angle steel (12) is eight, and each two angle steel (12) is one group, and fixed between the angle steel (12) of both sides Fixed plate (14) is connected with, the first bolt (13) is threaded with angle steel (12) surface, and between two fixed plates (14) U-board (15) is fixedly connected with, the quantity of U-board (15) is four, and each two U-board (15) is one group, and wherein Two U-boards (15) be arranged in above first support bar (1) in fixed plate (14), remaining two U-boards (15) set Put in the fixed plate (14) below first support bar (1), rotating shaft (3) be connected with the inner surface of U-board (15), And bull stick (16) is fixedly connected between two often relative rotating shafts (3), the point of intersection of bull stick (16) passes through the second bolt (24) it is threadedly coupled, by setting U-board (15), bull stick (15) and the second bolt (24), the bull stick being staggered (16), makes the It is more stable between one supporting steel plate (1) and the second supporting steel plate (2), make the stability of the steel construction escape way stronger, the The bottom of one supporting steel plate (1) and the second supporting steel plate (2) is fixedly connected with connecting plate (17), and the bottom of connecting plate (17) opens up Fluted (18), slide rail (19) are fixedly connected with the left of groove (18) inwall, slide rail is connected with pulley on the right side of (19) (20) mounting blocks (21), are provided with the right side of pulley (20), it is fixed between mounting blocks (21) and the top of groove (18) inwall to connect The first adjustable spring (22) is connected to, by setting the first adjustable spring (22), utilizes the elastic reaction of the first adjustable spring (22) Under normal circumstances, reset connecting plate (17), the effect for making the steel construction escape way that there is practicality to strengthen, mounting blocks (21) bottom is fixedly connected with base (23), by setting slide rail (19), pulley (20), mounting blocks (21) and base (23), When making to run into weight, pulley (20) is moved on slide rail (19), connecting plate (17) is slightly moved down, make the steel knot Structure escape way has stability, and the effect for making the steel construction escape way that there is practicality to strengthen, the bottom of base (23) Portion is fixedly connected with block rubber, and the bottom of block rubber is coarse setting, makes base (23) be not easy to skid.
Can to sum up obtain, (1), the present invention by set the first V shaped slab (6), the second V shaped slab (7), the first contiguous block (8) and Second contiguous block (9), the first contiguous block (8) and the second contiguous block (9) that right angle is set, can be such that steel construction escape way more pacifies Entirely, it is more stable, and two V shaped slabs can make when emergency case is run into, and stability is stronger, is not easy escape way occur Crack collapses, the effect for making the steel construction escape way that there is practicality to strengthen.
(2), the present invention is by setting U-board (15), bull stick (15) and the second bolt (24), the bull stick being staggered (16), make more to stablize between the first supporting steel plate (1) and the second supporting steel plate (2), make the stabilization of the steel construction escape way Property is stronger.
(3), the present invention makes to run into weight by setting slide rail (19), pulley (20), mounting blocks (21) and base (23) When, pulley (20) is moved on slide rail (19), connecting plate (17) is slightly moved down, have the steel construction escape way There is stability, and the effect for making the steel construction escape way that there is practicality to strengthen.
(4), the present invention is by setting the first adjustable spring (22), using the elastic reaction of the first adjustable spring (22) just In the case of often, reset connecting plate (17), the effect for making the steel construction escape way that there is practicality to strengthen.
(5), the present invention makes rainwater flow to arc from leak-off chute (10) by setting leak-off chute (10) and curved pipe (11) Manage (11), and flow to ground, be not easy to corrode steel construction body, the effect for making the steel construction escape way that there is practicality to strengthen Fruit, and make the stability of the steel construction escape way more preferable.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Other identical element also be present in process, method, article or equipment including the key element.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of good steel construction escape way of stability, including the first supporting steel plate (1) and the second supporting steel plate (2), described The top of first supporting steel plate (1) and the second supporting steel plate (2) is fixedly connected with fixed block (5) by the first reinforcing plate (4), and And it is installed with the first V shaped slab (6) and the second V shaped slab (7), the first V between two fixed blocks (5) successively from top to bottom The first contiguous block (8) and the second contiguous block (9) are fixedly connected between shape plate (6) and the second V shaped slab (7), described first connects Connect and leak-off chute (10) is offered at the top of block (8), it is fixed on the surface of leak-off chute (10) described in the quantity of the leak-off chute (10) Curved pipe (11) is connected with, angle steel has been fixedly connected with the inside of first supporting steel plate (1) and the second supporting steel plate (2) (12), the quantity of the angle steel (12) is eight, and each two angle steel (12) is one group, and between the angle steel (12) of both sides Fixed plate (14) is fixedly connected with, the first bolt (13), and two fixed plates are threaded with angle steel (12) surface (14) U-board (15) is fixedly connected between, the quantity of the U-board (15) is four, and each two U-board (15) is one Group, and two U-boards (15) therein are arranged in above first support bar (1) in fixed plate (14), remaining two U Shape plate (15) is arranged in the fixed plate (14) below first support bar (1), movable on the inner surface of the U-board (15) Rotating shaft (3) is connected with, and bull stick (16), first supporting steel plate are fixedly connected between often relative two rotating shafts (3) (1) and the bottom of the second supporting steel plate (2) is fixedly connected with connecting plate (17), and the bottom of the connecting plate (17) opens up fluted (18) slide rail (19), is fixedly connected with the left of groove (18) inwall, cunning is connected with the right side of the slide rail (19) Take turns (20), mounting blocks (21), the mounting blocks (21) and the top of groove (18) inwall are provided with the right side of the pulley (20) Between be fixedly connected with the first adjustable spring (22), the bottom of the mounting blocks (21) is fixedly connected with base (23).
A kind of 2. good steel construction escape way of stability according to claim 1, it is characterised in that:First connection Junction between block (8) and the second contiguous block (9) is 90 degree of settings.
A kind of 3. good steel construction escape way of stability according to claim 1, it is characterised in that:The bull stick (16) Point of intersection pass through the second bolt (24) be threadedly coupled.
A kind of 4. good steel construction escape way of stability according to claim 1, it is characterised in that:The base (23) Bottom be fixedly connected with block rubber, and the bottom of block rubber is coarse setting.
A kind of 5. good steel construction escape way of stability according to claim 1-4, it is characterised in that:Described first connects The quantity equal at least two of block (8) and the second contiguous block (9) is connect, and the first contiguous block (8) and the second contiguous block (9) are mutual It is staggered.
A kind of 6. good steel construction escape way of stability according to claim 1-5, it is characterised in that:Described first adds Strong plate (4) is shaped as (L-shaped).
A kind of 7. preparation method of the good steel construction escape way of stability, it is characterised in that:By set the first V shaped slab (6), Second V shaped slab (7), the first contiguous block (8) and the second contiguous block (9), the first contiguous block (8) and the second contiguous block that right angle is set (9), steel construction escape way can be made safer,;By setting U-board (15), bull stick (15) and the second bolt (24), staggeredly The bull stick (16) of setting, make more stable between the first supporting steel plate (1) and the second supporting steel plate (2);By setting slide rail (19), pulley (20), mounting blocks (21) and base (23), when making to run into weight, pulley (20) is made to be moved up in slide rail (19) It is dynamic, connecting plate (17) is slightly moved down;By setting the first adjustable spring (22), the bullet of the first adjustable spring (22) is utilized Property effect under normal circumstances;By setting leak-off chute (10) and curved pipe (11), rainwater is set to flow to arc from leak-off chute (10) Shape pipe (11), and ground is flow to, it is not easy to corrode steel construction body, the effect for making the steel construction escape way that there is practicality to strengthen Fruit, and make the stability of the steel construction escape way more preferable.
CN201711077689.8A 2017-11-06 2017-11-06 A kind of good steel construction escape way of stability Withdrawn CN107816215A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711077689.8A CN107816215A (en) 2017-11-06 2017-11-06 A kind of good steel construction escape way of stability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711077689.8A CN107816215A (en) 2017-11-06 2017-11-06 A kind of good steel construction escape way of stability

