CN107797501A - A kind of power system outdoor equipment latency condensation data analysis set-up - Google Patents

A kind of power system outdoor equipment latency condensation data analysis set-up Download PDF

Info

Publication number
CN107797501A
CN107797501A CN201710804968.3A CN201710804968A CN107797501A CN 107797501 A CN107797501 A CN 107797501A CN 201710804968 A CN201710804968 A CN 201710804968A CN 107797501 A CN107797501 A CN 107797501A
Authority
CN
China
Prior art keywords
relay
condensation
data analysis
power system
analysis set
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710804968.3A
Other languages
Chinese (zh)
Other versions
CN107797501B (en
Inventor
王世祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Bureau Co Ltd
Original Assignee
Shenzhen Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Bureau Co Ltd filed Critical Shenzhen Power Supply Bureau Co Ltd
Priority to CN201710804968.3A priority Critical patent/CN107797501B/en
Publication of CN107797501A publication Critical patent/CN107797501A/en
Application granted granted Critical
Publication of CN107797501B publication Critical patent/CN107797501B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Circuit Arrangement For Electric Light Sources In General (AREA)
  • Inverter Devices (AREA)

Abstract

The present invention provides a kind of power system outdoor equipment latency condensation data analysis set-up, including condensation inductor, the first relay, the second relay, abnormal lamp, power lights and inverter;Wherein, the first coil control terminal of the first relay is concatenated into primary Ioops with condensation inductor;Second coil control terminal of the second relay is concatenated into tie point with power lights, and the normally closed contact of the second relay is connected into the second branch road with abnormal lamp string;Be in parallel connection between tie point, the second branch road and inverter three, and the sys node formed between three is connected by the normal opened contact of the first relay with outside one end except condensation device, another sys node formed between three is directly connected with the outside other end except condensation device.Implement the present invention, can timely and effectively judge the condensation data of outdoor power equipment, early warning simultaneously eliminates safe hidden trouble, so as to ensure the safe and stable operation of outdoor power equipment.

