CN107770237A - Schedule control device, facilities management system and schedule control method - Google Patents

Schedule control device, facilities management system and schedule control method Download PDF

Info

Publication number
CN107770237A
CN107770237A CN201710670145.6A CN201710670145A CN107770237A CN 107770237 A CN107770237 A CN 107770237A CN 201710670145 A CN201710670145 A CN 201710670145A CN 107770237 A CN107770237 A CN 107770237A
Authority
CN
China
Prior art keywords
control
schedule
state
machine
setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710670145.6A
Other languages
Chinese (zh)
Other versions
CN107770237B (en
Inventor
鹿岛亨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Azbil Corp
Original Assignee
Azbil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Azbil Corp filed Critical Azbil Corp
Publication of CN107770237A publication Critical patent/CN107770237A/en
Application granted granted Critical
Publication of CN107770237B publication Critical patent/CN107770237B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/54Presence management, e.g. monitoring or registration for receipt of user log-on information, or the connection status of the users
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/535Tracking the activity of the user

Abstract

The invention provides a kind of schedule control device, facilities management system and schedule control method.The facilities control device is not inherited when being changed on the date with BACnet etc. can be directed in the facilities management system of the communication protocol of the state of a control of machine to control the control schedule of the machine in facility to set the control schedule across the date without the individual other reply operation carried out by user.The schedule control device of the present invention possesses:Configured information acceptance division (201), it receives the control schedule setting configured information for the control schedule setting for making machine (4n);And state configuration part (2021), its control schedule setting configured information according to received by configured information acceptance division (201), the state of a control setting of the machine when date of the date to being specified in the control schedule setting configured information changes and the last set state of a control identical state of a control in the previous day.

