CN107755973A - A kind of automobile wind-guiding attachment means preparation method - Google Patents

A kind of automobile wind-guiding attachment means preparation method Download PDF

Info

Publication number
CN107755973A
CN107755973A CN201610690608.0A CN201610690608A CN107755973A CN 107755973 A CN107755973 A CN 107755973A CN 201610690608 A CN201610690608 A CN 201610690608A CN 107755973 A CN107755973 A CN 107755973A
Authority
CN
China
Prior art keywords
seconds
workpiece
time
carries out
press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610690608.0A
Other languages
Chinese (zh)
Inventor
柴叶飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vertical Rich Automobile Component Precision Casting Co Ltd In Qingdao
Original Assignee
Vertical Rich Automobile Component Precision Casting Co Ltd In Qingdao
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vertical Rich Automobile Component Precision Casting Co Ltd In Qingdao filed Critical Vertical Rich Automobile Component Precision Casting Co Ltd In Qingdao
Priority to CN201610690608.0A priority Critical patent/CN107755973A/en
Publication of CN107755973A publication Critical patent/CN107755973A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P2700/00Indexing scheme relating to the articles being treated, e.g. manufactured, repaired, assembled, connected or other operations covered in the subgroups
    • B23P2700/50Other automobile vehicle parts, i.e. manufactured in assembly lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacture Of Motors, Generators (AREA)

Abstract

The present invention relates to a kind of automobile wind-guiding attachment means preparation method, the technological process carries out blanking using plate shearing machine, carries out mold bending and separation using press, is welded using electric welding machine, the power bracket of the press is 30KW/h 65KW/h;The problems such as present invention solves the problems, such as low production efficiency and improves product qualification rate well, while solves and paste the drawbacks of label process efficiency is low, and welding quality is not sufficiently stable.After production technology is improved, the economic benefit of product is greatly improved.

