CN107784403A - The interactive management method and device of Construction Party's task in engineering management - Google Patents
The interactive management method and device of Construction Party's task in engineering management Download PDFInfo
- Publication number
- CN107784403A CN107784403A CN201610720353.8A CN201610720353A CN107784403A CN 107784403 A CN107784403 A CN 107784403A CN 201610720353 A CN201610720353 A CN 201610720353A CN 107784403 A CN107784403 A CN 107784403A
- Authority
- CN
- China
- Prior art keywords
- task
- data
- construction party
- assigner
- results verification
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 87
- 238000007726 management method Methods 0.000 title claims abstract description 51
- 230000002452 interceptive effect Effects 0.000 title claims abstract description 20
- 238000012795 verification Methods 0.000 claims abstract description 43
- 238000000034 method Methods 0.000 claims abstract description 39
- 238000013139 quantization Methods 0.000 claims abstract description 20
- 238000009826 distribution Methods 0.000 claims abstract description 15
- 230000008859 change Effects 0.000 claims description 10
- 238000012423 maintenance Methods 0.000 claims description 7
- 238000011002 quantification Methods 0.000 claims description 4
- 238000000151 deposition Methods 0.000 claims description 2
- 238000004886 process control Methods 0.000 abstract description 3
- 230000008569 process Effects 0.000 description 11
- 238000010586 diagram Methods 0.000 description 9
- 238000003860 storage Methods 0.000 description 9
- 238000004891 communication Methods 0.000 description 7
- 238000004590 computer program Methods 0.000 description 6
- 238000012545 processing Methods 0.000 description 6
- 238000005194 fractionation Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012550 audit Methods 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The embodiment of the present application provides the interactive management method and device of Construction Party's task in a kind of engineering management, wherein, methods described includes:Expert quantifies to Construction Party's task;Assigner distributes the task quantified, also, the task after distribution is classified;Person liable performs the task quantified;Assigner carries out results verification to the task being finished;If results verification is by storing the data of task, subsequently can carry out inquiry operation to the data of task;If results verification is not by being remodified by person liable or being performed task.The interactive management method and device of Construction Party's task in the engineering management of the embodiment of the present application, it is easy to carry out effective process control to the task system of quantization, focus on the Whole Course Management of task, each stage of task can effectively be managed, meanwhile after task distribution, task is sorted out, each step of task is obtained tracing control, also provide guarantee for retrospect of the later stage to task result.
Description
Technical field
The application is related to a kind of interactive management method of Construction Party's task in data processing field, more particularly to engineering management
And device.
Background technology
With the development of building field, the development of project management information is also increasingly paid close attention in engineering management.Existing work
Thread management, it is traditional OA management modes typically using result as what is be oriented to.Existing task is all no process trace,
So both it had been unfavorable for examination personnel, and can not have also met the needs of the engineering management of current complexity.In engineering management, Construction Party is usually
Need to carry out timely and effective process management to substantial amounts of task, rather than just the OA pipes being confined to working result
Reason.
The content of the invention
The first aspect of the application Construction Party's task in a kind of engineering management is provided interactive management method, including:
Step 110:Expert quantifies to Construction Party's task;
Step 120:Assigner distributes the task quantified, also, the task after distribution is classified;
Step 130:Person liable performs the task quantified;
Step 140:Assigner carries out results verification to the task being finished;If results verification is by depositing
The data of task are stored up, can subsequently carry out inquiry operation to the data of task;If results verification is not by returning
Step 130 is returned, is remodified by person liable or performed the task quantified.
Preferably, expert rule of thumb quantifies with national regulation to Construction Party's task
Preferably, the task of quantization can be distributed to task owner by Construction Party's task assigner according to working condition
Preferably, methods described also includes:Before assigner carries out results verification to the task being finished, engineering
Document, data during tasks carrying can be temporarily stored into local or be uploaded to cloud server;In assigner to being finished
After task carries out results verification, document, data in engineering duty implementation procedure upload to cloud server.
Preferably, methods described also includes:It is that task will enter historical data, and can not after to confirm result
Modification, can subsequently fuzzy query operation be carried out to the data of task.