Description

Schedule control device, facilities management system and schedule control method
Technical field
The present invention relates to the day process control dress that a kind of information of the management to for carrying out the machine in facility is controlled Put, facilities management system and schedule control method.
Background technology
In the facilities management system being managed to the operation to the machine in the equipment being arranged in facility, in the past Knowing has setting to control the technology of the control schedule of the machine in facility.
For example, disclosing a kind of apparatus-machine management device in patent document 1, it is arranged to via network and equipment machine Control device communicated, make the operation schedule of the equipment machine of specified time limit, and make corresponding with the operation schedule The control data of equipment machine.
On the other hand, in recent years, in facilities management system, even if the various machines in equipment in facility are manufacturers Intrinsic autonomous specification, also provides general-purpose interface, therefore, using BACnet (Building Automation and Control Networking protocol, registration mark, record omitted below) set as thermal source machine, air-conditioning machine, lighting machine etc. The situation of the integrated network of machine in applying is on the increase.
In facilities management system, the purpose of in order to realize while operate, such as have to thermal source machine, air-conditioning machine, flare-aircraft Machine in the facilities such as device run the function of the setting of schedule, and by making the BACnet for supporting to be used as open protocol System, schedule setting information can be shared in the case of multiple suppliers.
【Prior art literature】
【Patent document】
【Patent document 1】Japanese Patent Laid-Open 2009-296555 publications
The content of the invention
【Problems to be solved by the invention】
In such technology disclosed in patent document 1, the operation schedule of the equipment machine of specified time limit can be made.So And the apparatus-machine management device disclosed in patent document 1 does not support BACnet.
In BACnet, schedule setting was carried out in units of 1 day, for example, in the control being set to across the date of setting , will not be according to the state of a control of the machine from the previous day, but with advance when changing on the date in the case of the schedule of state The initial value of setting carrys out control machine.
Thus, in facilities management system, according to be that such as BACnet does not so inherit machine when changing on the date The communication protocol of the state of a control of device, then there are the following problems, for example, it is desirable that to be inherited the day of same state across two days In the case that journey carrys out control device machine, it is necessary to machine state of a control by initial value before reset into institute by user The operations such as desired setting.
The present invention is formed to solve problem as described above, and its object is to provide one kind with BACnet etc. to exist Date is not inherited when changing in the facilities management system of the communication protocol of the state of a control of machine, can be directed to control facility The control schedule of interior machine, carry out an other reply operation without user and set the facilities management across the control schedule on date Device, facilities control method and facilities management system.
【The technological means solved the problems, such as】
The schedule control device setting control schedule of the present invention, the control schedule can not be inherited when with date change In the facilities management system of the communication protocol of the state of a control of machine, to control managed machine, the dress of process control in this day Put and possess:Configured information acceptance division, it receives the control schedule setting instruction for the control schedule for making state configuration part setting machine Information;And state configuration part, its control schedule setting configured information according to received by configured information acceptance division, to the control The state of a control of machine during the date change on the same day on date specified by schedule setting configured information processed, setting and the previous day Last set state of a control identical state of a control.
【The effect of invention】
According to the present invention, the communication protocol of the state of a control of machine is not inherited when supporting BACnet etc. changing on the date In facilities management system, it can be directed to control the control schedule of the equipment machine in facility, without carried out by user It is other to tackle operation and set the control schedule across the date.
Brief description of the drawings
Fig. 1 is to represent that the device in the facilities management system is more generally in the facilities management system for supporting BACnet The vivid figure of one of schedule setting information is shared in the case of individual supplier.
Fig. 2 is generally in the facilities management system for supporting BACnet, and central monitoring device was set in the morning for certain 1 day 9 points start machines (ON), in the afternoon 5 points stop machine (OFF) this operation schedule in the case of, by server make fortune Vivid one of row schedule data.
Fig. 3 be generally in facilities management system, not according to the last set running status of the previous day but on the day of according to " initial value of state of a control " carrys out vivid one of the operation schedule data of the situation of control machine.
Fig. 4 is the figure of the composition for the facilities management system for representing embodiments of the present invention 1.
Fig. 5 is the pie graph of the facilities control device of embodiments of the present invention 1.
Fig. 6 is by embodiments of the present invention 1, schedule control device that server carries pie graph.
" operation schedule setting indicator function " in the facilities control device of the embodiments 1 of Fig. 7 to illustrate the invention is related The flow chart of action.
The flow chart of the action for the schedule control device that Fig. 8 is carried by server in the explanation embodiment 1.
The figure of one of the information that Fig. 9 is stored by schedule storage part in the explanation embodiment 1.
The figure of one of the information that Figure 10 is stored by schedule storage part in the explanation embodiment 1.
Figure 11 comes from user to represent in the facilities management system of embodiment 1 according to received by facilities control device The instruction of operation schedule setting, the operation shape that the automatic date for being set with the same day changes time point is made in schedule control device The operation schedule data of state, and control data is made according to the operation schedule data, controller is controlled according to the control data The vivid figure of the flow of machine processed.
The action of " operation schedule display function " correlation in the facilities control device of the embodiments 1 of Figure 12 to illustrate the invention Flow chart.
Figure 13 is the display for representing the operation schedule that display control unit makes display part show in the form of images in the embodiment 1 The figure of one of picture.
Figure 14 is the figure of one for representing to show the display picture of operation schedule in conventional facilities control device commonly.
Figure 15 is to illustrate generally do not setting 0 in annex a:In the case of 00 running status, nearest operation shape is set with The vivid figure of one of the control schedule of state.
Figure 16 is the pie graph of the schedule control device of embodiments of the present invention 2.
The flow chart of the action of the schedule control device of the embodiments 2 of Figure 17 to illustrate the invention.
The figure of one of the information that Figure 18 is stored by the schedule storage part of schedule control device in the explanation embodiment 2.
Figure 19 is that the display control unit for representing facilities control device in the embodiment 2 makes what display part was shown in the form of images Run the figure of one of the display picture of schedule.
Embodiment
Below, one side refer to the attached drawing, while embodiments of the present invention are described in detail.
Embodiment 1.
First, the BACnet to the premise of the facilities management system as the present invention and the facilities management system of the BACnet is supported The problem of in system, illustrates.
Facilities management system possesses central monitoring device, server, controller and thermal source machine, air-conditioning machine, lighting machine Deng the machine in facility, when setting the operation schedule of each machine in central monitoring device, server can be made based on the fortune The control data of row schedule is simultaneously sent to controller.Then, controller is controlled to the machine in facility, and be according to from The control data that server is sent controls each machine.
In the present invention, it is premised on facilities management system supports BACnet.
So-called BACnet, it is a kind of international communication specification, is to will be by different suppliers i.e. manufacturer or sales company The standardization open protocol that the system of structure is connected with each other.
In facilities management system, when the central monitoring device for forming the facilities management system is set to control the machine in facility During the control schedule of device, can the control schedule that be set in the server according to this make control schedule data, so as to basis The control schedule data controls the machine in facilities management system.Specifically, in order to realize the machine for example in facility The purpose of operating simultaneously, user are used as control day using central monitoring device to carry out the setting of the operation schedule of the machine Journey.Furthermore herein, so-called operation schedule, the content of the start and stop of the operation comprising such as machine is the running status and hair of machine Go out the date-time of the instruction of the start and stop.
Below, herein, it is managed in facilities management system to control using being set in central monitoring device as one The start and stop of operation of machine be that the situation of operation schedule of running status illustrates, but this is not limited to, in central monitoring In device, such as it can set to control managed in the facilities management systems such as design temperature or the valve opening of air-conditioning machine All machines all state of a controls control schedule.
As long as facilities management system supports BACnet, schedule setting letter just can be shared in the case of multiple suppliers Breath.
For example, following utilization can be realized:As shown in figure 1, the user such as facilities management personnel utilizes central monitoring device 101 in A On the server 102 of company's manufacture, set to control the operation schedule for the thermal source machine 104 that the C companies in facility manufacture, when The server 102 writes the information of the operation schedule made according to set content to the thermal source machine of B companies manufacture During controller 103, the thermal source machine controller 103 is controlled to thermal source machine 104.
In this way, in facilities management system, by using BACnet as central monitoring device 101, server 102, heat source machine Communication protocol between device controller 103 and thermal source machine 104, can be regardless of for device in facilities management system etc. It is used as control machine to supplier, so as to build the spirit under multiple vendor according to the various purposes such as cost, scale, function System living.
In this BACnet, the setting that controls schedule is to keep data in units of 1 day.For example, by a certain machine The operation schedule setting of a certain day of device is in 9 points of startup machines (ON) of the morning, in the afternoon 5 points of situations for stopping machine (OFF) Under, the operation schedule is set in central monitoring device 101, the image such as Fig. 2 of the operation schedule data made by server 102 It is shown.
Fig. 2 is in the facilities management system for supporting BACnet, and central monitoring device 101 was set at 9 points in the morning for certain 1 day Operation made by startup machine (ON), in the afternoon 5 points of stopping the situations of machine (OFF) this operation schedule, server 102 Vivid one of schedule data.
As shown in Fig. 2 in server 102, such as make and store " 9:00ON”、“17:This data of 00OFF " are as operation Schedule data.
Herein, generally, user can specify the switching instant of running status, and set its control when setting runs schedule Content.For above-mentioned example, user is to do following hypothesis to set operation schedule:It is assumed that 0:00~9:Be between 00 with from The running status of the previous day carrys out control machine, and 9 on the day of arriving at:The running status that 00 this time point entered to be about to machine is set to The switching of " ON ", thereafter, until 17:Untill 00 for should " ON " state, when arriving at 17:When 00, enter to be about to the operation shape of machine State is set to the switching of " OFF ".
But in BACnet, as described above, be to keep data in units of 1 day, therefore it can not inherit last in the previous day The running status of setting.That is, as shown in Fig. 2 on made operation schedule data, the 0 of the same day:00~9:It is not between 00 It is set with the state of running status.
And then in BACnet, the running status without the setting period, it is specified that for thermal source machine controller 103 etc. The running status of " initial value of state of a control " that controller is separately set with following controls the grade machine of thermal source machine 104.Again Person, " initial value of state of a control " are to be set in advance by users such as facilities management personnel using central monitoring device 101.
Thus, in the case of figure 2, not according to the last set running status in the previous day, but will not from server 102 It is set with 0:00~9:The control data of 00 running status is sent to controller, in the controller, set in advance to follow The running status of " initial value of state of a control " is 0:00~9:Machine is controlled during 00.
Fig. 3 be in facilities management system not according to the last set running status of the previous day but on the day of according to " initial value of state of a control " carrys out vivid one for running schedule data in the case of control machine.
It in Fig. 3, will be set to the previous day the 1st, the same day will be set to the 2nd, for example, being set by the user machine at 9 points in the morning Running status be set to " ON " and start this operation schedule of machine to be used as the operation schedule of the 1st day.In addition, " state of a control Initial value " is set as " OFF ".
In this case, when arrive at the 1st day 9:When 00, machine according to operation schedule start, when arrive at the 2nd day 0:When 00, Machine is according to " initial value of state of a control " and as the state not started.
