CN107797461A - Progress control method, resource shared device and computer-readable recording medium - Google Patents
Progress control method, resource shared device and computer-readable recording medium Download PDFInfo
- Publication number
- CN107797461A CN107797461A CN201710941119.2A CN201710941119A CN107797461A CN 107797461 A CN107797461 A CN 107797461A CN 201710941119 A CN201710941119 A CN 201710941119A CN 107797461 A CN107797461 A CN 107797461A
- Authority
- CN
- China
- Prior art keywords
- home appliance
- duration
- powered
- flat
- control terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 44
- 230000005540 biological transmission Effects 0.000 claims abstract description 12
- 238000004891 communication Methods 0.000 claims description 39
- 241000256844 Apis mellifera Species 0.000 claims description 7
- 230000010267 cellular communication Effects 0.000 claims description 7
- 230000002093 peripheral effect Effects 0.000 claims description 7
- 238000004590 computer program Methods 0.000 claims description 5
- 238000010411 cooking Methods 0.000 claims description 5
- 230000004044 response Effects 0.000 claims description 4
- 235000010469 Glycine max Nutrition 0.000 claims description 2
- 244000068988 Glycine max Species 0.000 claims description 2
- 239000008267 milk Substances 0.000 claims description 2
- 210000004080 milk Anatomy 0.000 claims description 2
- 235000013336 milk Nutrition 0.000 claims description 2
- 238000005406 washing Methods 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 2
- 230000006855 networking Effects 0.000 claims 1
- 230000008569 process Effects 0.000 abstract description 4
- 230000005611 electricity Effects 0.000 description 9
- 230000001815 facial effect Effects 0.000 description 9
- 230000008901 benefit Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000005265 energy consumption Methods 0.000 description 3
- 238000010438 heat treatment Methods 0.000 description 3
- 238000002791 soaking Methods 0.000 description 3
- 241000894007 species Species 0.000 description 3
- 230000003442 weekly effect Effects 0.000 description 3
- 238000004378 air conditioning Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 235000012054 meals Nutrition 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 235000013547 stew Nutrition 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/26—Pc applications
- G05B2219/2642—Domotique, domestic, home control, automation, smart house
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Selective Calling Equipment (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a kind of progress control method, resource shared device and computer-readable recording medium, wherein, progress control method includes:Receive the flat of the second home appliance transmission and be both powered up duration;Determine that the flat of the first home appliance is both powered up duration;Flat according to the second home appliance is both powered up duration and the flat of the first home appliance is both powered up duration, determines that the flat duration that is both powered up in the first home appliance and the second home appliance meets the home appliance of preset duration condition as control terminal home appliance.By technical scheme, the hardware arrangement cost of Internet of Things is reduced, improves the reliability and user experience of Internet of Things control process.
Description
Technical field
The present invention relates to family's electro-technical field, in particular to a kind of progress control method, a kind of money of home appliance
Source sharing means and a kind of computer-readable recording medium.
Background technology
In correlation technique, Internet of Things is applied to the usage experience that user can be effectively lifted in terms of smart home, Internet of Things
One control terminal home appliance is generally set in net, for example, the communication equipment such as router, interchanger or server, wherein, control
End home appliance receives the operational factor of the home appliance associated in Internet of Things, and adjusts according to operational factor and control household electrical appliances to set
Standby running status, and home appliance can only be used as controlled end equipment to run.For example, some indoor room is provided with infrared sensing
Device, infrared sensor are sent to router when detecting human body signal, then by router generation temperature control instruct and send to
Air conditioner, air conditioner instruct automatic running according to indoor environment temperature and temperature control, and cumbersome operation step is carried out without user
Suddenly.
But many technological deficiencies to be present as follows for the existing control program of above-mentioned Internet of Things:
(1) when control terminal home appliance breaks down, the home appliance in Internet of Things can not realize coordinated signals.
(2) control terminal home appliance is additionally set to improve Internet of things hardware layout cost.
The content of the invention
It is contemplated that at least solves one of technical problem present in prior art or correlation technique.
Therefore, it is an object of the present invention to provide a kind of progress control method.
It is another object of the present invention to provide a kind of resource shared device of home appliance.
It is another object of the present invention to provide a kind of computer-readable recording medium.
To achieve these goals, embodiment according to the first aspect of the invention, there is provided a kind of progress control method,
Including:Receive the flat of the second home appliance transmission and be both powered up duration;Determine that the flat of the first home appliance is both powered up duration;According to
The flat of two home appliances is both powered up duration and the flat of the first home appliance is both powered up duration, determines the first home appliance and second
The flat duration that is both powered up in electric equipment meets the home appliance of preset duration condition as control terminal home appliance.
In the technical scheme, contrasted by the flat duration that is both powered up of the second home appliance and the first home appliance,
If the first home appliance it is flat be both powered up the home appliance of time length ratio second it is flat be both powered up duration length, using the first home appliance as
Control terminal home appliance, it is on the contrary then be both powered up duration to be put down in the second home appliance and meet that a household electrical appliances of preset duration condition are set
It is standby to be used as control terminal home appliance, Pass through above-mentioned technical proposal so that control terminal home appliance is in upper electric duration and meets to preset
When elongate member state, improve the stability of Internet of Things normal operation.
Wherein, put down and be both powered up duration and obtained by home appliance local counting user use habit, for example, home appliance
The flat of home appliance is counted weekly and is both powered up duration, or monthly counts the flat of home appliance and is both powered up duration, is improved
The flat accuracy for being both powered up duration, reduce because duration statistics is wrong and caused by situation about judging by accident, improve Consumer's Experience.
Specifically, it is determined that control terminal home appliance be one when, by a control terminal home appliance to Internet of Things its
He carries out coordinated signals by home appliance.(it is 24 hours to put down and be both powered up duration when it is determined that control terminal home appliance is multiple
Air conditioner, refrigerator and computer), multiple control terminal home appliances in control process, can be with other home appliances of Collaborative Control
The generation of data collision is reduced, sets control priority list as shown in table 1 respectively for multiple control terminal home appliances, or respectively
Control authority is set for each control terminal home appliance, as shown in table 2.
Table 1
Control terminal home appliance | Air conditioner | Refrigerator | Computer |
Priority | It is advanced | Middle rank | It is rudimentary |
Table 2
Above-mentioned preset duration condition can be:It is flat to be both powered up that duration is most long, flat be both powered up duration and be more than or equal to preset duration
At least one of.
In any of the above-described technical scheme, it is preferable that also include:Receive the system of the Secondary resource of the second home appliance transmission
One URLs;The URL of the first resource of the first home appliance is determined, wherein, first resource and the second money
Source is identical resource, and the remaining running space of control terminal home appliance can be accessed according to same URLs and loaded pair
The first resource for the first home appliance answered or the Secondary resource of the second home appliance.
