CN107784403A - The interactive management method and device of Construction Party's task in engineering management - Google Patents

The interactive management method and device of Construction Party's task in engineering management Download PDF

Info

Publication number
CN107784403A
CN107784403A CN201610720353.8A CN201610720353A CN107784403A CN 107784403 A CN107784403 A CN 107784403A CN 201610720353 A CN201610720353 A CN 201610720353A CN 107784403 A CN107784403 A CN 107784403A
Authority
CN
China
Prior art keywords
task
data
construction party
assigner
results verification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610720353.8A
Other languages
Chinese (zh)
Inventor
谢远玉
薛奇辉
单立新
肖发权
卢平
卢一平
徐福兵
陈小东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Thick Cloud Technology Co Ltd
Original Assignee
Beijing Thick Cloud Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Thick Cloud Technology Co Ltd filed Critical Beijing Thick Cloud Technology Co Ltd
Priority to CN201610720353.8A priority Critical patent/CN107784403A/en
Publication of CN107784403A publication Critical patent/CN107784403A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the present application provides the interactive management method and device of Construction Party's task in a kind of engineering management, wherein, methods described includes:Expert quantifies to Construction Party's task;Assigner distributes the task quantified, also, the task after distribution is classified;Person liable performs the task quantified;Assigner carries out results verification to the task being finished;If results verification is by storing the data of task, subsequently can carry out inquiry operation to the data of task;If results verification is not by being remodified by person liable or being performed task.The interactive management method and device of Construction Party's task in the engineering management of the embodiment of the present application, it is easy to carry out effective process control to the task system of quantization, focus on the Whole Course Management of task, each stage of task can effectively be managed, meanwhile after task distribution, task is sorted out, each step of task is obtained tracing control, also provide guarantee for retrospect of the later stage to task result.