Even if for example, in user by the 9 of the 1st day:00 startup machine, also kept by the 2nd day starting state, when arriving at the 2nd The 17 of day:Stop this content of machine when 00 to set in the operation schedule of the 2nd day as desired operation schedule “17:In the case of 00OFF ", i.e. even if wishing to make machine by across in the case of running in a manner of two days, the 2nd is not yet The last set running status of the 1st day can be inherited, further, since " initial value of state of a control " is set to " OFF ", therefore The 0 of 2nd day:00, machine will stop.
Therefore, in conventional support BACnet facilities management system, exist for tackle such case and need by with Individually tackled this problem in family.
So-called other reply, specifically, such as can enumerate user using central monitoring device 101 arrive at the 2nd day 0: " initial value of state of a control " is changed to " ON " from " OFF " before 00.Then, when 0 more than the 2nd day:When 00, after change " initial value of state of a control " recover to counter-measures such as " OFF ".
However, in the counter-measure, it is possible to setting error occurs or forgets setting etc., in this case, can also exist Influence the operation schedule of the machine of another day this problem.
In addition, as other other replies, such as user can be enumerated using central monitoring device 101 to reset " ON " as the 2nd day 0:This counter-measure of 00 running status.That is, setting " 0 can be enumerated:00ON”、“17:00OFF " this Counter-measure of the one operation schedule as the operation schedule of the 2nd day.
However, in the counter-measure, user needs specially to set the 0 of the 2nd day:00 running status, more labor intensive.This Outside, there are problems that it is also possible to forgetting to set this.
Additionally, there are following problem:As the premise for carrying out reply as described above, user also needs to be related to BACnet And the knowledge of processing of " initial value of state of a control " in BACnet etc., and this be likely to become for a user it is larger Burden.
In order to solve as above problem, in the autonomous criterion for BACnet that NEC equipment association (IEIEJ) formulates “IEIEJ-G-0006:(in annex a), recommendation has " state of a control to the addition content of 2006 (BACnet system interoperabilities criterions) " Initial value " automatic rewriting.The so-called automatic rewriting that annex a is recommended, refers to be not set with the situation of control schedule Under, continuous updating " initial value of state of a control " This move is come with " nearest setting value " all the time.That is, for example scheming In the case of such example shown in 3, the 2nd day 0:00 point sets " nearest setting value " i.e. conduct automatically to operation schedule " ON " of the final running status of the 1st day.
Thus, even if arriving at the 0 of the 2nd day:00, machine will not also stop, and keep machine to open so as to realize across two days Move this state.
However, as described above, annex a be NEC equipment association formulate, do not adopted extensively in the world With.Thus, for example in the case where facilities management system mixes the multiple vendor system deposited for the equipment of Japan with overseas equipment, The information of set operation schedule can not be shared between the Japanese equipment and overseas equipment.For example, shown in Fig. 1 that In the example of sample, in the case where server 102 supports that annex a, thermal source machine controller 103 do not support annex a, it can not share The information of schedule is run, so as to which day process control heat source machine device 104 can not be run so that user is desired.As a result, for example, when desired In a manner of crossing over two days during control machine, however it remains the individual other reply as described above for needing to be carried out by user being asked Topic.
In addition, as BACnet, user also needs to the related knowledge of annex a, and larger bear is likely to become so as to exist Carry on a shoulder pole this problem.
The present invention solves as above problem, with the state of a control for not inheriting machine when being changed on the date such as BACnet Communication protocol as in the facilities surveillance system of communication protocol, can be directed to control the control day of the machine in facility Journey, the control schedule across the date is set without the individual other reply operation carried out by users such as facilities management personnel.Then, tie Fruit can be without individual other control across the date that the machine in facilities surveillance system should be carried out to operation by user's progress Control under schedule.
Fig. 4 is the figure of the composition for the facilities management system for representing embodiments of the present invention 1.
As shown in figure 4, facilities management system is by facilities control device 1, server 2, the machine of more than 1 being arranged in facility 41st, 42,43 and it is connected to the controller 31,32,33 of more than 1 of the machine 41,42,43 Form.Hereinafter, the controller 31,32,33 of more than 1 is expressed as controller 3n.In addition, by the machine of more than 1 41st, 42,43 it is expressed as machine 4n.
Facilities control device 1, server 2 and controller 3n connect via network.In addition, controller 3n and machine 4n via Network and connect.Furthermore facilities control device 1, server 2, controller 3n are by the program using CPU based on software Manage to perform.Furthermore although being omitted in Fig. 4, server 2 is equipped with schedule control device 21.Day process control dress The details for putting 21 will be in describing hereinafter.
In addition, in facilities management system as shown in Figure 4, facilities control device 1, server 2, controller 3n and machine Communication protocol between 4n uses BACnet.
Controller 3n controls the machine 4n such as heat source machine device, air-conditioning machine, lighting machine.
Facilities control device 1 is each machine 4n in facility can be managed collectively via server 2, controller 3n Central monitoring device, such as by PC (Personal Computer, PC) etc. form.Facilities control device 1 is for example set Put in caretaker room of facility etc..
Facilities control device 1 is received from users such as facilities management personnel to control the control schedule of each machine 4n in facility Make instruction.The making of the control schedule received is indicated that related control schedule makes configured information by facilities control device 1 Send the schedule control device 21 carried to server 2.Preferably in 1, as one of control schedule, facilities management Device 1 carries out the setting instruction of each machine 4n operation schedule.
In addition, facilities control device 1 makes each machine in facility according to the instruction of the users such as the administrative staff from facility 4n operation schedule is shown.User confirms the operation schedule shown, so as to confirm each machine 4n operation conditions Deng.
Furthermore as described above, preferably in 1, as one, facilities control device 1 is instruction setting machine Running status is the making of the operation schedule data of the start and stop of the operation of machine, but is not limited to this, and facilities control device 1 can Indicate to carrying out control schedule data that the state of a control of the control beyond start and stop of the operation of machine etc. set Make.
Server 2 makes configured information to make and store setting according to the control schedule sent from facilities control device 1 There is to control the control schedule data of the control schedule of each machine 4n in facility.Herein, so-called control data, such as refer to Even if to carry out the data of machine 4n start and stop machine 4n operations or the control stopped.I.e., herein, server 2 is according to from setting The operation schedule for applying the transmission of managing device 1 makes configured information, to make and store the fortune for each machine 4n being set with facility The operation schedule data of row schedule.
In addition, server 2 to make to control machine 4n control data, and is incited somebody to action according to the operation schedule data made The control data is sent to controller 3n.I.e., herein, so-called control data, such as refer to carry out machine 4n start and stop i.e. Make the data of machine 4n operations or the control stopped.
The schedule control device 21 that the action of server 2 above is specifically carried by server 2 is carried out.
That is, the schedule control device 21 of server 2 makes operation schedule data, and by based on the operation schedule data Control data is sent to controller 3n., should control machine when arriving at operation or stopping etc. according to control data in controller 3n When at the time of device 4n, to the machine 4n met follow the control of control data.
In addition, server 2 is communicated with the monitoring period set with controller 3n, from controller 3n collection machines 4n Monitoring point data, and store the monitoring point data that collects.User for example makes in facilities control device 1 in the server 2 The monitoring point data of storage is shown in the form of images, can be come using the monitoring point data stored in the server 2 Monitor machine 4n state.
Fig. 5 is the pie graph of the facilities control device 1 of embodiments of the present invention 1.
As shown in figure 5, facilities control device 1 possess input acceptance division 11, configured information sending part 12, display control unit 13 and Display part 14.
Input the setting instruction that the input unit such as from mouse, keyboard of acceptance division 11 (diagram is omitted) receives operation schedule Or the display instruction of operation schedule.
Preferably in 1, user's such as startup optimization schedule setting picture, the input unit shown on display part 14 Middle desired operation schedule for inputting to be controlled each machine 4n in facility etc., thus carry out each machine in facility The setting instruction of device 4n operation schedule.
Input acceptance division 11 is in the case where receiving the setting instruction of operation schedule, by setting based on the operation schedule received Surely the operation schedule setting configured information indicated is exported to configured information sending part 12.
In addition, the administrative staff of facility etc. wait such as startup optimization schedule reference picture, shown on display part 14 Input unit in input wish the machine 4n that shows the operation schedule currently set, and " display is opened using mouse click Beginning button " etc., thus carry out making it is that the machine 4n in facility is set, controlling machine 4n operation schedule to show Display instruction on display part 14.
Input acceptance division 11, will be aobvious based on the operation schedule received in the case where receiving the display instruction of operation schedule Show that the operation schedule of instruction shows that configured information is exported to display control unit 13.
Configured information sending part 12 sends the operation schedule setting configured information exported from input acceptance division 11 to service The schedule control device 21 that device 2 is carried.
Operation schedule setting configured information is at least to associate machine 4n, in scheduled date and scheduled date specified by user Information obtained by the information of the running status of time.
The information of the so-called scheduled date included in schedule setting configured information is run, specifically, such as can be enumerated specified There is the information on the dates of date such as " on July 10th, 2016 ".Furthermore this is one, herein, operation schedule setting instruction letter The information of so-called scheduled date included in breath, such as the information for being assigned with " what day " is alternatively, or be assigned with The information of " periods " such as " on July 30,10 days~2016 July in 2016 ", or as " the 3rd Thursday of the even number moon " this Sample is assigned with what day the specific information in specific month.It is assigned with addition, being for example alternatively based on the day for presetting, storing The information of " red-letter day " gone through, " holiday " etc..The so-called scheduled date, as long as can be in schedule control device 21 it is determined that setting The information on the date met of the fixed last set state of a control identical state of a control with the previous day.That is, user Information as described above can be entered to be about to and be specified as the date, operation schedule setting instruction.
The composition of schedule control device 21 and setting and the last set control in the previous day in schedule control device 21 The action of state identical state of a control will be in describing hereinafter.
Display control unit 13 shows configured information, reference server 2 according to the operation schedule exported from input acceptance division 11 The schedule storage part 203 that the schedule control device 21 carried possesses, make the operation of scheduled date that is showing specified machine 4n The image of the content of schedule is shown on display part 14.
Display part 14 is CRT (Cathode Ray Tube, cathode-ray picture tube), liquid crystal display etc., to display control unit 13 images made are shown.
Fig. 6 is by embodiments of the present invention 1, schedule control device 21 that server 2 carries pie graph.
As shown in fig. 6, schedule control device 21 possesses configured information acceptance division 201, schedule data makes control unit 202, schedule Storage part 203, control data preparing department 204 and sending part 205.Schedule data makes control unit 202 and possesses state configuration part 2021 and schedule data preparing department 2022.
Configured information acceptance division 201 receives the operation schedule from the transmission of configured information sending part 12 of facilities control device 1 Set configured information.Configured information acceptance division 201 exports the operation schedule setting configured information received to schedule data system Make control unit 202.
Schedule data makes control unit 202 and indicates letter according to the operation schedule setting exported from configured information acceptance division 201 Breath, the running status when date on the day of setting machine 4n, scheduled date changes, make the fortune on the day of being set with the scheduled date The operation schedule data of row schedule, and store to schedule storage part 203.
Schedule data makes the state configuration part 2021 of control unit 202 according to the operation day of output self-indication information acceptance division 201 Journey sets configured information, it is on the day of machine 4n the, scheduled date specified in the setting configured information of setting operation schedule, towards this Running status during the date change of date.
Specifically, state configuration part 2021 is set to machine 4n, the operation schedule specified in operation schedule setting configured information Determine 0 of designated date in configured information:00 point of running status, setting and the last set running status phase in the previous day Same running status.
What the schedule data preparing department 2022 that schedule data makes control unit 202 exported according to configured information acceptance division 201 Run the 0 of the date met of schedule setting configured information and the setting of state configuration part 2021:The information of 00 point of running status To make operation schedule data.
Schedule data preparing department 2022 exports the operation schedule data made to control data preparing department 204.In addition, schedule Data creating portion 2022 stores the operation schedule data made to schedule storage part 203.
Schedule storage part 203 stores the schedule data making that schedule data makes control unit 202 for each machine 4n Operation schedule made by portion 2022.Schedule storage part 203 is formed such as by HDD, DVD, memory.
