CN107779532B - A kind of blast furnace opening device and method - Google Patents

A kind of blast furnace opening device and method Download PDF

Info

Publication number
CN107779532B
CN107779532B CN201711127905.5A CN201711127905A CN107779532B CN 107779532 B CN107779532 B CN 107779532B CN 201711127905 A CN201711127905 A CN 201711127905A CN 107779532 B CN107779532 B CN 107779532B
Authority
CN
China
Prior art keywords
blast furnace
wind deflector
support frame
furnace
coke
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711127905.5A
Other languages
Chinese (zh)
Other versions
CN107779532A (en
Inventor
江凌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Xichang Steel and Vanadium Co Ltd
Original Assignee
Pangang Group Xichang Steel and Vanadium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Xichang Steel and Vanadium Co Ltd filed Critical Pangang Group Xichang Steel and Vanadium Co Ltd
Priority to CN201711127905.5A priority Critical patent/CN107779532B/en
Publication of CN107779532A publication Critical patent/CN107779532A/en
Application granted granted Critical
Publication of CN107779532B publication Critical patent/CN107779532B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/02Internal forms
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • C21B5/001Injecting additional fuel or reducing agents
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • C21B5/007Conditions of the cokes or characterised by the cokes used

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The invention discloses a kind of blast furnace opening device and method, blast furnace opening device includes: wind deflector, and wind deflector and blast furnace crucibe outer form the first passage of edge department coke descent, and the circular hole on wind deflector is the second channel of middle part coke descent;Support frame, support frame support wind deflector, and support frame is the frame body with gap that pipe welding is formed;Ignitron, ignitron is evenly arranged on the furnace bottom of blast furnace, and is located at the lower end of support frame.Since ignitron is located at the bottom end of support frame, support frame ensure that ignitron do not broken by top furnace charge in charging process, be collapsed, and since support frame is the frame body with gap, coke can be fully burned heat importing furnace bottom in time in ignition process;Guarantee the ventilative liquid permeability of cupola well lower part coke using the sufficient space between wind deflector and support frame simultaneously;In addition, generating space after coke melts support frame and promoting furnace charge decline.Slag iron smooth discharge when i.e. the present invention realizes blast furnace opening.