Publications (1)

Publication Number Publication Date
CN107816215A true CN107816215A (en) 2018-03-20

Family

ID=61604778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711077689.8A Withdrawn CN107816215A (en) 2017-11-06 2017-11-06 A kind of good steel construction escape way of stability

Country Status (1)

Country Link
CN (1) CN107816215A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952195A (en) * 2018-07-18 2018-12-07 李义飞 A kind of construction site anti-falling device
WO2023237814A1 (en) * 2022-06-06 2023-12-14 Konecranes Global Corporation Container handling system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952195A (en) * 2018-07-18 2018-12-07 李义飞 A kind of construction site anti-falling device
CN108952195B (en) * 2018-07-18 2020-12-29 中国建筑第七工程有限公司 Building site is with preventing weighing down thing device
WO2023237814A1 (en) * 2022-06-06 2023-12-14 Konecranes Global Corporation Container handling system

Similar Documents

Publication Publication Date Title
CN107816215A (en) A kind of good steel construction escape way of stability
CN105888059A (en) Annular self-locking joint connecting structure
CN112112274B (en) Assembly type steel structure building assembly and assembly method
CN1963061A (en) Buckling-restrained brace of combined hot-rolled angle steel
CN205840337U (en) A kind of complete bolted reinforcing steel processing shed
CN201627386U (en) Main machine hall structure for large thermal power plant
CN207620411U (en) A kind of steel construction escape way that stability is good
CN210813600U (en) Fixing device for construction operation safety belt
CN104963280B (en) A kind of Novel circular steel cylinder pier
CN207793864U (en) A kind of anchor of bridge expanssion joint
CN210798365U (en) Basement roof construction passageway reinforced structure
CN206662131U (en) A kind of construction site hoop bending device for steel bars easy to use
CN209941519U (en) Reinforced structure is used in bridge construction
CN106522268A (en) Agglomeration mode type reinforced masonry retaining wall
CN207240163U (en) Assembled multi-functional bar piling bin
CN206581946U (en) A kind of tunnel suspension device
CN205557821U (en) Reinforced concrete frame structure with shock resistance
CN204875492U (en) Novel box steel bridge mound
CN203878567U (en) High-strength steel bar high-performance concrete precast solid square pile
CN220978916U (en) Portable limb protection device
CN108842588A (en) A kind of assembled steel hollow sandwich slab bridge and production method
CN219387319U (en) Building steel construction installation tie point reinforcing apparatus
CN220247736U (en) Remove reinforcing bar processing canopy
CN219061172U (en) Foldable telescopic safety guard rail for pipe network construction
CN107697540B (en) A kind of conveying track of high-wear-resistant alloy liner plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180320

WW01 Invention patent application withdrawn after publication