CN107761730A - Firm hydraulic pile equipment for building - Google Patents

Firm hydraulic pile equipment for building Download PDF

Info

Publication number
CN107761730A
CN107761730A CN201711035082.3A CN201711035082A CN107761730A CN 107761730 A CN107761730 A CN 107761730A CN 201711035082 A CN201711035082 A CN 201711035082A CN 107761730 A CN107761730 A CN 107761730A
Authority
CN
China
Prior art keywords
hydraulic pile
top board
annular briquetting
building
ring block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711035082.3A
Other languages
Chinese (zh)
Inventor
陈佳敏
倪翔
李�浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711035082.3A priority Critical patent/CN107761730A/en
Publication of CN107761730A publication Critical patent/CN107761730A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/10Follow-blocks of pile-drivers or like devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/08Drop drivers with free-falling hammer
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/14Components for drivers inasmuch as not specially for a specific driver construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present invention provides firm hydraulic pile equipment for building, including hydraulic pile driver tup mechanism and fixing bolt;Cylinder piston rod, and hydraulic pile driver tup actuator base contact pallet are fixedly connected with the top of the hydraulic pile driver tup mechanism, and the lower section of pallet is stake;Top board bottom shaft core position is installed with the buffering protective cushion consistent with annular briquetting inner ring diameter by two fixing bolts;The top shaft core position of the lower platen is installed with the buffering protective cushion consistent with annular briquetting inner ring diameter also by two fixing bolts.The quantity of annular briquetting is not limited to eight groups, add drop adjustment can be carried out, by the quantity for changing annular briquetting, to change the height of hollow chamber, when declining shock beneficial to impact head, wire sets are separated with the bottom face of hollow chamber temporarily, and then the top end face of hollow chamber gives wire sets bigger shock dynamics, in favor of improving the efficiency of piling.

Description

Firm hydraulic pile equipment for building
Technical field
The invention belongs to piling machinery technical field, more particularly to firm hydraulic pile equipment for building.
Background technology
Hydraulic pile hammer is to overcome a kind of New engineering machinery that diesel hammer noise is big, has pollution to occur, extensively should For bridge, industry, the pile foundation construction built.Tup pumps in its pile monkey hammer systems, hits pallet, transmits Impulsive force is to stake.
In the prior art, hydraulic pile hammer tup is that a monoblock forged steel is processed into cylinder or cuboid, due to beating Pile monkey work mainly utilizes the gravitional force of tup so that tup weight is larger.Monoblock tup is processed to lathe bearing capacity There are particular/special requirement, high processing costs;The problem of bigger, is, because the gravitional force of tup is produced by the impact with rigid pallet The form of raw stress wave passes to rigid pile cover, then passes to the stake beaten, and causes stake difficult when the stake beaten runs into rigid foundation During squeezing into ground, stress crest value caused by tup impact is very high, and the time of transmission is very short, the efficiency of this energy transmission It is low, it is easier to which that stake is broken.This very high stress crest can also produce very big destructive power to the part of tup in itself simultaneously.
Such as application number 201410673660.6 is used the invention discloses a kind of hydraulic pile hammer and combines tup, for pile foundation The pile monkey hammer systems of hydraulic pile hammer, the tup include the hammer body of an inner hollow, the bottom of the hammer body in plinth construction Portion sets impact head, top connection cylinder piston rod, and the hollow cavity inside of the hammer body is filled with metallic particles filler.Institute State hammer body and be superimposed connection by several metallic plates, wherein the lower plate positioned at bottom and the upper plate closing positioned at top, positioned at centre Some intermediate plates be frame shape hollow sheeting, after superposition formed hammer body inner hollow cavity.The present invention can effectively improve tup punching Stress wave when hitting, the peak value of stress wave is reduced to recommended minimum value and extends passing time of the stress wave in peak state, While improving impact energy and obtaining transmission efficiency and Piling speed, the impulsive force that pile hammer and stake are born is reduced, improves piling In the life-span of hammer, stake is protected not broken.
The inventors discovered that above-mentioned patent has the following disadvantages in actual use:The metal being filled in hollow cavity Granule filler is excessively scattered, and caused inertial impact force in real time is pressed downward under its effect of inertia and is excessively disperseed, causes institute The impulsive force that main piling can be played is weaker;The metallic particles filler being filled in hollow cavity is excessively intensive, Zhi Jiansuo It is smaller to have space, cause by be pressed downward under effect of inertia in real time, the inertial impact force that metallic particles filler plays compared with It is small and because the scattered of inertial impact force leads to not play the impulsive force effectively driven piles.
Such as application number 201410674856.7 is carrying the invention discloses a kind of hydraulic pile hammer blank-run prevention buffer unit Hammer cylinder block bottom is installed with integrated valve seat, and the integrated valve base cavity is arranged with block on the piston rod successively from top to bottom And guide sleeve, the guide sleeve are fixed on integrated seat bottom portion, its inner ring is slidably matched with piston rod, the outer ring of the block and Inner ring is slidably matched with the inwall and piston rod of integrated valve seat respectively, work of the cushion chamber between block and guide sleeve in overflow valve Back pressure is set up under, the resistance that moves downward to block is produced in the lower end area of block by the back pressure effect, finally makes work Stopper rod stops moving downward, and absorbs tup and is impacted because of empty beat caused by equipment, the service life of equipment of extension, ensures construction Safety.
Needs constantly repeat to drive piles above-mentioned patent is not easy to cause the stake squeeze into ground when running into rigid foundation there is also piling when The problem of operation is longer.
Then, in view of this, improvement is studied for existing structure and missing, there is provided firm hydraulic pile for building Equipment, to reach the purpose for having more more practical value.
The content of the invention
In order to solve the above-mentioned technical problem, the present invention provides firm hydraulic pile equipment for building, to solve existing hydraulic pressure When piling machine tup mechanism is not easy to cause the stake squeeze into ground when piling runs into rigid foundation needs constantly repeat piling operation compared with The problem of long.
The purpose and effect of the present invention firm hydraulic pile equipment for building, are reached by technological means in detail below:
Firm hydraulic pile equipment for building, including hydraulic pile driver tup mechanism, cylinder piston rod, pallet, stake, oil cylinder Connecting seat, fixation clip, upper ring block, lower ring block, bolt, Fixed latches, cushion pad, top board, buffering protective cushion, annular Briquetting, wire sets, metallic particles filler, lower platen, impact head, locking nut and fixing bolt;The hydraulic pile driver Cylinder piston rod, and hydraulic pile driver tup actuator base contact pallet are fixedly connected with the top of tup mechanism, and under pallet Side is stake;The hydraulic pile driver tup mechanism is by oil cylinder connecting seat, fixation clip, upper ring block, lower ring block, bolt, solid Determine latch, cushion pad, top board, buffering protective cushion, annular briquetting, wire sets, metallic particles filler, lower platen, shock Head, locking nut and fixing bolt collectively constitute;Be provided with top board below the fixation clip, and top board top end face with Ring block and lower ring block are provided between the bottom face of fixation clip;The fixation clip, upper ring block, lower ring block and Cushion pad is provided between top board;The cushion pad inwall is fixedly installed oil cylinder connecting seat, and the upper half of oil cylinder connecting seat Portion is located at foreign side through the outer wall of fixation clip;Lower platen, and lower platen top end face and upper pressure are provided with below the top board Annular briquetting described in eight groups is provided between plate bottom face;The lower platen bottom face is provided with impact head;The fixation clip, By two through described in its inwall between upper ring block, lower ring block, top board, annular briquetting, lower platen and impact head The mutually spacing fixation of Fixed latches;The fixation clip, upper ring block, lower ring block, top board, annular briquetting, lower platen and hit Four bolt threads through its outer wall being distributed between tapping the head by circular array shape are connected to a fixed, and spiral shell at the top of bolt Line be connected with locking nut locked it is integral;Top board bottom shaft core position is fixed by two fixing bolts The buffering protective cushion consistent with annular briquetting inner ring diameter is installed;The top shaft core position of the lower platen also by Two fixing bolts are installed with the buffering protective cushion consistent with annular briquetting inner ring diameter.
Further, between the inner face of the top board bottom face, annular briquetting described in lower platen top end face and eight groups Form hollow chamber at one.
Further, wire sets described in one group are slidably connected in the hollow chamber, and are provided with wire sets Metallic particles filler.
Further, the height under the wire sets occupied state is less than the height of hollow chamber, Gu Gangsiwangtaoding Portion is provided with one section of space between the top of hollow chamber.
Further, the diameter under the wire sets occupied state is slightly less than the diameter of hollow chamber.
Further, two fixing bolts of fixation are played on two pieces of buffering protective cushions in tightening state Its lower top end face is less than the outer face of the affiliated buffering protective cushion.
Further, the quantity of the annular briquetting is not limited to eight groups, can carry out add drop adjustment.
Further, the thickness of the buffering protective cushion is 1/3rd of lower platen gross thickness.
Compared with prior art, the present invention has the advantages that:
1. the wire sets of the full metallic particles filler of filling are arranged on top board bottom face, lower platen top end face and eight groups In the hollow chamber formed between the inner face of the annular briquetting, when impact head and pallet shock, because wire sets are filled out The height filled under state is less than the height of hollow chamber, therefore is provided with one between the top of wire sets distance from top hollow chamber Section space, so as to which when impact head declines and hit, wire sets are separated with the bottom face of hollow chamber, then middle cavity temporarily The top end face of room gives wire sets larger shock dynamics so that and wire sets are hit rapidly to the bottom face of hollow chamber, Its inertia energy is passed to pallet by this impact in the form of stress wave, then is delivered to the stake beaten, and passes through the space And the setting for the metallic particles filler being filled in wire sets is combined, beneficial to the shape when impact head and pallet are hit Cheng Geng great impulsive force, realize that pile after driving operates, more conducively improve the efficiency of piling, beneficial to when running into rigid foundation by two Secondary piling operation can be accelerated to squeeze into ground operation, reduce the piling operation constantly repeated during piling, further, hollow chamber Upper and lower ends are buffering protective cushion, pass through buffering protective cushion buffer protection so that wire sets of the present invention are being formed compared with favourable opposition While hitting power, the probability that damage is caused to hydraulic pile driver tup mechanism is reduced.