Description

A kind of blast furnace opening device and method
Technical field
The present invention relates to technical field of blast furnace process, more particularly, to a kind of blast furnace opening device and method.
Background technique
The method that modern blast furnace fills cupola well using coke, but because the combustibility of coke is poor, therefore, using full coke open furnace When bottom house space generation it is difficult, because cupola well bottom coke cannot be lighted in time when serious, slag iron is caused to be difficult to swimmingly Cause blow-on to have some setbacks from outlet discharge, or even induces gobbed up accident.
Therefore, how to realize that the smooth discharge of slag iron is that those skilled in the art's technology urgently to be resolved is asked when blast furnace opening Topic.
Summary of the invention
In view of this, the first purpose of the invention is to provide a kind of blast furnace opening device, slag when realizing blast furnace opening The smooth discharge of iron.
A second object of the present invention is to provide a kind of blast furnace opening process.
In order to realize above-mentioned first purpose, the present invention provides following schemes:
A kind of blast furnace opening device, comprising:
Blast-furnace tuyere lower end, and the wind deflector and the blast furnace crucibe is arranged in blast furnace in wind deflector, the wind deflector Outer forms the first passage of edge department coke descent, and the wind deflector is annular wind deflector, and the circular hole on the wind deflector For the second channel of middle part coke descent;
Support frame, support frame as described above support the wind deflector, and support frame as described above is pipe welding formation with gap Frame body;
Ignitron, the ignitron is evenly arranged on the furnace bottom of the blast furnace, and is located at the lower end of support frame as described above.
Preferably, in above-mentioned blast furnace opening device, the wind deflector and the concentric setting of the blast furnace.
Preferably, in above-mentioned blast furnace opening device, the number of the ignitron is the 30%- of the blast-furnace tuyere sum 40%.
Preferably, in above-mentioned blast furnace opening device, the cupola well diameter of the blast furnace is less than 10 meters, the ignitron difference It is evenly arranged on the outer diameter of cupola well Bisected Circle of the blast furnace, the Bisected Circle homalographic and is coaxially set.
Preferably, in above-mentioned blast furnace opening device, the cupola well diameter of the blast furnace is more than or equal to 10 meters, the point Fire tube is evenly arranged on respectively on the outer diameter of the third cyclotomy of cupola well of the blast furnace, the third cyclotomy homalographic and is coaxially set.
Preferably, in above-mentioned blast furnace opening device, support frame as described above is made of scrap steel pipe.
It can be seen from the above technical scheme that blast furnace opening device disclosed by the invention, wind deflector is arranged in blast furnace Blast-furnace tuyere lower end, and wind deflector and blast furnace crucibe outer form the first passage of edge department coke descent, the circle on wind deflector Hole is the second channel of middle part coke descent, and coke declines along first passage and second channel.Since ignitron is located at support The bottom end of frame, support frame ensure that ignitron do not broken by top furnace charge in charging process, be collapsed, and due to support frame be tool There is the frame body in gap, coke can be fully burned heat importing furnace bottom in time in ignition process;Simultaneously Guarantee the ventilative liquid permeability of cupola well lower part coke using the sufficient space between wind deflector and support frame;In addition, in furnace bottom coke It lights, after support frame ablation, fusing, generates space and promote furnace charge decline.The combustibility i.e. of the invention that can be improved coke, The generation in bottom house space is difficult when solving full coke open furnace, because cupola well bottom coke cannot be lighted in time when serious, causes Slag iron is difficult to swimmingly cause blow-on to have some setbacks from outlet discharge, or even induces the generation of gobbed up accident, realizes that blast furnace is opened Slag iron smooth discharge when furnace.
In order to realize above-mentioned second purpose, the present invention provides following schemes:
A kind of blast furnace opening process, comprising the following steps:
Step A: before baker, wind deflector, and the wind deflector and the State of Blast Furnace are installed in blast-furnace tuyere lower end in blast furnace Cylinder outer forms the first passage of edge department coke descent, and the wind deflector is annular wind deflector, and the circle on the wind deflector Hole is the second channel of middle part coke descent;
Step B: support frame is installed in the lower end of the wind deflector, support frame as described above supports the wind deflector, the support Frame is the frame body with gap that pipe welding is formed;
Step C: ignitron is evenly distributed in the furnace bottom of the blast furnace.
It can be seen from the above technical scheme that blast furnace opening process disclosed by the invention, before baker, in blast-furnace tuyere Wind deflector is installed in lower end, then, support frame is installed in the lower end of wind deflector, finally, the furnace bottom in blast furnace is evenly distributed with ignitron.It keeps out the wind The first passage that plate and blast furnace crucibe outer are formed, coke can decline along the second channel on first passage and wind deflector, Since ignitron is located at the bottom end of support frame, support frame ensure that ignitron is not broken by top furnace charge in charging process, presses It collapses, and since support frame is the frame body with gap, heat importing furnace bottom can be enabled into coke in time in ignition process Access full combustion;Guarantee the ventilative transparent liquid of cupola well lower part coke using the sufficient space between wind deflector and support frame simultaneously Property;In addition, being lighted in furnace bottom coke, after support frame ablation, fusing, generates space and promote furnace charge decline.I.e. the present invention can The combustibility for improving coke, the generation in bottom house space is difficult when solving full coke open furnace, because of cupola well bottom coke when serious Charcoal cannot be lighted in time, cause slag iron to be difficult to swimmingly cause blow-on to have some setbacks from outlet discharge, or even induce gobbed up thing Therefore generation, realize blast furnace opening when the smooth discharge of slag iron.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the overlooking structure diagram of blast furnace opening device provided by the invention;
Fig. 2 is the flow chart of blast furnace opening process provided by the invention.
Wherein, in Fig. 1:
Wind deflector 1, blast furnace 2, first passage 3, second channel 4.
Specific embodiment
It is with reference to the accompanying drawing and specific real in order to make those skilled in the art better understand technical solution of the present invention Applying mode, the present invention is described in further detail.
Embodiment one
As shown in Figure 1, the invention discloses a kind of blast furnace opening devices.Wherein, blast furnace opening device include wind deflector 1, Support frame and ignitron.
Blast-furnace tuyere lower end is arranged in blast furnace 2 in wind deflector 1, and wind deflector 1 and 2 cupola well outer of blast furnace form edge department coke The first passage 3 of charcoal decline, wind deflector 1 is annular wind deflector 1, and the circular hole on wind deflector 1 is the second of middle part coke descent The coke descent that is set as of channel 4, first passage 3 and second channel 4 is provided convenience.
Support frame is the frame body with gap that pipe welding is formed, and is mounted in blast furnace 2, is used to support wind deflector 1.
Ignitron is evenly arranged on the furnace bottom of blast furnace 2, and positioned at the lower end of support frame, support frame can protect ignitron.
Blast furnace opening device disclosed by the invention, wind deflector 1 be arranged in blast furnace 2 blast-furnace tuyere lower end, and wind deflector 1 with 2 cupola well outer of blast furnace forms the first passage 3 of edge department coke descent, and the circular hole on wind deflector 1 is the of middle part coke descent Two channels 4, coke decline along first passage 3 and second channel 4.Since ignitron is located at the bottom end of support frame, support frame is protected Demonstrate,proved ignitron do not broken by top furnace charge in charging process, be collapsed, and due to support frame be the frame body with gap, can Coke is fully burned heat importing furnace bottom in time in ignition process;Wind deflector 1 and support are utilized simultaneously Sufficient space between frame guarantees the ventilative liquid permeability of cupola well lower part coke;In addition, being lighted in furnace bottom coke, support frame is burnt After erosion, fusing, generates space and promote furnace charge decline.The combustibility i.e. of the invention that can be improved coke, solves full coke open furnace The generation of 2 lower space of Shi Gaolu is difficult, because cupola well bottom coke cannot be lighted in time when serious, slag iron is caused to be difficult to swimmingly Cause blow-on to have some setbacks from outlet discharge, or even induces the generation of gobbed up accident, slag iron smooth row when realizing 2 blow-on of blast furnace Out.
Embodiment two
The blast furnace in blast furnace opening device and embodiment one in second embodiment provided by the invention, in the present embodiment The structure of blow-on device is similar, just repeats no more to something in common, only introduces difference.
In the present embodiment, wind deflector 1 and the concentric setting of blast furnace 2 are specifically disclosed, realizes the uniformity of coke descent. It should be noted that wind deflector 1 can also be arranged with 2 decentraction of blast furnace.
Further, for the present inventor by creative experiment, the number for having obtained ignitron is 2 air port of blast furnace When the 30%-40% of sum, the burning of coke is most abundant.
Further, the invention discloses the cupola well diameters of blast furnace 2 less than 10 meters, and ignitron is evenly arranged on blast furnace 2 respectively Cupola well Bisected Circle outer diameter on, Bisected Circle homalographic and be coaxially set.The invention also discloses the cupola well of blast furnace 2 is straight Diameter is more than or equal to 10 meters, and ignitron is evenly arranged on respectively on the outer diameter of the third cyclotomy of cupola well of blast furnace 2, third cyclotomy homalographic And it is coaxially set.I.e. the invention discloses according to blast furnace 2 diameter difference, it is distributed two kinds of different modes of ignitron.
It in the present embodiment, specifically discloses support frame and is made of scrap steel pipe, realize that waste material utilizes.
Blast furnace opening device disclosed by the invention keeps 2 blow-on of blast furnace more efficient, quick and safe, reduces environmental pollution. It is tested through inventor, opposite timber filling cupola well method can shorten cool furnace and pile up the timber time 50 hours or more, it keeps away simultaneously Exempt from resistance to material temperature is greatly lowered and damage.Opposite full coke open furnace can improve direct motion condition, and it is small to accelerate stockline fall time 5 When more than, substantially can be motionless to avoid long-time stockline and be forced that wind is drawn to sit material, overcome that seat material bring furnace temperature is insufficient, slag iron stream The hidden danger such as the dynamic poor, slag tuyere of property, at the same can timely gas recovery, coal gas diffusion loss is greatly reduced, reduces environment dirt Dye.
Embodiment three
As shown in Fig. 2, the invention discloses a kind of blast furnace opening process, comprising the following steps:
Step S1: before baker, wind deflector is installed in blast-furnace tuyere lower end in blast furnace.
Wind deflector and blast furnace crucibe outer form the first passage of edge department coke descent, and wind deflector is annular wind deflector, And the circular hole on wind deflector is the second channel of middle part coke descent.
Wind deflector and the concentric setting of blast furnace, circular hole is concentric with wind deflector, realizes the uniformity of coke descent.
Step S2: support frame is installed in the lower end of wind deflector, support frame supports wind deflector.
Support frame is the frame body with gap that pipe welding is formed, and specifically, it is preferable to support frame is made of scrap steel pipe, Realize that waste material utilizes.
Step S3: ignitron is evenly distributed in the furnace bottom of blast furnace.
When the number of ignitron is the 30%-40% of blast-furnace tuyere sum, the burning of coke is most abundant.
When the cupola well diameter of blast furnace is less than 10 meters, ignitron is evenly arranged on the outer diameter of the cupola well Bisected Circle of blast furnace respectively On, it Bisected Circle homalographic and is coaxially set;When the cupola well diameter of blast furnace is more than or equal to 10 meters, ignitron is uniformly distributed respectively On the outer diameter of the third cyclotomy of cupola well of blast furnace, third cyclotomy homalographic and it is coaxially set.
Blast furnace opening process disclosed by the invention, before baker, in the lower end of blast-furnace tuyere, installation wind deflector is then being kept off Support frame is installed in the lower end of aerofoil, finally, the furnace bottom in blast furnace is evenly distributed with ignitron.Wind deflector and blast furnace crucibe outer formed the One channel, coke can decline along the second channel on first passage and wind deflector, since ignitron is located at the bottom of support frame End, support frame ensure that ignitron do not broken by top furnace charge in charging process, be collapsed, and due to support frame be with gap Frame body, can in ignition process in time by heat importing furnace bottom coke is fully burned;Gear is utilized simultaneously Sufficient space between aerofoil and support frame guarantees the ventilative liquid permeability of cupola well lower part coke;In addition, lighted in furnace bottom coke, it will After support frame ablation, fusing, generates space and promote furnace charge decline.The combustibility i.e. of the invention that can be improved coke, solves The generation in bottom house space is difficult when full coke open furnace, because cupola well bottom coke cannot be lighted in time when serious, causes slag iron difficult Swimmingly to cause blow-on to have some setbacks from outlet discharge, or even the generation of gobbed up accident is induced, slag when realizing blast furnace opening The smooth discharge of iron.
" first " in the present invention, " second " etc. are to be distinguished in description, without others particular meanings.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein and inventive features phase Consistent widest scope.

Claims (7)

1. a kind of blast furnace opening device characterized by comprising
Blast-furnace tuyere lower end, and the wind deflector (1) and the blast furnace is arranged in blast furnace in wind deflector (1), the wind deflector (1) (2) cupola well outer forms the first passage (3) of edge department coke descent, and the wind deflector (1) is annular wind deflector (1), and institute State the second channel (4) that the circular hole on wind deflector (1) is middle part coke descent;
Support frame, support frame as described above support the wind deflector (1), and support frame as described above is the frame with gap that pipe welding is formed Body;
Ignitron, the ignitron is evenly arranged on the furnace bottom of the blast furnace, and is located at the lower end of support frame as described above, the furnace bottom coke It lights, can support frame as described above ablation, fusing be generated space and promote furnace charge decline.
2. blast furnace opening device according to claim 1, which is characterized in that the wind deflector (1) and the blast furnace (2) are same Axle center setting.
3. blast furnace opening device according to claim 1, which is characterized in that the number of the ignitron is the blast furnace (2) 30%-40% of air port sum.
4. blast furnace opening device according to claim 1, which is characterized in that the cupola well diameter of the blast furnace (2) is less than 10 Rice, the ignitron is evenly arranged on respectively on the outer diameter of the cupola well Bisected Circle of the blast furnace (2), the Bisected Circle homalographic and It is coaxially set.
5. blast furnace opening device according to claim 1, which is characterized in that the cupola well diameter of the blast furnace (2) be greater than or Person is equal to 10 meters, and the ignitron is evenly arranged on respectively on the outer diameter of the third cyclotomy of cupola well of the blast furnace (2), the third cyclotomy It homalographic and is coaxially set.
6. blast furnace opening device described in any one of -5 according to claim 1, which is characterized in that support frame as described above is waste material Steel pipe is made.
7. a kind of blast furnace opening process, which comprises the following steps:
Step A: before baker, wind deflector is installed in blast-furnace tuyere lower end in blast furnace, and outside the wind deflector and the blast furnace crucibe Along the first passage for forming edge department coke descent, the wind deflector is annular wind deflector, and the circular hole on the wind deflector is The second channel of middle part coke descent;
Step B: support frame is installed in the lower end of the wind deflector, support frame as described above supports the wind deflector, and support frame as described above is The frame body with gap that pipe welding is formed;
Step C: being evenly distributed with ignitron in the furnace bottom of the blast furnace, and the furnace bottom coke is lighted, can be by support frame as described above ablation, molten Change, generates space and promote furnace charge decline.
CN201711127905.5A 2017-11-15 2017-11-15 A kind of blast furnace opening device and method Active CN107779532B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711127905.5A CN107779532B (en) 2017-11-15 2017-11-15 A kind of blast furnace opening device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711127905.5A CN107779532B (en) 2017-11-15 2017-11-15 A kind of blast furnace opening device and method

Publications (2)

Publication Number Publication Date
CN107779532A CN107779532A (en) 2018-03-09
CN107779532B true CN107779532B (en) 2019-10-11

Family

ID=61433225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711127905.5A Active CN107779532B (en) 2017-11-15 2017-11-15 A kind of blast furnace opening device and method

Country Status (1)

Country Link
CN (1) CN107779532B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112877487A (en) * 2021-01-27 2021-06-01 新疆八钢南疆钢铁拜城有限公司 Device for rapidly treating and preventing red coke collapse in air port small sleeve chamber cleaning

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201534851U (en) * 2009-08-26 2010-07-28 鞍钢股份有限公司 Blast furnace baking device
CN102899430A (en) * 2012-09-19 2013-01-30 攀钢集团攀枝花钢钒有限公司 Multipoint stereoscopic ignition device and method for blast furnace blow-in and blast furnace containing the device
CN203238278U (en) * 2013-03-11 2013-10-16 宝钢不锈钢有限公司 Air guide device for blowing-in preheating furnace hearth of blast furnace

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201534851U (en) * 2009-08-26 2010-07-28 鞍钢股份有限公司 Blast furnace baking device
CN102899430A (en) * 2012-09-19 2013-01-30 攀钢集团攀枝花钢钒有限公司 Multipoint stereoscopic ignition device and method for blast furnace blow-in and blast furnace containing the device
CN203238278U (en) * 2013-03-11 2013-10-16 宝钢不锈钢有限公司 Air guide device for blowing-in preheating furnace hearth of blast furnace

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
高炉全焦热装开炉新点火方法的研究和实践;高广旅;《河北冶金》;19861031(第5期);第35-36页 *
高炉开炉点火方法改进实践;高广旅;《炼铁》;19861031(第5期);第22-25页 *

Also Published As

Publication number Publication date
CN107779532A (en) 2018-03-09

Similar Documents

Publication Publication Date Title
CN101893233B (en) Biomass semi-gasification automatic control combustion engine
CN201706483U (en) Biomass semi-gasification automatic control combustion engine
CN205261590U (en) Ground torch
JP2014507619A5 (en)
CN107779532B (en) A kind of blast furnace opening device and method
CN105316452A (en) High-lance-position vacuum refining method based on coherent jet top lance
CN203177163U (en) Outer hexagonal air cap of circulating fluidized bed boiler
CN105333422B (en) The pulverized coal staging combustion device fired again for heat source so that inert component water power is added to vent one's spleen
CN107064408A (en) Combustion test equipment
CN105423299A (en) Gas distributing disk, combustor and gas stove
CN100565007C (en) A kind of low NOx DC micro-oil coal powder burner
CN203215677U (en) Heat exchanger for radiant tube
CN107606607A (en) Powder stable combustion type burner is given at the center that a kind of burnout degree is circular layout
CN105074014A (en) Blast furnace operation method and lance
CN209065935U (en) Blast furnace gas combustion apparatus for baking
CN203857455U (en) Biomass combustor
CN202808849U (en) Hot-blast stove using blast furnace gas as fuel
CN210220713U (en) Alloy heating baking oven
CN104057073A (en) Tank cover for baking
CN207122897U (en) The combustion furnace of high-efficiency environment friendly
CN205842638U (en) Coal burner
CN204042925U (en) The airtight burner of air cold wall type
CN204254619U (en) Burner for radiant tube
CN203744233U (en) Afterburning combustor used in waste heat boiler of gas turbine
CN221198083U (en) Totally-enclosed submerged arc furnace with safe pressure relief function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant