CN107806247A - Structure of hydropower station concrete surface adjusts sample rack - Google Patents

Structure of hydropower station concrete surface adjusts sample rack Download PDF

Info

Publication number
CN107806247A
CN107806247A CN201711025230.3A CN201711025230A CN107806247A CN 107806247 A CN107806247 A CN 107806247A CN 201711025230 A CN201711025230 A CN 201711025230A CN 107806247 A CN107806247 A CN 107806247A
Authority
CN
China
Prior art keywords
frame
sample rack
support column
hydropower station
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711025230.3A
Other languages
Chinese (zh)
Inventor
李利芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711025230.3A priority Critical patent/CN107806247A/en
Publication of CN107806247A publication Critical patent/CN107806247A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The invention discloses a kind of structure of hydropower station concrete surface to adjust sample rack;Belong to building auxiliary mould technical field;Technical points include upper support frame and lower bracing frame, are connected between upper support frame and lower bracing frame by being arranged vertically at the support column at lower bracing frame center, the top of upper support frame is concrete platform, it is characterised in that:The upper end of the support column is provided with through upper support frame and movable sleeve and embraces fixture block, and steel pipe, which is located in, to be embraced on fixture block, and steel pipe upper end is in contact with building plate face to be regulated;Manipulation block is threaded with the support column embraced between fixture block and upper support frame;The present invention is intended to provide a kind of adjust structure of hydropower station concrete surface regulation sample rack easy to operate, stability of strutting system is high;For architecture construction.

