CN107806117A - The realization device and implementation method of soil lateral pressure in pile foundation model test - Google Patents

The realization device and implementation method of soil lateral pressure in pile foundation model test Download PDF

Info

Publication number
CN107806117A
CN107806117A CN201711280972.0A CN201711280972A CN107806117A CN 107806117 A CN107806117 A CN 107806117A CN 201711280972 A CN201711280972 A CN 201711280972A CN 107806117 A CN107806117 A CN 107806117A
Authority
CN
China
Prior art keywords
pile
model
sleeping platform
adobe sleeping
heatable adobe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711280972.0A
Other languages
Chinese (zh)
Other versions
CN107806117B (en
Inventor
杨卓
侯明勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd
Guangzhou Construction Engineering Quality Safety Inspection Center Co Ltd
Guangzhou Institute of Building Science Co Ltd
Original Assignee
NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd
Guangzhou Construction Engineering Quality Safety Inspection Center Co Ltd
Guangzhou Institute of Building Science Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd, Guangzhou Construction Engineering Quality Safety Inspection Center Co Ltd, Guangzhou Institute of Building Science Co Ltd filed Critical NEW TECHNOLOGY DEVELOPMENT CENTER Co Ltd OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co Ltd
Priority to CN201711280972.0A priority Critical patent/CN107806117B/en
Publication of CN107806117A publication Critical patent/CN107806117A/en
Application granted granted Critical
Publication of CN107806117B publication Critical patent/CN107806117B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention provides the realization device and implementation method of soil lateral pressure in a kind of pile foundation model test.The realization device of soil lateral pressure includes Model Pile, annulus load plate, pressurized equipment, the reaction frame for coordinating pressure with pressurized equipment, force cell, the uplift pile for supporting heatable adobe sleeping platform and placement reaction frame in pile foundation model test;Uplift pile is located at the periphery of heatable adobe sleeping platform, and Model Pile is vertically placed in heatable adobe sleeping platform, and force cell is located at the bottom of Model Pile;After the soil body fills up heatable adobe sleeping platform, annulus load plate is placed in soil body surface centered on Model Pile;The inside radius of annulus load plate is more than or equal to the height of Model Pile;Reaction frame is in uplift pile, and pressurized equipment is located at the top surface of annulus load plate located at the top of Model Pile and equably, and pressurized equipment correspondingly acts on reaction frame.The present invention can be simulated from stake top to stake bottom as depth gradually increases the actual soil lateral pressure that soil lateral pressure also gradually increases.