Description

A kind of power system outdoor equipment latency condensation data analysis set-up
Technical field
The present invention relates to technical field of relay protection, more particularly to a kind of power system outdoor equipment latency condensation data Analytical equipment.
Background technology
Outdoor power equipment because simple in construction, maintenance capacity very little, operating cost is low, reliable and safe the advantages that it is extensive Easily outdoor power equipment is met with applied to city electric distribution system, but in China the Changjiang river areas to the south, the damp and hot environment of high temperature Run into serious condensation problem, cause outdoor power equipment to get rusty, operating mechanism bite corrosion, line short trip phenomena such as go out It is existing, so as to cause the defects of insulating reduction, DC earthing, directly affect power supply safety.
With the development of Protection Technology, people are more next to outdoor power equipment latency condensation data and relay protection More pay attention to, but can not also provide in the prior art a set of specifically to the early warning plane of outdoor equipment latency condensation data analysis System, early warning and it can eliminate safe hidden trouble, so as to ensure the safe and stable operation of outdoor power equipment.
The content of the invention
Technical problem to be solved of the embodiment of the present invention is, there is provided a kind of power system outdoor equipment latency condensation Data analysis set-up, it can timely and effectively judge the condensation data of outdoor power equipment, early warning simultaneously eliminates safe hidden trouble, so as to protect Demonstrate,prove the safe and stable operation of outdoor power equipment.
In order to solve the above-mentioned technical problem, the embodiments of the invention provide a kind of power system outdoor equipment latency condensation Data analysis set-up, with outside except condensation device is engaged, the power system outdoor equipment latency condensation data analysis dress Put including condensation inductor, the first relay, the second relay, abnormal lamp, power lights and inverter;Wherein,
First relay is provided with first coil control terminal and normal opened contact;Wherein, the First Line of first relay Circle control terminal is concatenated into primary Ioops with the condensation inductor;
Second relay is provided with the second coil control terminal and normally closed contact;Wherein, the second line of second relay Circle control terminal is concatenated into tie point with the power lights, and the normally closed contact of second relay is connected into the abnormal lamp string Second branch road;Be in parallel connection between the tie point, the second branch road and inverter three, and the tie point, The sys node formed between two branch roads and inverter three by the normal opened contact of first relay with it is described outer Portion is connected except one end of condensation device, another parallel connection formed between the tie point, the second branch road and inverter three Node is directly with the outside except the other end of condensation device is connected.
Wherein, when detecting that the inverter is in abnormal state, second relay is failure to actuate so that institute The normally closed contact for stating the second relay is kept closed, and it is the bright state of lamp to control the abnormal lamp.
Wherein, when detecting that the inverter is in normal condition, second actuating of relay, control described the The normally closed contact of two relays is off so that the abnormal lamp keeps lamp to go out state.
Wherein, when the condensation data for detecting the condensation inductor sensing are less than default threshold in first relay During value, first relay is failure to actuate and second actuating of relay so that the normal opened contact of first relay and The normally closed contact of second relay remains off, and keeps the outside to remove condensation device off position.
Wherein, preset when the condensation data for detecting the condensation inductor sensing are more than described in first relay Threshold value when, first actuating of relay and second relay act so that the normally opened of the first relay connects Point is kept closed and so that the normally closed contact of second relay remains off, and drives the outside to remove condensation Device enters working condition.
Wherein, the power system outdoor equipment latency condensation data analysis set-up also includes condensation percentages show Device, the condensation percentages show device are arranged between the coil control terminal of the condensation inductor and first relay.
Implement the embodiment of the present invention, have the advantages that:
In embodiments of the present invention, by device can gather the size of outside condensation data according to condensation inductor, control The different actuatings of relay, abnormal lamp different conditions switching is realized, therefore can timely and effectively judge the condensation of outdoor power equipment Data, early warning simultaneously eliminate safe hidden trouble, so as to ensure the safe and stable operation of outdoor power equipment.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, according to These accompanying drawings obtain other accompanying drawings and still fall within scope of the invention.
Fig. 1 is that the circuit of power system outdoor equipment latency condensation data analysis set-up provided in an embodiment of the present invention connects Connect schematic diagram.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, the present invention is made into one below in conjunction with accompanying drawing It is described in detail on step ground.
As shown in figure 1, in the embodiment of the present invention, there is provided a kind of power system outdoor equipment latency condensation data point Analysis apparatus, with outside except condensation device is engaged, the power system outdoor equipment latency condensation data analysis set-up includes solidifying Reveal inductor M, the first relay J1, the second relay J2, abnormal lamp L1, power lights L2 and inverter U;Wherein,
First relay J1 is provided with first coil control terminal and normal opened contact J1-1;Wherein, the first relay J1 First Line Circle control terminal is concatenated into primary Ioops with condensation inductor M;
Second relay J2 is provided with the second coil control terminal and normally closed contact J2-1;Wherein, the second relay J2 the second line Circle control terminal is concatenated into tie point with power lights L2, and the second relay J2 normally closed contact J2-1 concatenates with the abnormal lamp L1 Into the second branch road;Be in parallel connection between tie point, the second branch road and inverter U three, and tie point, the second branch road And the sys node a formed between inverter U three is coagulated by the first relay J1 normal opened contact J1-1 with outside remove One end of dew device is connected, and another sys node b formed between tie point, the second branch road and inverter U three is direct It is connected with the outside other end except condensation device.
In embodiments of the present invention, it is necessary first to filled by detecting the data analysis of power system outdoor equipment latency condensation Whether the inverter U put is in normal condition to judge that the outdoor equipment latency condensation data analysis set-up is normal or different Often, secondly need to be in the case where the outdoor equipment latency condensation data analysis set-up be in normal operating conditions, further according to condensation Inductor M gathers the size of condensation data, controls the different actuatings of relay, realizes abnormal lamp L1 different conditions switching, so as to The condensation data of outdoor power equipment can timely and effectively be judged, early warning simultaneously eliminates safe hidden trouble, so as to ensure outdoor electric The safe and stable operation of equipment.Above-mentioned steps are implemented as follows:
(I)Outdoor equipment latency condensation data analysis set-up is abnormal:When detecting that inverter U is in abnormal state, Second relay J2 is failure to actuate so that the second relay J2 normally closed contact J2-1 is kept closed, and controls the abnormal lamp L1 to be The bright state of lamp.
(II)Outdoor equipment latency condensation data analysis set-up is normal:When detecting that inverter U is in normal condition When, the second relay J2 actions, the second relay J2 of control normally closed contact J2-1 is off so that abnormal lamp L2 is protected Lamp is held to go out state.
It should be noted that in step(II)During outdoor equipment latency condensation data analysis set-up is normal, power lights L2 It is always maintained at the bright state of lamp.Meanwhile need further to gather the sizes of outside condensation data according to condensation inductor M to control not The same actuating of relay, specific implementation step are as follows:
(1)When the condensation data for detecting the condensation inductor M sensings are less than default threshold value in the first relay J1, the One relay J1 is failure to actuate and the second relay J2 actions so that the first relay J1 normal opened contact J1-1 and the second relay J2 normally closed contact J2-1 is remained off, and is kept outside and is removed condensation device off position;
(2)When detect condensation inductor M sensing condensation data be more than the first relay J1 in default threshold value when, first after Electrical equipment J1 act and the second relay J2 act so that the first relay J1 normal opened contact J1-1 be kept closed and So that the second relay J2 normally closed contact J2-1 is remained off, driving is outside except condensation device enters working condition.
For the size of the real-time display condensation inductor M condensation data sensed, therefore power system outdoor equipment Latency condensation data analysis set-up also includes condensation percentages show device P, and condensation percentages show device P is arranged at condensation sensing Between device M and the first relay J1 coil control terminal.
Implement the embodiment of the present invention, have the advantages that:
In embodiments of the present invention, by device can gather the size of outside condensation data according to condensation inductor, control The different actuatings of relay, abnormal lamp different conditions switching is realized, therefore can timely and effectively judge the condensation of outdoor power equipment Data, early warning simultaneously eliminate safe hidden trouble, so as to ensure the safe and stable operation of outdoor power equipment.
Above disclosure is only preferred embodiment of present invention, can not limit the right model of the present invention with this certainly Enclose, therefore the equivalent variations made according to the claims in the present invention, still belong to the scope that the present invention is covered.