In the technical scheme, the URL of the Secondary resource sent by receiving the second home appliance, really
The URL of the first resource of fixed first home appliance so that control terminal home appliance is stored with the first home appliance
First resource URI (Uniform Resource Identifier, URL) and the second home appliance
URI, also, control terminal home appliance can be accessed by URI and load corresponding resource, and then the family in the range of Internet of Things
Electric equipment can share acquisition resource, break the functional limitation of the home appliance in Internet of Things, and then can greatly carry
Rise the usage experience of user.
Wherein, the category of resource includes equipment, information, the functional part (such as infrared sensor) in equipment and operation energy
Power (such as image procossing and facial recognition capability), control terminal home appliance needs when accessing and loading above-mentioned resource
Realized by URI.
For example, the home appliance in Internet of Things is air conditioner, refrigerator and electric cooker, wherein, the resource of air conditioner includes:If
Camera is equipped with, and facial recognition capability is realized by camera collection image.If determined according to remaining running space
Refrigerator is the control terminal home appliance in Internet of Things, then refrigerator is stored with the URI of the resource of air conditioner, and by accessing and adding
URI is carried, in refrigerator controls electric cooker running, if determining that user leaves house by URI, is controlled after the completion of culinary art
Electric cooker processed stops heating or into keeping warm mode, and to realize, home appliance is shared to facial recognition capability in Internet of Things.
In any of the above-described technical scheme, it is preferable that also include:First home appliance and the second home appliance are provided with
One resource, the equipment that control terminal home appliance provides first resource for other home appliances into Internet of Things.
In the technical scheme, by setting the first home appliance and the second home appliance to be provided with first resource, control
The equipment that end home appliance provides first resource for other home appliances into Internet of Things, i.e. control terminal home appliance can lead to
Cross URI and enjoy first resource, and can be the shared first resource of other home appliances in Internet of Things, wherein, above-mentioned Internet of Things
Other home appliances in net are not limited to the first home appliance and the second home appliance.
In any of the above-described technical scheme, it is preferable that progress control method also includes:By the mark of control terminal home appliance
Information is sent to the second home appliance, wherein, the identification information includes the identity of the control terminal home appliance, time
Stamp and control duration.
In the technical scheme, the identification information in identification information is used to show the species and title belonging to household electrical appliances,
It is that each home appliance is specific, changeless, the identification information of control terminal home appliance is sent to second
Home appliance, be advantageous to the second home appliance and clearly receive control instruction from which equipment;Timestamp in identification information
Information, may be used to indicate that the when upper electricity of control device, when initially as control device, when send control instruction etc.;Mark
Know the control duration information in information, may be used to indicate that control terminal home appliance as control terminal home appliance in Internet of Things
The control duration that remaining home appliance is controlled.The identification information of control terminal home appliance is sent to the second home appliance,
Remaining home appliance controlled for showing which of Internet of Things equipment as control terminal home appliance in Internet of Things, and
When which home appliance control terminal home appliance can be used as according to identification information progress coordinated allocation.
In any of the above-described technical scheme, it is preferable that receive the second home appliance send it is flat be both powered up duration before, fortune
Row control method also includes:Prestore control priority list, controls the identification information comprising home appliance and control in priority list
The corresponding relation of priority.
In the technical scheme, by receive the second home appliance send it is flat be both powered up duration before, prestore control it is excellent
First level table, on the one hand, the corresponding relation that the control priority list to prestore includes control priority, control terminal household electrical appliances are set with improving
The standby accuracy judged, on the other hand, the identification information that the control priority list to prestore includes home appliance, received for working as
It is any when carrying control instruction, in the case of judging the identification information that the signal includes corresponding control terminal home appliance,
The control instruction can be performed, improves the accuracy of identification of second home appliance to control instruction, improves Consumer's Experience.
In any of the above-described technical scheme, it is preferable that flat according to the second home appliance is both powered up duration and the first household electrical appliances
The flat of equipment is both powered up duration, determines that the flat duration that is both powered up in the first home appliance and the second home appliance meets preset duration
The home appliance of condition specifically includes following steps as control terminal home appliance:According to the second home appliance it is average on
Electric duration and the flat of the first home appliance are both powered up duration, it is determined that flat be both powered up the home appliance that duration meets preset duration condition
For it is multiple when, parsing control priority list;Determined according to control priority list in the first home appliance and the second home appliance
One home appliance is as control terminal home appliance.
In the technical scheme, contrasted by the flat duration that is both powered up of the second home appliance and the first home appliance,
And then determine control terminal home appliance, when it is determined that it is flat be both powered up duration meet the home appliance of preset duration condition for it is multiple when,
Control terminal home appliance can be further determined that, with this more accurately to control terminal man by way of parsing and controlling priority list
Electric equipment judge, lifts Consumer's Experience.
In any of the above-described technical scheme, it is preferable that flat according to the second home appliance is both powered up duration and the first household electrical appliances
The flat of equipment is both powered up duration, determines that the flat duration that is both powered up in the first home appliance and the second home appliance meets preset duration
The home appliance of condition specifically includes following steps as control terminal home appliance:According to the second home appliance it is average on
Electric duration and the flat of the first home appliance are both powered up duration, it is determined that flat be both powered up the home appliance that duration meets preset duration condition
For one when, flat will be both powered up duration and meet that a home appliance of preset duration condition is defined as control terminal home appliance.
For example, the flat duration that is both powered up of the first home appliance and the second home appliance is as shown in table 3 below, is deposited in Internet of Things
In air conditioner, then understood with reference to table 1 and table 3, preferential air conditioner of choosing is as control terminal home appliance.
Table 3
In the technical scheme, contrasted by the flat duration that is both powered up of the second home appliance and the first home appliance,
And then determine control terminal home appliance, when it is determined that it is flat duration is both powered up to meet the home appliance of preset duration condition be one when,
This is flat to be both powered up duration and meets that the home appliance of preset duration condition is defined as control terminal home appliance.
In any of the above-described technical scheme, it is preferable that progress control method also includes:It is determined that control terminal home appliance
Afterwards, prompt message is generated and sent to peripheral communication equipment, wherein, prompt message includes the identity of control terminal home appliance
Identified with upper electric duration.
In the technical scheme, by the way that the prompt message of control terminal home appliance is sent to peripheral communication equipment, to
User's control end home appliance is reminded to determine to complete, wherein, prompt message includes the identity of control terminal home appliance, such as
Character marks such as " refrigerators ", " air conditioner " and " computer ", while prompt message also includes the upper electric duration of control terminal home appliance
Mark, such as " air conditioner need to keep 24 hours upper electricity ", namely prompting user keeps 24 hours upper electricity of air conditioner, using meet its as
The demand of controller home appliance, and other home appliances can shut down at any time, to reduce power consumption.