Description

The realization device and implementation method of soil lateral pressure in pile foundation model test
Technical field
The invention belongs to Geotechnical Engineering pile foundation modeling techniques field, and in particular to side in a kind of pile foundation model test To the realization device and implementation method of soil pressure.
Background technology
With the fast development of modern urban construction, there are many executive information systems, these buildings are to ground Requirement for bearing capacity is higher.Pile foundation is widely used in foundation engineering as a kind of main base form.And in pile foundation In engineering, the interaction of pile foundation and soil around pile is to study the key of pile foundation bearing capacity.Pile foundation model test is in research pile foundation Played an important role in terms of stress performance and the mechanism of action.
But in model test, because stake long-press is reduced according to similar proportion, cause the lateral of stake in model test Soil pressure differs larger with the soil lateral pressure of stake in Practical Project.In order to simulate actual soil lateral pressure, generally require and adopt Use centrifuge.But centrifuge test is on the one hand with high costs;On the other hand, in pile foundation model test, in order to truly reflect Actual pile-soil interaction, slip casting around pile effect etc., the reduced scale of model test is smaller, makes that moulded dimension is larger, weight Heavier, now the power capacity of centrifuge does not reach the requirement of experiment, and the soil lateral pressure in the soil body is between stake soil Rubbing action, the shape of stake soil cement plane have material impact.If actual soil lateral pressure can not be simulated, its result of the test is then It is difficult to actual mechanical behavior and engineering characteristic for evaluation engineering prototype.
Therefore, development is a kind of can realize the method and device for simulating actual soil lateral pressure, for pile foundation model test Development play an important roll.
The content of the invention
In order to overcome above-mentioned technological deficiency, the present invention provides a kind of realization device of soil lateral pressure in pile foundation model test And implementation method, it is not necessary to by means of centrifuge, actual soil lateral pressure can be realized in pile foundation model test.
To achieve these goals, the present invention uses following technical scheme:
In a kind of pile foundation model test the realization device of soil lateral pressure include Model Pile, annulus load plate, pressurized equipment, For coordinating the reaction frame of pressure, force cell with the pressurized equipment, for supporting heatable adobe sleeping platform and place the reaction frame Uplift pile;The uplift pile is located at the periphery of heatable adobe sleeping platform, and the Model Pile is vertically placed in the heatable adobe sleeping platform, and the force cell is set In the bottom of the Model Pile;After the soil body fills up heatable adobe sleeping platform, the annulus load plate is placed in the soil body centered on the Model Pile Surface;The inside radius of the annulus load plate is more than or equal to the height of the Model Pile;The reaction frame is located at the resistance to plucking In stake, the pressurized equipment is located at the top surface of the annulus load plate located at the top of the Model Pile and equably, and described Pressurized equipment correspondingly acts on the reaction frame.
Preferably, the annulus load plate is socketed successively by multiple donuts forms, and the inside radius of innermost layer annulus is big In or equal to the Model Pile height;Of annulus can be determined according to the soil lateral pressure size that experiment needs to realize Number.
Preferably, the radius of the heatable adobe sleeping platform is 2.5-3.5 times of the Model Pile height.The height of the Model Pile and half Footpath determines according to the model test likelihood ratio.
Preferably, the realization device of soil lateral pressure also includes foil gauge, the foil gauge in a kind of pile foundation model test Located at the Model Pile side;Can the height stake of measurement model stake at any time axle power change, calculate pile side friction and stake end branch Support force.
Preferably, the realization device of soil lateral pressure also includes being used for mould described in elastic carrier in a kind of pile foundation model test The latch plate of type stake, the latch plate are located at the bottom of the force cell.Latch plate is set more realistically to simulate stake Hold carrying effect.The depth of the heatable adobe sleeping platform is the Model Pile and the height sum of the latch plate.
Preferably, the number of the uplift pile is 6-12 roots.
Preferably, the reaction frame includes inner ring, the outer shroud concentric with the inner ring and the support for being connected inner ring and outer shroud Bar;The support bar is crossed to form central point;The angle that the adjacent support bar is formed is identical.
It is particularly preferred, the support bar include connection inner ring and outer shroud first support bar and connection inner ring and outer shroud and Meet at the second support bar at center;The second support bar is crossed to form central point;The first support bar and second support bar Interlaced arrangement, and adjacent first support bar is identical with the angle that second support bar is formed.
Preferably, the pressurized equipment is jack;The jack is located at the top of institute's displacement sensors, and very heavy The top on top corresponds to the central point of the reaction frame;The jack is further equally located at the top surface of the annulus load plate, and The top of jack is corresponded on the support bar of the reaction frame.The soil lateral pressure size for needing to realize according to experiment determines very heavy The number on top and jack top power size, and the height of the uplift pile determines according to jack top power size.