The application's further aspect is that provides a kind of interactive maintenance device of Construction Party's task in engineering management, including:
Quantization modules, Construction Party's task is defined for expert, Construction Party's task is quantified;Distribute module, for dividing
The task quantified is distributed with people, also, the task after distribution is classified;Execution module, held for person liable
The task that row quantifies;Confirm module, results verification is carried out to the task being finished for assigner;If result is true
Think by then storing the data of task, subsequently can carry out inquiry operation to the data of task;If results verification
For not by then remodifying or performing the task quantified by person liable.
Preferably, the quantization modules are additionally operable to:Expert is rule of thumb carried out with national regulation to Construction Party's task
Quantify, quantification tasks include completing the required step of some work and being completed required for completing each step for task.
Preferably, the distribute module is additionally operable to:
The task of quantization can be distributed to task owner by Construction Party's task assigner according to working condition
Preferably, described device also includes data uploading module:For entering in assigner to the task being finished
Before row results verification, document, data in engineering duty implementation procedure can be temporarily stored into local or be uploaded to cloud server;Dividing
After carrying out results verification to the task being finished with people, document, data in engineering duty implementation procedure take to high in the clouds
Business device uploads.
Preferably, described device also includes data history data inquiry module:For confirming that result is after, work is appointed
Business will enter historical data, and can not change, and subsequently can carry out fuzzy query operation to the data of task.
The interactive management method and device of Construction Party's task in the engineering management provided according to the embodiment of the present application, by special
Family defines Construction Party's task, and Construction Party's task is quantified;Assigner distributes the task quantified;Person liable
Perform the task quantified;Assigner carries out results verification to the task being finished, and is easy to the task body to quantization
System carries out effective process control, focuses on the Whole Course Management of task, each stage of task can be carried out effective
Management, meanwhile, task distribution after, task is sorted out, and is tracked each step of task
Control.Also guarantee is provided for retrospect of the later stage to task result.
Brief description of the drawings
Fig. 1 is the flow for showing the interactive management method of Construction Party's task in the engineering management according to the embodiment of the present application one
Figure;
Fig. 2 is the logic for showing the interactive maintenance device of Construction Party's task in the engineering management according to the embodiment of the present application two
Block diagram;
Fig. 3 is to show the interactive maintenance for being used to generate Construction Party's task in engineering management according to the embodiment of the present application three
The logic diagram of equipment;
Embodiment
The basic conception of the embodiment of the present application is to provide a kind of technology of the interactive maintenance of Construction Party's task in engineering management
Scheme.Specifically, first, expert defines Construction Party's task, and Construction Party's task is quantified;Secondly, divide
The task quantified is distributed with people;Then, person liable performs the task quantified;Again, assigner is to being finished
Task carries out results verification;Finally, if results verification be by, store task data, the work after storage
The data of task are read-only forms, subsequently can carry out inquiry operation to the data of task;If results verification is obstructed
Cross, then task is continued executing with by person liable.Technical scheme provided in an embodiment of the present invention is by the way that the work of Construction Party is appointed
Business carries out the quantification treatment of standard, and each side for sorting out a set of task is coordinated, the management method of interaction.The work of quantization
Make task, be the basis of high efficiency engineering management, the task duty and authority of quantization are clearly demarcated, can be used for examining, evaluation work
The execution of task owner or specific executor is horizontal and conscientious degree;Task system progress to quantization is effective excessively program control
System, focuses on the Whole Course Management of task, and the management of this flow will make the management of project more efficiently, quality to engineering,
Very important effect is played in the management such as progress, also provides guarantee for retrospect of the later stage to task result.
The interactive management method of Construction Party's task in the exemplary work management of the application is described in detail below in conjunction with the accompanying drawings
And device
Embodiment one
Fig. 1 is the flow chart for the interactive management method for showing Construction Party's task according to the embodiment of the present application one.
Reference picture 1, in step S110, expert defines Construction Party's task, and Construction Party's task is quantified.