Description

The interactive management method and device of Construction Party's task in engineering management
Technical field
The application is related to a kind of interactive management method of Construction Party's task in data processing field, more particularly to engineering management And device.
Background technology
With the development of building field, the development of project management information is also increasingly paid close attention in engineering management.Existing work Thread management, it is traditional OA management modes typically using result as what is be oriented to.Existing task is all no process trace, So both it had been unfavorable for examination personnel, and can not have also met the needs of the engineering management of current complexity.In engineering management, Construction Party is usually Need to carry out timely and effective process management to substantial amounts of task, rather than just the OA pipes being confined to working result Reason.
The content of the invention
The first aspect of the application Construction Party's task in a kind of engineering management is provided interactive management method, including:
Step 110:Expert quantifies to Construction Party's task;
Step 120:Assigner distributes the task quantified, also, the task after distribution is classified;
Step 130:Person liable performs the task quantified;
Step 140:Assigner carries out results verification to the task being finished;If results verification is by depositing The data of task are stored up, can subsequently carry out inquiry operation to the data of task;If results verification is not by returning Step 130 is returned, is remodified by person liable or performed the task quantified.
Preferably, expert rule of thumb quantifies with national regulation to Construction Party's task
Preferably, the task of quantization can be distributed to task owner by Construction Party's task assigner according to working condition
Preferably, methods described also includes:Before assigner carries out results verification to the task being finished, engineering Document, data during tasks carrying can be temporarily stored into local or be uploaded to cloud server;In assigner to being finished After task carries out results verification, document, data in engineering duty implementation procedure upload to cloud server.
Preferably, methods described also includes:It is that task will enter historical data, and can not after to confirm result Modification, can subsequently fuzzy query operation be carried out to the data of task.
The application's further aspect is that provides a kind of interactive maintenance device of Construction Party's task in engineering management, including: Quantization modules, Construction Party's task is defined for expert, Construction Party's task is quantified;Distribute module, for dividing The task quantified is distributed with people, also, the task after distribution is classified;Execution module, held for person liable The task that row quantifies;Confirm module, results verification is carried out to the task being finished for assigner;If result is true Think by then storing the data of task, subsequently can carry out inquiry operation to the data of task;If results verification For not by then remodifying or performing the task quantified by person liable.
Preferably, the quantization modules are additionally operable to:Expert is rule of thumb carried out with national regulation to Construction Party's task Quantify, quantification tasks include completing the required step of some work and being completed required for completing each step for task.
Preferably, the distribute module is additionally operable to:
The task of quantization can be distributed to task owner by Construction Party's task assigner according to working condition
Preferably, described device also includes data uploading module:For entering in assigner to the task being finished Before row results verification, document, data in engineering duty implementation procedure can be temporarily stored into local or be uploaded to cloud server;Dividing After carrying out results verification to the task being finished with people, document, data in engineering duty implementation procedure take to high in the clouds Business device uploads.
Preferably, described device also includes data history data inquiry module:For confirming that result is after, work is appointed Business will enter historical data, and can not change, and subsequently can carry out fuzzy query operation to the data of task.
The interactive management method and device of Construction Party's task in the engineering management provided according to the embodiment of the present application, by special Family defines Construction Party's task, and Construction Party's task is quantified;Assigner distributes the task quantified;Person liable Perform the task quantified;Assigner carries out results verification to the task being finished, and is easy to the task body to quantization System carries out effective process control, focuses on the Whole Course Management of task, each stage of task can be carried out effective Management, meanwhile, task distribution after, task is sorted out, and is tracked each step of task Control.Also guarantee is provided for retrospect of the later stage to task result.
Brief description of the drawings
Fig. 1 is the flow for showing the interactive management method of Construction Party's task in the engineering management according to the embodiment of the present application one Figure;
Fig. 2 is the logic for showing the interactive maintenance device of Construction Party's task in the engineering management according to the embodiment of the present application two Block diagram;
Fig. 3 is to show the interactive maintenance for being used to generate Construction Party's task in engineering management according to the embodiment of the present application three The logic diagram of equipment;
Embodiment
The basic conception of the embodiment of the present application is to provide a kind of technology of the interactive maintenance of Construction Party's task in engineering management Scheme.Specifically, first, expert defines Construction Party's task, and Construction Party's task is quantified;Secondly, divide The task quantified is distributed with people;Then, person liable performs the task quantified;Again, assigner is to being finished Task carries out results verification;Finally, if results verification be by, store task data, the work after storage The data of task are read-only forms, subsequently can carry out inquiry operation to the data of task;If results verification is obstructed Cross, then task is continued executing with by person liable.Technical scheme provided in an embodiment of the present invention is by the way that the work of Construction Party is appointed Business carries out the quantification treatment of standard, and each side for sorting out a set of task is coordinated, the management method of interaction.The work of quantization Make task, be the basis of high efficiency engineering management, the task duty and authority of quantization are clearly demarcated, can be used for examining, evaluation work The execution of task owner or specific executor is horizontal and conscientious degree;Task system progress to quantization is effective excessively program control System, focuses on the Whole Course Management of task, and the management of this flow will make the management of project more efficiently, quality to engineering, Very important effect is played in the management such as progress, also provides guarantee for retrospect of the later stage to task result.
The interactive management method of Construction Party's task in the exemplary work management of the application is described in detail below in conjunction with the accompanying drawings And device
Embodiment one
Fig. 1 is the flow chart for the interactive management method for showing Construction Party's task according to the embodiment of the present application one.
Reference picture 1, in step S110, expert defines Construction Party's task, and Construction Party's task is quantified.
Expert defines Construction Party's task, after specifically, approving and initiate a project, distributing, Construction Party's work is carried out to project and is appointed Business is split, and the type of fractionation includes but is not limited to report early stage and builds, surveys actual quantities, financial management, hands over real estate management's reason etc..It is logical in order to improve With property, the type of Construction Party's task can also be carried out self-defined.On Construction Party's task basis that type is determined On, Construction Party's task can further be split, refined according to the particular content of Construction Party's task.
Wherein, Construction Party's task of definition can also voluntarily be added by Construction Party
Construction Party's task is quantified, can also be by the way of Construction Party assesses.
Construction Party's assessment mode is that Construction Party can add new task on the basis of the task of quantization
After quantifying to task, tasks listing is formed.
Alternatively, after carrying out Construction Party's task fractionation to project, task splits data can be in the spissatus drawing system in ground Cloud server is stored, and is easy to assigner to inquire about task disposition.
In step S120, assigner distributes the task quantified, also, the task after distribution is classified.
Specifically, the task in Construction Party's tasks listing is extracted, Construction Party task assigner is determined, by distributing People determines the person liable of Construction Party's task, if it is desired, contributor can also be distributed, and coordinates person liable to complete work and appoints Business.
After the task that shares out the work, the distribution data of task can upload to cloud server, be stored by cloud server The distribution data of task, it is easy to assigner to inquire about allocated task, task to be allocated.
Wherein, after task distribution, task is sorted out, for example has distributed, be unallocated, be executed, pending, true Recognize, completed, while be also divided into task that is oneself distribution and being distributed for other people,
In step S130, person liable performs the task quantified.
Specifically, after person liable is connected to task, the implementation status of the real-time writing task task of meeting, and uploading operation is appointed The achievement of business, such as document, data, contributor assist to coordinate person liable to perform task.The whole of task performed Journey overall process is transparent visible.
In step S140, assigner carries out results verification to the task being finished;If results verification be by, The data of task are stored, the data of the task after storage are read-only forms, subsequently can be to the number of task According to progress inquiry operation;If results verification is by return to step S130, not remodified by person liable or being performed what is quantified Task.
It is worth noting that, the classification of task can also be had an impact after task carries out results verification.
Alternatively, person liable can inquire about the result whether task is identified and confirms.
Alternatively, assigner can check to task, when pinpointing the problems, to person liable's transmission and task Related data, and problem.Person liable can change the data related to task, document, and be fed back to assigner.
Alternatively, before assigner carries out results verification to the task being finished, in engineering duty implementation procedure Document, data not to cloud server upload.After assigner carries out results verification to the task being finished, engineering Document, data during tasks carrying upload to cloud server.
Alternatively, it is that task will enter historical data, and can not change, subsequently can be right after to confirm result The data of task carry out fuzzy query operation.
For above-mentioned method and step for example, Construction Party engineering manager needs to carry out " construction in engineering progress Project checking ", it is 3 days that assigner, which assesses the task to need the time,.He can distribute to this task person liable Zhang San, and The deadline is set as 3 days, it is alternatively possible to directly add the deadline (such as 2016 No. 8.12).Zhang San is connected to task Afterwards, the necessary all data of this task will be set about.And the phased Achievements of task are uploaded in real time, alternatively, in the mistake that engineering is carried out Cheng Zhong, any interim engineering data can be kept in, be uploaded with unified after all complete informations.Construction Party engineering manager It can will at any time check current task status.All data and achievement all after the completion of, Zhang San submit task, determine task Through completing.Now Construction Party engineering manager can audit achievement and confirm that task has been completed.Result is confirmed to pass through this When, the task enters historic task.Task can not be changed, and the Overall Steps of task can be checked.