Description

A kind of automobile wind-guiding attachment means preparation method
Technical field
The invention belongs to automobile manufacturing field, and in particular to a kind of automobile wind-guiding attachment means preparation method.
Background technology
Air ducting bindiny mechanism is the principal organ of automobile external, and volume is bigger, and manufacturing process process is various, welding Part requirements precision is high, and technique is mainly manifested at present:1)It is relatively low to stock utilization;2)Production equipment energy consumption is larger;3)It is right Welding procedure mode is not ideal enough;4)Label adhering processes efficiency is low, and the product of formation is easily distorted; 5)Product Precision and quality Have much room for improvement, waste of material is serious, and product qualification rate is low, leverages production efficiency.
The content of the invention
Instant invention overcomes the deficiencies in the prior art, it is proposed that a kind of automobile wind-guiding attachment means preparation method, the work Skill flow improves Product Precision and quality, solves the problems, such as low production efficiency, and it is low, easy to have prevented stickup label process efficiency Phenomena such as distortion, while highly stable welding quality can also be obtained to welding portion.The improvement of production technology greatly promotes The economic benefit of product.
The technical scheme is that:A kind of automobile air ducting bindiny mechanism fabrication processing, the technological process Blanking is carried out using plate shearing machine, mould bending and separation is carried out using press, is welded using electric welding machine, the work(of the press Rate scope is 30KW -65KW/h;
The technological process includes following process:
Process 1. utilizes plate shearing machine for blanking according to Workpiece structure;
Process 2. carries out mould to workpiece using press and cuts punching, and it is the 15-38 seconds to cut and rush the time;
Process 3. carries out mold bending shaping using press to workpiece, and in bending, ess-strain point is carried out to the feature of workpiece Analysis, the bending time is the 15-38 seconds;
Process 4. carries out mould bending using press to workpiece, and the residence time is the 15-38 seconds;
Process 5. carries out mould bending to workpiece using press and carves pressing steel stamp, and it is the 15-38 seconds to carve the pressure time;
The of process 6 carries out die punching using press to workpiece, and separation punching press, residence time 15- are carried out to left and right workpiece 38 seconds;
Process 7. carries out carbon-dioxide arc welding to left and right workpiece base angle using electric welding machine and connect, and weld interval is the 35-58 seconds;
Process 8. carries out acid washing phosphorization, second time 20-30 to workpiece;
Process 9. carries out spray painting processing to workpiece, and the time is the 80-120 seconds;
Process 10. pastes parts information sign;
The entrucking of process 11. is put in storage.
Compared with existing process flow:1. improve operating efficiency(Process 5 reaches 57%;Process 6 reaches 81%;Process 10 reaches To 53%;);2. improve welding characteristic(Process 7 reaches 70%;)3. improve product quality(Process 8 reaches 69%;Process 9 reaches 65%).
For process 6, left and right separation is carried out to workpiece using press, die cost has greatly been saved, has obtained production efficiency again Significant raising is arrived;
For process 7, carbon-dioxide arc welding is carried out to workpiece, the extraordinary welding stability that ensure that workpiece is special with outward appearance Sign.
The present invention has the advantages that:
1)After adjusting process flow of the present invention, the reasonability of technique is enhanced;
2)The present invention greatly improves product qualification rate;
3)The present invention does a punching press using press, serves the effect of two workpiece of punching press.Punching press is separated, has both saved mould The expense of exploitation greatly improves production efficiency again.It is extraordinary to alleviate the drawbacks of conventional production efficiency is low;
4)The weld signature that ensure that workpiece of carbon-dioxide arc welding high degree of the present invention, solves welding matter Measure the problem of unstable, further product quality is got a promotion.
Embodiment
Embodiment 1:
The plate shearing machine for blanking of process 1..
The mould of process 2. cuts punching.(Equipment J36-800 presses, main motor current 61KW/h)(Production efficiency 1 time/30 seconds)
The mold bending of process 3..(Equipment YZ27-630 presses, main motor current 44KW/h)(Production efficiency 1 time/31 seconds)
The mould bending of process 4..(Equipment J31-315 presses, main motor current 33KW/h)(Production efficiency 1 time/25 seconds)
The mould bending of process 5., carve pressing steel stamp.(Equipment J31-315 presses, main motor current 33KW/h)(Production efficiency 1 time/ 36 seconds)
The die punching of process 6., separation workpiece.(Equipment J36-800 presses, main motor current 61KW/h)(Production efficiency 1 time/ 28 seconds)
The carbon-dioxide arc welding of process 7..(Solder joint at left and right workpiece each 3, solder joint production efficiency 1 time/40 seconds at totally 6)
The acid washing phosphorization of process 8.(Production efficiency 1 time/23 seconds)
The spray painting of process 9. is handled(Production efficiency 1 time/90 seconds).
Process 10. pastes parts information sign(Production efficiency 1 time/15 seconds).
The entrucking of process 11. is put in storage.
Compared with existing process flow:1. improve operating efficiency(Process 5 reaches 63%;Process 6 reaches 78%;Process 10 reaches To 57%;);2. improve welding characteristic(Process 7 reaches 67%;)3. improve product quality(Process 8 reaches 73%;Process 9 reaches 66%).
Embodiment 2:
The plate shearing machine for blanking of process 1..
The mould of process 2. cuts punching.(Equipment J36-800 presses, main motor current 61KW/h)(Production efficiency 1 time/33 seconds)
The mold bending of process 3..(Equipment YZ27-630 presses, main motor current 44KW/h)(Production efficiency 1 time/28 seconds)
The mould bending of process 4..(Equipment J31-315 presses, main motor current 33KW/h)(Production efficiency 1 time/23 seconds)
The mould bending of process 5., carve pressing steel stamp.(Equipment J31-315 presses, main motor current 33KW/h)(Production efficiency 1 time/ 34 seconds)
The die punching of process 6., separation workpiece.(Equipment J36-800 presses, main motor current 61KW/h)(Production efficiency 1 time/ 22 seconds)
The carbon-dioxide arc welding of process 7..(Solder joint at left and right workpiece each 3, solder joint production efficiency 1 time/49 seconds at totally 6)
The acid washing phosphorization of process 8.(Production efficiency 1 time/26 seconds)
The spray painting of process 9. is handled(Production efficiency 1 time/96 seconds).
Process 10. pastes parts information sign(Production efficiency 1 time/18 seconds).
The entrucking of process 11. is put in storage.
Compared with existing process flow:1. improve operating efficiency(Process 5 reaches 57%;Process 6 reaches 81%;Process 10 reaches To 53%;);2. improve welding characteristic(Process 7 reaches 70%;)3. improve product quality(Process 8 reaches 69%;Process 9 reaches 65%).
Embodiment 3:
The plate shearing machine for blanking of process 1..
The mould of process 2. cuts punching.(Equipment J36-800 presses, main motor current 61KW/h)(Production efficiency 1 time/19 seconds)
The mold bending of process 3..(Equipment YZ27-630 presses, main motor current 44KW/h)(Production efficiency 1 time/26 seconds)
The mould bending of process 4..(Equipment J31-315 presses, main motor current 33KW/h)(Production efficiency 1 time/32 seconds)
The mould bending of process 5., carve pressing steel stamp.(Equipment J31-315 presses, main motor current 33KW/h)(Production efficiency 1 time/ 35 seconds)
The die punching of process 6., separation workpiece.(Equipment J36-800 presses, main motor current 61KW/h)(Production efficiency 1 time/ 25 seconds)
The carbon-dioxide arc welding of process 7..(Solder joint at left and right workpiece each 3, solder joint production efficiency 1 time/43 seconds at totally 6)
The acid washing phosphorization of process 8.(Production efficiency 1 time/24 seconds)
The spray painting of process 9. is handled(Production efficiency 1 time/97 seconds).
Process 10. pastes parts information sign(Production efficiency 1 time/18 seconds).
The entrucking of process 11. is put in storage.
Compared with existing process flow:1. improve operating efficiency(Process 5 reaches 63%;Process 6 reaches 74%;Process 10 reaches To 60%;);2. improve welding characteristic(Process 7 reaches 72%;)3. improve product quality(Process 8 reaches 68%;Process 9 reaches 68%).
Embodiment 4:
The plate shearing machine for blanking of process 1..
The mould of process 2. cuts punching.(Equipment J36-800 presses, main motor current 61KW/h)(Production efficiency 1 time/27 seconds)
The mold bending of process 3..(Equipment YZ27-630 presses, main motor current 44KW/h)(Production efficiency 1 time/30 seconds)
The mould bending of process 4..(Equipment J31-315 presses, main motor current 33KW/h)(Production efficiency 1 time/29 seconds)
The mould bending of process 5., carve pressing steel stamp.(Equipment J31-315 presses, main motor current 33KW/h)(Production efficiency 1 time/ 33 seconds)
The die punching of process 6., separation workpiece.(Equipment J36-800 presses, main motor current 61KW/h)(Production efficiency 1 time/ 30 seconds)
The carbon-dioxide arc welding of process 7..(Solder joint at left and right workpiece each 3, solder joint production efficiency 1 time/41 seconds at totally 6)
The acid washing phosphorization of process 8.(Production efficiency 27)
The spray painting of process 9. is handled(Production efficiency 1 time/93 seconds).
Process 10. pastes parts information sign(Production efficiency 1 time/22 seconds).
The entrucking of process 11. is put in storage.
Compared with existing process flow, 1. improve operating efficiency(Process 5 reaches 63%;Process 6 reaches 71%;Process 10 reaches To 56%;);2. improve welding characteristic(Process 7 reaches 71%;)3. improve product quality(Process 8 reaches 70%;Process 9 reaches 69%).
Embodiment 5:
The plate shearing machine for blanking of process 1..
The mould of process 2. cuts punching.(Equipment J36-800 presses, main motor current 61KW/h)(Production efficiency 1 time/33 seconds)
The mold bending of process 3..(Equipment YZ27-630 presses, main motor current 44KW/h)(Production efficiency 1 time/31 seconds)
The mould bending of process 4..(Equipment J31-315 presses, main motor current 33KW/h)(Production efficiency 1 time/24 seconds)
The mould bending of process 5., carve pressing steel stamp.(Equipment J31-315 presses, main motor current 33KW/h)(Production efficiency 1 time/ 35 seconds)
The die punching of process 6., separation workpiece.(Equipment J36-800 presses, main motor current 61KW/h)(Production efficiency 1 time/ 26 seconds)
The carbon-dioxide arc welding of process 7..(Solder joint at left and right workpiece each 3, solder joint production efficiency 1 time/51 seconds at totally 6)
The acid washing phosphorization of process 8.(Production efficiency 1 time/25 seconds)
The spray painting of process 9. is handled(Production efficiency 1 time/100 seconds).
Process 10. pastes parts information sign(Production efficiency 1 time/17 seconds).
The entrucking of process 11. is put in storage.
Compared with existing process flow:1. improve operating efficiency(Process 5 reaches 64%;Process 6 reaches 83%;Process 10 reaches To 65%;);2. improve welding characteristic(Process 7 reaches 74%;)3. improve product quality(Process 8 reaches 78%;Process 9 reaches 73%).

Claims (1)

  1. A kind of 1. automobile wind-guiding attachment means preparation method, it is characterised in that:The technological process carries out blanking using plate shearing machine, Mold bending and separation are carried out using press, is welded using electric welding machine, the power bracket of the press is 30KW/h- 65KW/h;
    The technological process includes following process:
    Process 1. utilizes plate shearing machine for blanking according to Workpiece structure;
    Process 2. carries out mould to workpiece using press and cuts punching, and it is the 15-38 seconds to cut and rush the time;
    Process 3. carries out mold bending shaping using press to workpiece, and in bending, ess-strain point is carried out to the feature of parent part Analysis, the bending time is the 15-38 seconds;
    Process 4. carries out mould bending using press to workpiece, and the residence time is the 15-38 seconds;
    Process 5. carries out mould bending to workpiece using press and carves pressing steel stamp, and it is the 15-38 seconds to carve the pressure time;
    The of process 6 carries out die punching using press to workpiece, and separation punching press, residence time 15- are carried out to left and right workpiece 38 seconds;
    Process 7. carries out carbon-dioxide arc welding to left and right workpiece base angle using electric welding machine and connect, and weld interval is the 35-58 seconds;
    Process 8. carries out acid washing phosphorization, second time 20-30 to workpiece;
    Process 9. carries out spray painting processing to workpiece, and the time is the 80-120 seconds;
    Process 10. pastes parts information sign;
    The entrucking of process 11. is put in storage.
CN201610690608.0A 2016-08-20 2016-08-20 A kind of automobile wind-guiding attachment means preparation method Pending CN107755973A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610690608.0A CN107755973A (en) 2016-08-20 2016-08-20 A kind of automobile wind-guiding attachment means preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610690608.0A CN107755973A (en) 2016-08-20 2016-08-20 A kind of automobile wind-guiding attachment means preparation method

Publications (1)

Publication Number Publication Date
CN107755973A true CN107755973A (en) 2018-03-06

Family

ID=61261886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610690608.0A Pending CN107755973A (en) 2016-08-20 2016-08-20 A kind of automobile wind-guiding attachment means preparation method

Country Status (1)

Country Link
CN (1) CN107755973A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112296681A (en) * 2019-07-29 2021-02-02 朴洪顺 Processing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112296681A (en) * 2019-07-29 2021-02-02 朴洪顺 Processing device
CN112296681B (en) * 2019-07-29 2023-02-03 朴洪顺 Processing device

Similar Documents

Publication Publication Date Title
CN201537814U (en) Tailor-welded blank roll-forming device
CN206551648U (en) A kind of arc composite plate production mould
CN206794441U (en) A kind of pressing mold cutting device of battery pole piece
CN101664879A (en) Tailor-welded blank roll bending forming method and device thereof
CN101691003B (en) Machining process of bent cross beams of heavy truck frames
CN102248366A (en) Automobile skylight frame and manufacturing process thereof
CN206764066U (en) Breaker of switch cabinet cabinet automatic welding machine people's system
CN107755973A (en) A kind of automobile wind-guiding attachment means preparation method
CN206046795U (en) A kind of process equipment of elevator door pocket
CN104162569A (en) Stamping production equipment and stamping production technology
CN206185016U (en) Novel staple bolt forming die
CN206535940U (en) A kind of handset shell diel
CN104759853A (en) Manufacturing flow of automobile air ducting connecting mechanism
CN102218650A (en) Process flow for manufacturing heat exchange circulating device of air conditioner external unit
CN104708278A (en) Engine rear cross beam machining method
CN102198581B (en) Manufacturing process for air temperature adjusting bottom plate mechanism
CN201260116Y (en) Bending mold for motor coil assembly
CN104148892B (en) A kind of vehicle-containing side bar processing technology
CN204338708U (en) The special stamping jig of a kind of shackle plate
CN103143605B (en) Plate flanging, bending, forming and trimming machine
CN206882563U (en) The automatic rotation diel combination that a kind of steel pipe flattens
CN202655781U (en) Brake shoe roll projection welding machine
CN202779472U (en) Grid suspension hardware processing mold set
CN202934006U (en) Cold-cutting mold of titanium alloy precision forging blades
CN217775183U (en) Flattening die

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180306

WD01 Invention patent application deemed withdrawn after publication