Claims (6)

1. a kind of power system outdoor equipment latency condensation data analysis set-up, with outside except condensation device is engaged, it is special Sign is that the power system outdoor equipment latency condensation data analysis set-up includes condensation inductor(M), the first relay (J1), the second relay(J2), abnormal lamp(L1), power lights(L2)And inverter(U);Wherein,
First relay(J1)It is provided with first coil control terminal and normal opened contact(J1-1);Wherein, first relay Device(J1)First coil control terminal and the condensation inductor(M)It is concatenated into primary Ioops;
Second relay(J2)It is provided with the second coil control terminal and normally closed contact(J2-1);Wherein, second relay Device(J2)The second coil control terminal and the power lights(L2)It is concatenated into tie point, second relay(J2)It is normally closed Contact(J2-1)With the abnormal lamp(L1)It is concatenated into the second branch road;The tie point, the second branch road and inverter(U)Three Be in parallel connection between person, and the tie point, the second branch road and inverter(U)The sys node formed between three Pass through first relay(J1)Normal opened contact(J1-1)With the outside except one end of condensation device is connected, described first Branch road, the second branch road and inverter(U)Another sys node formed between three directly removes condensation device with the outside The other end be connected.
2. power system outdoor equipment latency condensation data analysis set-up as claimed in claim 1, it is characterised in that work as inspection Measure the inverter(U)During in abnormal state, second relay(J2)It is failure to actuate so that second relay Device(J2)Normally closed contact(J2-1)It is kept closed, controls the abnormal lamp(L1)For the bright state of lamp.
3. power system outdoor equipment latency condensation data analysis set-up as claimed in claim 1, it is characterised in that work as inspection Measure the inverter(U)During in normal condition, second relay(J2)Action, control second relay (J2)Normally closed contact(J2-1)It is off so that the abnormal lamp(L2)Lamp is kept to go out state.
4. power system outdoor equipment latency condensation data analysis set-up as claimed in claim 3, it is characterised in that work as inspection Measure the condensation inductor(M)The condensation data of sensing are less than first relay(J1)In default threshold value when, it is described First relay(J1)It is failure to actuate and second relay(J2)Action so that first relay(J1)Normal opened contact (J1-1)With second relay(J2)Normally closed contact(J2-1)Remain off, keep the outside to be filled except condensation Put off position.
5. power system outdoor equipment latency condensation data analysis set-up as claimed in claim 4, it is characterised in that work as inspection Measure the condensation inductor(M)The condensation data of sensing are more than first relay(J1)Described in default threshold value when, First relay(J1)Action and second relay(J2)Act so that first relay(J1)It is normally opened Contact(J1-1)It is kept closed and causes second relay(J2)Normally closed contact(J2-1)Remain off, The outside is driven to enter working condition except condensation device.
6. the power system outdoor equipment latency condensation data analysis set-up as any one of claim 1-5, it is special Sign is that the power system outdoor equipment latency condensation data analysis set-up also includes condensation percentages show device(P), institute State condensation percentages show device(P)It is arranged at the condensation inductor(M)With first relay(J1)Coil control terminal Between.
CN201710804968.3A 2017-09-08 2017-09-08 Latent condensation data analysis device for outdoor equipment of power system Active CN107797501B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710804968.3A CN107797501B (en) 2017-09-08 2017-09-08 Latent condensation data analysis device for outdoor equipment of power system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710804968.3A CN107797501B (en) 2017-09-08 2017-09-08 Latent condensation data analysis device for outdoor equipment of power system

Publications (2)

Publication Number Publication Date
CN107797501A true CN107797501A (en) 2018-03-13
CN107797501B CN107797501B (en) 2023-12-12

Family

ID=61532267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710804968.3A Active CN107797501B (en) 2017-09-08 2017-09-08 Latent condensation data analysis device for outdoor equipment of power system