Furthermore herein, as shown in fig. 6, schedule storage part 203 is equipped with by schedule control device 21, but this is not limited to, Schedule storage part 203 can be also provided in the outside of schedule control device 21, schedule control device 21 refers to day via network Journey storage part 203.
Control data preparing department 204 makes use according to the operation schedule data of the schedule data making output of control unit 202 With control machine 4n control data.Specifically, control data preparing department 204 is for example mono- with control machine 4n controller 3n Position come make by each controller 3n machine 4n controlled information with to control the information of the machine 4n operation schedule pass The control data that connection gets up and set.
Control data preparing department 204 exports the control data made to sending part 205.
Sending part 205 sends the control data made by control data preparing department 204 symbol set into control data The controller 3n of conjunction.
Although in addition, eliminating diagram in Fig. 6, server 2 has the time from controller 3n taken at regular intervals machines 4n The data acquisition portion of the monitoring point data of sequence.Data acquisition portion for example can be with the monitoring period of setting for each monitoring point Collection monitoring point data, also can ceaselessly gather monitoring point data from controller 3n.
Data acquisition portion stores the monitoring point data collected from controller 3n to monitoring point data storage part (diagram is omitted). Furthermore now, the monitoring point data collected and the information and monitoring point data of monitoring point are gathered the moment by data acquisition portion Associate and store to monitoring point data storage part.
User can carry out each machine in facility by reference to the content of the monitoring point data stored in monitoring point data storage part Device 4n management.
Action to the facilities control device 1 of embodiments of the present invention 1 illustrates.
The facilities control device 1 of embodiments of the present invention 1 has " operation schedule setting indicator function " and " operation schedule is shown Function ".
First, " operation schedule setting indicator function " related action to facilities control device 1 illustrates.
" operation schedule setting indicator function " in the facilities control device 1 of the embodiments 1 of Fig. 7 to illustrate the invention is related The flow chart of action.First, according to Fig. 7, facilities control device 1, operation schedule making instruction action is illustrated.
Input acceptance division 11 standby before operation schedule setting instruction is received (is the feelings of "No" in step ST701 Condition), when receiving operation schedule setting instruction (being the situation of "Yes" in step ST701), by based on the operation day received The operation schedule setting configured information of journey setting instruction is exported to configured information sending part 12.
The users such as facilities management personnel input unit such as operating mouse, keyboard, carry out the picture startup of operation schedule setting and refer to Show.Acceptance division 11 is inputted when receiving operation schedule setting picture startup instruction, the operation schedule setting that this is received Picture starts configured information and exported to display control unit 13, fortune of the display control unit 13 according to received by the input acceptance division 11 Row schedule setting picture starts instruction, operation schedule setting picture is shown on display part 14.
Input and include in shown input unit on the operation schedule setting picture that user for example shows on display part 14 Machine 4n in the facility to be controlled, the date-time being controlled and running status desired operation schedule etc., by This carries out the setting instruction of the operation schedule of each machine 4n in facility.
Input acceptance division 11 receives the information of operation schedule that user is inputted, machine 4n in step ST701.
Then, acceptance division 11 is inputted by the information of the running status comprising machine 4n, date-time and machine 4n received Information obtained by being associated is as operation schedule setting configured information.
Herein, for example, when user is set in 17 for machine A:Operation is set to " OFF " this operation schedule as 2016 by 00 During the operation schedule on July 10, in, input acceptance division 11 is by machine A information, the information on July 10th, 2016 and in 17: 00 using operation be set to " OFF " information be associated obtained by information as operation schedule setting configured information and export to instruction Information sending part 12.
Furthermore for example, when 17:00 by operation when being set to " OFF ", thereafter, is resetting the operation that is assigned with running status Before schedule, within same day, operation turns into the state for continuing " OFF ".
In addition, herein, what user was carried out is the instruction for the operation schedule for setting 1, but this is one, and user can also enter Row to set more days operation schedule instruction.
Configured information sending part 12 sends the operation schedule setting configured information exported from input acceptance division 11 to service The schedule control device 21 (step ST702) carried in device 2.
" operation schedule display function " related action of facilities control device 1 will be in describing, then, to the present invention hereinafter Embodiment 1 in receive from facilities control device 1 send operation schedule setting configured information schedule control device 21 Action illustrate.
The action of schedule control device 21 in the embodiments 1 of Fig. 8 to illustrate the invention, server 2 is carried Flow chart.
Configured information acceptance division 201 from the configured information sending part 12 of facilities control device 1 receive operation schedule setting refer to (being the situation of "No" in step ST801) standby before showing the information, (step when receiving operation schedule setting configured information It is the situation of "Yes" in ST801), the operation schedule setting configured information received is exported to schedule data and makes control unit 202。
The state configuration part 2021 that schedule data makes control unit 202 obtains operation schedule from configured information acceptance division 201 Configured information is set, is run with reference to schedule storage part 203 to set with the last set running status identical in the previous day State as the machine 4n specified by operation schedule setting configured information scheduled date on the day of, date towards the date Running status during change, that is, the 0 of the machine 4n met the date met:00 point of running status (step ST802).This Place, as described above, in facilities control device 1, for example, when user is set in 17 for machine A:00 is set to operation Operation schedule of " OFF " this operation schedule as on July 10th, 2016, so that by machine A information, in July, 2016 The information of 10 days and in 17:00 using operation be set to " OFF " information be associated obtained by information as operation schedule setting For configured information from during the output of configured information sending part 12 of facilities control device 1, state configuration part 2021 is set in July, 2016 The last set running status of 9 days as the machine A on July 10th, 2016 0:00 point of running status.For example, 2016 The machine A on July 9, in operation schedule is " 0:00OFF”、“9:In the case of 00ON ", last set running status is " ON ", therefore, state configuration part 2021 set 0 of " ON " as the machine A on July 10th, 2016:00 point of running status.
Herein, the figure of one of the information that Fig. 9 is stored by schedule storage part 203 in the explanation embodiment 1.
As shown in figure 9, in schedule storage part 203, for each machine 4n, the date information related to operation schedule is closed Join and store.In Fig. 9, as one, show the machine A stored in schedule storage part 203 operation schedule.
State configuration part 2021 can determine on July 9th, 2016 according to the information stored in schedule storage part 203 for machine A Last set running status.
Furthermore in the setting of schedule control device 21 etc., it is not stored with meeting for date for meeting in schedule storage part 203 The related operation schedules of machine 4n in the case of, initial value is set as 0 by state configuration part 2021:00 point of running status is Can." initial value of state of a control " is taken the circumstances into consideration to set in advance by user, is stored in inside schedule control device 21, schedule data system Make the place that control unit 202 can refer to.
In addition, the content shown in Fig. 9 is one, as long as at least associated storage has machine 4n, day in schedule storage part 203 Phase and the operation schedule for imparting the information that automatic setting indicates.Automatic setting mark will be in describing hereinafter.
State configuration part 2021 is by the 0 of the date met set:The information of 00 point of operation schedule is on July 10th, 2016 0:00 point of machine A running status " ON " this information exports to schedule data the schedule data system for making control unit 202 Make portion 2022.
The schedule data preparing department 2022 that schedule data makes control unit 202 receives according to configured information in step ST801 Meeting set by state configuration part 2021 in operation schedule setting configured information and step ST802 received by portion 201 The 0 of date:The information of 00 point of running status runs schedule data (step ST803) to make.Specifically, for each machine Device 4n, the operation schedule specified by for the operation schedule i.e. user on the date set in operation schedule setting configured information, system Make 0:00 point of running status sets 0 set by stateful configuration part 2021:The data of 00 point of running status are as fortune Row schedule data.Herein, schedule data preparing department 2022 makes to be associated with for the machine A on July 10th, 2016 is set to " 0: 00ON”、“17:The operation schedule data of this operation schedule of 00OFF ".
Now, schedule data preparing department 2022 is to 0 set by state configuration part 2021 in step ST802:00 point of operation shape The information of state assigns automatic setting mark=1 this information.Furthermore herein, the initial value of automatic setting mark is set to 0.
Schedule data preparing department 2022 exports the information for the operation schedule data made to control data preparing department 204 (step ST804).
In addition, schedule data preparing department 2022 stores the operation schedule data made to (the step of schedule storage part 203 ST805).As a result, the content of schedule storage part 203 as shown in Figure 9 turns into as shown in FIG. 10 to assign automatic setting The mode of the information of mark adds " the 0 of the machine A on July 10th, 2016:00ON”、“17:This operation schedule of 00OFF " and obtain Content.
Furthermore herein, in step ST803, schedule data preparing department 2022 is to the fortune set by state configuration part 2021 Row state assigns automatic setting and indicates and store to schedule storage part 203, but is not limited to this, as long as it is shape that imparting, which can be distinguished, Running status set by state configuration part 2021, it is not by running status that user specifies but schedule control device 21 is automatic The information of the running status of setting.
The operation day number of passes that control data preparing department 204 is exported according to schedule data preparing department 2022 in step ST804 According to information make the control data (step ST806) to control machine 4n.Specifically, control data preparing department 204 Such as in units of control machine 4n controller 3n come make by each controller 3n machine 4n controlled information with to The control data for controlling the information of machine 4n operation schedule to be associated and set.
Schedule control device 21 is for example previously stored with controller 3n with being somebody's turn to do in the place that control data preparing department 204 can refer to The machine 4n that controller 3n is controlled is through corresponding table obtained by association.Control data preparing department 204 determines with reference to the corresponding table Control machine 4n controller 3n.
Herein, in corresponding table, if that control machine A controller 3n defines is controller B, control data preparing department 204 Controller B is made for machine A and is set to " 0:00ON”、“17:00OFF " control data.
Control data preparing department 204 exports the control data made to sending part 205.
Sending part 205 sends the control data made by control data preparing department 204 in step ST806 to control data The controller 3n (step ST807) met of middle setting.Herein, controller B is sent and machine A is set to " 0:00ON”、“17: 00OFF " control data.
In the controller 3n of control data is received, follow the machine 4n of control data control.I.e., herein, When arriving at 0:When 00, controller B machine A is entered to be about to operation be set to " ON " even if, the control of its operation, when arriving at 17:00 When, controller B machine A is entered to be about to operation be set to " OFF " even if, its stop control.
In this way, in schedule control device 21, facilities control device 1 is in " operation schedule setting indicator function " from user The desired operation schedule of machine 4n correlations in reception facilities, day is run according to being sent based on the operation schedule received Journey sets configured information, and running status when being changed come the date on the day of setting the 4n of machine, scheduled date, making is set with The operation schedule data of operation schedule on the day of scheduled date.
In schedule control device 21, the 0 of the scheduled date for setting the machine 4n specified by user automatically:00 point of operation shape During state, setting be with the last set running status identical running status in the previous day, therefore, it is desirable that with across the date Mode make machine 4n under same running status in the case of continuous service, even if user is without for example " state of a control The rewriting of initial value ", the 0 of the 2nd day:The other reply of setting of 00 point of running status etc., can also realize and continue across the date Operation schedule setting.That is, manually setting by individual other running status of user's progress can be omitted.In addition, user exists Do not have to pay close attention to again " initial value of state of a control " when run the setting of schedule.
In addition, in schedule control device 21, make and be based on being set with 0 automatically:The running status at 00 this time point The control data of schedule is run, the control data that this is made is sent to controller 3n, and controller 3n is according to the control data To carry out machine 4n control.
Due to control data setting be unit on the 1st operation schedule, therefore, the control data have followed BACnet regulation, So that will not be 0 as in the past:The content of 00 control data is the content invalid of running status and is rewritten as " state of a control Initial value ", but carry out control machine 4n to follow the content of control data.
Also, tube controller 3n does not support still not supporting annex a, all carrys out control machine 4n to follow the content of control schedule.