Expert defines Construction Party's task, after specifically, approving and initiate a project, distributing, Construction Party's work is carried out to project and is appointed
Business is split, and the type of fractionation includes but is not limited to report early stage and builds, surveys actual quantities, financial management, hands over real estate management's reason etc..It is logical in order to improve
With property, the type of Construction Party's task can also be carried out self-defined.On Construction Party's task basis that type is determined
On, Construction Party's task can further be split, refined according to the particular content of Construction Party's task.
Wherein, Construction Party's task of definition can also voluntarily be added by Construction Party
Construction Party's task is quantified, can also be by the way of Construction Party assesses.
Construction Party's assessment mode is that Construction Party can add new task on the basis of the task of quantization
After quantifying to task, tasks listing is formed.
Alternatively, after carrying out Construction Party's task fractionation to project, task splits data can be in the spissatus drawing system in ground
Cloud server is stored, and is easy to assigner to inquire about task disposition.
In step S120, assigner distributes the task quantified, also, the task after distribution is classified.
Specifically, the task in Construction Party's tasks listing is extracted, Construction Party task assigner is determined, by distributing
People determines the person liable of Construction Party's task, if it is desired, contributor can also be distributed, and coordinates person liable to complete work and appoints
Business.
After the task that shares out the work, the distribution data of task can upload to cloud server, be stored by cloud server
The distribution data of task, it is easy to assigner to inquire about allocated task, task to be allocated.
Wherein, after task distribution, task is sorted out, for example has distributed, be unallocated, be executed, pending, true
Recognize, completed, while be also divided into task that is oneself distribution and being distributed for other people,
In step S130, person liable performs the task quantified.
Specifically, after person liable is connected to task, the implementation status of the real-time writing task task of meeting, and uploading operation is appointed
The achievement of business, such as document, data, contributor assist to coordinate person liable to perform task.The whole of task performed
Journey overall process is transparent visible.
In step S140, assigner carries out results verification to the task being finished;If results verification be by,
The data of task are stored, the data of the task after storage are read-only forms, subsequently can be to the number of task
According to progress inquiry operation;If results verification is by return to step S130, not remodified by person liable or being performed what is quantified
Task.
It is worth noting that, the classification of task can also be had an impact after task carries out results verification.
Alternatively, person liable can inquire about the result whether task is identified and confirms.
Alternatively, assigner can check to task, when pinpointing the problems, to person liable's transmission and task
Related data, and problem.Person liable can change the data related to task, document, and be fed back to assigner.
Alternatively, before assigner carries out results verification to the task being finished, in engineering duty implementation procedure
Document, data not to cloud server upload.After assigner carries out results verification to the task being finished, engineering
Document, data during tasks carrying upload to cloud server.
Alternatively, it is that task will enter historical data, and can not change, subsequently can be right after to confirm result
The data of task carry out fuzzy query operation.
For above-mentioned method and step for example, Construction Party engineering manager needs to carry out " construction in engineering progress
Project checking ", it is 3 days that assigner, which assesses the task to need the time,.He can distribute to this task person liable Zhang San, and
The deadline is set as 3 days, it is alternatively possible to directly add the deadline (such as 2016 No. 8.12).Zhang San is connected to task
Afterwards, the necessary all data of this task will be set about.And the phased Achievements of task are uploaded in real time, alternatively, in the mistake that engineering is carried out
Cheng Zhong, any interim engineering data can be kept in, be uploaded with unified after all complete informations.Construction Party engineering manager
It can will at any time check current task status.All data and achievement all after the completion of, Zhang San submit task, determine task
Through completing.Now Construction Party engineering manager can audit achievement and confirm that task has been completed.Result is confirmed to pass through this
When, the task enters historic task.Task can not be changed, and the Overall Steps of task can be checked.
The interactive management method for Construction Party's task that the embodiment of the present application provides, by the way that first, expert defines Construction Party's work
Make task, Construction Party's task is quantified;Secondly, assigner distributes the task quantified;Then, person liable performs
The task of quantization;Again, assigner carries out results verification to the task being finished;Finally, if results verification is
By then storing the data of task, the data of the task after storage are read-only forms, and subsequently work can be appointed
The data of business carry out inquiry operation;If results verification for not by, task is continued executing with by person liable, can to work
Each stage of task is effectively managed, and each step of task is obtained tracing control, also be the later stage to work
The retrospect of task result provides guarantee.
The interactive management method for Construction Party's task that the embodiment of the present application provides, has the following technical effect that:
Task is quantified, the data of examination, evaluation work task owner or specific executor can be provided
Execution is horizontal and conscientious degree;Effective process control is carried out to the task system of quantization, focuses on the overall process pipe of task
Reason, can effectively be managed each stage of task, each step of task is obtained tracing control.
Guarantee is provided for retrospect of the later stage to task result.
Embodiment two
Based on identical technical concept, Fig. 3 is to show Construction Party's task in the engineering management according to the embodiment of the present application two
Interactive maintenance device logic diagram.It can be used to perform the interaction of Construction Party's task in the engineering management as described in embodiment one
The flow of management method.
Reference picture 3, the interactive maintenance device of Construction Party's task includes in engineering management:Quantization modules 310, distribute module
320th, execution module 330 and confirmation module 340.
Quantization modules, Construction Party's task is defined for expert, Construction Party's task is quantified;
Distribute module, the task quantified is distributed for assigner, also, the task after distribution is returned
Class;
Execution module, the task quantified is performed for person liable;
Confirm module, results verification is carried out to the task being finished for assigner;If results verification be by,
The data of task are then stored, alternatively, the data of the task after storage are read-only forms, subsequently can be to work
The data of task carry out inquiry operation;If results verification is by not remodified by person liable or being performed the work quantified
Task.
Quantization modules 310, Construction Party's task is defined for assigner, Construction Party's task is quantified.
Construction Party's task is defined, after specifically, approving and initiate a project, distribute, project progress Construction Party's task is torn open
Point, conventional Construction Party's task is classified by preset kind, and the type of classification includes but is not limited to report early stage and builds, surveys
Actual quantities, financial management.In order to improve versatility, the type of Construction Party's task can also be carried out self-defined.Determining
, can be according to the particular content of Construction Party's task, to Construction Party's task on the basis of Construction Party's task of type
Further split, refined.
Construction Party's task is quantified, can also be by the way of Construction Party assesses.
Construction Party's assessment mode is that Construction Party adds new task
After quantifying to task, tasks listing is formed.
Alternatively, after carrying out Construction Party's task fractionation to project, task splits data can be in the spissatus drawing system in ground
Cloud server is stored, and is easy to assigner to inquire about task disposition.
Distribute module 320, the task quantified is distributed for assigner.
Specifically, the task in Construction Party's tasks listing is extracted, Construction Party task assigner is determined, by distributing
People determines the person liable of Construction Party's task, if it is desired, contributor can also be distributed, and coordinates person liable to complete work and appoints
Business.
After the task that shares out the work, the distribution data of task can upload to cloud server, be stored by cloud server
The distribution data of task, it is easy to assigner to inquire about allocated task, task to be allocated.
Execution module 330, the task quantified is performed for person liable.
Specifically, after person liable is connected to task, the implementation status of the real-time writing task task of meeting, and uploading operation is appointed
The achievement of business, such as document, data, contributor assist to coordinate person liable to perform task.The whole of task performed
Journey overall process is transparent visible.
Confirm module 340, results verification is carried out to the task being finished for assigner;If results verification is logical
Cross, then store the data of task, the data of the task after storage are read-only forms, subsequently can be to task
Data carry out fuzzy query operation;If results verification is by not performing the task quantified by person liable.
Alternatively, person liable can inquire about the result whether task is identified and confirms.
Alternatively, assigner can check to task, when pinpointing the problems, to person liable's transmission and task
Related data, and problem.Person liable can change the data related to task, document, and be fed back to assigner.
Alternatively, before assigner carries out results verification to the task being finished, in engineering duty implementation procedure
Document, data can be temporarily stored into local or be uploaded to cloud server.The task being finished is tied in assigner
After fruit confirms, document, data in engineering duty implementation procedure upload to cloud server.
Alternatively, it is that task will enter historical data, and can not change, subsequently can be right after to confirm result
The data of task carry out fuzzy query operation.
Embodiment three
Fig. 3 is the structural representation for showing the equipment according to the embodiment of the present application three, and the application specific embodiment is not right
The specific implementation of equipment 400 limits.As shown in figure 3, the equipment 400 can include:
Processor (processor) 410, communication interface (Communications Interface) 420, memory
(memory) 430 and communication bus 440.Wherein:
Processor 410, communication interface 420 and memory 430 complete mutual communication by communication bus 440.
Communication interface 420, for being communicated with the network element of such as client etc..
Processor 410, for configuration processor 432, it can specifically perform the correlation step in above method embodiment.
Specifically, program 432 can include program code, and described program code includes computer-managed instruction.
Processor 410 is probably a central processor CPU, or specific integrated circuit ASIC (Application
Specific Integrated Circuit), or it is arranged to implement the integrated electricity of one or more of the embodiment of the present application
Road.
Memory 430, for depositing program 432.Memory 430 may include high-speed RAM memory, it is also possible to also include
Nonvolatile memory (non-volatile memory), for example, at least a magnetic disk storage.Program 432 can specifically be used
Following operation is performed in causing the equipment 400:
Assigner defines Construction Party's task, and Construction Party's task is quantified;Assigner distributes the work quantified
Make task;Person liable performs the task quantified;Assigner carries out results verification to the task being finished;If result
Confirm as by, then store task data, alternatively, the data of the task after storage are read-only forms, after
It is continuous to carry out inquiry operation to the data of task;If results verification is not by continuing executing with work by person liable
Task.
Corresponding to the specific implementation of each step may refer in corresponding steps and the unit in above-described embodiment in program 432
Description, will not be described here.
It is apparent to those skilled in the art that for convenience and simplicity of description, the equipment of foregoing description
With the specific work process of module, the corresponding process description in preceding method embodiment is may be referred to, will not be repeated here.
It may be noted that according to the needs of implementation, all parts/step described in this application can be split as more multi-section
Part/step, the part operation of two or more components/steps or components/steps can be also combined into new components/steps,
To realize the purpose of the application.
Each embodiment in specification is described by the way of progressive, what each embodiment stressed be and its
The difference of his embodiment, between each embodiment identical similar part mutually referring to.
It should be understood by those skilled in the art that, the embodiment of the embodiment of the present invention can be provided as method, apparatus or calculate
Machine program product.Therefore, the embodiment of the present invention can use complete hardware embodiment, complete software embodiment or combine software and
The form of the embodiment of hardware aspect.Moreover, the embodiment of the present invention can use one or more wherein include computer can
With in the computer-usable storage medium (including but is not limited to magnetic disk storage, CD-ROM, optical memory etc.) of program code
The form of the computer program product of implementation.
The embodiment of the present invention is with reference to method according to embodiments of the present invention, terminal device (system) and computer program
The flow chart and/or block diagram of product describes.It should be understood that can be by computer program instructions implementation process figure and/or block diagram
In each flow and/or square frame and the flow in flow chart and/or block diagram and/or the combination of square frame.These can be provided
Computer program instructions are set to all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing terminals
Standby processor is to produce a machine so that is held by the processor of computer or other programmable data processing terminal equipments
Capable instruction is produced for realizing in one flow of flow chart or multiple flows and/or one square frame of block diagram or multiple square frames
The device for the function of specifying.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing terminal equipments
In the computer-readable memory to work in a specific way so that the instruction being stored in the computer-readable memory produces bag
The manufacture of command device is included, the command device is realized in one flow of flow chart or multiple flows and/or one side of block diagram
The function of being specified in frame or multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing terminal equipments so that
Series of operation steps is performed on computer or other programmable terminal equipments to produce computer implemented processing, so that
The instruction performed on computer or other programmable terminal equipments is provided for realizing in one flow of flow chart or multiple flows
And/or specified in one square frame of block diagram or multiple square frames function the step of.