The interactive management method for Construction Party's task that the embodiment of the present application provides, by the way that first, expert defines Construction Party's work Make task, Construction Party's task is quantified;Secondly, assigner distributes the task quantified;Then, person liable performs The task of quantization;Again, assigner carries out results verification to the task being finished;Finally, if results verification is By then storing the data of task, the data of the task after storage are read-only forms, and subsequently work can be appointed The data of business carry out inquiry operation;If results verification for not by, task is continued executing with by person liable, can to work Each stage of task is effectively managed, and each step of task is obtained tracing control, also be the later stage to work The retrospect of task result provides guarantee.
The interactive management method for Construction Party's task that the embodiment of the present application provides, has the following technical effect that:
Task is quantified, the data of examination, evaluation work task owner or specific executor can be provided Execution is horizontal and conscientious degree;Effective process control is carried out to the task system of quantization, focuses on the overall process pipe of task Reason, can effectively be managed each stage of task, each step of task is obtained tracing control. Guarantee is provided for retrospect of the later stage to task result.
Embodiment two
Based on identical technical concept, Fig. 3 is to show Construction Party's task in the engineering management according to the embodiment of the present application two Interactive maintenance device logic diagram.It can be used to perform the interaction of Construction Party's task in the engineering management as described in embodiment one The flow of management method.
Reference picture 3, the interactive maintenance device of Construction Party's task includes in engineering management:Quantization modules 310, distribute module 320th, execution module 330 and confirmation module 340.
Quantization modules, Construction Party's task is defined for expert, Construction Party's task is quantified;
Distribute module, the task quantified is distributed for assigner, also, the task after distribution is returned Class;
Execution module, the task quantified is performed for person liable;
Confirm module, results verification is carried out to the task being finished for assigner;If results verification be by, The data of task are then stored, alternatively, the data of the task after storage are read-only forms, subsequently can be to work The data of task carry out inquiry operation;If results verification is by not remodified by person liable or being performed the work quantified Task.
Quantization modules 310, Construction Party's task is defined for assigner, Construction Party's task is quantified.
Construction Party's task is defined, after specifically, approving and initiate a project, distribute, project progress Construction Party's task is torn open Point, conventional Construction Party's task is classified by preset kind, and the type of classification includes but is not limited to report early stage and builds, surveys Actual quantities, financial management.In order to improve versatility, the type of Construction Party's task can also be carried out self-defined.Determining , can be according to the particular content of Construction Party's task, to Construction Party's task on the basis of Construction Party's task of type Further split, refined.
Construction Party's task is quantified, can also be by the way of Construction Party assesses.
Construction Party's assessment mode is that Construction Party adds new task
After quantifying to task, tasks listing is formed.
Alternatively, after carrying out Construction Party's task fractionation to project, task splits data can be in the spissatus drawing system in ground Cloud server is stored, and is easy to assigner to inquire about task disposition.
Distribute module 320, the task quantified is distributed for assigner.
Specifically, the task in Construction Party's tasks listing is extracted, Construction Party task assigner is determined, by distributing People determines the person liable of Construction Party's task, if it is desired, contributor can also be distributed, and coordinates person liable to complete work and appoints Business.
After the task that shares out the work, the distribution data of task can upload to cloud server, be stored by cloud server The distribution data of task, it is easy to assigner to inquire about allocated task, task to be allocated.
Execution module 330, the task quantified is performed for person liable.
Specifically, after person liable is connected to task, the implementation status of the real-time writing task task of meeting, and uploading operation is appointed The achievement of business, such as document, data, contributor assist to coordinate person liable to perform task.The whole of task performed Journey overall process is transparent visible.
Confirm module 340, results verification is carried out to the task being finished for assigner;If results verification is logical Cross, then store the data of task, the data of the task after storage are read-only forms, subsequently can be to task Data carry out fuzzy query operation;If results verification is by not performing the task quantified by person liable.
Alternatively, person liable can inquire about the result whether task is identified and confirms.
Alternatively, assigner can check to task, when pinpointing the problems, to person liable's transmission and task Related data, and problem.Person liable can change the data related to task, document, and be fed back to assigner.
Alternatively, before assigner carries out results verification to the task being finished, in engineering duty implementation procedure Document, data can be temporarily stored into local or be uploaded to cloud server.The task being finished is tied in assigner After fruit confirms, document, data in engineering duty implementation procedure upload to cloud server.
Alternatively, it is that task will enter historical data, and can not change, subsequently can be right after to confirm result The data of task carry out fuzzy query operation.
Embodiment three
Fig. 3 is the structural representation for showing the equipment according to the embodiment of the present application three, and the application specific embodiment is not right The specific implementation of equipment 400 limits.As shown in figure 3, the equipment 400 can include:
Processor (processor) 410, communication interface (Communications Interface) 420, memory (memory) 430 and communication bus 440.Wherein:
Processor 410, communication interface 420 and memory 430 complete mutual communication by communication bus 440.
Communication interface 420, for being communicated with the network element of such as client etc..
Processor 410, for configuration processor 432, it can specifically perform the correlation step in above method embodiment.
Specifically, program 432 can include program code, and described program code includes computer-managed instruction.
Processor 410 is probably a central processor CPU, or specific integrated circuit ASIC (Application Specific Integrated Circuit), or it is arranged to implement the integrated electricity of one or more of the embodiment of the present application Road.
Memory 430, for depositing program 432.Memory 430 may include high-speed RAM memory, it is also possible to also include Nonvolatile memory (non-volatile memory), for example, at least a magnetic disk storage.Program 432 can specifically be used Following operation is performed in causing the equipment 400:
Assigner defines Construction Party's task, and Construction Party's task is quantified;Assigner distributes the work quantified Make task;Person liable performs the task quantified;Assigner carries out results verification to the task being finished;If result Confirm as by, then store task data, alternatively, the data of the task after storage are read-only forms, after It is continuous to carry out inquiry operation to the data of task;If results verification is not by continuing executing with work by person liable Task.
Corresponding to the specific implementation of each step may refer in corresponding steps and the unit in above-described embodiment in program 432 Description, will not be described here.
It is apparent to those skilled in the art that for convenience and simplicity of description, the equipment of foregoing description With the specific work process of module, the corresponding process description in preceding method embodiment is may be referred to, will not be repeated here.
It may be noted that according to the needs of implementation, all parts/step described in this application can be split as more multi-section Part/step, the part operation of two or more components/steps or components/steps can be also combined into new components/steps, To realize the purpose of the application.
Each embodiment in specification is described by the way of progressive, what each embodiment stressed be and its The difference of his embodiment, between each embodiment identical similar part mutually referring to.
It should be understood by those skilled in the art that, the embodiment of the embodiment of the present invention can be provided as method, apparatus or calculate Machine program product.Therefore, the embodiment of the present invention can use complete hardware embodiment, complete software embodiment or combine software and The form of the embodiment of hardware aspect.Moreover, the embodiment of the present invention can use one or more wherein include computer can With in the computer-usable storage medium (including but is not limited to magnetic disk storage, CD-ROM, optical memory etc.) of program code The form of the computer program product of implementation.
The embodiment of the present invention is with reference to method according to embodiments of the present invention, terminal device (system) and computer program The flow chart and/or block diagram of product describes.It should be understood that can be by computer program instructions implementation process figure and/or block diagram In each flow and/or square frame and the flow in flow chart and/or block diagram and/or the combination of square frame.These can be provided Computer program instructions are set to all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing terminals Standby processor is to produce a machine so that is held by the processor of computer or other programmable data processing terminal equipments Capable instruction is produced for realizing in one flow of flow chart or multiple flows and/or one square frame of block diagram or multiple square frames The device for the function of specifying.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing terminal equipments In the computer-readable memory to work in a specific way so that the instruction being stored in the computer-readable memory produces bag The manufacture of command device is included, the command device is realized in one flow of flow chart or multiple flows and/or one side of block diagram The function of being specified in frame or multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing terminal equipments so that Series of operation steps is performed on computer or other programmable terminal equipments to produce computer implemented processing, so that The instruction performed on computer or other programmable terminal equipments is provided for realizing in one flow of flow chart or multiple flows And/or specified in one square frame of block diagram or multiple square frames function the step of.
Although having been described for the preferred embodiment of the embodiment of the present invention, those skilled in the art once know base This creative concept, then other change and modification can be made to these embodiments.So appended claims are intended to be construed to Including preferred embodiment and fall into having altered and changing for range of embodiment of the invention.
It should also be noted that, herein, such as first and second or the like relational terms are used merely to one Entity or operation make a distinction with another entity or operation, and not necessarily require or imply between these entities or operation Any this actual relation or order be present.Moreover, term " comprising ", "comprising" or its any other variant are intended to contain Lid nonexcludability includes, so that process, method, article or terminal device including a series of elements not only include that A little key elements, but also the other element including being not expressly set out, or also include for this process, method, article or The intrinsic key element of terminal device.In the absence of more restrictions, the key element limited by sentence "including a ...", and It is not precluded within the process including the key element, method, article or terminal device and other identical element is also present.
Described above, the only embodiment of the application, but the protection domain of the application is not limited thereto is any Those familiar with the art can readily occur in change or replacement in the technical scope that the application discloses, and should all contain Cover within the protection domain of the application.Therefore, the protection domain of the application should be based on the protection scope of the described claims.

Claims (10)

1. the interactive management method of Construction Party's task in a kind of engineering management, it is characterised in that methods described includes:
Step 110:Expert quantifies to Construction Party's task;
Step 120:Assigner distributes the task quantified, also, the task after distribution is classified;
Step 130:Person liable performs the task quantified;
Step 140:Assigner carries out results verification to the task being finished;If results verification is by storing work Make the data of task, can subsequently carry out inquiry operation to the data of task;If results verification is by not returning to step Rapid 130, remodified by person liable or performed the task quantified.
2. according to the method for claim 1, it is characterised in that the expert carries out quantization bag to Construction Party's task Include:
Expert rule of thumb quantifies with national regulation to Construction Party's task, and quantification tasks include completing some work Required step and complete being completed required for each step for task.
3. according to the method for claim 1, it is characterised in that Construction Party's task assigner can be according to working condition amount The task of change distributes to task owner.
4. according to the method described in claim 1, it is characterised in that methods described also includes:
Before assigner carries out results verification to the task being finished, document, data in engineering duty implementation procedure It can be temporarily stored into local or be uploaded to cloud server;Results verification is carried out to the task being finished in assigner Afterwards, the document in engineering duty implementation procedure, data upload to cloud server.
5. according to the method for claim 1, it is characterised in that methods described also includes:It is the work after to confirm result Task will enter historical data, and can not change, and subsequently can carry out fuzzy query operation to the data of task.
6. the interactive maintenance device of Construction Party's task in a kind of engineering management, it is characterised in that described device includes:
Quantization modules, expert quantify to Construction Party's task;
Distribute module, the task quantified is distributed for assigner, also, the task after distribution is classified;
Execution module, the task quantified is performed for person liable;
Confirm module, results verification is carried out to the task being finished for assigner;If results verification is by depositing The data of task are stored up, can subsequently carry out inquiry operation to the data of task;If results verification for not by, by Person liable remodifies or performed the task quantified.
7. device according to claim 6, it is characterised in that the quantization modules are additionally operable to:
Expert rule of thumb quantifies with national regulation to Construction Party's task, and quantification tasks include completing some work Required step and complete being completed required for each step for task.
8. device according to claim 6, it is characterised in that the quantization modules are additionally operable to:
The task of quantization can be distributed to task owner by Construction Party's task assigner according to working condition.
9. according to the device described in claim 6, it is characterised in that described device also includes data uploading module:
For before assigner carries out results verification to the task that is finished, document in engineering duty implementation procedure, Data can be temporarily stored into local or be uploaded to cloud server;It is true that result is carried out to the task being finished in assigner After recognizing, document, data in engineering duty implementation procedure upload to cloud server.
10. device according to claim 6, it is characterised in that described device also includes data history data inquiry module: For confirming that result is that task will enter historical data, and can not change, subsequently can be to the number of task after According to progress fuzzy query operation.
CN201610720353.8A 2016-08-24 2016-08-24 The interactive management method and device of Construction Party's task in engineering management Pending CN107784403A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610720353.8A CN107784403A (en) 2016-08-24 2016-08-24 The interactive management method and device of Construction Party's task in engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610720353.8A CN107784403A (en) 2016-08-24 2016-08-24 The interactive management method and device of Construction Party's task in engineering management

Publications (1)

Publication Number Publication Date
CN107784403A true CN107784403A (en) 2018-03-09

Family

ID=61388649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610720353.8A Pending CN107784403A (en) 2016-08-24 2016-08-24 The interactive management method and device of Construction Party's task in engineering management

Country Status (1)

Country Link
CN (1) CN107784403A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109165810A (en) * 2018-07-20 2019-01-08 徐州道格信息科技有限公司 Task dividing method under mobile cloud environment
CN111950847A (en) * 2020-07-08 2020-11-17 泰康保险集团股份有限公司 Task allocation method and device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102999385A (en) * 2012-11-06 2013-03-27 苏州懿源宏达知识产权代理有限公司 Multiprocessor co-processing method in computation equipment
CN103778510A (en) * 2014-01-23 2014-05-07 北京荣之联科技股份有限公司 Task management method and device for quantifying task value

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102999385A (en) * 2012-11-06 2013-03-27 苏州懿源宏达知识产权代理有限公司 Multiprocessor co-processing method in computation equipment
CN103778510A (en) * 2014-01-23 2014-05-07 北京荣之联科技股份有限公司 Task management method and device for quantifying task value

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邹礼礼: ""协同设计方法在房产测绘管理中的应用与研究"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109165810A (en) * 2018-07-20 2019-01-08 徐州道格信息科技有限公司 Task dividing method under mobile cloud environment
CN111950847A (en) * 2020-07-08 2020-11-17 泰康保险集团股份有限公司 Task allocation method and device

Similar Documents

Publication Publication Date Title
CN102834809B (en) Sight status processing system and method for computing in grid computing environment
CN112183708A (en) Cognitive robot process automation
US20200134564A1 (en) Resource Configuration and Management System
CN105095970A (en) Execution method and system of third-party application
CN110163739B (en) Payment complaint method, device, server and readable storage medium
CN108460094A (en) The method and system of storage statistical data
CN111191088B (en) Method, system and readable medium for analyzing cross-boundary service demand
DE102012220390A1 (en) Use the geographic location to determine element and territory data for provision to a computing device
CN105580001A (en) Processing a hybrid flow associated with a service class
Nasirzadeh et al. System dynamics approach for construction risk analysis
CN109658003A (en) A kind of property facility equipment management system and method
DE102014116744B4 (en) Information technology resource management
DE102013206354A1 (en) Adaptive assessment of object relevance based on dynamic user properties
CN109242288A (en) Performance data matching process and system
CN107784403A (en) The interactive management method and device of Construction Party's task in engineering management
CN109978512A (en) The control method of project management system, electronic equipment, storage medium
US20150310390A1 (en) Aggregation and workflow engines for managing project information
CN109978380A (en) A kind of workflow processing method and device
CN113706101A (en) Power grid project management intelligent system architecture and method
CN101697217A (en) Method and device for generating evaluation scheme
CN110599130A (en) Third party authentication management method based on BPM, storage medium and electronic equipment
DE102021122503A1 (en) ANALYZE RECEIVED DATA AND CALCULATE A RISK OF DAMAGE TO A PACKAGE FOR DELIVERY
Ahmed et al. Adopting lean six sigma to AnyLogic simulation in a manufacturing environment
CN104765608A (en) Implementation method and device of audio and video workflow application system
Giuffrida et al. Sketching smart and fair cities WebGIS and spread sheets in a code

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180309