The implementation method of soil lateral pressure, step are as follows in a kind of pile foundation model test:
S1:Heatable adobe sleeping platform is arranged, and uplift pile is set on heatable adobe sleeping platform periphery;
S2:Force cell is located to the bottom of Model Pile, then the Model Pile is vertically placed in heatable adobe sleeping platform;And to heatable adobe sleeping platform In insert the soil body, until fill up whole heatable adobe sleeping platform;
S3:By annulus load plate centered on the Model Pile, soil body surface is placed in, is then placed on counter-force described anti- The top of pile pulling, and it is fixed;The inside radius of the annulus load plate is more than or equal to the height of the Model Pile;
S4:By pressurized equipment located at the top of the Model Pile and equably in the annulus load plate, and described Pressurized equipment correspondingly acts on the reaction frame;
S5:During experiment, the pressurized equipment starts to press, and applies different loads by the pressurized equipment, obtains experiment Data.
Preferably, the step S2 includes for force cell being located at the bottom of Model Pile, and latch plate then is located at into institute The bottom of force cell is stated, then the Model Pile is vertically placed in heatable adobe sleeping platform;And the soil body is inserted into heatable adobe sleeping platform, until filling up whole Individual heatable adobe sleeping platform.
Preferably, the step S4 includes for displacement transducer being located at the top of the Model Pile, and the pressurized equipment is set In the top of institute's displacement sensors and equably located at the top surface of the annulus load plate, and pressurized equipment correspondingly acts on institute State reaction frame.
Particularly preferred, the pressurized equipment is jack;The step S4 includes institute's displacement sensors being located at institute The top of Model Pile is stated, then the jack is located at the top of institute's displacement sensors, and the corresponding effect in top of jack In the central point of the reaction frame, jack is further equally located at the top surface of the annulus load plate, and the top pair of jack It should act on the support bar of the reaction frame.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, the present invention is more than or equal to the annulus load plate of Model Pile height by inside radius, added located at Model Pile and annulus Pressurized equipment on support plate coordinates reaction frame to apply pressure to the soil body, can simulate from stake top to stake bottom as depth gradually increases The actual soil lateral pressure that big soil lateral pressure also gradually increases;
2nd, by the force cell located at Model Pile bottom, can the bottom of feedback model stake at any time stressing conditions;
3rd, Model Pile is vertically placed in heatable adobe sleeping platform by the present invention, and heatable adobe sleeping platform size and depth can be true according to different tests requirement Determine, not the certain model casing of size depth, the soil lateral pressure field of different depth can be realized according to different tests condition, this For in research pile foundation test, there is crucial shadow the problems such as pile-soil interaction, slip casting around pile effect, stake soil cement plane shape Ring;
4th, pressurized equipment is located at the top surface of the annulus load plate located at the top of the bit model stake and equably, realizes Model Pile is fifty-fifty by the soil lateral pressure in all directions.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the schematic diagram of principle of the invention experiment;
Fig. 3 is the datagram of lateral stress in experiment shown in Fig. 2;
Fig. 4 is the schematic flow sheet of the device implementation method shown in Fig. 1;
1- Model Piles;2- force cells;3- latch plates;4- displacement transducers;5- annulus load plates;6- jack;7- Reaction frame;8- uplift piles;9- heatable adobe sleeping platforms.
Embodiment
The preferred embodiments of the present invention are illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein preferred real Apply example to be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Embodiment 1:
As shown in figure 1, the realization device of soil lateral pressure includes Model Pile 1 in a kind of pile foundation model test, annulus loads Plate 5, pressurized equipment, force cell 2, for pressurized equipment coordinate pressure reaction frame 7, for supporting heatable adobe sleeping platform 9 and place The uplift pile 8 of reaction frame 7.The inside radius of annulus load plate 5 is more than or equal to the height of Model Pile 1.Preferably, annulus load plate 5 are socketed and form successively by multiple donuts, and the inside radius of innermost layer annulus is more than or equal to the height of Model Pile 1;Can root Factually testing needs the soil lateral pressure size realized to determine the number of annulus.In the present embodiment, annulus number is 3.