Although having been described for the preferred embodiment of the embodiment of the present invention, those skilled in the art once know base
This creative concept, then other change and modification can be made to these embodiments.So appended claims are intended to be construed to
Including preferred embodiment and fall into having altered and changing for range of embodiment of the invention.
It should also be noted that, herein, such as first and second or the like relational terms are used merely to one
Entity or operation make a distinction with another entity or operation, and not necessarily require or imply between these entities or operation
Any this actual relation or order be present.Moreover, term " comprising ", "comprising" or its any other variant are intended to contain
Lid nonexcludability includes, so that process, method, article or terminal device including a series of elements not only include that
A little key elements, but also the other element including being not expressly set out, or also include for this process, method, article or
The intrinsic key element of terminal device.In the absence of more restrictions, the key element limited by sentence "including a ...", and
It is not precluded within the process including the key element, method, article or terminal device and other identical element is also present.
Described above, the only embodiment of the application, but the protection domain of the application is not limited thereto is any
Those familiar with the art can readily occur in change or replacement in the technical scope that the application discloses, and should all contain
Cover within the protection domain of the application.Therefore, the protection domain of the application should be based on the protection scope of the described claims.
Claims (10)
1. the interactive management method of Construction Party's task in a kind of engineering management, it is characterised in that methods described includes:
Step 110:Expert quantifies to Construction Party's task;
Step 120:Assigner distributes the task quantified, also, the task after distribution is classified;
Step 130:Person liable performs the task quantified;
Step 140:Assigner carries out results verification to the task being finished;If results verification is by storing work
Make the data of task, can subsequently carry out inquiry operation to the data of task;If results verification is by not returning to step
Rapid 130, remodified by person liable or performed the task quantified.
2. according to the method for claim 1, it is characterised in that the expert carries out quantization bag to Construction Party's task
Include:
Expert rule of thumb quantifies with national regulation to Construction Party's task, and quantification tasks include completing some work
Required step and complete being completed required for each step for task.
3. according to the method for claim 1, it is characterised in that Construction Party's task assigner can be according to working condition amount
The task of change distributes to task owner.
4. according to the method described in claim 1, it is characterised in that methods described also includes:
Before assigner carries out results verification to the task being finished, document, data in engineering duty implementation procedure
It can be temporarily stored into local or be uploaded to cloud server;Results verification is carried out to the task being finished in assigner
Afterwards, the document in engineering duty implementation procedure, data upload to cloud server.
5. according to the method for claim 1, it is characterised in that methods described also includes:It is the work after to confirm result
Task will enter historical data, and can not change, and subsequently can carry out fuzzy query operation to the data of task.
6. the interactive maintenance device of Construction Party's task in a kind of engineering management, it is characterised in that described device includes:
Quantization modules, expert quantify to Construction Party's task;
Distribute module, the task quantified is distributed for assigner, also, the task after distribution is classified;
Execution module, the task quantified is performed for person liable;
Confirm module, results verification is carried out to the task being finished for assigner;If results verification is by depositing
The data of task are stored up, can subsequently carry out inquiry operation to the data of task;If results verification for not by, by
Person liable remodifies or performed the task quantified.
7. device according to claim 6, it is characterised in that the quantization modules are additionally operable to:
Expert rule of thumb quantifies with national regulation to Construction Party's task, and quantification tasks include completing some work
Required step and complete being completed required for each step for task.
8. device according to claim 6, it is characterised in that the quantization modules are additionally operable to:
The task of quantization can be distributed to task owner by Construction Party's task assigner according to working condition.
9. according to the device described in claim 6, it is characterised in that described device also includes data uploading module:
For before assigner carries out results verification to the task that is finished, document in engineering duty implementation procedure,
Data can be temporarily stored into local or be uploaded to cloud server;It is true that result is carried out to the task being finished in assigner
After recognizing, document, data in engineering duty implementation procedure upload to cloud server.
10. device according to claim 6, it is characterised in that described device also includes data history data inquiry module:
For confirming that result is that task will enter historical data, and can not change, subsequently can be to the number of task after
According to progress fuzzy query operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610720353.8A CN107784403A (en) | 2016-08-24 | 2016-08-24 | The interactive management method and device of Construction Party's task in engineering management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610720353.8A CN107784403A (en) | 2016-08-24 | 2016-08-24 | The interactive management method and device of Construction Party's task in engineering management |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107784403A true CN107784403A (en) | 2018-03-09 |
Family
ID=61388649
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610720353.8A Pending CN107784403A (en) | 2016-08-24 | 2016-08-24 | The interactive management method and device of Construction Party's task in engineering management |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107784403A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109165810A (en) * | 2018-07-20 | 2019-01-08 | 徐州道格信息科技有限公司 | Task dividing method under mobile cloud environment |
CN111950847A (en) * | 2020-07-08 | 2020-11-17 | 泰康保险集团股份有限公司 | Task allocation method and device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102999385A (en) * | 2012-11-06 | 2013-03-27 | 苏州懿源宏达知识产权代理有限公司 | Multiprocessor co-processing method in computation equipment |
CN103778510A (en) * | 2014-01-23 | 2014-05-07 | 北京荣之联科技股份有限公司 | Task management method and device for quantifying task value |
-
2016
- 2016-08-24 CN CN201610720353.8A patent/CN107784403A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102999385A (en) * | 2012-11-06 | 2013-03-27 | 苏州懿源宏达知识产权代理有限公司 | Multiprocessor co-processing method in computation equipment |
CN103778510A (en) * | 2014-01-23 | 2014-05-07 | 北京荣之联科技股份有限公司 | Task management method and device for quantifying task value |
Non-Patent Citations (1)
Title |
---|
邹礼礼: ""协同设计方法在房产测绘管理中的应用与研究"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109165810A (en) * | 2018-07-20 | 2019-01-08 | 徐州道格信息科技有限公司 | Task dividing method under mobile cloud environment |
CN111950847A (en) * | 2020-07-08 | 2020-11-17 | 泰康保险集团股份有限公司 | Task allocation method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102834809B (en) | Sight status processing system and method for computing in grid computing environment | |
CN112183708A (en) | Cognitive robot process automation | |
US20200134564A1 (en) | Resource Configuration and Management System | |
CN105095970A (en) | Execution method and system of third-party application | |
CN110163739B (en) | Payment complaint method, device, server and readable storage medium | |
CN108460094A (en) | The method and system of storage statistical data | |
CN111191088B (en) | Method, system and readable medium for analyzing cross-boundary service demand | |
DE102012220390A1 (en) | Use the geographic location to determine element and territory data for provision to a computing device | |
CN105580001A (en) | Processing a hybrid flow associated with a service class | |
Nasirzadeh et al. | System dynamics approach for construction risk analysis | |
CN109658003A (en) | A kind of property facility equipment management system and method | |
DE102014116744B4 (en) | Information technology resource management | |
DE102013206354A1 (en) | Adaptive assessment of object relevance based on dynamic user properties | |
CN109242288A (en) | Performance data matching process and system | |
CN107784403A (en) | The interactive management method and device of Construction Party's task in engineering management | |
CN109978512A (en) | The control method of project management system, electronic equipment, storage medium | |
US20150310390A1 (en) | Aggregation and workflow engines for managing project information | |
CN109978380A (en) | A kind of workflow processing method and device | |
CN113706101A (en) | Power grid project management intelligent system architecture and method | |
CN101697217A (en) | Method and device for generating evaluation scheme | |
CN110599130A (en) | Third party authentication management method based on BPM, storage medium and electronic equipment | |
DE102021122503A1 (en) | ANALYZE RECEIVED DATA AND CALCULATE A RISK OF DAMAGE TO A PACKAGE FOR DELIVERY | |
Ahmed et al. | Adopting lean six sigma to AnyLogic simulation in a manufacturing environment | |
CN104765608A (en) | Implementation method and device of audio and video workflow application system | |
Giuffrida et al. | Sketching smart and fair cities WebGIS and spread sheets in a code |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180309 |