In any of the above-described technical scheme, it is preferable that progress control method also includes:It is determined that control terminal home appliance
Afterwards, the operational factor of local is reported into control terminal home appliance;Control terminal home appliance is received to feed back in response to operational factor
Control instruction;One section of preset duration is run according to control instruction.
In the technical scheme, by other home appliances that control terminal home appliance controls by its local operational factor
To control terminal home appliance, control terminal home appliance receives to produce after operational factor and responds and generate the control of feedback and refer to report
Order, then control instruction is received by other home appliances, meanwhile, a period of time is run with the control instruction, each household electrical appliances is detected and sets
It is standby whether normal operation.
Wherein, hardware operational factor can be rotation speed of fan, compressor frequency and air outlet angle of air conditioner etc., Ke Yishi
Culinary art power, the culinary art duration and soaking time etc. of cooking apparatus.
In any of the above-described technical scheme, it is preferable that Internet of Things includes bluetooth communication network, purple honeybee communication network, Wi-Fi
At least one of communication network, radio frequency communication network and mobile cellular communication network.
In the technical scheme, Internet of Things is using bluetooth communication network, purple honeybee communication network, Wi-Fi communication networks, radio frequency
At least one of communication network and mobile cellular communication network, above-mentioned communication network be respectively provided with easy to connect, transmission rate is high,
The features such as low in energy consumption, and one-to-many connected mode is realized, and then meet that a control terminal home appliance controls multiple household electrical appliances to set
Standby demand.
Technical scheme according to the second aspect of the invention, there is provided a kind of resource shared device, including:Memory, place
Reason device and the resource-sharing program for storing the home appliance that can be run on a memory and on a processor, the resource of home appliance
The step of any one of first aspect present invention technical scheme progress control method is realized when shared routing is executed by processor.Family
Electric equipment is electric cooker, soy bean milk making machine, electric pressure cooking saucepan, insulating pot, wall-breaking machine, refrigerator, air conditioner, computer, stereo set, washing machine
With one kind in water heater.
Technical scheme according to the third aspect of the invention we, there is provided a kind of computer-readable recording medium, store thereon
There is computer program, computer program is performed the step of realizing the progress control method such as first aspect.
The additional aspect and advantage of the present invention will provide in following description section, will partly become from the following description
Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
The above-mentioned and/or additional aspect and advantage of the present invention will become in the description from combination accompanying drawings below to embodiment
Substantially and it is readily appreciated that, wherein:
Fig. 1 shows the schematic flow diagram of progress control method according to an embodiment of the invention;
Fig. 2 shows the configuration diagram of Internet of Things according to an embodiment of the invention;
Fig. 3 shows the schematic diagram of an operation control program in Internet of Things as shown in Figure 2.
Embodiment
It is below in conjunction with the accompanying drawings and specific real in order to be more clearly understood that the above objects, features and advantages of the present invention
Mode is applied the present invention is further described in detail.It should be noted that in the case where not conflicting, the implementation of the application
Feature in example and embodiment can be mutually combined.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still, the present invention may be used also
To be different from other modes described here using other to implement, therefore, protection scope of the present invention is not by described below
Specific embodiment limitation.
Progress control method according to an embodiment of the invention is specifically described with reference to Fig. 1 to Fig. 3.
As shown in figure 1, progress control method according to an embodiment of the invention, including:Step S102, receive the second household electrical appliances
The flat of equipment transmission is both powered up duration;Step S104, determine that the flat of the first home appliance is both powered up duration;Step S106, according to
The flat of second home appliance is both powered up duration and the flat of the first home appliance is both powered up duration, determines the first home appliance and second
The flat duration that is both powered up in home appliance meets the home appliance of preset duration condition as control terminal home appliance.
In the technical scheme, contrasted by the flat duration that is both powered up of the second home appliance and the first home appliance,
If the first home appliance it is flat be both powered up the home appliance of time length ratio second it is flat be both powered up duration length, using the first home appliance as
Control terminal home appliance, it is on the contrary then be both powered up duration to be put down in the second home appliance and meet that a household electrical appliances of preset duration condition are set
It is standby to be used as control terminal home appliance, Pass through above-mentioned technical proposal so that control terminal home appliance is in upper electric duration and meets to preset
When elongate member state, improve the stability of Internet of Things normal operation.
Wherein, put down and be both powered up duration and obtained by home appliance local counting user use habit, for example, home appliance
The flat of home appliance is counted weekly and is both powered up duration, or monthly counts the flat of home appliance and is both powered up duration, is improved
The flat accuracy for being both powered up duration, reduce because duration statistics is wrong and caused by situation about judging by accident, improve Consumer's Experience.
Specifically, it is determined that control terminal home appliance be one when, by a control terminal home appliance to Internet of Things its
He carries out coordinated signals by home appliance.(it is 24 hours to put down and be both powered up duration when it is determined that control terminal home appliance is multiple
Air conditioner, refrigerator and computer), multiple control terminal home appliances in control process, can be with other home appliances of Collaborative Control
The generation of data collision is reduced, sets control priority list as shown in table 1 respectively for multiple control terminal home appliances, or respectively
Control authority is set for each control terminal home appliance, as shown in table 2.
Table 1
Control terminal home appliance | Air conditioner | Refrigerator | Computer |
Priority | It is advanced | Middle rank | It is rudimentary |
Table 2
Above-mentioned preset duration condition can be:It is flat to be both powered up that duration is most long, flat be both powered up duration and be more than or equal to preset duration
At least one of.
In any of the above-described technical scheme, it is preferable that also include:Receive the system of the Secondary resource of the second home appliance transmission
One URLs;The URL of the first resource of the first home appliance is determined, wherein, first resource and the second money
Source is identical resource, and the remaining running space of control terminal home appliance can be accessed according to same URLs and loaded pair
The first resource for the first home appliance answered or the Secondary resource of the second home appliance.
In the technical scheme, the URL of the Secondary resource sent by receiving the second home appliance, really
The URL of the first resource of fixed first home appliance so that control terminal home appliance is stored with the first home appliance
First resource URI (Uniform Resource Identifier, URL) and the second home appliance
URI, also, control terminal home appliance can be accessed by URI and load corresponding resource, and then the family in the range of Internet of Things
Electric equipment can share acquisition resource, break the functional limitation of the home appliance in Internet of Things, and then can greatly carry
Rise the usage experience of user.
Wherein, the category of resource includes equipment, information, the functional part (such as infrared sensor) in equipment and operation energy
Power (such as image procossing and facial recognition capability), control terminal home appliance needs when accessing and loading above-mentioned resource
Realized by URI.