Specifically, the radius of heatable adobe sleeping platform 9 is 2.5-3.5 times of the height of Model Pile 1;The depth of heatable adobe sleeping platform 9 is Model Pile 1 and spring The height sum of plate 3.The height and radius of Model Pile 1 determine according to the model test likelihood ratio.Uplift pile 8 is located at the week of heatable adobe sleeping platform 9 Side.Preferably, the number of uplift pile 8 is 6-12 roots.Force cell 2 is located at the bottom of Model Pile 1.Model Pile 1 is vertically placed to In heatable adobe sleeping platform 9.Reaction frame 7 includes inner ring, the outer shroud concentric with inner ring and the support bar for being connected inner ring and outer shroud;Support bar intersects shape Into central point, the angle that adjacent supports bar is formed is identical.In the present embodiment, support bar includes first of connection inner ring and outer shroud Strut and connection inner ring and outer shroud and meet at the second support bar at center;Second support bar is crossed to form central point.First support Bar and second support bar interlaced arrangement, and adjacent first support bar is identical with the angle that second support bar is formed.Filled out in the soil body After full heatable adobe sleeping platform 9, annulus load plate 5 is placed in soil body surface centered on Model Pile 1.Pressurized equipment located at Model Pile 1 top and Equably in annulus load plate 5, and pressurized equipment correspondingly acts on reaction frame 7.Pressurized equipment is very heavy in the present embodiment Top 6.Jack 6 is located at the top of displacement transducer 4, and the top of jack 6 correspondingly acts on the central point of reaction frame 7;Thousand Jin top 6 is further equally located at the top surface of annulus load plate 5, and the top of jack 6 correspondingly acts on the support bar of reaction frame 7 On.The number of jack 6 and the top power size of jack 6 are determined according to the soil lateral pressure size that experiment needs to realize, and resisted The height of pile pulling 8 determines according to the top power size of jack 6.
As shown in figure 1, the realization device of soil lateral pressure also includes being used for elastic carrier mould in a kind of pile foundation model test The latch plate 3 of type stake 1, latch plate 3 are located at the bottom of force cell 2.Set latch plate 3 more realistically to simulate an end to hold Load acts on.
As shown in figure 1, the realization device of soil lateral pressure also includes displacement transducer 4, position in a kind of pile foundation model test Displacement sensor 4 is located at the top of Model Pile 1.Displacement transducer 4 can feedback model stake at any time 1 moved down after compression Situation.
The technical principle of the realization device of soil lateral pressure in the pile foundation model test of the present embodiment:
As shown in Fig. 2 under conditions of gradually increasing with vertical height, it is different with outer radius scale to inside radius Annulus applies identical load, calculates the change of lateral stress.It is theoretical using " Boussinesq's formula ", laterally should caused by calculating As shown in figure 3, when vertical height/annulus inside radius is less than or equal to 1, lateral stress gradually increases power;When vertical height/circle When ring inside radius is more than 1, lateral stress is gradually reduced.Therefore, inventor has found this principle being used in pile foundation model test, The inside radius of annulus load plate is more than or equal to Model Pile height, and pressurized equipment is equably set in annulus load plate, can be real The effect that existing soil lateral pressure gradually increases.Soil lateral pressure changing rule suffered by Practical Project stake be from stake top to stake bottom with Depth gradually increases soil lateral pressure and also gradually increased.It can be seen that the present invention is more than or equal to the height of Model Pile 1 by inside radius Annulus load plate 5 and the pressurized equipment in annulus load plate 5 apply pressure to the soil body, can accurately simulate and reality Soil lateral pressure suffered by engineering pile.
In addition, as shown in Fig. 2 the numerical value of annulus outer radius/annulus inside radius is bigger, then lateral stress is bigger.It can be seen that circle The external diameter of ring load plate is used for the maximum for controlling the soil lateral pressure applied.Therefore, the side realized can be needed according to experiment The outside dimension of annulus load plate 5 is determined to soil pressure size, you can determines the annulus number of annulus load plate 5.
As shown in figure 4, realizing the method for actual soil lateral pressure in pile foundation model test described in the present embodiment, step is such as Under:
S1:Heatable adobe sleeping platform 9 is arranged, and uplift pile 8 is set on heatable adobe sleeping platform periphery;
S2:Force cell 2 is located to the bottom of force cell 2 located at the bottom of Model Pile 1, latch plate 3, then by mould Type stake 1 is vertically placed in heatable adobe sleeping platform 9;And the soil body is inserted into heatable adobe sleeping platform 9, until filling up whole heatable adobe sleeping platform;
S3:By annulus load plate 5 centered on Model Pile 1, soil body surface is placed in, reaction frame 6 is then placed in uplift pile 8 Top, it is and fixed;The inside radius of annulus load plate 5 is more than or equal to the height of Model Pile 1;
S4:Displacement transducer 4 is located to the top of Model Pile 1, then jack 6 is located at the top of displacement transducer 4, and The top of jack 6 correspondingly acts on the central point of reaction frame 7;Jack 6 is further equally located at the top surface of annulus load plate 5, And the top of jack 6 correspondingly acts on the support bar of reaction frame 7.
S5:During experiment, pressurized equipment starts to press, and applies different loads by pressurized equipment, obtains test data.
The above described is only a preferred embodiment of the present invention, any formal limitation not is done to the present invention, therefore All contents without departing from technical solution of the present invention, the technical spirit according to the present invention any are simply repaiied to made for any of the above embodiments Change, equivalent variations and modification, in the range of still falling within technical solution of the present invention.

Claims (10)

1. the realization device of soil lateral pressure in a kind of pile foundation model test, it is characterised in that loaded including Model Pile, annulus Plate, pressurized equipment, for the pressurized equipment coordinate pressure reaction frame, force cell, for supporting heatable adobe sleeping platform and placement The uplift pile of the reaction frame;
The uplift pile is located at the periphery of heatable adobe sleeping platform, and the Model Pile is vertically placed in the heatable adobe sleeping platform, and the force cell is located at The bottom of the Model Pile;
After the soil body fills up heatable adobe sleeping platform, the annulus load plate is placed in soil body surface centered on the Model Pile;The annulus adds The inside radius of support plate is more than or equal to the height of the Model Pile;
For the reaction frame in the uplift pile, the pressurized equipment is located at the top of the Model Pile and is equably located at institute The top surface of annulus load plate is stated, and the pressurized equipment correspondingly acts on the reaction frame.
2. the realization device of soil lateral pressure in a kind of pile foundation model test according to claim 1, it is characterised in that institute State annulus load plate and be socketed successively by multiple donuts and formed, the inside radius of innermost layer annulus is more than or equal to the Model Pile Height.
3. the realization device of soil lateral pressure in a kind of pile foundation model test according to claim 1, it is characterised in that institute The radius for stating heatable adobe sleeping platform is 2.5-3.5 times of the Model Pile height.
4. the realization device of soil lateral pressure in a kind of pile foundation model test according to claim 1, it is characterised in that also Including foil gauge, the foil gauge is located at the Model Pile side.
5. the realization device of soil lateral pressure in a kind of pile foundation model test according to claim 1, it is characterised in that also Including the latch plate for Model Pile described in elastic carrier, the latch plate is located at the bottom of the force cell.
6. the realization device of soil lateral pressure in a kind of pile foundation model test according to claim 1, it is characterised in that institute Stating reaction frame includes inner ring, the outer shroud concentric with the inner ring and the support bar for being connected inner ring and outer shroud;The support bar intersects Form central point;The angle that the adjacent support bar is formed is identical.
7. the realization device of soil lateral pressure in a kind of pile foundation model test according to claim 6, it is characterised in that institute It is jack to state pressurized equipment;The jack is located at the top of the Model Pile, and the top of jack correspondingly acts on institute State the central point of reaction frame;The jack is further equally located at the top surface of the annulus load plate, and the top pair of jack The support bar of the reaction frame should be acted on.
8. the realization device of soil lateral pressure in a kind of pile foundation model test according to claim 1, it is characterised in that also Including displacement transducer, institute's displacement sensors are located between the Model Pile and pressurized equipment.
9. the implementation method of soil lateral pressure in a kind of pile foundation model test, it is characterised in that step is as follows:
S1:Heatable adobe sleeping platform is arranged, and uplift pile is set on heatable adobe sleeping platform periphery;
S2:Force cell is located to the bottom of Model Pile, then the Model Pile is vertically placed in heatable adobe sleeping platform;And filled out into heatable adobe sleeping platform Enter the soil body, until filling up whole heatable adobe sleeping platform;
S3:By annulus load plate centered on the Model Pile, soil body surface is placed in, counter-force is then placed on the uplift pile Top, it is and fixed;The inside radius of the annulus load plate is more than or equal to the height of the Model Pile;
S4:By pressurized equipment located at the top of the Model Pile and equably in the annulus load plate, and the pressurization Equipment correspondingly acts on the reaction frame;
S5:During experiment, the pressurized equipment starts to press, and applies different loads by the pressurized equipment, obtains test data.
10. implementation method according to claim 9, it is characterised in that the step S2 includes force cell being located at The bottom of Model Pile, then latch plate is located to the bottom of the force cell, then the Model Pile is vertically placed to heatable adobe sleeping platform In;And the soil body is inserted into heatable adobe sleeping platform, until filling up whole heatable adobe sleeping platform;And/or the step S4 includes displacement transducer being located at institute The top of Model Pile is stated, the pressurized equipment is located at the top of institute's displacement sensors and is equably located at the annulus load plate Top surface, and pressurized equipment correspondingly acts on the reaction frame.
CN201711280972.0A 2017-12-06 2017-12-06 Device and method for realizing lateral soil pressure in pile foundation model test Active CN107806117B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711280972.0A CN107806117B (en) 2017-12-06 2017-12-06 Device and method for realizing lateral soil pressure in pile foundation model test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711280972.0A CN107806117B (en) 2017-12-06 2017-12-06 Device and method for realizing lateral soil pressure in pile foundation model test

Publications (2)

Publication Number Publication Date
CN107806117A true CN107806117A (en) 2018-03-16
CN107806117B CN107806117B (en) 2024-01-26

Family

ID=61588903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711280972.0A Active CN107806117B (en) 2017-12-06 2017-12-06 Device and method for realizing lateral soil pressure in pile foundation model test

Country Status (1)

Country Link
CN (1) CN107806117B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706908A (en) * 2019-01-28 2019-05-03 重庆大学 A kind of soil around pile Particle Breakage measuring device and its measurement method
CN111505250A (en) * 2020-06-08 2020-08-07 金陵科技学院 Landslide fixed support model based on composite material and matched sensor arrangement method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01116424A (en) * 1987-10-30 1989-05-09 Chiyoda Corp Method and apparatus for loading test of pile
US6082173A (en) * 1997-09-15 2000-07-04 Wai; Yee Kong Method and apparatus for pile driving
JP2004204569A (en) * 2002-12-25 2004-07-22 Mitani Sekisan Co Ltd Computational method for support force of spliced pile, loading tester for pile. and test method for peripheral face friction force of pile
CN105649123A (en) * 2016-03-21 2016-06-08 青岛理工大学琴岛学院 Model testing method simulating influence of pile side radial stress on pile body axial stress
CN106480910A (en) * 2016-12-09 2017-03-08 广州市建筑科学研究院有限公司 The device and method that a kind of simulation is acted on test pile end different bearer
CN106769478A (en) * 2017-01-23 2017-05-31 浙江大学 A kind of pile-soil interface shearing test device
CN206245361U (en) * 2016-12-09 2017-06-13 广州市建筑科学研究院有限公司 A kind of device simulated with the effect of test pile end different bearer
CN107012896A (en) * 2017-03-20 2017-08-04 山东大学 A kind of Multifunctional pile base model assay systems and its assembling and test method
CN206693282U (en) * 2017-04-10 2017-12-01 中国建筑西南勘察设计研究院有限公司 One kind is banketed side friction model test apparatus
CN207597459U (en) * 2017-12-06 2018-07-10 广州建设工程质量安全检测中心有限公司 The realization device of soil lateral pressure in pile foundation model test

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01116424A (en) * 1987-10-30 1989-05-09 Chiyoda Corp Method and apparatus for loading test of pile
US6082173A (en) * 1997-09-15 2000-07-04 Wai; Yee Kong Method and apparatus for pile driving
JP2004204569A (en) * 2002-12-25 2004-07-22 Mitani Sekisan Co Ltd Computational method for support force of spliced pile, loading tester for pile. and test method for peripheral face friction force of pile
CN105649123A (en) * 2016-03-21 2016-06-08 青岛理工大学琴岛学院 Model testing method simulating influence of pile side radial stress on pile body axial stress
CN106480910A (en) * 2016-12-09 2017-03-08 广州市建筑科学研究院有限公司 The device and method that a kind of simulation is acted on test pile end different bearer
CN206245361U (en) * 2016-12-09 2017-06-13 广州市建筑科学研究院有限公司 A kind of device simulated with the effect of test pile end different bearer
CN106769478A (en) * 2017-01-23 2017-05-31 浙江大学 A kind of pile-soil interface shearing test device
CN107012896A (en) * 2017-03-20 2017-08-04 山东大学 A kind of Multifunctional pile base model assay systems and its assembling and test method
CN206693282U (en) * 2017-04-10 2017-12-01 中国建筑西南勘察设计研究院有限公司 One kind is banketed side friction model test apparatus
CN207597459U (en) * 2017-12-06 2018-07-10 广州建设工程质量安全检测中心有限公司 The realization device of soil lateral pressure in pile foundation model test