Description

Structure of hydropower station concrete surface adjusts sample rack
Technical field
The present invention relates to the building technology field of water resource stations building, more particularly to structure of hydropower station concrete surface Adjust sample rack structure.
Background technology
The building in power station, it is high to the flatness requirement of concrete surface, to ensure construction quality, typically in coagulation The lower section on native surface is installed by adjustable sample rack.In the prior art, sample rack includes upper lower bracing frame, is spaced between upper lower bracing frame More height-adjustable support columns are installed, Adjusting bolt Adjusting screw is installed on support column, support column is adjusted by rotary threaded sleeve Highly, so as to adjust the spacing in upper lower bracing frame between multiple points, what the final upper surface for ensureing upper support frame was each put hangs down Straight coordinate is consistent, that is, realizes that support is in relative level.The sample rack of this structure, has the drawback that:Screw is placed in up and down Need to stretch into support between support frame, during regulation, it is troublesome in poeration;The both sides of support column lack balancing pole, single support column It is not high to the stability of strutting system of support frame;Contacted between steel cylindrical tube and concrete flat slab that upper support frame passes through longitudinal direction, its Stability of strutting system is not high.
The content of the invention
The applicant is directed to the disadvantages mentioned above of prior art, is studied and is improved, there is provided a kind of structure of hydropower station mixes Native surface modulation sample rack is coagulated, it, which has, adjusts the characteristics of easy to operate, stability of strutting system is high.
In order to solve the above problems, the present invention uses following scheme:
A kind of structure of hydropower station concrete surface adjusts sample rack, including upper support frame and lower bracing frame, upper support frame with Connected between lower bracing frame by being arranged vertically at the support column at lower bracing frame center, the top of upper support frame is coagulation Native platform, it is characterised in that:The upper end of the support column is provided with through upper support frame and movable sleeve and embraces fixture block, and steel pipe, which is located in, to be embraced On fixture block, steel pipe upper end is in contact with building plate face to be regulated;The spiral shell on the support column embraced between fixture block and upper support frame Line is connected with manipulation block.
In above-mentioned structure of hydropower station concrete surface regulation sample rack, the support column is from the bottom to top by supporting part, spiral shell Line portion and guide part composition;Embrace fixture block and be movably set in guide part, manipulate block and be connected with threaded portion.
In above-mentioned structure of hydropower station concrete surface regulation sample rack, described armful of fixture block embraces folder by what is be engaged with steel pipe Seat, it is oppositely arranged on armful folder for embracing the clamping arm of holder two bottom sides, being arranged on clamping arm free end and being engaged with support column Arc plate and it is arranged on and embraces grip hold arc plate lower end and the spacing ring relative with operating block and form;It is provided with holder is embraced and is engaged with steel pipe Spacing breach, the opening portion width of spacing breach is less than diameter of steel tube.
In above-mentioned structure of hydropower station concrete surface regulation sample rack, the lower surface of the upper support frame and lower bracing frame Upper surface be symmetrically installed with balancing stand, the balancing stand includes the balance weight being placed on support column, and the sidepiece of balance weight leads to Excessive root balancing pole is connected with upper support frame or lower bracing frame;Back-moving spring is installed between upper and lower balance weight.
In above-mentioned structure of hydropower station concrete surface regulation sample rack, the upper surface of the lower bracing frame is provided with positioning Cover for seat, the lower end of support column, which is arranged at, to be rotated in cover for seat.
In above-mentioned structure of hydropower station concrete surface regulation sample rack, the lower bracing frame edge is vertically provided with Scale post, the through hole being adapted with scale post is provided with upper support frame.
The technical effects of the invention are that:
In the present invention, the top that block is placed in upper support frame, the convenient height for adjusting upper support frame are manipulated;Upper lower bracing frame it Between balancing stand is installed, improve the stability of strutting system of support frame;Fixture block is embraced in the upper end installation of support column, is embraced fixture block and is both used to strengthen Connection between steel pipe and support column, when and can causes support column with fastener for connection, it is not necessary to again by the way of being welded and fixed, Fast and easy is dismounted and reused.
Brief description of the drawings
The present invention is described in further detail for embodiment in below in conjunction with the accompanying drawings, but does not form to the present invention's Any restrictions.
Fig. 1 is the structural representation of the present invention.
In figure:Upper support frame 1, lower bracing frame 2, support column 3, concrete platform 4, armful fixture block 5, steel pipe 6, manipulation block 7, branch Support part 3a, threaded portion 3b, guide part 3c, holder 5a, clamping arm 5b are embraced, grip hold arc plate 5c is embraced, is spacing ring 5d, spacing breach 5e, flat Weigh frame 8, balance weight 8a, balancing pole 8b, back-moving spring 9, positioning cover for seat 10, scale post 11.
Embodiment
As shown in figure 1, a kind of structure of hydropower station concrete surface regulation sample rack of the present embodiment, including upper support frame 1 And lower bracing frame 2, by being arranged vertically at the support column at the center of lower bracing frame 2 between upper support frame 1 and lower bracing frame 2 3 connections, the top of upper support frame 1 is concrete platform 4 to be onstructed.More consolidated in order that support column is fixed, in lower support The upper surface of frame 2 is provided with positioning cover for seat 10, and the lower end of support column 3 is arranged in positioning cover for seat 10.
In order that structure is more firm, it is symmetrically installed with the upper surface of the lower surface of upper support frame 1 and lower bracing frame 2 flat Weigh frame 8, and the balancing stand 8 includes the balance weight 8a being placed on support column 3, and balance weight 8a sidepiece passes through more balancing pole 8b It is connected with upper support frame 1 or lower bracing frame 2;Back-moving spring 9 is installed between upper and lower balance weight 8a.In the present embodiment, it is described Support column 3 is made up of supporting part 3a, threaded portion 3b and guide part 3c from the bottom to top;Embrace fixture block 5 and be movably set in guide part 3a, grasp Vertical block 7 is threadedly coupled with threaded portion 3b.
In order that regulation is more accurate, scale post 11 is vertically provided with the edge of lower bracing frame 2, in upper support frame 1 It is provided with the through hole being adapted with scale post 11.
It being provided with through upper support frame 1 and movable sleeve in the upper end of support column 3 and embrace fixture block 5, steel pipe 6, which is located in, to be embraced on fixture block 5, The upper end of steel pipe 6 is in contact with building plate face to be regulated;Screw thread connects on the support column 4 embraced between fixture block 5 and upper support frame 1 It is connected to and manipulates block 7.
Preferably, described armful of fixture block 5 by be engaged with steel pipe 6 embrace holder 5a, be oppositely arranged on embrace a holder 5a bottoms two The clamping arm 5b of side, be arranged on clamping arm 5b free ends and be engaged with support column 3 embrace grip hold arc plate 5c and be arranged on embrace a grip hold arc Plate 5c lower ends and the spacing ring 5d relative with operating block 7 compositions;The spacing breach being engaged with steel pipe 6 is provided with holder 5a is embraced 5e, spacing breach 5e opening portion width are less than the diameter of steel pipe 6.
In use, according to the shape of concrete platform, steel pipe corresponding to selection, then pass through the regulation sample rack pair of the present invention Steel pipe is fixed.Steel pipe is set to be on precalculated position further according to the height for requiring to adjust each regulation sample rack.Pouring coagulation Soil and close to it is pre-hardening when, reference be used as to the floating operation of concrete platform progress by default steel pipe.
Embodiment provided above is the better embodiment of the present invention, is only used for the convenient explanation present invention, not to this hair It is bright to make any formal limitation, any those of ordinary skill in the art, if putting forward skill not departing from the present invention In the range of art feature, using the equivalent embodiment locally changed or modified made by disclosed technology contents, and Without departing from the technical feature content of the present invention, in the range of still falling within the technology of the present invention feature.

Claims (6)

1. a kind of structure of hydropower station concrete surface adjusts sample rack, including upper support frame (1) and lower bracing frame (2), upper support It is connected between frame (1) and lower bracing frame (2) by being arranged vertically at the support column (3) at lower bracing frame (2) center, upper branch The top of support (1) is concrete platform (4), it is characterised in that:Upper support frame (1) is run through simultaneously in the upper end of the support column (3) Movable sleeve, which is provided with, embraces fixture block (5), and steel pipe (6), which is located in, to be embraced on fixture block (5), steel pipe (6) upper end and building plate face to be regulated It is in contact;It is threaded with the support column (4) embraced between fixture block (5) and upper support frame (1) and manipulates block (7).
2. structure of hydropower station concrete surface according to claim 1 adjusts sample rack, it is characterised in that the support column (3) it is made up of from the bottom to top supporting part (3a), threaded portion (3b) and guide part (3c);Embrace fixture block (5) and be movably set in guide part (3a), manipulate block (7) and be threadedly coupled with threaded portion (3b).
3. structure of hydropower station concrete surface according to claim 1 or 2 adjusts sample rack, it is characterised in that described armful Fixture block (5) by be engaged with steel pipe (6) embrace holder (5a), be oppositely arranged on embrace holder (5a) two bottom sides clamping arm (5b), be arranged on clamping arm (5b) free end and be engaged with support column (3) embrace grip hold arc plate (5c) and be arranged on embrace a grip hold arc plate (5c) lower end and the spacing ring (5d) relative with operating block (7) composition;It is provided with what is be engaged with steel pipe (6) on holder (5a) is embraced Spacing breach (5e), the opening portion width of spacing breach (5e) are less than steel pipe (6) diameter.
4. adjust sample rack according to the structure of hydropower station concrete surface described in claim 1, it is characterised in that the upper support The lower surface of frame (1) and the upper surface of lower bracing frame (2) are symmetrically installed with balancing stand (8), and the balancing stand (8) includes being placed on Balance weight (8a) on support column (3), the sidepiece of balance weight (8a) pass through more balancing poles (8b) and upper support frame (1) or lower branch Support (2) is connected;Back-moving spring (9) is installed between upper and lower balance weight (8a).
5. adjust sample rack according to the structure of hydropower station concrete surface described in claim 1, it is characterised in that the lower support The upper surface of frame (2) is provided with positioning cover for seat (10), and the lower end of support column (3) is arranged in positioning cover for seat (10).
6. adjust sample rack according to the structure of hydropower station concrete surface described in claim 1, it is characterised in that the lower support Frame (2) edge is vertically provided with scale post (11), is provided with upper support frame (1) and leads to what scale post (11) was adapted Hole.
CN201711025230.3A 2017-10-27 2017-10-27 Structure of hydropower station concrete surface adjusts sample rack Pending CN107806247A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711025230.3A CN107806247A (en) 2017-10-27 2017-10-27 Structure of hydropower station concrete surface adjusts sample rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711025230.3A CN107806247A (en) 2017-10-27 2017-10-27 Structure of hydropower station concrete surface adjusts sample rack

Publications (1)

Publication Number Publication Date
CN107806247A true CN107806247A (en) 2018-03-16

Family

ID=61582864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711025230.3A Pending CN107806247A (en) 2017-10-27 2017-10-27 Structure of hydropower station concrete surface adjusts sample rack

Country Status (1)

Country Link
CN (1) CN107806247A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719414A (en) * 2020-07-07 2020-09-29 郑琼华 Internal welding and external pouring type bridge pier and beam connection structure and beam and bridge pier butt joint method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001159240A (en) * 1999-12-03 2001-06-12 Asanuma Corp Concrete direct finishing method and jig
JP2009002026A (en) * 2007-06-21 2009-01-08 Tomokazu Okuda Height regulating tool
CN201730342U (en) * 2010-05-10 2011-02-02 中建七局第三建筑有限公司 Control support for controlling plainness of large area concrete construction
CN202148693U (en) * 2011-06-30 2012-02-22 新蒲建设集团有限公司 Surface elevation control device for concrete pouring
CN202787999U (en) * 2012-09-29 2013-03-13 深圳市建工集团股份有限公司 Movable type support bridge for efficient large area concrete terrace construction
CN205720304U (en) * 2016-04-14 2016-11-23 国网山东省电力公司济宁供电公司 A kind of high-potting cable support instrument
CN206397162U (en) * 2017-01-17 2017-08-11 广东鼎耀工程技术有限公司 A kind of slab thickness controls mould
CN207582988U (en) * 2017-10-27 2018-07-06 张善岳 A kind of structure of hydropower station concrete surface adjusts sample rack

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001159240A (en) * 1999-12-03 2001-06-12 Asanuma Corp Concrete direct finishing method and jig
JP2009002026A (en) * 2007-06-21 2009-01-08 Tomokazu Okuda Height regulating tool
CN201730342U (en) * 2010-05-10 2011-02-02 中建七局第三建筑有限公司 Control support for controlling plainness of large area concrete construction
CN202148693U (en) * 2011-06-30 2012-02-22 新蒲建设集团有限公司 Surface elevation control device for concrete pouring
CN202787999U (en) * 2012-09-29 2013-03-13 深圳市建工集团股份有限公司 Movable type support bridge for efficient large area concrete terrace construction
CN205720304U (en) * 2016-04-14 2016-11-23 国网山东省电力公司济宁供电公司 A kind of high-potting cable support instrument
CN206397162U (en) * 2017-01-17 2017-08-11 广东鼎耀工程技术有限公司 A kind of slab thickness controls mould
CN207582988U (en) * 2017-10-27 2018-07-06 张善岳 A kind of structure of hydropower station concrete surface adjusts sample rack

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719414A (en) * 2020-07-07 2020-09-29 郑琼华 Internal welding and external pouring type bridge pier and beam connection structure and beam and bridge pier butt joint method
CN111719414B (en) * 2020-07-07 2021-12-10 淮北淮海建设工程有限责任公司 Internal welding and external pouring type bridge pier and beam connection structure and beam and bridge pier butt joint method

Similar Documents

Publication Publication Date Title
CN107803918A (en) One kind experiment pours mould with adjustable beams of concrete
CN108952008A (en) Insert-type steel pipe concrete column and construction method
CN209129395U (en) A kind of control device for the control of built-in fitting absolute altitude
CN107090775A (en) A kind of full framing space beam-ends cable guide pipe construction localization method
CN207582988U (en) A kind of structure of hydropower station concrete surface adjusts sample rack
CN205776167U (en) Levelling pile foundation steel bar cage downward putting device
CN208949882U (en) The adjustable pile foundation steel pile casting positioning device of a kind of diameter
CN107806247A (en) Structure of hydropower station concrete surface adjusts sample rack
CN205857756U (en) A kind of construction discharging platform
CN208310244U (en) A kind of device for control panel surface evenness
CN207499480U (en) A kind of convenient regulating type building floor concrete surface adjusts sample rack
CN104773654B (en) A kind of cement electric pole press-rod apparatus
CN109332980A (en) Wielding neck means for correcting and bearing calibration
CN209179483U (en) A kind of adjustable pre-made void node formwork for placing
CN207847086U (en) A kind of tall and big beam form support frame
CN207277355U (en) A kind of pre-embedded bolt pours positioner
CN110097807A (en) Hv cable termination experiment porch
CN214363495U (en) Control device is laid to concrete bored concrete pile steel reinforcement cage
CN212336733U (en) Closed stair formwork device for constructional engineering
CN207878662U (en) Combined type pre-embedded steel slab
CN207131092U (en) Floor concrete casting operation platform is built in a kind of room
CN111893867A (en) Top steel plate adjusting structure of concrete stand column and construction method
CN206512611U (en) A kind of empty rail bridge pier of suspension type, which is installed, uses ground frock
CN206233571U (en) Beam formwork for building bracing means
CN205369921U (en) Template roof beam strutting arrangement with adjustable

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180316