For example, the home appliance in Internet of Things is air conditioner, refrigerator and electric cooker, wherein, the resource of air conditioner includes:If
Camera is equipped with, and facial recognition capability is realized by camera collection image.If determined according to remaining running space
Refrigerator is the control terminal home appliance in Internet of Things, then refrigerator is stored with the URI of the resource of air conditioner, and by accessing and adding
URI is carried, in refrigerator controls electric cooker running, if determining that user leaves house by URI, is controlled after the completion of culinary art
Electric cooker processed stops heating or into keeping warm mode, and to realize, home appliance is shared to facial recognition capability in Internet of Things.
In any of the above-described technical scheme, it is preferable that also include:First home appliance and the second home appliance are provided with
One resource, the equipment that control terminal home appliance provides first resource for other home appliances into Internet of Things.
In the technical scheme, by setting the first home appliance and the second home appliance to be provided with first resource, control
The equipment that end home appliance provides first resource for other home appliances into Internet of Things, i.e. control terminal home appliance can lead to
Cross URI and enjoy first resource, and can be the shared first resource of other home appliances in Internet of Things, wherein, above-mentioned Internet of Things
Other home appliances in net are not limited to the first home appliance and the second home appliance.
In any of the above-described technical scheme, it is preferable that progress control method also includes:By the mark of control terminal home appliance
Information is sent to the second home appliance, wherein, the identification information includes the identity of the control terminal home appliance, time
Stamp and control duration.
In the technical scheme, the identification information in identification information is used to show the species and title belonging to household electrical appliances,
It is that each home appliance is specific, changeless, the identification information of control terminal home appliance is sent to second
Home appliance, be advantageous to the second home appliance and clearly receive control instruction from which equipment;Timestamp in identification information
Information, may be used to indicate that the when upper electricity of control device, when initially as control device, when send control instruction etc.;Mark
Know the control duration information in information, may be used to indicate that control terminal home appliance as control terminal home appliance in Internet of Things
The control duration that remaining home appliance is controlled.The identification information of control terminal home appliance is sent to the second home appliance,
Remaining home appliance controlled for showing which of Internet of Things equipment as control terminal home appliance in Internet of Things, and
When which home appliance control terminal home appliance can be used as according to identification information progress coordinated allocation.
In any of the above-described technical scheme, it is preferable that receive the second home appliance send it is flat be both powered up duration before, fortune
Row control method also includes:Prestore control priority list, controls the identification information comprising home appliance and control in priority list
The corresponding relation of priority.
In the technical scheme, by receive the second home appliance send it is flat be both powered up duration before, prestore control it is excellent
First level table, on the one hand, the corresponding relation that the control priority list to prestore includes control priority, control terminal household electrical appliances are set with improving
The standby accuracy judged, on the other hand, the identification information that the control priority list to prestore includes home appliance, received for working as
It is any when carrying control instruction, in the case of judging the identification information that the signal includes corresponding control terminal home appliance,
The control instruction can be performed, improves the accuracy of identification of second home appliance to control instruction, improves Consumer's Experience.
In any of the above-described technical scheme, it is preferable that flat according to the second home appliance is both powered up duration and the first household electrical appliances
The flat of equipment is both powered up duration, determines that the flat duration that is both powered up in the first home appliance and the second home appliance meets preset duration
The home appliance of condition specifically includes following steps as control terminal home appliance:According to the second home appliance it is average on
Electric duration and the flat of the first home appliance are both powered up duration, it is determined that flat be both powered up the home appliance that duration meets preset duration condition
For it is multiple when, parsing control priority list;Determined according to control priority list in the first home appliance and the second home appliance
One home appliance is as control terminal home appliance.
In the technical scheme, contrasted by the flat duration that is both powered up of the second home appliance and the first home appliance,
And then determine control terminal home appliance, when it is determined that it is flat be both powered up duration meet the home appliance of preset duration condition for it is multiple when,
Control terminal home appliance can be further determined that, with this more accurately to control terminal man by way of parsing and controlling priority list
Electric equipment judge, lifts Consumer's Experience.
In any of the above-described technical scheme, it is preferable that flat according to the second home appliance is both powered up duration and the first household electrical appliances
The flat of equipment is both powered up duration, determines that the flat duration that is both powered up in the first home appliance and the second home appliance meets preset duration
The home appliance of condition specifically includes following steps as control terminal home appliance:According to the second home appliance it is average on
Electric duration and the flat of the first home appliance are both powered up duration, it is determined that flat be both powered up the home appliance that duration meets preset duration condition
For one when, flat will be both powered up duration and meet that a home appliance of preset duration condition is defined as control terminal home appliance.
For example, the flat duration that is both powered up of the first home appliance and the second home appliance is as shown in table 3 below, is deposited in Internet of Things
In air conditioner, then understood with reference to table 1 and table 3, preferential air conditioner of choosing is as control terminal home appliance.
Table 3
In the technical scheme, contrasted by the flat duration that is both powered up of the second home appliance and the first home appliance,
And then determine control terminal home appliance, when it is determined that it is flat duration is both powered up to meet the home appliance of preset duration condition be one when,
This is flat to be both powered up duration and meets that the home appliance of preset duration condition is defined as control terminal home appliance.
In any of the above-described technical scheme, it is preferable that progress control method also includes:It is determined that control terminal home appliance
Afterwards, prompt message is generated and sent to peripheral communication equipment, wherein, prompt message includes the identity of control terminal home appliance
Identified with upper electric duration.
In the technical scheme, by the way that the prompt message of control terminal home appliance is sent to peripheral communication equipment, to
User's control end home appliance is reminded to determine to complete, wherein, prompt message includes the identity of control terminal home appliance, such as
Character marks such as " refrigerators ", " air conditioner " and " computer ", while prompt message also includes the upper electric duration of control terminal home appliance
Mark, such as " air conditioner need to keep 24 hours upper electricity ", namely prompting user keeps 24 hours upper electricity of air conditioner, using meet its as
The demand of controller home appliance, and other home appliances can shut down at any time, to reduce power consumption.
In any of the above-described technical scheme, it is preferable that progress control method also includes:It is determined that control terminal home appliance
Afterwards, the operational factor of local is reported into control terminal home appliance;Control terminal home appliance is received to feed back in response to operational factor
Control instruction;One section of preset duration is run according to control instruction.
In the technical scheme, by other home appliances that control terminal home appliance controls by its local operational factor
To control terminal home appliance, control terminal home appliance receives to produce after operational factor and responds and generate the control of feedback and refer to report
Order, then control instruction is received by other home appliances, meanwhile, a period of time is run with the control instruction, each household electrical appliances is detected and sets
It is standby whether normal operation.
Wherein, hardware operational factor can be rotation speed of fan, compressor frequency and air outlet angle of air conditioner etc., Ke Yishi
Culinary art power, the culinary art duration and soaking time etc. of cooking apparatus.
In any of the above-described technical scheme, it is preferable that Internet of Things includes bluetooth communication network, purple honeybee communication network, Wi-Fi
At least one of communication network, radio frequency communication network and mobile cellular communication network.
In the technical scheme, Internet of Things is using bluetooth communication network, purple honeybee communication network, Wi-Fi communication networks, radio frequency
At least one of communication network and mobile cellular communication network, above-mentioned communication network be respectively provided with easy to connect, transmission rate is high,
The features such as low in energy consumption, and one-to-many connected mode is realized, and then meet that a control terminal home appliance controls multiple household electrical appliances to set
Standby demand.
Embodiment one:
As shown in Fig. 2 Internet of Things includes electric cooker 302, air conditioner 304 and the refrigerator 306 of associated connection, it is assumed that with electric meal
It is the first home appliance to stew 302, with air conditioner 304 and refrigerator 306 for the second home appliance, need not additionally be set in Internet of Things
Gateway device, reduce the hardware arrangement cost of Internet of Things, further, electric cooker 302 receive air conditioner 304 it is average on
A length of 2 hours when electric, refrigerator 306 is flat a length of 24 hours when being both powered up, and a length of 4 hours when electric cooker 302 flat is both powered up, energy
Enough identification informations using refrigerator 306 as control terminal home appliance, the then mutual broadcasting refrigerator 306 of the home appliance in Internet of Things.
Embodiment two:
As shown in figure 3, after the confirmation for receiving refrigerator 306 responds instruction, electric cooker 302 and air conditioner 304 determine
Refrigerator 306 is control terminal home appliance, wherein, electric cooker 302 reports hardware operational factor 408A to refrigerator 306, such as cooks work(
Rate and culinary art duration, and the feedback control instruction 410A of the transmission of refrigerator 306 is received, as " after completing to cook, into insulation shape
State ", similar, air conditioner 304 reports hardware operational factor 408B to refrigerator 306, if target temperature is 23 DEG C, and receives refrigerator
The 306 feedback control instruction 410B sent, such as " temperature is reduced to 23 DEG C ".
According to an embodiment of the invention, it is also proposed that a kind of computer-readable recording medium, be stored thereon with computer journey
Sequence, above computer program realize following steps when being performed:Receive the flat of the second home appliance transmission and be both powered up duration;It is determined that
The flat of first home appliance is both powered up duration;Flat according to the second home appliance is both powered up being averaged for duration and the first home appliance
Upper electric duration, determine the flat household electrical appliances for being both powered up duration and meeting preset duration condition in the first home appliance and the second home appliance
Equipment is as control terminal home appliance.
In the technical scheme, contrasted by the flat duration that is both powered up of the second home appliance and the first home appliance,
If the first home appliance it is flat be both powered up the home appliance of time length ratio second it is flat be both powered up duration length, using the first home appliance as
Control terminal home appliance, it is on the contrary then be both powered up duration to be put down in the second home appliance and meet that a household electrical appliances of preset duration condition are set
It is standby to be used as control terminal home appliance, Pass through above-mentioned technical proposal so that control terminal home appliance is in upper electric duration and meets to preset
When elongate member state, improve the stability of Internet of Things normal operation.
Wherein, put down and be both powered up duration and obtained by home appliance local counting user use habit, for example, home appliance
The flat of home appliance is counted weekly and is both powered up duration, or monthly counts the flat of home appliance and is both powered up duration, is improved
The flat accuracy for being both powered up duration, reduce because duration statistics is wrong and caused by situation about judging by accident, improve Consumer's Experience.
Specifically, it is determined that control terminal home appliance be one when, by a control terminal home appliance to Internet of Things its
He carries out coordinated signals by home appliance.(it is 24 hours to put down and be both powered up duration when it is determined that control terminal home appliance is multiple
Air conditioner, refrigerator and computer), multiple control terminal home appliances in control process, can be with other home appliances of Collaborative Control
The generation of data collision is reduced, sets control priority list as shown in table 1 respectively for multiple control terminal home appliances, or respectively
Control authority is set for each control terminal home appliance, as shown in table 2.
Table 1
Control terminal home appliance | Air conditioner | Refrigerator | Computer |
Priority | It is advanced | Middle rank | It is rudimentary |
Table 2
Above-mentioned preset duration condition can be:It is flat to be both powered up that duration is most long, flat be both powered up duration and be more than or equal to preset duration
At least one of.
In any of the above-described technical scheme, it is preferable that also include:Receive the system of the Secondary resource of the second home appliance transmission
One URLs;The URL of the first resource of the first home appliance is determined, wherein, first resource and the second money
Source is identical resource, and the remaining running space of control terminal home appliance can be accessed according to same URLs and loaded pair
The first resource for the first home appliance answered or the Secondary resource of the second home appliance.
In the technical scheme, the URL of the Secondary resource sent by receiving the second home appliance, really
The URL of the first resource of fixed first home appliance so that control terminal home appliance is stored with the first home appliance
First resource URI (Uniform Resource Identifier, URL) and the second home appliance
URI, also, control terminal home appliance can be accessed by URI and load corresponding resource, and then the family in the range of Internet of Things
Electric equipment can share acquisition resource, break the functional limitation of the home appliance in Internet of Things, and then can greatly carry
Rise the usage experience of user.
Wherein, the category of resource includes equipment, information, the functional part (such as infrared sensor) in equipment and operation energy
Power (such as image procossing and facial recognition capability), control terminal home appliance needs when accessing and loading above-mentioned resource
Realized by URI.
For example, the home appliance in Internet of Things is air conditioner, refrigerator and electric cooker, wherein, the resource of air conditioner includes:If
Camera is equipped with, and facial recognition capability is realized by camera collection image.If determined according to remaining running space
Refrigerator is the control terminal home appliance in Internet of Things, then refrigerator is stored with the URI of the resource of air conditioner, and by accessing and adding
URI is carried, in refrigerator controls electric cooker running, if determining that user leaves house by URI, is controlled after the completion of culinary art
Electric cooker processed stops heating or into keeping warm mode, and to realize, home appliance is shared to facial recognition capability in Internet of Things.
In any of the above-described technical scheme, it is preferable that also include:First home appliance and the second home appliance are provided with
One resource, the equipment that control terminal home appliance provides first resource for other home appliances into Internet of Things.