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706908A (en) * 2019-01-28 2019-05-03 重庆大学 A kind of soil around pile Particle Breakage measuring device and its measurement method
CN111505250A (en) * 2020-06-08 2020-08-07 金陵科技学院 Landslide fixed support model based on composite material and matched sensor arrangement method

Also Published As

Publication number Publication date
CN107806117B (en) 2024-01-26

Similar Documents

Publication Publication Date Title
Lee et al. Tunnel stability and arching effects during tunneling in soft clayey soil
Gajan et al. Centrifuge modeling of load-deformation behavior of rocking shallow foundations
Turan et al. Design and commissioning of a laminar soil container for use on small shaking tables
CN103969012A (en) Shake table test real-time loading device for simulating different burial depths of rock tunnel
CN111537356B (en) Test device and method for simulating underground cavern ground vibration force reaction
CN202610847U (en) Measuring device of pile soil negative friction
CN107012896A (en) A kind of Multifunctional pile base model assay systems and its assembling and test method
CN107024574A (en) A kind of soil arching effect simulation test device and test method
CN109754697A (en) A kind of similar physics experimental rig of three-dimensional of simulation fault movement
CN207597459U (en) The realization device of soil lateral pressure in pile foundation model test
CN109706981B (en) Vibrating table model test system for high-steep slope pier foundation stress deformation characteristics
CN204590104U (en) A kind of bath scaled model experimental device of simulating self-balance testing pile method
CN107806117A (en) The realization device and implementation method of soil lateral pressure in pile foundation model test
CN107907286A (en) A kind of new unsymmetrial loading tunnel Research on Shaking Table for Simulating system
CN103898929B (en) Prestressed concrete pipe pile horizontal bearing attribute testing model and data test method
CN203365430U (en) Testing device for three-dimensional soil arch effect of pile type reinforcement embankment
CN103389364A (en) Pile-supported reinforced embankment three-dimensional soil arching effect testing apparatus and pile-supported reinforced embankment three-dimensional soil arching effect testing method
Kang et al. Dynamic soil-pile-raft interaction in normally consolidated soft clay during earthquakes
Xiao-ling et al. Model test study on horizontal bearing behavior of pile under existing vertical load
CN112227432B (en) Bearing capacity test device and test method for pile foundation in soft soil during vibration subsidence
CN106400857B (en) For the model equipment and method of the inaccessible degree of soil plug in in-site measurement opening pile
CN205776415U (en) Piled-box foundaton isolation property test model case
CN206038343U (en) Indoor test device of accurate simulation of tunnel bottom structure stress
CN115404923B (en) Pile foundation characteristic test device under aftershock effect and application method
CN110528602A (en) Earth lateral pressure experiment simulator under diaphram wall difference level of ground water operating condition

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 510440 Baiyun Avenue North 833, Baiyun District, Guangzhou, Guangdong

Applicant after: GUANGZHOU CONSTRUCTION QUALITY AND SAFETY TESTING CENTER Co.,Ltd.

Applicant after: Guangzhou Academy of Building Sciences Group Co.,Ltd.

Applicant after: Guangzhou Construction Industry Development Co.,Ltd.

Address before: Jianyan building, no.833, Baiyun Avenue North, Guangzhou, Guangdong 510440

Applicant before: GUANGZHOU CONSTRUCTION QUALITY AND SAFETY TESTING CENTER Co.,Ltd.

Applicant before: GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co.,Ltd.

Applicant before: NEW TECHNOLOGY DEVELOPMENT CENTER Co.,Ltd. OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant