CN107762025A - A kind of preparation method of gas-state building roof - Google Patents

A kind of preparation method of gas-state building roof Download PDF

Info

Publication number
CN107762025A
CN107762025A CN201711090894.8A CN201711090894A CN107762025A CN 107762025 A CN107762025 A CN 107762025A CN 201711090894 A CN201711090894 A CN 201711090894A CN 107762025 A CN107762025 A CN 107762025A
Authority
CN
China
Prior art keywords
air
wall
roof
air compressor
shower nozzle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711090894.8A
Other languages
Chinese (zh)
Inventor
霍治澎
杨虎城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanan University
Original Assignee
Yanan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanan University filed Critical Yanan University
Priority to CN201711090894.8A priority Critical patent/CN107762025A/en
Publication of CN107762025A publication Critical patent/CN107762025A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a kind of preparation method of gas-state building roof:The four sides wall in house is built or assembles in the position in required construction house;Several exhaust shower nozzles are installed at the top of the face wall in the four sides wall;All exhaust shower nozzles, which are mutually close to, to be fixed on wall;Air compressor is placed on to the bottom of wall, air compressor is consistent with exhaust shower nozzle quantity;The exhaust outlet of air compressor is mutually fixedly connected by blast pipe with the exhaust shower nozzle of installation at the top of wall;A diameter of 12 15cm of the blast pipe;All air compressors are connected by wire with controller;Controller switches are opened, the air compressive strength of air compressor and jet length are adjusted according to the roof area of four sides wall composition;Gaseous state roof that this method is produced it is easy for installation it is quick, can move at any time, after utilization after architecture indoor daylighting it is good, solve the problems, such as to build roof time-consuming, laborious.

Description

A kind of preparation method of gas-state building roof
Technical field
The invention belongs to architectural engineering research field, and in particular to a kind of preparation method of gas-state building roof.
Background technology
The building roof of ordinary meaning is manufactured using solid-state material, but is come for the place of some template activities Say, " scaffolding builds account " to make a great fuss is very troublesome, and the long span building for especially needing to build roof is even more to bother, and is not only taken When, it is laborious;And provisional place is dismantled also very bothersome after use, gives people to bring very big burden.
The content of the invention
It is an object of the invention to provide a kind of preparation method of gas-state building roof, the gaseous state roof that this method is produced is pacified Dress fast and easy, can move at any time, after utilization after architecture indoor daylighting it is good, solve and build the problems such as roof is time-consuming, laborious.
The invention provides a kind of preparation method of gas-state building roof, step are as follows:
Step 1:The four sides wall in house is built or assembles in the position in required construction house, without closing roof;Institute The length for stating wall is:3-6m;
Step 2:Several exhaust shower nozzles are installed at the top of the face wall in the four sides wall;All exhaust sprays Head, which is mutually close to, to be fixed on wall;The purpose being close between exhaust shower nozzle is to be vented in order to each between the air curtain of shower nozzle discharge Hole will not be retained;The diameter dimension of the exhaust shower nozzle is 12-15cm;
Step 3:Air compressor is placed on to the bottom of wall, air compressor is consistent with exhaust shower nozzle quantity;
Step 4:Mutually fixation connects the exhaust shower nozzle that the exhaust outlet of air compressor is installed by blast pipe with wall top Connect;A diameter of 12-15cm of the blast pipe;
Step 5:All air compressors are connected by connecting wire with controller;Controller is used to control power supply And the air compressive strength of air compressor and the spray penetration of air.
Step 6:Controller switches are opened, the sky of air compressor is adjusted according to the roof area of four sides wall composition Gas compressive strength and jet length;
Step 7:Air compressor will be compressed by air inlet in the air inhalation machine body outside wall, work as air When being compressed to 5-300 atmospheric pressure, then the top of building is discharged to by being vented shower nozzle, passes through the gas of top of building at a high speed Curtain is gaseous state roof.
Preferably, the air compressor is BW125 compressors, and operating pressure is between 0.5-300bar.
Preferably, the blast pipe is fixed on the surface of wall by fixing band and nut.
Preferably, the exhaust shower nozzle is fixed on the top of wall by fixing band and nut.
Preferably, when the air compressor compresses air to five atmospheric pressure, it is 0.5 gram that can prevent weight Density is 2g/cm3Globular solids gaseous state roof is passed through with the speed of 1 meter per second;Compress air to 100 atmospheric pressure, energy It is 2g/cm enough to prevent the density that weight is 2.5 grams3Globular solids gaseous state roof is passed through with the speed of 1 meter per second.
In the present invention, a kind of preparation method of gas-state building roof, gaseous state roof that this method is produced is easy for installation fast Speed, it can move at any time, the architecture indoor daylighting after utilization is good, solves that to build roof time-consuming, laborious, and purchase construction material is spent The problem of many funds.
Brief description of the drawings
Below by the drawings and specific embodiments, the present invention is described further.
Fig. 1 is a kind of structural representation of the preparation method of gas-state building roof of the present invention;
Fig. 2 is the exhaust shower nozzle scheme of installation in a kind of preparation method of gas-state building roof of the present invention;
Fig. 3 is the blast pipe scheme of installation in a kind of preparation method of gas-state building roof of the present invention.
Description of reference numerals:1- controllers, 2- connecting wires, 3- air inlets, 4- air compressors, 5- exhaust outlets, 6- rows Tracheae, 7- fixing bands, 7-1- nuts, 8- walls, 9- exhaust shower nozzles, 10- air curtains.
Embodiment
Below in conjunction with the accompanying drawings, the specific embodiment of the present invention is described in detail, it is to be understood that of the invention Protection domain do not limited by embodiment.
As shown in Figure 1 to Figure 3, a kind of preparation method of gas-state building roof of the invention, step are as follows:
Step 1:The four sides wall 8 in house is built or assembles in the position in required construction house, without closing roof; The length of the wall is:3-6m;
Step 2:The top of a face wall 8 in the four sides wall is provided with several exhaust shower nozzles 9;All exhausts For shower nozzle 9 mutually by being fixed on wall 8, it is the gas discharged for each exhaust shower nozzle 9 to be vented the purpose being close between shower nozzle 9 Hole will not be retained between curtain;9 diameter dimension of the exhaust shower nozzle is 12-15cm;
Step 3:Air compressor 4 is placed on to the bottom of wall 8, air compressor 4 and the exhaust quantity one of shower nozzle 9 Cause;
Step 4:The exhaust outlet 5 of air compressor 4 is passed through into blast pipe 6 and the phase of exhaust shower nozzle 9 of the top of wall 8 installation It is fixedly connected;A diameter of 12-15cm of the blast pipe 6;
Step 5:All air compressors 4 are connected by connecting wire with controller 1;Controller 1 is used to control Power supply and the air compressive strength of air compressor 4 and the spray penetration of air.
Step 6:Open controller 1 to switch, air compressor 4 is adjusted according to the roof area of four sides wall composition Air compressive strength and jet length;
Step 7:Air compressor 4 will be compressed by air inlet 3 in the air inhalation machine body outside wall, work as sky When air pressure is reduced to 5-300 atmospheric pressure, then it is discharged to by being vented shower nozzle 9 top of building;Due to the air in the overhead of wall 8 Pressure is relatively small, and the air pressure discharged with exhaust shower nozzle 9 forms very high draught head, therefore is vented the air that shower nozzle 9 is discharged The overhead of building can be sprayed at a high speed, and is at a high speed gaseous state roof by the air curtain 10 of top of building.
The air compressor 4 is BW125 compressors, and operating pressure is between 0.5-300bar.
The blast pipe 6 is fixed on the surface of wall 8 by fixing band 7 and nut 7-1.
The exhaust shower nozzle 9 is fixed on the top of wall 8 by fixing band 7 and nut 7-1.
When the air compressor 4 compresses air to five atmospheric pressure, the density that weight can be prevented to be 0.5 gram is 2g/cm3Globular solids gaseous state roof is passed through with the speed of 1 meter per second;100 atmospheric pressure are compressed air to, can be prevented The density that weight is 2.5 grams is 2g/cm3Globular solids gaseous state roof is passed through with the speed of 1 meter per second.
Case:A kind of preparation method of gas-state building roof, step are as follows:
Step 1:The length of side for building wall 8 at one is 4 meters, a height of 4 meters of square unroofed room;
Step 2:A diameter of 15 centimetres of exhaust shower nozzle 9 is mutually close to and is fixed on one side wall 8;
Step 3:Model BW125 air compressor 4 is placed on the bottom of wall 8;
Step 4:Exhaust shower nozzle 9 is connected by a diameter of 15 centimetres of blast pipe 6 with the exhaust outlet 5 of air compressor 4 Connect;
Step 5:All air compressors 4 are connected by connecting wire with controller 1;
Step 6:Open controller 1 to switch, air compressor is adjusted according to the roof area of the composition of four sides wall 8 Air compressive strength and jet length;
Step 7:Air compressor 4 compresses air to five atmospheric pressure, and jet length is set as four meters, passed through at a high speed The air curtain 10 of top of building is gaseous state roof, and its density that weight can be prevented to be 0.5 gram is 2g/cm3Globular solids Gaseous state roof is passed through with the speed of 1 meter per second.
Gaseous state roof that the present invention produces it is easy for installation it is quick, can move at any time, the architecture indoor daylighting after utilization is good, Solve and build the problem of roof is time-consuming, laborious, and purchase construction material spends many funds.
Disclosed above is only the specific embodiment of the present invention, and still, the embodiment of the present invention is not limited to this, Ren Heben What the technical staff in field can think change should all fall into protection scope of the present invention.

Claims (5)

  1. A kind of 1. preparation method of gas-state building roof, it is characterised in that the specific steps of the preparation method of gas-state building roof It is:
    Step 1:The four sides wall (8) in house is built or assembles in the position in required construction house, without closing roof;Institute The length for stating wall is:3-6m;
    Step 2:Several exhaust shower nozzles (9) are installed at the top of the face wall (8) in the four sides wall;All exhausts Shower nozzle (9), which is mutually close to, to be fixed on wall (8);The diameter dimension of (9) of the exhaust shower nozzle is 12-15cm;
    Step 3:Air compressor (4) is placed on to the bottom of wall (8), air compressor (4) and exhaust shower nozzle (9) quantity Unanimously;
    Step 4:Exhaust shower nozzle by the exhaust outlet (5) of air compressor (4) by installation at the top of blast pipe (6) and wall (8) (9) it is fixedly connected;A diameter of 12-15cm of the blast pipe (6);
    Step 5:All air compressors (4) are connected by connecting wire (2) with controller (1);Controller (1) is used for Control power supply and the air compressive strength of air compressor (4) and the spray penetration of air.
    Step 6:Controller (1) switch is opened, air compressor (4) is adjusted according to the roof area of four sides wall composition Air compressive strength and jet length;
    Step 7:Air compressor (4) will be compressed by air inlet (3) in the air inhalation machine body outside wall, work as sky When air pressure is reduced to 5-300 atmospheric pressure, then the top of building is discharged to by being vented shower nozzle (9), passes through building top at a high speed The air curtain (10) in portion is gaseous state roof.
  2. A kind of 2. preparation method of gas-state building roof according to claim 1, it is characterised in that the air compressor (4) it is BW125 compressors, operating pressure is between 0.5-300bar.
  3. A kind of 3. preparation method of gas-state building roof according to claim 1, it is characterised in that the blast pipe (6) The surface of wall (8) is fixed on by fixing band (7) and nut (7-1).
  4. A kind of 4. preparation method of gas-state building roof according to claim 1, it is characterised in that the exhaust shower nozzle (9) top of wall (8) is fixed on by fixing band (7) and nut (7-1).
  5. A kind of 5. preparation method of gas-state building roof according to claim 1, it is characterised in that the air compressor (4) when compressing air to five atmospheric pressure, the density that weight can be prevented to be 0.5 gram is 2g/cm3Globular solids with 1 meter/ The speed of second passes through gaseous state roof;100 atmospheric pressure are compressed air to, the density that weight can be prevented to be 2.5 grams is 2g/ cm3Globular solids gaseous state roof is passed through with the speed of 1 meter per second.
CN201711090894.8A 2017-11-08 2017-11-08 A kind of preparation method of gas-state building roof Pending CN107762025A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711090894.8A CN107762025A (en) 2017-11-08 2017-11-08 A kind of preparation method of gas-state building roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711090894.8A CN107762025A (en) 2017-11-08 2017-11-08 A kind of preparation method of gas-state building roof

Publications (1)

Publication Number Publication Date
CN107762025A true CN107762025A (en) 2018-03-06

Family

ID=61272114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711090894.8A Pending CN107762025A (en) 2017-11-08 2017-11-08 A kind of preparation method of gas-state building roof

Country Status (1)

Country Link
CN (1) CN107762025A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2347398Y (en) * 1997-07-28 1999-11-10 于学海 Airflow mosquito-repellent device
CN2782806Y (en) * 2005-02-21 2006-05-24 江保国 Inflation type roof
CN1884760A (en) * 2006-06-15 2006-12-27 沈阳建筑大学 Gas-state building roof making method
CN101498153A (en) * 2008-01-30 2009-08-05 中建国际(深圳)设计顾问有限公司 Sunshading method and structure for multi-layer ETFE membrane air pillow exterior-protected construction
CN102635161A (en) * 2011-02-10 2012-08-15 张赋华 Single-chamber multi-air-bag architectural structure body
US20130001820A1 (en) * 2008-04-10 2013-01-03 Velcro Industries B.V. Forming construction underlayment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2347398Y (en) * 1997-07-28 1999-11-10 于学海 Airflow mosquito-repellent device
CN2782806Y (en) * 2005-02-21 2006-05-24 江保国 Inflation type roof
CN1884760A (en) * 2006-06-15 2006-12-27 沈阳建筑大学 Gas-state building roof making method
CN101498153A (en) * 2008-01-30 2009-08-05 中建国际(深圳)设计顾问有限公司 Sunshading method and structure for multi-layer ETFE membrane air pillow exterior-protected construction
US20130001820A1 (en) * 2008-04-10 2013-01-03 Velcro Industries B.V. Forming construction underlayment
CN102635161A (en) * 2011-02-10 2012-08-15 张赋华 Single-chamber multi-air-bag architectural structure body

Similar Documents

Publication Publication Date Title
CN104989443A (en) Device and method for quick dust falling during tunnel detonating
CN109552905A (en) Dust unloads ash trapping integrated apparatus
CN107762025A (en) A kind of preparation method of gas-state building roof
CN207959638U (en) Novel combination type curtain wall for building
CN207815553U (en) A kind of air cleaning canopy
CN103161653A (en) Hydraulic power potential energy comprehensive utilization system
CN205680022U (en) A kind of historical relic's protection nitrogen charging Laboratory Module
CN102374599A (en) Natural ventilation device in high rise building
CN107476297A (en) The Cement Mixing Pile constructing device of a kind of soft foundation processing and its into pile operation method
CN101757823B (en) Bypass wet dedusting system
CN202249008U (en) Fully-closed and central air conditioner temperature controlling electromagnetic wire factory arrangement structure
CN108195001A (en) Apparatus of oxygen supply in a kind of novel and multifunctional building intellectualization room
CN207221539U (en) A kind of equipment using dedusting fan dedusting
CN209613381U (en) A kind of paint-spraying baking booth structure with filtration system
CN209470322U (en) A kind of air inducing air exhausting device
CN210032750U (en) Derrick protection canopy
CN208720851U (en) A kind of centrifugation air blast cross flow cooling tower of top greening
CN209179557U (en) Integrated booster fan room
CN209034625U (en) The device of pressure speed governing type sprayed coating
CN206262276U (en) A kind of separate type jetting deashing device
CN207829943U (en) Mining gas control mechanical timer automatic spray dust removal device
CN205994901U (en) A kind of time sour ditch air displacer
CN208186664U (en) Apparatus of oxygen supply in a kind of novel and multifunctional building intellectualization room
CN206221379U (en) Roof ventilation device
CN207756281U (en) A kind of novel building manufacture of cement humidifying device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180306