Country Status (1)

Country Link
CN (1) CN107797501B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108512045A (en) * 2018-04-02 2018-09-07 国网宁夏电力有限公司中卫供电公司 A kind of condensation detection sweep-out method and device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201690206U (en) * 2010-06-07 2010-12-29 河南省电力公司信阳供电公司 Alternate-current power-loss warning device of station end communication power supply
CN202049657U (en) * 2011-04-02 2011-11-23 安徽电气工程职业技术学院 Simulation circuit breaker
CN104291220A (en) * 2014-09-28 2015-01-21 河南重工起重机集团有限公司 Special dew detection and dew removal system for crane
CN204783772U (en) * 2015-07-06 2015-11-18 国家电网公司 Linkage fan control case is felt to cigarette
CN204835232U (en) * 2015-06-16 2015-12-02 国网山东省电力公司济南供电公司 Looped netowrk cabinet secondary circuit stator indicator
CN205753005U (en) * 2016-06-27 2016-11-30 吕晓平 A kind of auxiliary circuits in cabinet monitoring device
CN106291218A (en) * 2016-09-26 2017-01-04 深圳供电局有限公司 A kind of protection analog acquisition loop Hidden fault analytical equipment
CN206092365U (en) * 2016-10-17 2017-04-12 淮南矿业(集团)有限责任公司 Firefighting system
CN206196101U (en) * 2016-08-02 2017-05-24 湖南信息学院 Energy -saving lamp control circuit

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201690206U (en) * 2010-06-07 2010-12-29 河南省电力公司信阳供电公司 Alternate-current power-loss warning device of station end communication power supply
CN202049657U (en) * 2011-04-02 2011-11-23 安徽电气工程职业技术学院 Simulation circuit breaker
CN104291220A (en) * 2014-09-28 2015-01-21 河南重工起重机集团有限公司 Special dew detection and dew removal system for crane
CN204835232U (en) * 2015-06-16 2015-12-02 国网山东省电力公司济南供电公司 Looped netowrk cabinet secondary circuit stator indicator
CN204783772U (en) * 2015-07-06 2015-11-18 国家电网公司 Linkage fan control case is felt to cigarette
CN205753005U (en) * 2016-06-27 2016-11-30 吕晓平 A kind of auxiliary circuits in cabinet monitoring device
CN206196101U (en) * 2016-08-02 2017-05-24 湖南信息学院 Energy -saving lamp control circuit
CN106291218A (en) * 2016-09-26 2017-01-04 深圳供电局有限公司 A kind of protection analog acquisition loop Hidden fault analytical equipment
CN206092365U (en) * 2016-10-17 2017-04-12 淮南矿业(集团)有限责任公司 Firefighting system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108512045A (en) * 2018-04-02 2018-09-07 国网宁夏电力有限公司中卫供电公司 A kind of condensation detection sweep-out method and device

Also Published As

Publication number Publication date
CN107797501B (en) 2023-12-12

Similar Documents

Publication Publication Date Title
CN103515921B (en) A kind of online protective circuit of high-voltage circuit breaker/closing coil and guard method thereof
CN107797501A (en) A kind of power system outdoor equipment latency condensation data analysis set-up
CN107545691A (en) A kind of leakage fire alarming control system
CN106405178A (en) Electricity larceny prevention device for electric energy meter measuring box
CN206301013U (en) Box-type substation cable leakage detects warning device
CN105261530B (en) A kind of more strokes of breaker realize circuit and control method
CN207301753U (en) A kind of electric system outdoor equipment latency condensation data analysis set-up
CN204652727U (en) Remote monitor system for road lamp
CN204391717U (en) A kind of Novel electric surge protector
CN206076642U (en) A kind of safe leakage protecting plug that all can be detected
CN206378569U (en) A kind of voltage relay abnormal detector
CN2753010Y (en) Power socket with overcurrent and short circuit protective device
CN207801459U (en) A kind of device of monitoring reactor operating condition
CN102680129A (en) Prewarning system of high-tension switch cabinet
CN106291218B (en) Latent fault analysis device for protection analog acquisition loop
CN209329686U (en) A kind of protective relaying device for distinguishing station internal fault and line fault
CN106253212A (en) A kind of lack zero, phase shortage, phase sequence mistake power-off protection apparatus
CN201490684U (en) Leakage detection protective circuit
CN206274333U (en) The voltage monitoring system of switch cubicle
CN108347035A (en) A kind of device and method of monitoring reactor operating condition
CN206023372U (en) A kind of intelligent controller of omnipotent breaker
CN204538681U (en) A kind of Novel electric surge protector
CN204538680U (en) A kind of Novel electric surge protector
CN207198286U (en) A kind of current-collector discharging detection device
CN104753047A (en) Novel surge protection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant