CN107806187A - A kind of resistance to plucking not shearing resistance WELDING STUDS - Google Patents

A kind of resistance to plucking not shearing resistance WELDING STUDS Download PDF

Info

Publication number
CN107806187A
CN107806187A CN201711222043.4A CN201711222043A CN107806187A CN 107806187 A CN107806187 A CN 107806187A CN 201711222043 A CN201711222043 A CN 201711222043A CN 107806187 A CN107806187 A CN 107806187A
Authority
CN
China
Prior art keywords
resistance
pipe sleeve
plucking
welding studs
nail body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711222043.4A
Other languages
Chinese (zh)
Inventor
余晓琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201711222043.4A priority Critical patent/CN107806187A/en
Publication of CN107806187A publication Critical patent/CN107806187A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/48Dowels, i.e. members adapted to penetrate the surfaces of two parts and to take the shear stresses
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/48Dowels, i.e. members adapted to penetrate the surfaces of two parts and to take the shear stresses
    • E04B1/483Shear dowels to be embedded in concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of resistance to plucking not shearing resistance WELDING STUDS, including ailhead, nail body and latex pipe sleeve, the ailhead is fixed on one end of nail body, and the latex pipe sleeve is socketed on nail body, and the length ratio between the nail body and latex pipe sleeve is 0.8~0.95;The length of the nail body is 5cm~25cm, and the thickness of the latex pipe sleeve is 5mm~9mm.The WELDING STUDS of the present invention has good performance, improves the performance of its resistance to plucking not shearing resistance, and easy for construction.

Description

A kind of resistance to plucking not shearing resistance WELDING STUDS
Technical field
The present invention relates to the WELDING STUDS that shear is used for bridge structure and building structure etc., and in particular to a kind of resistance to plucking is not Shearing resistance WELDING STUDS.
Background technology
Traditional steel-concrete combined structure typically uses WELDING STUDS, makes concrete slab consistent with the deformation of girder steel, reaches To the purpose of combining structure.The effect of WELDING STUDS is to pass on the shearing and confined concrete plate and steel between concrete slab and girder steel Beam forms entirety.But such a structure pier top concrete slab is easily ftractureed due to larger hogging moment, apply even in pier top pre- Stress, because girder steel and concrete have connected into entirety by WELDING STUDS, prestressing force is mainly applied to the steel knot in combining structure On structure, concrete structure can not effectively carry prestressing force, thus need more steel beams, cause the waste on material.
One of method for solving combination negative moment section of beam concrete slab cracking is to use resistance to plucking not shear stud, makes hogging moment Area's concrete can longitudinally have small displacement, and so as to be separated with girder steel deformation, concrete slab is no longer complies with plane section with girder steel It is assumed that now, the internal force that concrete slab is born changes, and moment of flexure greatly reduces, solve splitting for hogging moment area concrete slab Seam becomes easy, it is possible to reduce the steel using amount of bridge.The material usage of the resistance to plucking used at present not shear stud is more, performance compared with Difference, working procedure is more, and damage is easily caused in work progress.
The content of the invention
The invention aims to overcome above the shortcomings of the prior art, there is provided and it is a kind of simple and reasonable for structure, Performance is good and can reduce the resistance to plucking not shearing resistance WELDING STUDS of site operation amount.
The purpose of the present invention is realized by following technical scheme:This resistance to plucking not shearing resistance WELDING STUDS, including ailhead, nail body and Latex pipe sleeve, the ailhead are fixed on one end of nail body, and the latex pipe sleeve is socketed on nail body, the nail body and latex pipe sleeve it Between length ratio be 0.8~0.95;The length of the nail body is 5cm~25cm, and the thickness of the latex pipe sleeve is 5mm~9mm.
Preferably, the ailhead and nail body are integrally formed.
Preferably, the Mo Shi hardness of the latex pipe sleeve is 1~1.5, and the rebound degree of the latex pipe sleeve is 100%.
The present invention has the following advantages relative to prior art:
1st, this resistance to plucking not shearing resistance WELDING STUDS to traditional WELDING STUDS by being improved, on the basis of traditional WELDING STUDS Latex pipe sleeve is additionally arranged, and the length of the nail body of WELDING STUDS is adjusted, and makes length phase of the length of emulsion tube with following closely body Matching, so that the WELDING STUDS of the present invention has good performance, improve the ability of its resistance to plucking not shearing resistance.
2nd, this resistance to plucking not shearing resistance WELDING STUDS sets up latex pipe sleeve in nail body, changes being monolithically fabricated and applying for traditional WELDING STUDS Work mode, therefore easily promoted in engineering, the worry that the construction quality of no in-site installation nut cannot be guaranteed, reduces scene and applies Work workload.
3rd, in this resistance to plucking not shearing resistance WELDING STUDS latex pipe sleeve stable performance, have enough pliability and intensity, pour mixed It will not be destroyed during solidifying soil, performance reliability is strong.
Brief description of the drawings
Fig. 1 is the structural representation of the resistance to plucking not shearing resistance WELDING STUDS of the present invention.
Fig. 2 is the first scheme of installation of the resistance to plucking not shearing resistance WELDING STUDS of the present invention.
Fig. 3 is the second scheme of installation of the resistance to plucking not shearing resistance WELDING STUDS of the present invention.
Fig. 4 is the 3rd scheme of installation of the resistance to plucking not shearing resistance WELDING STUDS of the present invention.
Fig. 5 is the 4th scheme of installation of the resistance to plucking not shearing resistance WELDING STUDS of the present invention.
Wherein, 1 is ailhead, and 2 be nail body, and 3 be latex pipe sleeve, and 4 be steel plate, and 5 be concrete slab, and a is the length for following closely body, b For the thickness of latex pipe sleeve.
Embodiment
The invention will be further described with reference to the accompanying drawings and examples.
Embodiment 1
As shown in figure 1, the resistance to plucking not shearing resistance WELDING STUDS of the present embodiment, including ailhead, nail body and latex pipe sleeve, the ailhead One end of nail body is fixed on, the latex pipe sleeve is socketed on nail body, and the length ratio between the nail body and latex pipe sleeve is 0.85; The length of the nail body is 15cm, and the thickness of the latex pipe sleeve is 7mm.The ailhead and nail body are integrally formed.Make entirely to cut The firm stable of power nail is high.The Mo Shi hardness of the latex pipe sleeve is 1.2, and the rebound degree of the latex pipe sleeve is 100%.
Shearing resistance nail need not change the ailhead of WELDING STUDS and follow closely the script structure of body this resistance to plucking, and breast is additionally arranged in nail body Glue pipe socket, i.e., body and concrete slab will be followed closely by latex pipe sleeve and will be separated, so that nail body is only subjected to pulling force, and suffered moment of flexure Greatly reducing, life-load stress width also greatly reduces, so as to improve the fatigue behaviour of whole WELDING STUDS, Du Genggao safe to use, Service life is longer.
When the resistance to plucking not shearing resistance WELDING STUDS connection concrete slab and steel plate using the present embodiment, due to ailhead and concrete Collective effect, concrete slab vertically closely fitting with steel plate, realizing " resistance to plucking ".And the nail body of WELDING STUDS is with mixing Isolated between solidifying soil by latex pipe sleeve, emulsion tube set has certain thickness, and the modulus of elasticity of latex pipe sleeve is far below mixed The modulus of elasticity of soil and the modulus of elasticity of steel are coagulated, then is following closely body between concrete equivalent to the gap together with having, this gap Size it is equal with the thickness of latex pipe sleeve.Therefore when concrete deforms, latex pipe sleeve also accordingly deforms, so as to The vertically and horizontally deformation of concrete is not prevented, realizes " not shearing resistance " effect, to ensure the stability between concrete slab and steel plate.
The work progress that concrete slab and steel plate are connected using the resistance to plucking not shearing resistance WELDING STUDS of the present embodiment is as described below:
1st, as shown in Fig. 2 by the end of the nail body of WELDING STUDS by being fixedly welded on steel plate;
2nd, as shown in Figure 3 and Figure 4, after emulsion tube being inserted in into ailhead, then pull down so that latex pipe sleeve is inserted in nail body;
3rd, as shown in figure 5, then concrete directly to be covered to whole WELDING STUDS again, coagulation is formed after these concrete settings Native plate, then WELDING STUDS will between concrete slab and steel plate can by WELDING STUDS connect and be brought into close contact.
Embodiment 2
The resistance to plucking not shearing resistance WELDING STUDS of the present embodiment is in addition to following technical characteristic with embodiment 1:The nail body and emulsion tube Length ratio between set is 0.9;The length of the nail body is 10cm, and the thickness of the latex pipe sleeve is 6mm.The latex pipe sleeve Mo Shi hardness be 1.3.
Embodiment 3
The resistance to plucking not shearing resistance WELDING STUDS of the present embodiment is in addition to following technical characteristic with embodiment 1:The nail body and emulsion tube Length ratio between set is 0.8;The length of the nail body is 5cm, and the thickness of the latex pipe sleeve is 5mm.The latex pipe sleeve Mo Shi hardness be 1.
Embodiment 4
The resistance to plucking not shearing resistance WELDING STUDS of the present embodiment is in addition to following technical characteristic with embodiment 1:The nail body and emulsion tube Length ratio between set is 0.95;The length of the nail body is 25cm, and the thickness of the latex pipe sleeve is 9mm.
Above-mentioned embodiment is the preferred embodiments of the present invention, can not be limited the invention, and others are appointed The change or other equivalent substitute modes what is made without departing from technical scheme, are included in the protection of the present invention Within the scope of.

Claims (3)

  1. A kind of 1. resistance to plucking not shearing resistance WELDING STUDS, it is characterised in that:It is fixed on including ailhead, nail body and latex pipe sleeve, the ailhead One end of body is followed closely, the latex pipe sleeve is socketed on nail body, and the length ratio between the nail body and latex pipe sleeve is 0.8~0.95; The length of the nail body is 5cm~25cm, and the thickness of the latex pipe sleeve is 5mm~9mm.
  2. 2. resistance to plucking not shearing resistance WELDING STUDS according to claim 1, it is characterised in that:The ailhead and nail body are integrally formed.
  3. 3. resistance to plucking not shearing resistance WELDING STUDS according to claim 1, it is characterised in that:The Mohs' hardness of the latex pipe sleeve is 1~1.5, the rebound degree of the latex pipe sleeve is 100%.
CN201711222043.4A 2017-11-29 2017-11-29 A kind of resistance to plucking not shearing resistance WELDING STUDS Pending CN107806187A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711222043.4A CN107806187A (en) 2017-11-29 2017-11-29 A kind of resistance to plucking not shearing resistance WELDING STUDS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711222043.4A CN107806187A (en) 2017-11-29 2017-11-29 A kind of resistance to plucking not shearing resistance WELDING STUDS

Publications (1)

Publication Number Publication Date
CN107806187A true CN107806187A (en) 2018-03-16

Family

ID=61582104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711222043.4A Pending CN107806187A (en) 2017-11-29 2017-11-29 A kind of resistance to plucking not shearing resistance WELDING STUDS

Country Status (1)

Country Link
CN (1) CN107806187A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110274802A (en) * 2019-05-29 2019-09-24 湖北工业大学 A kind of steel-concrete combined structure, preparation method and shear behavior detection method
CN110409305A (en) * 2019-07-16 2019-11-05 清华大学 Continuous composite beam bridge hogging moment area crack resistence construction equipment, construction method and beam bridge
CN112376386A (en) * 2020-10-30 2021-02-19 东南大学 Steel-concrete combined continuous beam and connecting piece and construction method of hogging moment area of steel-concrete combined continuous beam
CN113373791A (en) * 2021-06-04 2021-09-10 华南理工大学 Anti-pulling and non-shearing connecting piece and construction method
CN115928891A (en) * 2022-12-21 2023-04-07 浙江精工钢结构集团有限公司 Thin-wall buckling type anti-pulling and non-shearing stud connecting piece

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10317324A (en) * 1997-05-23 1998-12-02 Shigeyuki Matsui Beam bridge
JP2001011938A (en) * 1999-06-30 2001-01-16 Kawada Industries Inc Shear preventive for coupling steel with concrete
JP2001193174A (en) * 1999-11-05 2001-07-17 Nkk Corp Steel-concrete joining structure
CN201648965U (en) * 2010-03-29 2010-11-24 中铁二院工程集团有限责任公司 Flexible connecting structure of railway bridge ballast channel plate and steel bridge deck
CN102182141A (en) * 2011-03-18 2011-09-14 清华大学 Longitudinal non-shearing-resistant T-shaped anti-pulling connecting piece and construction method thereof
CN102425105A (en) * 2011-12-09 2012-04-25 清华大学 Longitudinal non-shearing resistance screw-type pullout-resistance connecting piece and construction method thereof
CN204325920U (en) * 2014-12-09 2015-05-13 华北水利水电大学 A kind of bridge deck pavement structure
CN105672116A (en) * 2016-02-02 2016-06-15 河海大学 Prefabricated assembled steel-concrete composite beam structure
CN207609028U (en) * 2017-11-29 2018-07-13 华南理工大学 A kind of resistance to plucking not shearing resistance WELDING STUDS

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10317324A (en) * 1997-05-23 1998-12-02 Shigeyuki Matsui Beam bridge
JP2001011938A (en) * 1999-06-30 2001-01-16 Kawada Industries Inc Shear preventive for coupling steel with concrete
JP2001193174A (en) * 1999-11-05 2001-07-17 Nkk Corp Steel-concrete joining structure
CN201648965U (en) * 2010-03-29 2010-11-24 中铁二院工程集团有限责任公司 Flexible connecting structure of railway bridge ballast channel plate and steel bridge deck
CN102182141A (en) * 2011-03-18 2011-09-14 清华大学 Longitudinal non-shearing-resistant T-shaped anti-pulling connecting piece and construction method thereof
CN102425105A (en) * 2011-12-09 2012-04-25 清华大学 Longitudinal non-shearing resistance screw-type pullout-resistance connecting piece and construction method thereof
CN204325920U (en) * 2014-12-09 2015-05-13 华北水利水电大学 A kind of bridge deck pavement structure
CN105672116A (en) * 2016-02-02 2016-06-15 河海大学 Prefabricated assembled steel-concrete composite beam structure
CN207609028U (en) * 2017-11-29 2018-07-13 华南理工大学 A kind of resistance to plucking not shearing resistance WELDING STUDS

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110274802A (en) * 2019-05-29 2019-09-24 湖北工业大学 A kind of steel-concrete combined structure, preparation method and shear behavior detection method
CN110409305A (en) * 2019-07-16 2019-11-05 清华大学 Continuous composite beam bridge hogging moment area crack resistence construction equipment, construction method and beam bridge
CN110409305B (en) * 2019-07-16 2024-04-30 清华大学 Anti-cracking construction equipment and construction method for hogging moment area of continuous composite beam bridge and beam bridge
CN112376386A (en) * 2020-10-30 2021-02-19 东南大学 Steel-concrete combined continuous beam and connecting piece and construction method of hogging moment area of steel-concrete combined continuous beam
CN113373791A (en) * 2021-06-04 2021-09-10 华南理工大学 Anti-pulling and non-shearing connecting piece and construction method
CN115928891A (en) * 2022-12-21 2023-04-07 浙江精工钢结构集团有限公司 Thin-wall buckling type anti-pulling and non-shearing stud connecting piece

Similar Documents

Publication Publication Date Title
CN107806187A (en) A kind of resistance to plucking not shearing resistance WELDING STUDS
CN207609028U (en) A kind of resistance to plucking not shearing resistance WELDING STUDS
CN105544385B (en) A kind of seam construction of prefabricated subsection formula concrete-bridge
CN105484151B (en) The construction and its construction method connected between a kind of enhancing precast concrete segment
CN105672116B (en) Prefabricated assembled steel-concrete composite beam structure
CN106638961A (en) Assembly type steel frame connection node with post-seismic recoverable function
CN207194146U (en) Prestressing force assembly concrete frame joint attachment structure
CN208455444U (en) A kind of insert fenestration Lamb wave shape steel web combination beam connector
CN105401655B (en) Self-control energy consumption unbonded prestressed concrete frame
CN108560419B (en) L-shaped side groove UHPC bridge deck slab in hogging moment area of steel-concrete composite beam and longitudinal connection thereof
CN203821254U (en) Rigid connection reinforcing device for hinge joint of fabricated plate girders
CN103741584A (en) Lower flange anti-pulling composite box girder with corrugated steel webs and construction method
CN204081079U (en) A kind of structure of open pore steel plate shear force
CN105297641A (en) Highway T beam diaphragm plate prestress reinforcing structure and working method for reinforcement using reinforcing structure
CN105803939A (en) Open steel tube and reinforced-concrete combined girder bridge structure
CN204715195U (en) A kind of Gang Liang – concrete slab composite continuous bridge hogging moment area cracking resistance structure
CN207619818U (en) A kind of shearing resistance composite structure of the concrete of bridge
CN207436278U (en) A kind of assembly concrete-filled steel tube column-girder steel punching node
CN203729192U (en) Combined box girder with pulling-resistant lower flange steel webs
CN215561853U (en) Connecting rod group device for steel-concrete composite beam
CN206693469U (en) A kind of precast floor slab connecting node
CN205576737U (en) Trompil steel pipe steel and concrete composite beam bridge structure
CN206646406U (en) Steel and ultra-high performance concrete combined bridge deck structure with bar dowel shearing resistance construction
CN206457715U (en) A kind of hybrid beam toughened internal stress structure
CN109736198A (en) A kind of combined type interface is tightly connected high-performance steel-UHPC thin plate combined structure system in advance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180316