Figure 11 represents coming from according to received by facilities control device 1 in preferably 1 facilities management system Made in the schedule control device 21 (diagram is eliminated in Figure 11) that the operation schedule setting instruction of user is carried in server 2 The operation schedule data of the running status at the automatic change time point on date for being set with the same day and according to the operation schedule data come Making control data, controller 3n carry out the image of control machine 4n flow according to the control data.
Furthermore the above is explanation carried out to following flow:In schedule control device 21, from facilities control device 1 In the case of receiving operation schedule setting configured information, operation schedule data is made, and make based on operation day number of passes According to control data and send to controller 3n.
In addition to the action, also acted as follows in schedule control device 21:Control data preparing department 204 to set in advance Fixed cycle reference schedule storage part 203 and be controlled the making of data, and send this to the controller 3n met and make Control data.
In order to carry out machine 4n control, must be maintained in controller 3n based on the content with being stored in schedule storage part 203 Identical runs the control data of schedule, but the capacity of information that controller 3n can be kept is less than schedule storage part 203.Also To say, be only capable of keeping in controller 3n it is a certain periodically between control schedule.
Therefore, control data preparing department 204 is as described above with the cycle set in advance according to storing in schedule storage part 203 Schedule data is run to make control data and send to the controller 3n met, thus, all the time can in the controller 3n met Enough keep controller 3n control machines 4n nearest control data.
The action specification of facilities control device 1 is back to, to " operation schedule shows work(possessed by facilities control device 1 Can " illustrate.
" operation schedule display function " correlation in the facilities control device 1 of the embodiments 1 of Figure 12 to illustrate the invention is moved The flow chart of work.
The input acceptance division 11 of facilities control device 1 is standby (in step ST1201 before operation schedule display instruction is received For the situation of "No"), when receiving operation schedule display instruction (being the situation of "Yes" in step ST1201), it will be based on receiving To operation schedule display instruction operation schedule show configured information export to display control unit 13.
The users such as facilities management personnel input unit such as operating mouse, keyboard, carry out the display picture startup of operation schedule and refer to Show.Input acceptance division 11 and receive operation schedule display picture startup instruction, the operation schedule display picture that this is received is opened Dynamic configured information is exported to display control unit 13, and display control unit 13 starts configured information according to the operation schedule display picture to be made Operation schedule display picture is shown on display part 14.
Input and wish in shown input unit in the operation schedule display picture that user for example shows on display part 14 Display runs machine 4n and date in the facility of schedule etc., thus the operation day of a certain day of each machine 4n in progress facility The display instruction of journey.
Machine in input acceptance division 11 receiving step ST1201 in the facility for the hope display operation schedule that user is inputted Device 4n and show machine 4n operation schedule date information.
Then, input acceptance division 11 using the machine 4n information received and the information on date through information obtained by associating as transporting Row schedule shows configured information.
Herein, for example, when user's input makes the instruction that the operation schedule in machine A 10 days July in 2016 is shown, input Acceptance division 11 shows using this information of machine A with this information on July 10th, 2016 through information obtained by associating as operation schedule Show configured information and export to display control unit 13.
Furthermore herein, what user was carried out is that the display of the operation schedule of 1 day indicates that but this is one, and user can also carry out more The display instruction of the operation schedule of day.
Display control unit 13 obtains the operation schedule exported from input acceptance division 11 and shows configured information, joins via network The possessed schedule storage part 203 of schedule control device 21 is examined, makes and shows that the display of configured information is used based on the operation schedule Data (step ST1202).Specifically, display control unit 13 obtains operation schedule from schedule storage part 203 and shows configured information The information of the operation schedule correlation on machine 4n, setting the date of middle setting, makes to make the operation schedule with image Form is shown in the display data on display part 14.
Herein, if what is stored in schedule storage part 203 is the information of the content shown in Figure 10, display control unit 13 obtains " 0: 00ON”、“17:This data of 00OFF " are as machine A, on July 10th, 2016 operation schedule.Now, display control unit 13 The information of automatic setting mark is also obtained in the lump.
Then, display control unit 13, which makes, makes machine 4n, date and the operation schedule for imparting the information that automatic setting indicates The display data shown in the form of images through data obtained by association.
Display control unit 13 is according to display data, to allow people to understand in the side which slot setup has which kind of operation schedule Formula, operation schedule is set to show that the operation schedule of the machine 4n set in configured information scheduled date is shown in the form of images On display part 14 (step ST1203).
Herein, Figure 13 is to represent that display control unit 13 makes the operation that display part 14 is shown in the form of images in the embodiment 1 The figure of one of the display picture of schedule.
As shown in figure 13, association shows machine 4n information, the information on date and operation schedule on display part 14.
Operation schedule be by allow people understand different time under set be which kind of running status in a manner of shown.Opened up in Figure 13 Show be for machine A scheduled date i.e. 2016 on July 10, and with bar chart display time interval and the example of running status.
In addition, indicating that what is set is 1 running status for setting automatically, display control unit 13 makes to allow people's understanding to be set with this certainly The display of dynamic setting mark this case is shown in the lump with running status.In Figure 13, understand as people is allowed to 0:00~17: 00 running status " ON " is set with the display of automatic setting mark this case, is note " * ".
What it is for automatic setting mark setting is the 0 i.e. running status of initial value, and display control unit 13 as " * " without showing Show.In this way, by whether note has " * ", user will appreciate that whether be the running status set automatically.
Furthermore the operation schedule display picture shown in Figure 13 is one, display control unit 13 can also pass through other displays Method shows operation schedule, as long as it is with machine, the scheduled date the time specified by user corresponding to allow people to understand The mode of running status is subject to display.
In addition, allowing people to understand the display being set with this case that automatic setting indicates is not limited to " * ", for example, display control unit 13 can also be attached the display beyond " * ", can also make to show the bar chart of the running status met color show shallower or It is relatively deep, " ON " this word on bar chart can also flashed.As long as display control unit 13 is set with automatically with allowing people to understand The mode of this case that the running status that setting mark is set automatically by schedule control device 21 shows the running status Come.
In the facilities management system for supporting BACnet, as described above, can not generally inherit the last set of the previous day Running status, when changing on the date, running status will be cleared, and turn into the state for not being set with running status.In the situation Under, 0:Running status at 00 will not be stored to schedule storage part 203, but be sent out from server 2 to controller 3n When having sent control machine 4n control data, " control shape is set by BACnet schedule setting function in controller 3n The initial value of state ".
Thus, in common conventional facilities control device 1, in the case where user shows operation schedule, not by The running status of storage is (with reference to the figure 14) that can not be shown.
In contrast, preferably in 1 facilities management system, in the schedule control device 21 that server 2 is carried, As described above, 0 can be set automatically:Running status when 00 this time point was date change.Thus, as shown in figure 13, can show Show running status during date change, so that not showing running status and causing user can not grasp running status this feelings Condition has not existed.
People's understanding is allowed to be automatic setting this case in addition, being assigned to the running status set automatically in schedule control device 21 Information is simultaneously stored in schedule storage part 203, and the note in " operation schedule display function " of facilities control device 1 allows people Solution has the display of this case that the running status that this sets automatically, and therefore, user, which can easily grasp note, the display Running status is the state this case obtained by the final running status of setting the previous day that continues.
Furthermore in the facilities management system of the embodiment 1 more than, as one, setting is facilities control device 1st, the communication protocol between server 2, controller 3n and machine 4n uses BACnet, but is not limited to this, above-mentioned facility The use that is configured to apply to for the schedule control device 21 that managing device 1, server 2 are carried is not inherited when changing on the date All systems of the communication protocol of the state of a control of machine.
As described above, according to the embodiment 1, with the control for not inheriting machine when being changed on the date such as BACnet The communication protocol of state processed can be directed to control the machine 4n's in facility as in the facilities management system of communication protocol Control schedule sets the control schedule across the date without the individual other reply operation carried out by users such as facilities management personnel.
In addition, in facilities control device 1, the control set automatically can be also shown in the set control schedule of display State, so that due to being control schedule across the date so being cleared etc. and causing not that control status, user can not The state of a control this case for grasping the period for not being set with the state of a control has not existed.
In addition, it to allow people to understand is control that this sets automatically that the state of a control set automatically in facilities control device 1, which is, What the state of this case that state was shown, therefore, user can easily grasp be continue setting with the previous day most This case that state of a control obtained by the state of a control identical state of a control set afterwards.
In addition, originally for a user, understand that BACnet or annex a content this case is inherently larger and bear Load, and according to the embodiment 1, such as in user setting is wished in the case of the control schedule on date, even without working as It date change when the state of a control from the previous day will be cleared and be set to " initial value of state of a control " if or Be support annex a then can the 2nd day 0:00 is rewritten as knowing for BACnet as nearest state of a control etc. or annex a automatically Know, do not recognize BACnet or annex a, also can easily be controlled the making of schedule or by controlling the aobvious of schedule Show to carry out content check.
In addition, for example, carried out in the controller 3n for being desirable with support annex a and the controller 3n for not supporting annex a In the case of same control, without respective setting is carried out respectively again, also the software for controlling schedule setting need not be carried out again Dual exploitation etc., so as to cut down development cost.
Furthermore as described above, in BACnet, for example, for the control schedule of two days across the date, the 2nd day 0: 00, because the date has changed, therefore, the state of a control from the previous day can be cleared, the setting of state of a control disappears, and changed " initial value of state of a control " is written as, but if supporting annex a, then nearest control can be set to " initial value of state of a control " State processed, therefore, it is possible to inherit the last set state of a control of the 1st day automatically, as a result, the control day across the date can be made Journey.
Thus, at first sight, in the case that all machine 4n, controller 3n in facilities management system etc. support annex a, i.e., Prior art is will pass through, sensation can also be set carries out machine 4n control across the control schedule on date.
For example, it is desirable that in the case of the operation schedule on date, user utilizes facility for setting between the 1st day, this two days on the 2nd Managing device 1 sets the 2nd day on the 1st and is all set to " 9:00ON”、“17:This operation schedule of 00OFF ".
In this case, in server 2, i.e. in schedule control device 21, the 2nd day 0:00 point, running status is set It is fixed to disappear, and be rewritten as " initial value of state of a control ", but " initial value of state of a control " by being rewritten is recently i.e. Last set " OFF " of the 1st day, therefore, even if user is without the rewriting of " initial value of state of a control " or in the 2nd The 0 of day:00 be set to reset of " OFF " this operation schedule etc. individually tackle, as a result can also set the 1st day 17:00 arrives The 9 of 2nd day:00 be set to " OFF " this across the date operation schedule.
However, in annex a, in the case where not being set with operation schedule, can be held all the time with " nearest setting value " It is continuous to update " initial value of state of a control " and set operation schedule, it thus can produce problems with.
For example, in the above example, when 9 more than the 2nd day:When 00, thereafter 17:It is according to set operation before 00 State and the control for carrying out " ON ", 0 for the 2nd day:00~9:Running status between 00 is cleared and the period without setting, It is to be rewritten as under the time point nearest " ON " this running status as " initial value of state of a control " (with reference to figure 15).
I.e., it is assumed that be the 12 of the 2nd day now:00, then the 0 of the 2nd day:00~9:00 running status can be rewritten as " ON ".
Now, it is set in the change that the moment is carried out on facilities management system and has pulled back to the 6 of the 2nd day:00.
In this case, due to the 2nd day 0:00~9:00 running status has been rewritten into " ON ", therefore, the 6 of the 2nd day:00 Running status be set to " ON ", at the time of on facilities management system and control schedule is rolled back.