In the technical scheme, by setting the first home appliance and the second home appliance to be provided with first resource, control
The equipment that end home appliance provides first resource for other home appliances into Internet of Things, i.e. control terminal home appliance can lead to
Cross URI and enjoy first resource, and can be the shared first resource of other home appliances in Internet of Things, wherein, above-mentioned Internet of Things
Other home appliances in net are not limited to the first home appliance and the second home appliance.
In any of the above-described technical scheme, it is preferable that progress control method also includes:By the mark of control terminal home appliance
Information is sent to the second home appliance, wherein, the identification information includes the identity of the control terminal home appliance, time
Stamp and control duration.
In the technical scheme, the identification information in identification information is used to show the species and title belonging to household electrical appliances,
It is that each home appliance is specific, changeless, the identification information of control terminal home appliance is sent to second
Home appliance, be advantageous to the second home appliance and clearly receive control instruction from which equipment;Timestamp in identification information
Information, may be used to indicate that the when upper electricity of control device, when initially as control device, when send control instruction etc.;Mark
Know the control duration information in information, may be used to indicate that control terminal home appliance as control terminal home appliance in Internet of Things
The control duration that remaining home appliance is controlled.The identification information of control terminal home appliance is sent to the second home appliance,
Remaining home appliance controlled for showing which of Internet of Things equipment as control terminal home appliance in Internet of Things, and
When which home appliance control terminal home appliance can be used as according to identification information progress coordinated allocation.
In any of the above-described technical scheme, it is preferable that receive the second home appliance send it is flat be both powered up duration before, fortune
Row control method also includes:Prestore control priority list, controls the identification information comprising home appliance and control in priority list
The corresponding relation of priority.
In the technical scheme, by receive the second home appliance send it is flat be both powered up duration before, prestore control it is excellent
First level table, on the one hand, the corresponding relation that the control priority list to prestore includes control priority, control terminal household electrical appliances are set with improving
The standby accuracy judged, on the other hand, the identification information that the control priority list to prestore includes home appliance, received for working as
It is any when carrying control instruction, in the case of judging the identification information that the signal includes corresponding control terminal home appliance,
The control instruction can be performed, improves the accuracy of identification of second home appliance to control instruction, improves Consumer's Experience.
In any of the above-described technical scheme, it is preferable that flat according to the second home appliance is both powered up duration and the first household electrical appliances
The flat of equipment is both powered up duration, determines that the flat duration that is both powered up in the first home appliance and the second home appliance meets preset duration
The home appliance of condition specifically includes following steps as control terminal home appliance:According to the second home appliance it is average on
Electric duration and the flat of the first home appliance are both powered up duration, it is determined that flat be both powered up the home appliance that duration meets preset duration condition
For it is multiple when, parsing control priority list;Determined according to control priority list in the first home appliance and the second home appliance
One home appliance is as control terminal home appliance.
In the technical scheme, contrasted by the flat duration that is both powered up of the second home appliance and the first home appliance,
And then determine control terminal home appliance, when it is determined that it is flat be both powered up duration meet the home appliance of preset duration condition for it is multiple when,
Control terminal home appliance can be further determined that, with this more accurately to control terminal man by way of parsing and controlling priority list
Electric equipment judge, lifts Consumer's Experience.
In any of the above-described technical scheme, it is preferable that flat according to the second home appliance is both powered up duration and the first household electrical appliances
The flat of equipment is both powered up duration, determines that the flat duration that is both powered up in the first home appliance and the second home appliance meets preset duration
The home appliance of condition specifically includes following steps as control terminal home appliance:According to the second home appliance it is average on
Electric duration and the flat of the first home appliance are both powered up duration, it is determined that flat be both powered up the home appliance that duration meets preset duration condition
For one when, flat will be both powered up duration and meet that a home appliance of preset duration condition is defined as control terminal home appliance.
For example, the flat duration that is both powered up of the first home appliance and the second home appliance is as shown in table 3 below, is deposited in Internet of Things
In air conditioner, then understood with reference to table 1 and table 3, preferential air conditioner of choosing is as control terminal home appliance.
Table 3
In the technical scheme, contrasted by the flat duration that is both powered up of the second home appliance and the first home appliance,
And then determine control terminal home appliance, when it is determined that it is flat duration is both powered up to meet the home appliance of preset duration condition be one when,
This is flat to be both powered up duration and meets that the home appliance of preset duration condition is defined as control terminal home appliance.
In any of the above-described technical scheme, it is preferable that progress control method also includes:It is determined that control terminal home appliance
Afterwards, prompt message is generated and sent to peripheral communication equipment, wherein, prompt message includes the identity of control terminal home appliance
Identified with upper electric duration.
In the technical scheme, by the way that the prompt message of control terminal home appliance is sent to peripheral communication equipment, to
User's control end home appliance is reminded to determine to complete, wherein, prompt message includes the identity of control terminal home appliance, such as
Character marks such as " refrigerators ", " air conditioner " and " computer ", while prompt message also includes the upper electric duration of control terminal home appliance
Mark, such as " air conditioner need to keep 24 hours upper electricity ", namely prompting user keeps 24 hours upper electricity of air conditioner, using meet its as
The demand of controller home appliance, and other home appliances can shut down at any time, to reduce power consumption.
In any of the above-described technical scheme, it is preferable that progress control method also includes:It is determined that control terminal home appliance
Afterwards, the operational factor of local is reported into control terminal home appliance;Control terminal home appliance is received to feed back in response to operational factor
Control instruction;One section of preset duration is run according to control instruction.
In the technical scheme, by other home appliances that control terminal home appliance controls by its local operational factor
To control terminal home appliance, control terminal home appliance receives to produce after operational factor and responds and generate the control of feedback and refer to report
Order, then control instruction is received by other home appliances, meanwhile, a period of time is run with the control instruction, each household electrical appliances is detected and sets
It is standby whether normal operation.
Wherein, hardware operational factor can be rotation speed of fan, compressor frequency and air outlet angle of air conditioner etc., Ke Yishi
Culinary art power, the culinary art duration and soaking time etc. of cooking apparatus.
In any of the above-described technical scheme, it is preferable that Internet of Things includes bluetooth communication network, purple honeybee communication network, Wi-Fi
At least one of communication network, radio frequency communication network and mobile cellular communication network.
In the technical scheme, Internet of Things is using bluetooth communication network, purple honeybee communication network, Wi-Fi communication networks, radio frequency
At least one of communication network and mobile cellular communication network, above-mentioned communication network be respectively provided with easy to connect, transmission rate is high,
The features such as low in energy consumption, and one-to-many connected mode is realized, and then meet that a control terminal home appliance controls multiple household electrical appliances to set
Standby demand.
Embodiment three:
As shown in figure 3, Internet of Things includes electric cooker 302, air conditioner 304 and the refrigerator 306 of associated connection, by preset duration
To be both powered up duration most long to be flat for condition setting, it is assumed that with electric cooker 302 for the first home appliance, with air conditioner 304 and refrigerator 306
For the second home appliance, gateway device need not be additionally set in Internet of Things, reduce the hardware arrangement cost of Internet of Things.Enter one
Step ground, electric cooker 302 are received when air conditioner 304 flat is both powered up a length of 2 hours, and it is a length of 24 small that refrigerator 306 is flat when being both powered up
When, and a length of 4 hours when electric cooker 302 flat is both powered up, refrigerator 306 can determine by the first home appliance electric cooker 302
The flat duration that is both powered up meet preset duration condition, i.e., refrigerator 306 in electric cooker 302, air conditioner 304 and the three of refrigerator 306
The flat duration that is both powered up is most long, therefore, using refrigerator 306 as control terminal home appliance.
Example IV:
As shown in figure 3, Internet of Things includes electric cooker 302, air conditioner 304 and the refrigerator 306 of associated connection, by preset duration
Condition setting is more than preset duration 2 hours for the flat duration that is both powered up, it is assumed that with electric cooker 302 for the first home appliance, with air-conditioning
Device 304 and refrigerator 306 are the second home appliance, need not additionally set gateway device in Internet of Things, reduce the hard of Internet of Things
Part is laid out cost.Further, electric cooker 302 is flat a length of 3 hours when being both powered up, and refrigerator 306 is flat a length of 24 hours when being both powered up,
A length of 5 hours when air conditioner 304 flat is both powered up, preset duration is 4 hours.Now, the flat duration that is both powered up of refrigerator 306 exceedes in advance
If duration 20 hours, the flat duration that is both powered up of air conditioner 304 exceedes preset duration 1 hour, and the flat duration that is both powered up of electric cooker 302 does not surpass
Preset duration is crossed, by judging, only refrigerator 306 meets preset duration condition, therefore, using refrigerator 306 as control terminal household electrical appliances
Equipment.
Be described in detail technical scheme above in association with accompanying drawing, the present invention propose a kind of progress control method,
The resource shared device and computer-readable recording medium of home appliance, pass through the flat of the second home appliance and the first home appliance
It is both powered up duration to be contrasted, if flat the flat of the home appliance of time length ratio second that be both powered up of the first home appliance is both powered up duration
It is long, then it is on the contrary then be both powered up duration satisfaction in advance to be put down in the second home appliance using the first home appliance as control terminal home appliance
If when elongate member a home appliance as control terminal home appliance, Pass through above-mentioned technical proposal so that control terminal household electrical appliances are set
The standby state for meeting preset duration condition in upper electric duration, improve the stability of Internet of Things normal operation.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies
Change, equivalent substitution, improvement etc., should be included in the scope of the protection.
Claims (13)
1. a kind of progress control method, the first home appliance suitable for Internet of Things, first home appliance and the thing
At least one second home appliance connection in networking, it is characterised in that the progress control method includes:
Receive the flat of the second home appliance transmission and be both powered up duration;
Determine that the flat of the first home appliance is both powered up duration;
Flat according to second home appliance is both powered up duration and the flat of the first home appliance is both powered up duration, determines institute
The flat duration that is both powered up stated in the first home appliance and second home appliance meets that the home appliance of preset duration condition is made
For control terminal home appliance.
2. progress control method according to claim 1, it is characterised in that also include:
Receive the URL for the Secondary resource that second home appliance is sent;
The URL of the first resource of first home appliance is determined,
Wherein, the first resource and the Secondary resource are identical resource, and the remaining of the control terminal home appliance runs
Space can be accessed according to the same URLs and the first resource or of first home appliance corresponding to loading
The Secondary resource of two home appliances.
3. progress control method according to claim 2, it is characterised in that also include:
First home appliance and second home appliance are provided with the first resource, and the control terminal home appliance is
The equipment that other home appliances into the Internet of Things provide the first resource.
4. progress control method according to claim 1, it is characterised in that also include:
The identification information of the control terminal home appliance is sent to second home appliance,
Wherein, the identification information includes identity, timestamp and the control duration of the control terminal home appliance.
5. progress control method according to claim 1, it is characterised in that receiving what second home appliance was sent
Put down before being both powered up duration, in addition to:
Prestore control priority list, the identification information comprising home appliance and pair of control priority in the control priority list
It should be related to.
6. progress control method according to claim 5, it is characterised in that described according to the flat of second home appliance
It is both powered up duration and the flat of the first home appliance is both powered up duration, determines first home appliance and second household electrical appliances
Flat in equipment is both powered up home appliance that duration meets preset duration condition as control terminal home appliance, specifically includes following
Step:
Duration is being both powered up and the flat of the first home appliance is both powered up duration according to the flat of second home appliance, it is determined that
It is described it is flat be both powered up duration meet the home appliance of preset duration condition for it is multiple when, parse the control priority list;
Determine that a household electrical appliances in first home appliance and second home appliance are set according to the control priority list
It is standby to be used as the control terminal home appliance.
7. progress control method according to claim 1, it is characterised in that described according to the flat of second home appliance
It is both powered up duration and the flat of the first home appliance is both powered up duration, determines first home appliance and second household electrical appliances
Flat in equipment is both powered up home appliance that duration meets preset duration condition as control terminal home appliance, specifically includes following
Step:
Duration is being both powered up and the flat of the first home appliance is both powered up duration according to the flat of second home appliance, it is determined that
It is described it is flat be both powered up duration to meet the home appliance of preset duration condition when being one, by it is described it is flat be both powered up duration meet it is default
When elongate member a home appliance be defined as the control terminal home appliance.
8. progress control method according to any one of claim 1 to 7, it is characterised in that also include:
It is determined that after the control terminal home appliance, prompt message is being generated and sent to peripheral communication equipment,
Wherein, the prompt message includes the identity of the control terminal home appliance and upper electric duration mark.
9. progress control method according to any one of claim 1 to 7, it is characterised in that also include:
It is determined that after the control terminal home appliance, the operational factor of local is reported into the control terminal home appliance;
Receive the control instruction that the control terminal home appliance feeds back in response to the operational factor;
One section of preset duration is run according to the control instruction.
10. progress control method according to any one of claim 1 to 7, it is characterised in that
The Internet of Things includes bluetooth communication network, purple honeybee communication network, Wi-Fi communication networks, radio frequency communication network and movement
At least one of cellular communications networks.
A kind of 11. resource shared device of home appliance, it is characterised in that including:
Memory, processor and it is stored in the resource of the home appliance that can be run on the memory and on the processor and is total to
Program is enjoyed, the resource-sharing program of the home appliance is realized during the computing device as any in claim 1 to 10
Described in progress control method the step of.
12. the resource shared device of home appliance according to claim 11, it is characterised in that
The home appliance is electric cooker, soy bean milk making machine, electric pressure cooking saucepan, insulating pot, wall-breaking machine, refrigerator, air conditioner, computer, sound equipment
One kind in equipment, washing machine and water heater.
13. a kind of computer-readable recording medium, is stored thereon with computer program, it is characterised in that the computer program
When being performed, the step of realizing progress control method as any one of claim 1 to 8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710941119.2A CN107797461A (en) | 2017-09-30 | 2017-09-30 | Progress control method, resource shared device and computer-readable recording medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710941119.2A CN107797461A (en) | 2017-09-30 | 2017-09-30 | Progress control method, resource shared device and computer-readable recording medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107797461A true CN107797461A (en) | 2018-03-13 |
Family
ID=61532697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710941119.2A Pending CN107797461A (en) | 2017-09-30 | 2017-09-30 | Progress control method, resource shared device and computer-readable recording medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107797461A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109753034A (en) * | 2018-12-10 | 2019-05-14 | 深圳绿米联创科技有限公司 | A kind of control method, device, electronic equipment and storage medium |
CN110173899A (en) * | 2019-05-21 | 2019-08-27 | 四川虹美智能科技有限公司 | Method, water heater and Internet of things system based on Internet of Things control water heater |
CN110896370A (en) * | 2018-09-13 | 2020-03-20 | 青岛海尔洗衣机有限公司 | Control method for household appliance system and household appliance system |
CN112543209A (en) * | 2019-09-20 | 2021-03-23 | 京东方科技集团股份有限公司 | Action resource creating method, action resource executing method, electronic device and storage medium |
CN113176736A (en) * | 2021-04-13 | 2021-07-27 | 宁波奥克斯电气股份有限公司 | Centralized driving device sharing control method and centralized driving device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1701570A (en) * | 2003-06-02 | 2005-11-23 | 松下电器产业株式会社 | Device, method, and program for performing master/slave switching process |
CN103513579A (en) * | 2012-06-18 | 2014-01-15 | 珠海格力电器股份有限公司 | Control device and control method of household appliance and air conditioner |
US20140086150A1 (en) * | 2010-05-03 | 2014-03-27 | Interdigital Patent Holdings, Inc. | Addressing wireless nodes |
CN103997441A (en) * | 2013-02-17 | 2014-08-20 | 海尔集团公司 | Data sharing method, device and system and household equipment |
WO2016189709A1 (en) * | 2015-05-27 | 2016-12-01 | 三菱電機株式会社 | Controller |
-
2017
- 2017-09-30 CN CN201710941119.2A patent/CN107797461A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1701570A (en) * | 2003-06-02 | 2005-11-23 | 松下电器产业株式会社 | Device, method, and program for performing master/slave switching process |
US20140086150A1 (en) * | 2010-05-03 | 2014-03-27 | Interdigital Patent Holdings, Inc. | Addressing wireless nodes |
CN103513579A (en) * | 2012-06-18 | 2014-01-15 | 珠海格力电器股份有限公司 | Control device and control method of household appliance and air conditioner |
CN103997441A (en) * | 2013-02-17 | 2014-08-20 | 海尔集团公司 | Data sharing method, device and system and household equipment |
WO2016189709A1 (en) * | 2015-05-27 | 2016-12-01 | 三菱電機株式会社 | Controller |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110896370A (en) * | 2018-09-13 | 2020-03-20 | 青岛海尔洗衣机有限公司 | Control method for household appliance system and household appliance system |
CN110896370B (en) * | 2018-09-13 | 2022-03-15 | 青岛海尔洗衣机有限公司 | Control method for household appliance system and household appliance system |
CN109753034A (en) * | 2018-12-10 | 2019-05-14 | 深圳绿米联创科技有限公司 | A kind of control method, device, electronic equipment and storage medium |
CN109753034B (en) * | 2018-12-10 | 2021-12-07 | 深圳绿米联创科技有限公司 | Control method, control device, electronic equipment and storage medium |
CN110173899A (en) * | 2019-05-21 | 2019-08-27 | 四川虹美智能科技有限公司 | Method, water heater and Internet of things system based on Internet of Things control water heater |
CN112543209A (en) * | 2019-09-20 | 2021-03-23 | 京东方科技集团股份有限公司 | Action resource creating method, action resource executing method, electronic device and storage medium |
CN113176736A (en) * | 2021-04-13 | 2021-07-27 | 宁波奥克斯电气股份有限公司 | Centralized driving device sharing control method and centralized driving device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107797461A (en) | Progress control method, resource shared device and computer-readable recording medium | |
US11824677B2 (en) | Smart home device control method, medium, mobile terminal and apparatus | |
CN107807965A (en) | Progress control method, resource shared device and computer-readable recording medium | |
CN104375497A (en) | Smart home, smart home control method, control system and electronic equipment | |
CN105549407A (en) | Household electrical appliance control method and apparatus | |
CN204764953U (en) | Cooking utensil , intelligent terminal , culinary art reservation control system | |
US20150293511A1 (en) | Appliances control devices and methods | |
CN106707770B (en) | Intelligent electrical appliance control and intelligent Home Appliance Controller | |
CN204903991U (en) | Cooking utensil control system of adaptable different height above sea level | |
CN103324105A (en) | Remote control system of terminal cooking device and remote control method thereof | |
CN104007729A (en) | Broadcast control method and broadcast control device | |
CN110412503A (en) | A kind of active response method and system of smart machine | |
CN113891513B (en) | Cooking apparatus and control method of cooking apparatus | |
CN107204904A (en) | The control method of smart home, Centralized Controller, intelligent domestic system | |
CN104456851A (en) | Control system, method, unit, terminal and domestic electric appliance for indoor air quality | |
CN106292308A (en) | User terminal, household central controller, intelligent home furnishing control method and system | |
CN107942711A (en) | Household electrical appliances progress control method, household electrical appliances and computer-readable recording medium | |
CN110736230B (en) | Air conditioner control method and device and air conditioner control system | |
CN106155001B (en) | The control method and device of household appliance | |
CN107763782A (en) | Temperature and humidity adjusting system and control method thereof | |
CN107942696A (en) | Household electrical appliances operation method, system, household electrical appliances and computer-readable recording medium | |
CN108415303A (en) | A kind of control method and device of cooking pot | |
CN104566832B (en) | The control method and air treatment system of air treatment system | |
CN207515137U (en) | Temperature and humidity adjusting system | |
CN111954279A (en) | Communication method of intelligent household appliance and intelligent household appliance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180313 |
|
RJ01 | Rejection of invention patent application after publication |