2. the quantity of annular briquetting is not limited to eight groups, add drop adjustment can be carried out, by the number for changing annular briquetting Amount, to change the height of hollow chamber, decline beneficial to impact head when hitting, the wire sets bottom face phase with hollow chamber temporarily Separation, then the top end face of hollow chamber gives wire sets bigger shock dynamics, in favor of improving the efficiency of piling.
Brief description of the drawings
Fig. 1 is the assembled state broken section structural representation of the present invention.
Fig. 2 is the hydraulic pile driver tup mechanism cross section structure diagram of the present invention.
Fig. 3 be the present invention Fig. 2 in partial enlargement structural representation at A.
Fig. 4 be the present invention Fig. 2 in partial enlargement structural representation at B.
Fig. 5 is the hydraulic pile driver tup mechanism main structure diagram of the present invention.
Fig. 6 is the hydraulic pile driver tup mechanism overlooking the structure diagram of the present invention.
Fig. 7 is the hydraulic pile driver tup mechanism transverse direction cross section structure diagram of the present invention.
Fig. 8 is the hydraulic pile driver tup mechanism present invention looks up structural representation of the present invention.
In figure:1- hydraulic pile driver tups mechanism, 2- cylinder piston rods, 3- pallets, 4- stakes, 101- oil cylinder connecting seats, 102- fixation clips, the upper ring blocks of 103-, ring block under 104-, 105- bolts, 106- Fixed latches, 107- cushion pads, 108- Top board, 109- buffering protective cushions, 110- annular briquettings, 111- wire sets, 112- metallic particles fillers, 113- are pushed Plate, 114- impact heads, 115- locking nuts, 116- fixing bolts.
Embodiment
The present invention is described further below in conjunction with accompanying drawing:
Embodiment:
As shown in accompanying drawing 1 to accompanying drawing 8:
The present invention provides firm hydraulic pile equipment for building, including hydraulic pile driver tup mechanism 1, cylinder piston rod 2, Pallet 3, stake 4, oil cylinder connecting seat 101, fixation clip 102, upper ring block 103, lower ring block 104, bolt 105, Fixed latches 106th, cushion pad 107, top board 108, buffering protective cushion 109, annular briquetting 110, wire sets 111, metallic particles filler 112nd, lower platen 113, impact head 114, locking nut 115 and fixing bolt 116;The top of hydraulic pile driver tup mechanism 1 Cylinder piston rod 2, and the bottom contact pallet 3 of hydraulic pile driver tup mechanism 1 are fixedly connected with, and the lower section of pallet 3 is stake 4; The hydraulic pile driver tup mechanism 1 is by oil cylinder connecting seat 101, fixation clip 102, upper ring block 103, lower ring block 104, spiral shell Bolt 105, Fixed latches 106, cushion pad 107, top board 108, buffering protective cushion 109, annular briquetting 110, wire sets 111, Metallic particles filler 112, lower platen 113, impact head 114, locking nut 115 and fixing bolt 116 collectively constitute;It is described solid The lower section of fixed pressuring plate 102 is provided with top board 108, and is set between the bottom face of the top end face of top board 108 and fixation clip 102 There are upper ring block 103 and lower ring block 104;The fixation clip 102, upper ring block 103, lower ring block 104 and top board 108 Between be provided with cushion pad 107;The inwall of cushion pad 107 is fixedly installed oil cylinder connecting seat 101, and oil cylinder connecting seat 101 The first half be located at foreign side through the outer wall of fixation clip 102;The lower section of top board 108 is provided with lower platen 113, and pushes Annular briquetting 110 described in eight groups is provided between the top end face of plate 113 and the bottom face of top board 108;The bottom face of lower platen 113 It is provided with impact head 114;The fixation clip 102, upper ring block 103, lower ring block 104, top board 108, annular briquetting 110th, two 106 mutually spacing fixations of the Fixed latches for running through its inwall are passed through between lower platen 113 and impact head 114;Institute State fixation clip 102, upper ring block 103, lower ring block 104, top board 108, annular briquetting 110, lower platen 113 and impact head Four bolts 105 through its outer wall being distributed between 114 by circular array shape, which are screwed, to be connected, and bolt 105 Screw top be connected with locking nut 115 locked it is integral;The bottom shaft core position of top board 108 passes through described in two Fixing bolt 116 is installed with the buffering protective cushion 109 consistent with the annular inner ring diameter of briquetting 110;It is described to push The top shaft core position of plate 113 is installed with and the annular inner ring diameter phase of briquetting 110 also by two fixing bolts 116 The consistent buffering protective cushion 109.
Wherein, the bottom face of top board 108, the inner face of annular briquetting 110 described in the top end face of lower platen 113 and eight groups Between form hollow chamber at one.
Wherein, wire sets 111 described in one group are slidably connected in the hollow chamber, and are set in wire sets 111 There is metallic particles filler 112.
Wherein, the height under the occupied state of wire sets 111 is less than the height of hollow chamber, therefore wire sets 111 One section of space is provided between the top of distance from top hollow chamber, slip and follow-up impact behaviour beneficial to wire sets 111 Make.
Wherein, the diameter under the occupied state of wire sets 111 is slightly less than the diameter of hollow chamber, is beneficial to The slip of wire sets 111 and follow-up blasting operation.
Wherein, two fixing bolts 116 of fixation are played on two pieces of buffering protective cushions 109 in fastening shape Its top end face is less than the outer face of the affiliated buffering protective cushion 109 under state, avoids the top of fixing bolt 116 to wire sets 111 cause to damage.
Wherein, the quantity of the annular briquetting 110 is not limited to eight groups, can carry out add drop adjustment, hollow beneficial to adjusting The height of chamber, increase the impact dynamics of wire sets 111.
Wherein, the thickness of the buffering protective cushion 109 is 1/3rd of the gross thickness of lower platen 113.
The specifically used mode of the present embodiment and effect:
Cylinder piston rod 2, which lifts after hydraulic pile driver tup mechanism 1 rises to certain height, to hurtle down, and is beaten in hydraulic pressure The bottom face of top board 108, the top end face of lower platen 113 and eight groups of annular briquettings are in the fast drop course of Zhuan Ji tups mechanism 1 The wire sets 111 for filling up metallic particles filler 112 in the hollow chamber formed between 110 inner face, because of steel wire The height that height under 111 occupied states is less than hollow chamber is covered, between the top of the distance from top hollow chamber of wire sets 111 One section of space is provided with, therefore the bottom face of wire sets 111 and the bottom face of hollow chamber are separated, impact head after rapid decrease 114 strike pallet 3 first, and Shock stress Wave is produced between impact head 6 and pallet 1, pass through the form of stress wave, impact head 114 Its impact energy is passed into pallet 3, impact energy is delivered to the stake 4 beaten, realized under stake 4 by pallet 3 in the form of stress wave again It is heavy;The top end face of hollow chamber will strike the top end faces of wire sets 111 and give wire sets 111 1 impulse forces simultaneously, So that the bottom face of wire sets 111 is hit to the bottom face of hollow chamber rapidly, this impact is in the form of stress wave Its inertia energy is passed into pallet 3, then is delivered to the stake 4 beaten, by the space and combines and is filled in steel wire The setting of metallic particles filler 112 in set 111, bigger impact is formed beneficial to when impact head 114 and pallet 3 are hit Power, realize that pile after driving operates, further, the upper and lower ends of hollow chamber are buffering protective cushion 109, pass through buffer protection Pad 109 buffer protections so that wire sets 111 of the present invention reduce and hydraulic pile driver is hammered into shape while greater impact power is formed Head mechanism 1 causes the probability of damage;
The quantity of annular briquetting 110 is not limited to eight groups, can carry out add drop adjustment, by changing annular briquetting 110 Quantity, to change the height of hollow chamber, beneficial to impact head 114 decline hit when, wire sets 111 temporarily with hollow chamber The spacing that bottom face is separated lengthens, and then the top end face of hollow chamber gives wire sets 111 bigger shock dynamics, with Beneficial to the efficiency for improving piling.
Using technical scheme of the present invention, or those skilled in the art is under the inspiration of technical solution of the present invention, if Similar technical scheme is counted out, and reaches above-mentioned technique effect, is to fall into protection scope of the present invention.

Claims (8)

1. firm hydraulic pile equipment for building, it is characterised in that:The firm hydraulic pile equipment for building includes hydraulic pile Machine tup mechanism, cylinder piston rod, pallet, stake, oil cylinder connecting seat, fixation clip, upper ring block, lower ring block, bolt, fixation Latch, cushion pad, top board, buffering protective cushion, annular briquetting, wire sets, metallic particles filler, lower platen, impact head, Locking nut and fixing bolt;Cylinder piston rod, and hydraulic pile are fixedly connected with the top of the hydraulic pile driver tup mechanism Machine tup actuator base contacts pallet, and the lower section of pallet is stake;The hydraulic pile driver tup mechanism is by oil cylinder connecting seat, solid Fixed pressuring plate, upper ring block, lower ring block, bolt, Fixed latches, cushion pad, top board, buffering protective cushion, annular briquetting, steel wire Net, metallic particles filler, lower platen, impact head, locking nut and fixing bolt collectively constitute;Under the fixation clip Side is provided with top board, and ring block and lower ring block are provided between top board top end face and the bottom face of fixation clip; Cushion pad is provided between the fixation clip, upper ring block, lower ring block and top board;The cushion pad inwall fixed setting There is oil cylinder connecting seat, and the first half of oil cylinder connecting seat is located at foreign side through the outer wall of fixation clip;Set below the top board Lower platen is equipped with, and annular briquetting described in eight groups is provided between lower platen top end face and top board bottom face;The lower platen Bottom face is provided with impact head;The fixation clip, upper ring block, lower ring block, top board, annular briquetting, lower platen and hit Pass through two mutually spacing fixations of the Fixed latches for running through its inwall between tapping the head;The fixation clip, upper ring block, lower ring Four be distributed between shape block, top board, annular briquetting, lower platen and impact head by circular array shape run through its outer wall Bolt thread is connected to a fixed, and bolt screw top be connected with locking nut locked it is integral;The top board bottom Shaft core position is installed with the buffer protection consistent with annular briquetting inner ring diameter by two fixing bolts Pad;The top shaft core position of the lower platen is installed with and annular briquetting inner ring diameter also by two fixing bolts The consistent buffering protective cushion.
2. firm hydraulic pile equipment for building as claimed in claim 1, it is characterised in that:The top board bottom face, push Hollow chamber at one is formed between the inner face of annular briquetting described in plate top end face and eight groups.
3. firm hydraulic pile equipment for building as claimed in claim 1 or 2, it is characterised in that:Slided in the hollow chamber Wire sets described in one group are connected with, and metallic particles filler is provided with wire sets.
4. the firm hydraulic pile equipment for building as described in claim 1 or 2 or 3, it is characterised in that:The wire sets filling Height under state is less than the height of hollow chamber, therefore is provided with one section between the top of wire sets distance from top hollow chamber Space.
5. firm hydraulic pile equipment for building as claimed in claim 1 or 2 or 3 or 4, it is characterised in that:The wire sets Diameter under occupied state is slightly less than the diameter of hollow chamber.
6. firm hydraulic pile equipment for building as claimed in claim 1, it is characterised in that:Risen on two pieces of buffering protective cushions To the outer end of two fixing bolts its top end face buffering protective cushion less than belonging under tightening state of fixation Face.
7. firm hydraulic pile equipment for building as claimed in claim 1, it is characterised in that:The quantity of the annular briquetting is not Eight groups are confined to, add drop adjustment can be carried out.
8. firm hydraulic pile equipment for building as claimed in claim 1, it is characterised in that:The thickness of the buffering protective cushion is / 3rd of lower platen gross thickness.
CN201711035082.3A 2017-10-30 2017-10-30 Firm hydraulic pile equipment for building Withdrawn CN107761730A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711035082.3A CN107761730A (en) 2017-10-30 2017-10-30 Firm hydraulic pile equipment for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711035082.3A CN107761730A (en) 2017-10-30 2017-10-30 Firm hydraulic pile equipment for building

Publications (1)

Publication Number Publication Date
CN107761730A true CN107761730A (en) 2018-03-06

Family

ID=61270834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711035082.3A Withdrawn CN107761730A (en) 2017-10-30 2017-10-30 Firm hydraulic pile equipment for building

Country Status (1)

Country Link
CN (1) CN107761730A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385684A (en) * 2018-03-22 2018-08-10 广东力源液压机械有限公司 A kind of the hammer core buffer control method and combined hammer core buffer unit of hydraulic pile driver
CN111042129A (en) * 2019-12-24 2020-04-21 广东力源液压机械有限公司 Anti-loosening method and device for hammer core of hydraulic pile driver
WO2020153838A1 (en) * 2019-01-21 2020-07-30 Itrec B.V. Pile driving methods and systems for driving a pile
NL2023210B1 (en) * 2019-03-28 2020-10-06 Itrec Bv Pile driving method and system for driving a pile.
CN113789783A (en) * 2021-09-29 2021-12-14 中机锻压江苏股份有限公司 Combined hammer head of piling hammer with self-wedging device
CN114753364A (en) * 2022-04-19 2022-07-15 浙江永安工程机械有限公司 Hammer core lifting structure with safety function

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385684A (en) * 2018-03-22 2018-08-10 广东力源液压机械有限公司 A kind of the hammer core buffer control method and combined hammer core buffer unit of hydraulic pile driver
WO2020153838A1 (en) * 2019-01-21 2020-07-30 Itrec B.V. Pile driving methods and systems for driving a pile
NL2023210B1 (en) * 2019-03-28 2020-10-06 Itrec Bv Pile driving method and system for driving a pile.
CN111042129A (en) * 2019-12-24 2020-04-21 广东力源液压机械有限公司 Anti-loosening method and device for hammer core of hydraulic pile driver
CN111042129B (en) * 2019-12-24 2024-04-05 广东力源液压机械有限公司 Anti-loosening method and device for hammer core of hydraulic pile driver
CN113789783A (en) * 2021-09-29 2021-12-14 中机锻压江苏股份有限公司 Combined hammer head of piling hammer with self-wedging device
CN113789783B (en) * 2021-09-29 2022-08-26 中机锻压江苏股份有限公司 Combined hammer head of piling hammer with self-wedging device
CN114753364A (en) * 2022-04-19 2022-07-15 浙江永安工程机械有限公司 Hammer core lifting structure with safety function
CN114753364B (en) * 2022-04-19 2024-05-07 浙江永安工程机械有限公司 Hammer core lifting structure of safety insurance

Similar Documents

Publication Publication Date Title
CN107761730A (en) Firm hydraulic pile equipment for building
CN108561471B (en) Hydraulic hammer body and pile cap buffer control method and annular connection buffer structure
CN107283909A (en) A kind of strong stamping machine of shock resistance
CN207143947U (en) Movable driving cap
CN207862932U (en) Firm hydraulic pile equipment for building
CN108385684A (en) A kind of the hammer core buffer control method and combined hammer core buffer unit of hydraulic pile driver
CN215290104U (en) Hydraulic pile hammer convenient to dismantle maintenance
CN104404959A (en) Combined hammer head for hydraulic pile hammer
CN113789783B (en) Combined hammer head of piling hammer with self-wedging device
US6135214A (en) Impact absorbing fluid operated hammer
US4427078A (en) Pile-driving ram
CN217149927U (en) Damage stopping device for large-cantilever single-column pier bridge after impact
US3823786A (en) Impact body of a hammer
CN105113507A (en) Hydraulic pile hammer
CN2893301Y (en) Damper with function of reducing secondary impact
CN202377469U (en) Anvil block for forging machine
CN208041034U (en) A kind of annular connection buffer structure of hydraulic hammer hammer body and pile cover
CN203066072U (en) Counter pull type impact piling machine
CN217378887U (en) Piling device
KR101222419B1 (en) Pile helmet for prevention of eccentricity and noise
CN101476321A (en) Piston type pile cap
CN211755565U (en) Combined mill lining plate
CN206128164U (en) Nitrogen explodes formula vibration system
CN208586610U (en) A kind of hydraulic pile driver hammer core buffer unit
CN217267446U (en) Buffering heat radiation structure of percussion hammer core

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180306

WW01 Invention patent application withdrawn after publication