However, according to reproduce traced according to original operation schedule at the time of under state viewpoint for, the 6 of the 2nd day: 00 running status should be set to the last running status " OFF " of the 1st day.
In this way, in annex a, such as in the case of having carried out on facilities management system the change at moment, exist and be possible to send out Life can not realize the problem of reproduction this case consistent with original control schedule.
In contrast, preferably in 1 schedule control device 21, due to being the date change on the automatic setting same day When state of a control, therefore, the state of non-control status has not existed, will not be because of the state for being non-control status So " initial value of state of a control " is rewritten as, even if in the case of back changing the time in facilities management system, also can be again The now state consistent with set schedule.I.e., moreover it is possible to solve problem possessed by annex a as described above.
Embodiment 2.
It is that the state of a control under the change time point on date with the same day is clear in schedule control device 21 in embodiment 1 It is empty and as premised on this case that the state without setting, the last set state of a control of the previous day can be set automatically and set The fixed control schedule across the date.
But user also was intended in next day 0 sometimes:00 with the different control shape of last set state of a control with the previous day State carrys out control machine 4n.
Preferably in 2, illustrated to mode is implemented as follows:It is being set by the user 0:The feelings of 00 point of state of a control Under condition, the last set state of a control of the previous day is not set automatically.
On the composition of the facilities management system of embodiments of the present invention 2, due to use Fig. 4 in embodiment 1 and The composition illustrated is identical, therefore the repetitive description thereof will be omitted.
In addition, the composition of the facilities control device 1 on embodiments of the present invention 2, due to using Fig. 5 in embodiment 1 And the composition illustrated is identical, therefore the repetitive description thereof will be omitted.
In addition, the action of the facilities control device 1 on the embodiment 2, due to using Fig. 7, Tu12Er in embodiment 1 The action illustrated is identical, therefore the repetitive description thereof will be omitted.
Figure 16 is the schedule control device 21a of embodiments of the present invention 2 pie graph.
Preferably in 2, as one, also with according to from the facilities control device 1 as central monitoring device Operation schedule setting configured information and in schedule control device 21a set it is managed in facilities management system to control The machine 4n start and stop of operation be that the situation of operation schedule of running status illustrates, but this is not limited to, in facility pipe Manage device 1 in, such as can carry out controlling in the facilities management systems such as design temperature or the valve opening of air-conditioning machine by The setting instruction of the control schedule of all state of a controls of all machines of management, in schedule control device 21a, can make To control the control schedule data of all state of a controls.
In Figure 16, pair symbol identical with the identical of the schedule control device 21 composition mark that Fig. 6 is used in embodiment 1 and was illustrated Number and the repetitive description thereof will be omitted.
The schedule control device 21a of the embodiment 2 only difference is that day with the schedule control device 21 of embodiment 1 Journey data creating control unit 202a is also equipped with determination unit 2023.
The operation schedule that the determination unit 2023 that schedule data makes control unit 202a is directed to from the output of configured information acceptance division 201 is set Determine configured information and determine whether to be set with 0:00 point of running status.
Whether determination unit 2023 will be set with 0:The information of the result of determination of 00 point of running status is exported to state configuration part 2021。
Action is illustrated.
The flow chart of the schedule control device 21a of the embodiments 2 of Figure 17 to illustrate the invention action.
Configured information acceptance division 201 from the configured information sending part 12 of facilities control device 1 receive operation schedule setting refer to (being the situation of "No" in step ST1701) standby before showing the information, (step when receiving operation schedule setting configured information It is the situation of "Yes" in ST1701), the operation schedule setting configured information received is exported to schedule data and makes control unit 202a determination unit 2023.Step ST1701 specific action and the Fig. 8 illustrated in embodiment 1 step ST801 phases Together, difference is only in that, in Fig. 8 step ST801, the output destination of operation schedule setting configured information is schedule The state configuration part 2021 of data creating control unit 202, in contrast, in step ST1701, operation schedule setting instruction The output destination of information is determination unit 2023, therefore, omits detailed description.
Herein, for example, when user is set in 0 for machine A:Operation is set to " ON ", 17 by 00:00 is set to operation During operation schedule of " OFF " this running status as on July 10th, 2016, configured information acceptance division 201 is received machine A's Information, the information on July 10th, 2016 and 0:Operation is set to " ON ", 17 by 00:00 is set to operation the information of " OFF " Information obtained by being associated is exported to determination unit 2023 as operation schedule setting configured information.
Furthermore it is preferably same in 2, if for example, 17:Operation is set to " OFF " by 00, then thereafter, in weight Before new settings operation schedule, the state of " OFF " will be continued by being run within same day.
In addition, herein, what user was carried out is the instruction for the operation schedule for setting 1, but this is one, and user can also enter Row to set more days operation schedule instruction.
Schedule data makes control unit 202a determination unit 2023 according to the operation day exported from configured information acceptance division 201 Journey sets configured information, running status i.e. 0 when the date on the day of determining whether to be set with machine 4n, scheduled date changes: 00 point of running status (step ST1702).
In step ST1702, judging not to be set with 0:(it is "No" in step ST1702 in the case of 00 point of running status Situation), the state configuration part 2021 that schedule data makes control unit 202a obtains operation schedule from configured information acceptance division 201 Configured information is set, is run with reference to schedule storage part 203 to set with the last set running status identical in the previous day Operation shape when state is as date change on the day of machine 4n the, scheduled date specified in operation schedule setting configured information State is the 0 of the date met:00 point of running status (step ST1703).That is, state configuration part 2021 sets and at 2016 7 The last set running status identical running status of months 9 days as the machine A on July 10th, 2016 0:00 point of operation State.For example, the operation schedule in the machine A on July 9th, 2016 is " 0:00OFF”、“9:00ON”、“17:00OFF " feelings Under condition, last set running status is " OFF ", and therefore, state configuration part 2021 sets " OFF " and is used as on July 10th, 2016 Machine A 0:00 point of running status.
State configuration part 2021 is by the 0 of the date setting, meeting:The information of 00 point of running status is exported to schedule data Make control unit 202a schedule data preparing department 2022.Step ST1703 action and the Fig. 8 illustrated in embodiment 1 Step ST802 it is identical, therefore omit detailed description.
In step ST1702, judging to be set with 0:(it is in step ST1702 in the case of 00 point of running status The situation of "Yes"), skip step ST1703 and enter to step ST1704.
Herein, due to being set with 0:Operation is set to operation day of " ON " this operation schedule as on July 10th, 2016 by 00 Journey, therefore skip step ST1703.That is, the running status during date change in 2016 on July 10, will not be rewritten as preceding The last set running status of one day.
The schedule data preparing department 2022 that schedule data makes control unit 202a connects according to configured information in step ST1701 In operation schedule setting configured information and step ST1703 that receipts portion 201 is exported set by state configuration part 2021, meet Date 0:The information of 00 point of running status runs schedule data (step ST1704) to make.In embodiment 2, In step ST1704, if exporting 0 from state configuration part 2021:The information of 00 point of running status, then schedule data preparing department The running status is set as 0 by 2022:00 point of running status, if not from the output of state configuration part 2,021 0:00 point of operation shape The information of state, then the operation schedule setting that information acceptance division 201 is exported as indicated of schedule data preparing department 2022 instruction are believed Cease to set 0:00 point of running status, so as to make the operation schedule data for being set with operation schedule.Other actions and implementation The Fig. 8 illustrated in mode 1 step ST803 action is identical, therefore omits detailed description.
Herein, due to skip it is being carried out by state configuration part 2021,0:00 point of running status setting processing (step ST1703), therefore, the operation schedule setting that information acceptance division 201 is exported as indicated of schedule data preparing department 2022 indicates Information makes operation schedule data.That is, make to 0:" ON " this operation set by 00 point of operation schedule setting user Schedule data is run obtained by state.
In addition, 0 is set to running status in step ST1703 in state configuration part 2021:The situation of 00 point of running status Under, in step ST1704, schedule data preparing department 2022 information of the running status is assigned automatic setting mark=1 this One information.Furthermore the initial value of automatic setting mark is set to 0.
As described above, herein, to 0:00 point running status setting user set by, i.e. follow operation schedule setting instruction believe " ON " this running status of breath, therefore, schedule data preparing department 2022 make automatic setting mark keep initial value constant.
Schedule data preparing department 2022 exports the information for the operation schedule data made to control data preparing department 204 (step ST1705).The step ST804 for specifically acting Fig. 8 with illustrating in embodiment 1 is identical.
In addition, schedule data preparing department 2022 stores the operation schedule data made to (the step of schedule storage part 203 ST1706).As a result, as shown in figure 18, " the 0 of on July 10th, 2016 is stored for machine A in schedule storage part 203: 00ON”、“17:This operation schedule of 00OFF ".In 0:00 to be set to " ON " this running status be the running status that user specifies, The running status not set automatically in schedule control device 21a, therefore, the automatic mark that sets are set as initial value i.e. 0.
Step ST1707, the step ST1708 specific action step ST806 with Fig. 8 for illustrating in embodiment 1, step respectively Rapid ST807 is identical, therefore the repetitive description thereof will be omitted.
In this way, desired operation schedule phase related machine 4ns of the schedule control device 21a out of user reception facilities The operation schedule setting configured information of pass, operation schedule data is made simultaneously according to the operation schedule setting configured information received Store to schedule storage part 203.Now, in schedule control device 21a, if not being set with operation schedule setting configured information Machine 4n, the scheduled date 0 specified:00 point of running status, then automatic setting 0:00 point of running status, if being set with The 0 of scheduled date:00 point of running status, then the running status set this is as 0:00 point of running status.
As long as it is set with 0:00 point of running status, just the running status will not be rewritten using the running status set automatically, Therefore, it is possible to prevent user be set with it is desired operation schedule when, in the case of unwitting by a manner of across the date Automatic continuous operation schedule covering this case.
Furthermore in the case where the content of schedule storage part 203 is content as shown in Figure 18, in facilities control device In 1, when input acceptance division 11 receives the display instruction of machine A, on July 10th, 2016 operation schedule from user, lead to Cross display control unit 13 and picture for example shown in Figure 19 is shown on display part 14.Due to by 0:00 to 17:00 running status It is the operation schedule being set by the user to be set to " ON " this operation schedule, therefore what automatic setting mark was set is 0 i.e. initial Value, is not attached " * " etc..
Show the action of the display picture and " run schedule display function " in embodiment 1 as facilities control device 1 Action be illustrated it is consistent, therefore omit detailed description.
As embodiment 1, the day that facilities control device 1, the server 2 of the embodiment 2 of the above are carried is program control The device 21a processed communication protocol for being configured to apply to use the state of a control for not inheriting machine when changing on the date owns System.
As described above, according to the embodiment 2, with the control for not inheriting machine when being changed on the date such as BACnet The communication protocol of state processed is as in the facilities management system of communication protocol, for controlling the control of the machine 4n in facility Schedule setting processed is when the control schedule on date, can be with the case of the state of a control when being set by the user date change The state of a control set is preferential, therefore, for a user, can be prevented in the case of unwitting by with across the date Mode it is automatic continuous running status covering this case, so as to reflect the desired control schedule of user.
Furthermore the facilities control device 1 illustrated in embodiment 1, embodiment 2 can apply to as administration office The facilities control device of the central monitoring device of all facilities such as space, workshop, factory.In addition, in embodiment 1, embodiment 2 Schedule control device 21, the 21a illustrated can apply to make to manage the control of all facilities such as building, workshop, factory The schedule control device of information processed.
In addition, the present application can carry out the independent assortment of each embodiment or each implementation within the scope of the invention The deformation for being formed arbitrarily key element of mode, or can be omitted in each embodiment and be formed arbitrarily key element.
Symbol description
1 facilities control device
2nd, 102 server
11 input acceptance divisions
12 configured information sending parts
13 display control units
14 display parts
21st, 21a schedules control device
31st, 32,33,3n, 103 controllers
41st, 42,43,4n, 104 machines
101 central monitoring devices
201 configured information acceptance divisions
202nd, 202a schedule datas make control unit
203 schedule storage parts
204 control data preparing department
205 sending parts
2021 state configuration parts
2022 schedule data preparing department
2023 determination units.

Claims (10)

1. a kind of schedule control device, it sets control schedule, the control schedule to in facilities management system by The machine of management is controlled, and the facilities management system is used in the state of a control that the machine can not be inherited during date change Communication protocol, the schedule control device is characterised by possessing:
Configured information acceptance division, it receives the control schedule setting configured information for the control schedule setting for making the machine;And
State configuration part, its control schedule setting configured information received according to the configured information acceptance division, to this Control schedule setting configured information in specify date date change when the machine state of a control setting with The last set state of a control identical state of a control of the previous day.
2. schedule control device according to claim 1, it is characterised in that
Possess schedule data preparing department, in the control schedule set in the control schedule setting configured information, the schedule The state of a control during date change set by the state configuration part is reflected in data creating portion, so as on the day of making the scheduled date Control schedule data.
3. schedule control device according to claim 1, it is characterised in that
Determination unit is also equipped with, the determination unit determines whether to be set with the day for the control schedule setting configured information State of a control when phase changes, also,
In the case of state of a control when the determination unit judges to be set with the date change, the state configuration part is not entered The setting of state of a control during the change of the row date.
4. the schedule control device according to Claims 2 or 3, it is characterised in that be also equipped with:
Control data preparing department, its described control schedule data according to made by the schedule data preparing department, to make use To control the control data of the machine;And
Sending part, it sends the control data made by the control data preparing department to the controller for controlling the machine.
5. a kind of facilities management system, it is used in the communication protocol for the state of a control that machine can not be inherited during date change, should Facilities management system is characterised by possessing:
Schedule control device according to any one of claim 1 to 4:
Acceptance division is inputted, it receives the control schedule display instruction for showing the control schedule of the machine;And
Facilities control device, it has display control unit, and the display control unit is according to the control schedule display instruction correlation Information, the control schedule data based on the state of a control set by the schedule control device is shown in the form of images Come.
6. facilities management system according to claim 5, it is characterised in that
When changing on the date for the date specified during the state configuration part is to the control schedule setting configured information The state of a control of the machine is set with the feelings of the last set state of a control identical state of a control with the previous day Under condition, the display control unit with allow people understand by the state configuration part be set with the date change when state of a control this The mode of situation shows the control schedule data.
7. facilities management system according to claim 5, it is characterised in that
When changing on the date for the date specified during the state configuration part is to the control schedule setting configured information The state of a control of the machine is set with the feelings of the last set state of a control identical state of a control with the previous day Under condition, the display control unit makes the control in a manner of the state of a control note mark to being set by the state configuration part Schedule data is shown.
8. facilities management system according to claim 5, it is characterised in that
When changing on the date for the date specified during the state configuration part is to the control schedule setting configured information The state of a control of the machine is set with the feelings of the last set state of a control identical state of a control with the previous day Under condition, the display control unit is in a manner of changing the display color weight by the state of a control of state configuration part setting Show the control schedule data.
9. facilities management system according to claim 5, it is characterised in that
When changing on the date for the date specified during the state configuration part is to the control schedule setting configured information The state of a control of the machine is set with the feelings of the last set state of a control identical state of a control with the previous day Under condition, the display control unit makes the control in a manner of making the state of a control flickering display by state configuration part setting Schedule data is shown.
10. a kind of schedule control method, it is the schedule control method of schedule control device, the schedule control device setting control Schedule processed, the control schedule to managed machine in facilities management system to be controlled, the facilities management System is used in the communication protocol for the state of a control that the machine can not be inherited during date change, the feature of the schedule control method It is possess following steps:
Configured information acceptance division receives the step of control schedule setting configured information for the control schedule setting for making the machine;With And
The control schedule setting configured information that state configuration part receives according to the configured information acceptance division, to the control The date specified in schedule setting configured information date change when the machine state of a control setting with previous The step of it last set state of a control identical state of a control.
CN201710670145.6A 2016-08-15 2017-08-08 Schedule control device, facility management system, and schedule control method Active CN107770237B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016-159150 2016-08-15
JP2016159150A JP6846889B2 (en) 2016-08-15 2016-08-15 Facility management system and schedule display method

Publications (2)

Publication Number Publication Date
CN107770237A true CN107770237A (en) 2018-03-06
CN107770237B CN107770237B (en) 2021-02-02

Family

ID=61249096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710670145.6A Active CN107770237B (en) 2016-08-15 2017-08-08 Schedule control device, facility management system, and schedule control method

Country Status (3)

Country Link
JP (1) JP6846889B2 (en)
KR (1) KR101967988B1 (en)
CN (1) CN107770237B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3734952B1 (en) 2018-02-15 2022-01-12 Aiphone Co., Ltd. Climate information providing system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001014026A (en) * 1999-06-30 2001-01-19 Matsushita Electric Works Ltd Operation managing device, operation management system, and recording medium on which program of operation managing device is recorded
CN101291268A (en) * 2007-04-20 2008-10-22 索尼株式会社 Data communication system, portable electronic apparatus, server apparatus, data communication method and data communication program
CN101547122A (en) * 2009-04-27 2009-09-30 深圳华为通信技术有限公司 Method, device and system for recovering terminal configuration
WO2012161041A1 (en) * 2011-05-24 2012-11-29 パナソニック株式会社 Apparatus administration system, display device, and program
JP2013058992A (en) * 2011-09-09 2013-03-28 Toshiba Corp Monitoring controller and control method
CN103034267A (en) * 2011-09-30 2013-04-10 株式会社东芝 Apparatus and a method for controlling facility devices
CN103959320A (en) * 2011-12-02 2014-07-30 洋马株式会社 Management server for remote monitoring system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10220843A (en) * 1997-02-03 1998-08-21 Toshiba Corp Air conditioning controller
JP2009296555A (en) 2008-06-09 2009-12-17 Daikin Ind Ltd Facility equipment management apparatus, facility equipment management system and facility equipment management method
JP5454516B2 (en) * 2011-06-13 2014-03-26 コニカミノルタ株式会社 Information processing apparatus, setting change method, and program

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001014026A (en) * 1999-06-30 2001-01-19 Matsushita Electric Works Ltd Operation managing device, operation management system, and recording medium on which program of operation managing device is recorded
CN101291268A (en) * 2007-04-20 2008-10-22 索尼株式会社 Data communication system, portable electronic apparatus, server apparatus, data communication method and data communication program
CN101547122A (en) * 2009-04-27 2009-09-30 深圳华为通信技术有限公司 Method, device and system for recovering terminal configuration
WO2012161041A1 (en) * 2011-05-24 2012-11-29 パナソニック株式会社 Apparatus administration system, display device, and program
JP2013058992A (en) * 2011-09-09 2013-03-28 Toshiba Corp Monitoring controller and control method
CN103034267A (en) * 2011-09-30 2013-04-10 株式会社东芝 Apparatus and a method for controlling facility devices
CN103959320A (en) * 2011-12-02 2014-07-30 洋马株式会社 Management server for remote monitoring system

Also Published As

Publication number Publication date
JP2018028719A (en) 2018-02-22
CN107770237B (en) 2021-02-02
JP6846889B2 (en) 2021-03-24
KR101967988B1 (en) 2019-04-10
KR20180019055A (en) 2018-02-23

Similar Documents

Publication Publication Date Title
US7620459B2 (en) Controlling and operating technical processes
US20190363932A1 (en) Data collecting apparatus, data collecting method, and program
JP2014241144A (en) Event synchronized reporting in process control systems
WO2012056675A1 (en) Testing reservation management system
JP5475546B2 (en) Energy saving diagnostic system
US10636002B2 (en) Methods and apparatus for interactive workflow for patient scheduling
CN106650283A (en) Event-driven emergency treatment process management system and method
JP2012099063A (en) Monitoring controller
CA2913358C (en) Computerized data processing systems and methods for generating graphical user interfaces
JP2008165704A (en) Medical examination reservation device, reservation screen display method and schedule management device
US10650355B2 (en) Integrated system for producing procedural data change sets communicated to client devices
CN107770237A (en) Schedule control device, facilities management system and schedule control method
US20150347981A1 (en) Calendar application features
JP5829013B2 (en) Electric blind control device
CN107797529A (en) Facilities management system, facilities control device, controller and facilities control method
JP5896934B2 (en) Supervisory control system
JP5694098B2 (en) Device control apparatus and control method
WO2020202993A1 (en) Maintenance method, maintenance server, and program
KR102116174B1 (en) System for Integrating PLC and HMI Based on Multi Core Processor
JP6102634B2 (en) Home care cooperation system and data management server
JP7018677B1 (en) Work status management system
JP7004923B2 (en) Equipment management system
US20230385724A1 (en) Autofill partial shift
JP4109172B2 (en) Schedule reservation system
JPH09251501A (en) Display system for hospital occupancy by patients

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant